Permit #2021090108
Permit Details
Status: CANCEL
| Parcel Id: 07-11-31-7010-00260-0360 |
| CONDITIONED SPACE: 1870 sqft |
| GARAGE: 453 sqft |
| OPENED PORCH (WITH ROOF) : 200 sqft |
| OPENED PORCH (WITH ROOF) : 37 sqft |
| Total Square Footage: 2560 sqft |
| Block: 00260 |
| Subdivision: 2137 - SECTION 10-FLORIDA PARK |
| Job Phone: 386-931-6577 |
| Location Address: 33 FRENORA LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/07/2021 |
| NOC: RECORDED |
| Applicant name: LUIS JORGE MEDEIROS |
| Owner: LIMA, KELLI & TENORIO, MARCELO |
|
Address 68 BEACON LN PALM COAST, FL 32137 |
| Lot: 0360 |
| Contracted Stated Job Value: ¤150,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
A PLUS HOME IMPROVEMENTS LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
306 S RAILROAD ST BUNNELL, FL 32110 |
CRC1327024 (Exp: 08/31/2026) | 386-263-2167 |
Sub Contractors
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
FERNANDO M FARIA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
23 FREELAND LANE PALM COAST, FL 32137 |
RF11067823 (Exp: 08/31/2027) | 386-569-4336 |
CHRISTIAN GALARZA
| Status | Location Address | State License Number | Phone |
| INACTIVE |
514 ELKHORN FERN LANE DELAND, FL 32720 |
CCC1332550 (Exp: 08/31/2024) | 386-734-1955 |
JOSEPH MOUAG
| Status | Location Address | State License Number | Phone |
| ACTIVE |
842 BANBURY DRIVE PORT ORANGE, FL 32129 |
EC13006957 (Exp: 08/31/2026) | 386-547-3722 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/18/2023 | APPROVED | AGAETANO |
| Note: 1/13/2023 - PREVIOUS INSPECTION NOTES 1. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2. R319.1 Residential R319.1 Address identification. Buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address identification shall be maintained. | |||
| ROOF VALLEY & METAL | 01/18/2023 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/13/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 1. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2. R319.1 Residential R319.1 Address identification. Buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address identification shall be maintained. | |||
| FOUND SURVEY APPROVED (OFFICE) | 12/06/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 11/16/2022 | APPROVED | AGAETANO |
| Note: 11/14/2022 - PREVIOUS INSPECTION NOTES 11-14-2022 Sheet 5/6 1F indicates 1 rebar continuous. Back left lintel at lanai rebar not instaeed as per plans. Check all. | |||
| TIE BEAM / LINTEL | 11/14/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 11-14-2022 Sheet 5/6 1F indicates 1 rebar continuous. Back left lintel at lanai rebar not instaeed as per plans. Check all. | |||
| ROW - DRAINAGE | 07/28/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: THIS IS A REINSPECTION ** 07/28/22 TEMPORARY PIPE ON SITE NOT INSTALLED, DRAINAGE STILL NEEDS TO BE OPENED ** NEED TO REMOVE CONCRETE THAT WAS DUMPED INTO SWALE ** NEXT INSPECTION ON 07/29/22 ** SEE ATTACHED PHOTOS THIS IS A REINSPECTION Contruction site needs a temporary culvert in the swale to allow for continuous drainage throughout construction. 7/21/22 - Drainage still not open across the front of the swale. Next inspection 7/28/22. | |||
| ROW - DRAINAGE | 07/21/2022 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION Contruction site needs a temporary culvert in the swale to allow for continuous drainage throughout construction. 7/21/22 - Drainage still not open across the front of the swale. Next inspection 7/28/22. | |||
| ROW - DRAINAGE | 07/15/2022 | Disapproved - NO FEE | RGROSS |
| Note: Contruction site needs a temporary culvert in the swale to allow for continuous drainage throughout construction. Next 7/21/22. | |||
| MONOLITHIC SLAB | 06/10/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION 1. collumn pads are not per typical detail (highlighted on plans 2. missing compaction report | |||
| MONOLITHIC SLAB | 06/08/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 1. collumn pads are not per typical detail (highlighted on plans 2. missing compaction report | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/18/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: SLEEVE AROUND 3'' MAIN DRAIN DOESN'T MEET CODE. CODE READS 2X LAREGER THAN PIPE PASSING THROUGH FOUNDATION OR 2 # 5 REBAR WITH RELIEVING ARCH FYI????? | |||
| WATER METER INSTALLATION REQUEST | 04/07/2022 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 3/25/2022 4:10:32 PM lot not clear piles of dirt | |||
| WATER METER INSTALLATION REQUEST | 03/25/2022 | Disapproved - NO FEE | CSTONE |
| Note: lot not clear piles of dirt | |||
| ALL ROUGH | |||
| WALL SHEATHING | |||
| INSULATION | |||
| BLD - BUILDING FINAL | |||
| GRAVITY SEWER TEST | |||
| ELECTRIC - EARLY POWER | |||
| FINAL SURVEY (OFFICE USE ONLY) | |||
| LATH/BRICK/ WATER BARRIER | |||
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| U - SEWER TIE IN | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | |||
| ROW - DRAINAGE | |||
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION ** 07/28/22 TEMPORARY PIPE ON SITE NOT INSTALLED, DRAINAGE STILL NEEDS TO BE OPENED ** NEED TO REMOVE CONCRETE THAT WAS DUMPED INTO SWALE ** NEXT INSPECTION ON 07/29/22 ** SEE ATTACHED PHOTOS THIS IS A REINSPECTION Contruction site needs a temporary culvert in the swale to allow for continuous drainage throughout construction. 7/21/22 - Drainage still not open across the front of the swale. Next inspection 7/28/22. | |||
| ROW - STORMWATER FINAL | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 01/09/2024 | 01/11/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 07/05/2023 | 07/05/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM SUBMIT CITY OF PALM COAST EXTENSION FORM | |||
| ENGIN1 | COMPLETE | 12/05/2022 | 12/06/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/05/2022 | 12/05/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/16/2021 | 09/17/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/16/2021 | 09/17/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 09/03/2021 | 09/07/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Building PLAN REVIEW COMMENTS: 1. Provide size of window in the proposed Master Bedroom. FBC 107 2. Provide size of proposed lintels above proposed openings. FBC 107 3. Elite panel roofing is called-out on the Product Approval Sheet. Provide area where the proposed panel roofing is to be installed. | |||
| CUSVC | COMPLETE | 09/03/2021 | 09/03/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 09/03/2021 | 09/03/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Outlets in kithcen need to be GFCI protected. NEC 2017 210.8 | |||
| ENGIN1 | COMPLETE | 09/03/2021 | 09/03/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/03/2021 | 09/08/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/03/2021 | 09/03/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/03/2021 | 09/14/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/03/2021 | 09/07/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 09/03/2021 | 11/17/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| METER - DEPOSIT | ¤60.00 | 10/07/2021 |
| WATER- TURN ON | ¤25.00 | 10/07/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/07/2021 |
| INSPECTION - RESIDENTIAL | ¤649.00 | 10/07/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤184.08 | 10/07/2021 |
| CONNECTION FEES | ¤1,017.83 | 10/07/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 10/07/2021 |
| IMPACT FEE FIRE | ¤367.00 | 10/07/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 10/07/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/07/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 10/07/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/07/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 10/07/2021 |
| SURCHARGE FS 533.721 | ¤9.16 | 10/07/2021 |
| SURCHARGE - FS 468.631 | ¤13.74 | 10/07/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/07/2021 |
| SW ENG INSPECTION 60 | ¤60.00 | 10/07/2021 |
| SW ENG PRE APRON | ¤30.00 | 10/07/2021 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/07/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/07/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 10/07/2021 |
| SEWER INSPECTION | ¤25.00 | 10/07/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 10/07/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 10/07/2021 |
| SITE PLAN 30 | ¤30.00 | 10/07/2021 |
| ¤0.00 | ||
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,273.41 |