Permit #2021090108

Permit Details

Status: CANCEL

Parcel Id: 07-11-31-7010-00260-0360
CONDITIONED SPACE: 1870 sqft
GARAGE: 453 sqft
OPENED PORCH (WITH ROOF) : 200 sqft
OPENED PORCH (WITH ROOF) : 37 sqft
Total Square Footage: 2560 sqft
Block: 00260
Subdivision: 2137 - SECTION 10-FLORIDA PARK
Job Phone: 386-931-6577
Location Address: 33 FRENORA LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/07/2021
NOC: RECORDED
Applicant name: LUIS JORGE MEDEIROS
Owner: LIMA, KELLI & TENORIO, MARCELO

Address

68 BEACON LN

PALM COAST, FL 32137

Lot: 0360
Contracted Stated Job Value: ¤150,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

A PLUS HOME IMPROVEMENTS LLC
Status Location Address State License Number Phone
ACTIVE

306 S RAILROAD ST

BUNNELL, FL 32110

CRC1327024 (Exp: 08/31/2026) 386-263-2167

Sub Contractors

JOHN ROBERT BLEVINS JR
Status Location Address State License Number Phone Fax
ACTIVE

17 PORWYN LANE

PALM COAST, FL 32164

CAC1816125 (Exp: 08/31/2026) 386-585-8283 386-263-2096
FERNANDO M FARIA
Status Location Address State License Number Phone
ACTIVE

23 FREELAND LANE

PALM COAST, FL 32137

RF11067823 (Exp: 08/31/2027) 386-569-4336
CHRISTIAN GALARZA
Status Location Address State License Number Phone
INACTIVE

514 ELKHORN FERN LANE

DELAND, FL 32720

CCC1332550 (Exp: 08/31/2024) 386-734-1955
JOSEPH MOUAG
Status Location Address State License Number Phone
ACTIVE

842 BANBURY DRIVE

PORT ORANGE, FL 32129

EC13006957 (Exp: 08/31/2026) 386-547-3722

Inspection History

Type Request Date Result Inspector
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/18/2023 APPROVED AGAETANO
Note: 1/13/2023 - PREVIOUS INSPECTION NOTES 1. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2. R319.1 Residential R319.1 Address identification. Buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address identification shall be maintained.
ROOF VALLEY & METAL 01/18/2023 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/13/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 1. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2. R319.1 Residential R319.1 Address identification. Buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address identification shall be maintained.
FOUND SURVEY APPROVED (OFFICE) 12/06/2022 APPROVED TBAKER
TIE BEAM / LINTEL 11/16/2022 APPROVED AGAETANO
Note: 11/14/2022 - PREVIOUS INSPECTION NOTES 11-14-2022 Sheet 5/6 1F indicates 1 rebar continuous. Back left lintel at lanai rebar not instaeed as per plans. Check all.
TIE BEAM / LINTEL 11/14/2022 Disapproved - NO FEE AGAETANO
Note: 11-14-2022 Sheet 5/6 1F indicates 1 rebar continuous. Back left lintel at lanai rebar not instaeed as per plans. Check all.
ROW - DRAINAGE 07/28/2022 Disapproved -FEE REQUIRED EMADISON
Note: THIS IS A REINSPECTION ** 07/28/22 TEMPORARY PIPE ON SITE NOT INSTALLED, DRAINAGE STILL NEEDS TO BE OPENED ** NEED TO REMOVE CONCRETE THAT WAS DUMPED INTO SWALE ** NEXT INSPECTION ON 07/29/22 ** SEE ATTACHED PHOTOS THIS IS A REINSPECTION Contruction site needs a temporary culvert in the swale to allow for continuous drainage throughout construction. 7/21/22 - Drainage still not open across the front of the swale. Next inspection 7/28/22.
ROW - DRAINAGE 07/21/2022 Disapproved -FEE REQUIRED RGROSS
Note: THIS IS A REINSPECTION Contruction site needs a temporary culvert in the swale to allow for continuous drainage throughout construction. 7/21/22 - Drainage still not open across the front of the swale. Next inspection 7/28/22.
ROW - DRAINAGE 07/15/2022 Disapproved - NO FEE RGROSS
Note: Contruction site needs a temporary culvert in the swale to allow for continuous drainage throughout construction. Next 7/21/22.
MONOLITHIC SLAB 06/10/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION 1. collumn pads are not per typical detail (highlighted on plans 2. missing compaction report
MONOLITHIC SLAB 06/08/2022 Disapproved -FEE REQUIRED LMILLER
Note: 1. collumn pads are not per typical detail (highlighted on plans 2. missing compaction report
PLUMBING 1ST ROUGH UNDERGROUND 04/18/2022 APPROVED - AS NOTED MGIBSON
Note: SLEEVE AROUND 3'' MAIN DRAIN DOESN'T MEET CODE. CODE READS 2X LAREGER THAN PIPE PASSING THROUGH FOUNDATION OR 2 # 5 REBAR WITH RELIEVING ARCH FYI?????
WATER METER INSTALLATION REQUEST 04/07/2022 APPROVED CSTONE
Note: THIS IS A REINSPECTION ADDED ON 3/25/2022 4:10:32 PM lot not clear piles of dirt
WATER METER INSTALLATION REQUEST 03/25/2022 Disapproved - NO FEE CSTONE
Note: lot not clear piles of dirt
ALL ROUGH
WALL SHEATHING
INSULATION
BLD - BUILDING FINAL
GRAVITY SEWER TEST
ELECTRIC - EARLY POWER
FINAL SURVEY (OFFICE USE ONLY)
LATH/BRICK/ WATER BARRIER
U-CROSS CONNECTION
ROW- PRE-APRON (PRE-POUR)
ROW - FINAL APRON (AFTER POUR)
U - SEWER TIE IN
ROW FIELD SURVEY /GRADING CERTIFICATION
ROW - DRAINAGE
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION ** 07/28/22 TEMPORARY PIPE ON SITE NOT INSTALLED, DRAINAGE STILL NEEDS TO BE OPENED ** NEED TO REMOVE CONCRETE THAT WAS DUMPED INTO SWALE ** NEXT INSPECTION ON 07/29/22 ** SEE ATTACHED PHOTOS THIS IS A REINSPECTION Contruction site needs a temporary culvert in the swale to allow for continuous drainage throughout construction. 7/21/22 - Drainage still not open across the front of the swale. Next inspection 7/28/22.
ROW - STORMWATER FINAL
U -UTILITY RESIDENTIAL FINAL

Review History

Department Status Date In Date Out
BLD COMPLETE 01/09/2024 01/11/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 07/05/2023 07/05/2023
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM SUBMIT CITY OF PALM COAST EXTENSION FORM
ENGIN1 COMPLETE 12/05/2022 12/06/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/05/2022 12/05/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC COMPLETE 09/16/2021 09/17/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD COMPLETE 09/16/2021 09/17/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD HOLD 09/03/2021 09/07/2021
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Building PLAN REVIEW COMMENTS: 1. Provide size of window in the proposed Master Bedroom. FBC 107 2. Provide size of proposed lintels above proposed openings. FBC 107 3. Elite panel roofing is called-out on the Product Approval Sheet. Provide area where the proposed panel roofing is to be installed.
CUSVC COMPLETE 09/03/2021 09/03/2021
Note: Released By: HALEIGH HAND - -
ELEC HOLD 09/03/2021 09/03/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Outlets in kithcen need to be GFCI protected. NEC 2017 210.8
ENGIN1 COMPLETE 09/03/2021 09/03/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 09/03/2021 09/08/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 09/03/2021 09/03/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 09/03/2021 09/14/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON COMPLETE 09/03/2021 09/07/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
SWALE COMPLETE 09/03/2021 11/17/2021
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
METER - DEPOSIT ¤60.00 10/07/2021
WATER- TURN ON ¤25.00 10/07/2021
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/07/2021
INSPECTION - RESIDENTIAL ¤649.00 10/07/2021
PLAN REVIEW - RESIDENTIAL ¤184.08 10/07/2021
CONNECTION FEES ¤1,017.83 10/07/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 10/07/2021
IMPACT FEE FIRE ¤367.00 10/07/2021
IMPACT FEE PARKS ¤1,199.12 10/07/2021
IMPACT FEE SCHOOL ¤3,600.00 10/07/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 10/07/2021
WATER -IRRIGATION INSPECTION ¤25.00 10/07/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 10/07/2021
SURCHARGE FS 533.721 ¤9.16 10/07/2021
SURCHARGE - FS 468.631 ¤13.74 10/07/2021
SW ENG - FOUNDATION SURVEY ¤20.00 10/07/2021
SW ENG INSPECTION 60 ¤60.00 10/07/2021
SW ENG PRE APRON ¤30.00 10/07/2021
SW ENG - REVIEW 20 ¤20.00 10/07/2021
SW ENG RES REVIEW 200 ¤200.00 10/07/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 10/07/2021
SEWER INSPECTION ¤25.00 10/07/2021
SEWER CAPITAL FACILITY ¤4,664.55 10/07/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 10/07/2021
SITE PLAN 30 ¤30.00 10/07/2021
¤0.00
Fees Total Due: ¤0.00 Total Paid: ¤17,273.41