Permit #2021090056

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-0040
CONDITIONED SPACE: 2825 sqft
GARAGE: 515 sqft
OPENED PORCH (WITH ROOF) : 449 sqft
OPENED PORCH (WITH ROOF) : 74 sqft
Total Square Footage: 3863 sqft
Block: 00000
Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH
Job Phone: 386-447-4400
Location Address: 217 CONSERVATORY DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/28/2021
NOC: RECORDED
Applicant name: DAVID PAUL CROCKETT
Owner: BELTZ EUGENE

Address

65 RIVERVIEW BEND

PALM COAST, FL 32137

Address

UNIT 1733

PALM COAST, FL 32137

Lot: 0040
Contracted Stated Job Value: ¤504,600.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SALTWATER HOMES INC
Status Location Address Mailing Address State License Number Phone Fax
DECEASED

138 PALM COAST PARKWAY

PALM COAST, FL 32137

SUITE 328

PALM COAST, FL 32137

RG0041345 (Exp: 08/31/2025) 386-447-4400 866-244-9639

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219

Inspection History

Type Request Date Result Inspector
WALL SHEATHING 02/15/2023 APPROVED AGAETANO
Note: Inspected on 6/27/2022
BLD - BUILDING FINAL 02/13/2023 FINAL APPROVED AGAETANO
ROW - STORMWATER FINAL 02/06/2023 APPROVED - AS NOTED PFLANAGAN
Note: AFTER FUTHER REVIEW THE SEDIMENT WAS THERE BEFORE BUILDING OF THE HOUSE. MAKING CONTRACTOR SOD THE AREAS TO HELP FROM BANK FROM WASHING IN. ----------------------------------------------------------------------------------------------- 2/3/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAN ALL SEDIMENT OUT OF THE POND IN THE BACK BEFORE THIS PASSES ----------------------------------------------------------------------------------------------- 01/06/23=NOTE TO THE INSPECTOR NEED TO REMOVE THE MULCH AND BUSHES FROM THE DRAINAGE CONVEYANCE ON THE LEFT SIDE BY THE AC UNIT AND BY THE CONCRETE PAD FROM THE POOL EQUIPMENT Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way (the swale area, between the edge of pavement and the property line). Show any trees or clusters of vegetation that would restrict flow along the side lines to the front swale, drainage ditch or other drainage conveyance SEC 300.03 C.F.
U -UTILITY RESIDENTIAL FINAL 02/03/2023 FINAL APPROVED DHANEY
ROW - STORMWATER FINAL 02/03/2023 Disapproved - NO FEE PFLANAGAN
Note: NEED TO CLEAN ALL SEDIMENT OUT OF THE POND IN THE BACK BEFORE THIS PASSES ----------------------------------------------------------------------------------------------- 01/06/23=NOTE TO THE INSPECTOR NEED TO REMOVE THE MULCH AND BUSHES FROM THE DRAINAGE CONVEYANCE ON THE LEFT SIDE BY THE AC UNIT AND BY THE CONCRETE PAD FROM THE POOL EQUIPMENT Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way (the swale area, between the edge of pavement and the property line). Show any trees or clusters of vegetation that would restrict flow along the side lines to the front swale, drainage ditch or other drainage conveyance SEC 300.03 C.F.
U-CROSS CONNECTION 02/03/2023 APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 01/06/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/06/2023 APPROVED GBERTOLA
ROW FIELD SURVEY /GRADING CERTIFICATION 01/06/2023 APPROVED GBERTOLA
ROW- PRE-APRON (PRE-POUR) 11/28/2022 APPROVED EMADISON
Note: ** COMPACTION CHECJKED READY TO SET PAVERS 11/15/2022 - PREVIOUS INSPECTION NOTES ** 11/15/22 APRON AND PAVER RESTRAINTS READY TO POUR ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL NEXT PR-POUR HAS BEEN APPROVED
ROW- PAVER RESTRAINTS 11/15/2022 APPROVED EMADISON
Note: ** 11/15/22 PAVER RESTRAINTS READY TO POUR WITH APRON
ROW- PRE-APRON (PRE-POUR) 11/15/2022 PARTIALLY APPROVED EMADISON
Note: ** 11/15/22 APRON AND PAVER RESTRAINTS READY TO POUR ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL NEXT PR-POUR HAS BEEN APPROVED
ELECTRIC - EARLY POWER 10/10/2022 APPROVED JMUNSON
LATH/BRICK/ WATER BARRIER 08/24/2022 APPROVED AGAETANO
ELECTRIC-TUG 07/20/2022 APPROVED AGAETANO
INSULATION 07/15/2022 APPROVED AGAETANO
Note: Inspector Notes from Inspection 2420 Contractor will pad out the kitchen pantry due to the refrigeration line. Refrigeration line will be fastened in the ceiling.
ALL ROUGH 06/29/2022 APPROVED - AS NOTED AGAETANO
Note: Contractor will pad out the kitchen pantry due to the refrigeration line. Refrigeration line will be fastened in the ceiling.
ROOF VALLEY & METAL 06/28/2022 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/27/2022 APPROVED AGAETANO
TIE BEAM / LINTEL 02/16/2022 APPROVED LMILLER
FOUND SURVEY APPROVED (OFFICE) 01/28/2022 APPROVED TBAKER
MONOLITHIC SLAB 01/07/2022 APPROVED AGAETANO
MONOLITHIC SLAB 12/27/2021 CANCELLED BY APPLICANT WEB
PLUMBING 1ST ROUGH UNDERGROUND 12/06/2021 APPROVED MGIBSON
GRAVITY SEWER TEST 12/06/2021 APPROVED MGIBSON
U - SEWER TIE IN 12/06/2021 APPROVED MGIBSON
ROW- PROJECT STATUS 11/18/2021 APPROVED GBERTOLA
Note: TRAINING THE CONCRETE GUYS ON THE LASER
ELECTRIC TEMP POLE 10/26/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 10:17 am
WATER METER INSTALLATION REQUEST 10/13/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
BLD COMPLETE 06/14/2022 06/14/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/27/2022 01/28/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/27/2022 01/27/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH COMPLETE 09/14/2021 09/14/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
URB COMPLETE 09/03/2021 09/07/2021
Note: Released By: JOHN BEAUDET - (386)986-2456 -
BLD COMPLETE 09/01/2021 09/03/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 09/01/2021 09/03/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 09/01/2021 09/01/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/01/2021 09/01/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 09/01/2021 09/02/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 09/01/2021 09/01/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy calcs and EPL card need to be signed by the builder
SW1 COMPLETE 09/01/2021 09/10/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON COMPLETE 09/01/2021 09/03/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 02/13/2023
PLAN REVIEW - REVISION ¤32.50 02/13/2023
CONNECTION FEES ¤25.00 09/28/2021
METER - DEPOSIT ¤60.00 09/28/2021
WATER-METER ¤441.07 09/28/2021
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/28/2021
INSPECTION - RESIDENTIAL ¤1,388.75 09/28/2021
PLAN REVIEW - RESIDENTIAL ¤393.90 09/28/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 09/28/2021
IMPACT FEE FIRE ¤367.00 09/28/2021
IMPACT FEE PARKS ¤1,199.12 09/28/2021
IMPACT FEE SCHOOL ¤3,600.00 09/28/2021
IMPACT FEE TRANSPORTATION ¤3,139.00 09/28/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 09/28/2021
SURCHARGE FS 533.721 ¤18.90 09/28/2021
SURCHARGE - FS 468.631 ¤28.35 09/28/2021
SW ENG - FOUNDATION SURVEY ¤20.00 09/28/2021
SW ENG INSPECTION 60 ¤60.00 09/28/2021
SW ENG PRE APRON ¤30.00 09/28/2021
SW ENG - REVIEW 20 ¤20.00 09/28/2021
SW ENG RES REVIEW 200 ¤200.00 09/28/2021
3% TRANS IMPACT FEE CREDIT (¤94.17) 09/28/2021
SEWER INSPECTION ¤25.00 09/28/2021
SITE PLAN 30 ¤30.00 09/28/2021
Fees Total Due: ¤0.00 Total Paid: ¤11,007.44