I want to search for...

Permit #2021090137

Permit Details

Status: COED

Parcel Id: 07-11-31-7013-00210-0380
CONDITIONED SPACE: 1804 sqft
GARAGE: 389 sqft
OPENED PORCH (WITH ROOF) : 270 sqft
OPENED PORCH (WITH ROOF) : 28 sqft
Total Square Footage: 2491 sqft
Block: 00210
Subdivision: 2192 - SECTION 13-BELLE TERRE
Job Phone: 321-271-9033
Location Address: 122 BRUSHWOOD LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/11/2021
NOC: RECORDED
Applicant name: KEITH E TANNER
Owner: VINTAGE ESTATE HOMES

Address

6905 N WICKHAM ROAD SUITE 303

MELBOURNE, FL 32940

Lot: 0380
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

MERCEDES PREMIER HOMES, LLC
Status Location Address Mailing Address State License Number Phone
INACTIVE

4885 N WICKHAM RD

MELBOURNE, FL 32940

STE 101

MELBOURNE, FL 32940

CGC1516602 (Exp: 08/31/2024) 321-610-3924

Sub Contractors

JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
JASON LEE JAMES
Status Location Address State License Number Phone
ACTIVE

217 N WESTMONTE DR SUITE 1007

ALTAMONTE SPRINGS, FL 32714

CAC1820196 (Exp: 08/31/2026) 407-404-4000

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/11/2022 FINAL APPROVED RMARTIN
Note: 10/4/2022 - PREVIOUS INSPECTION NOTES
BLD - BUILDING FINAL 10/04/2022 CANCELLED BY APPLICANT RMARTIN
U -UTILITY RESIDENTIAL FINAL 09/26/2022 FINAL APPROVED DHANEY
Note: 9/23/2022 - PREVIOUS INSPECTION NOTES Sewer clean out in yard needs trimmed to ground level . Repairs made .
U -UTILITY RESIDENTIAL FINAL 09/23/2022 Disapproved - NO FEE DHANEY
Note: Sewer clean out in yard needs trimmed to ground level .
U-CROSS CONNECTION 09/23/2022 APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 09/09/2022 APPROVED EMADISON
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/09/2022 APPROVED EMADISON
Note: Inspector Notes from Inspection 9270 07/18/22=AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL .......................................................................................................................................................................................................................... 07/13/22=NEED RE-BAR ON LEFT SIDE. CULVERT PIPE IS GOOD . MITER END NO EQUAL NEED TO REMOVE THE GRASS FOR THE APRON AND DRIVEWAY NEED A REBAR ON SITE ON THE LEFT SIDE .................................................................................................................................................................................................................................. ** 07/12/22 EDGE OF CUT NEEDS TO BE A CLEAN CUT TO MUCH DEBRIS IN POUR AREA (LARGE ASPHALT CHUNKS) NEED TO BE CLEANED ** DRIVEWAY FLARES ARE NOT EQUAL LEFT IS 30 1/2 INCHES RIGHT IS 34' NEED TO BE MINIMUM 36" ** CULVERT ELEVATIONS ARE GOOD AT THE TIME OF THIS INSPECTION ** NEED RE-BAR ON LEFT SIDE. ** SEE ATTACHED PHOTOS Not parallel with the road or swale line because the left side of culvert it further than 8 ft from road edge. Stand on the neighboring driveway and visually look down the swale line.
ROW FIELD SURVEY /GRADING CERTIFICATION 09/09/2022 APPROVED EMADISON
ROW - STORMWATER FINAL 09/09/2022 APPROVED EMADISON
ELECTRIC - EARLY POWER 08/31/2022 APPROVED JMUNSON
ROW- PRE-APRON (PRE-POUR) 07/18/2022 APPROVED - AS NOTED GBERTOLA
Note: 07/18/22=AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL .......................................................................................................................................................................................................................... 07/13/22=NEED RE-BAR ON LEFT SIDE. CULVERT PIPE IS GOOD . MITER END NO EQUAL NEED TO REMOVE THE GRASS FOR THE APRON AND DRIVEWAY NEED A REBAR ON SITE ON THE LEFT SIDE .................................................................................................................................................................................................................................. ** 07/12/22 EDGE OF CUT NEEDS TO BE A CLEAN CUT TO MUCH DEBRIS IN POUR AREA (LARGE ASPHALT CHUNKS) NEED TO BE CLEANED ** DRIVEWAY FLARES ARE NOT EQUAL LEFT IS 30 1/2 INCHES RIGHT IS 34' NEED TO BE MINIMUM 36" ** CULVERT ELEVATIONS ARE GOOD AT THE TIME OF THIS INSPECTION ** NEED RE-BAR ON LEFT SIDE. ** SEE ATTACHED PHOTOS Not parallel with the road or swale line because the left side of culvert it further than 8 ft from road edge. Stand on the neighboring driveway and visually look down the swale line.
ROW- PRE-APRON (PRE-POUR) 07/13/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 07/13/22=NEED RE-BAR ON LEFT SIDE. CULVERT PIPE IS GOOD . MITER END NO EQUAL NEED TO REMOVE THE GRASS FOR THE APRON AND DRIVEWAY NEED A REBAR ON SITE ON THE LEFT SIDE .................................................................................................................................................................................................................................. ** 07/12/22 EDGE OF CUT NEEDS TO BE A CLEAN CUT TO MUCH DEBRIS IN POUR AREA (LARGE ASPHALT CHUNKS) NEED TO BE CLEANED ** DRIVEWAY FLARES ARE NOT EQUAL LEFT IS 30 1/2 INCHES RIGHT IS 34' NEED TO BE MINIMUM 36" ** CULVERT ELEVATIONS ARE GOOD AT THE TIME OF THIS INSPECTION ** NEED RE-BAR ON LEFT SIDE. ** SEE ATTACHED PHOTOS Not parallel with the road or swale line because the left side of culvert it further than 8 ft from road edge. Stand on the neighboring driveway and visually look down the swale line.
ROW- PRE-APRON (PRE-POUR) 07/12/2022 Disapproved -FEE REQUIRED EMADISON
Note: THIS IS A REINSPECTION ** 07/12/22 EDGE OF CUT NEEDS TO BE A CLEAN CUT TO MUCH DEBRIS IN POUR AREA (LARGE ASPHALT CHUNKS) NEED TO BE CLEANED ** DRIVEWAY FLARES ARE NOT EQUAL LEFT IS 30 1/2 INCHES RIGHT IS 34' NEED TO BE MINIMUM 36" ** CULVERT ELEVATIONS ARE GOOD AT THE TIME OF THIS INSPECTION ** NEED RE-BAR ON LEFT SIDE. ** SEE ATTACHED PHOTOS Not parallel with the road or swale line because the left side of culvert it further than 8 ft from road edge. Stand on the neighboring driveway and visually look down the swale line.
ROW- PRE-APRON (PRE-POUR) 07/05/2022 Disapproved -FEE REQUIRED RGROSS
Note: Not parallel with the road or swale line because the left side of culvert it further than 8 ft from road edge. Stand on the neighboring driveway and visually look down the swale line.
U - SEWER TIE IN 06/23/2022 APPROVED MGIBSON
LATH/BRICK/ WATER BARRIER 05/13/2022 APPROVED FWILLIS
Note: THIS IS A REINSPECTION LATH MISSING IN REAR TOP OF LANAI.
INSULATION 05/11/2022 APPROVED FWILLIS
LATH/BRICK/ WATER BARRIER 04/28/2022 Disapproved - NO FEE FWILLIS
Note: LATH MISSING IN REAR TOP OF LANAI.
ALL ROUGH 04/12/2022 APPROVED KSANDOE
WALL SHEATHING 02/23/2022 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/23/2022 APPROVED FWILLIS
ROOF VALLEY & METAL 02/23/2022 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 12/21/2021 APPROVED TBAKER
TIE BEAM / LINTEL 12/06/2021 APPROVED FWILLIS
MONOLITHIC SLAB 11/22/2021 APPROVED FWILLIS
GRAVITY SEWER TEST 11/16/2021 APPROVED MGIBSON
Note: THIS IS A REINSPECTION SEE FIRST ROUGH NOTE
PLUMBING 1ST ROUGH UNDERGROUND 11/16/2021 APPROVED MGIBSON
Note: THIS IS A REINSPECTION NOT HOLDING 5' HEAD TEST, PRESSURE OK ON WATER DISTRIBUTION LINES
GRAVITY SEWER TEST 11/12/2021 Disapproved - NO FEE MGIBSON
Note: SEE FIRST ROUGH NOTE
PLUMBING 1ST ROUGH UNDERGROUND 11/12/2021 Disapproved -FEE REQUIRED MGIBSON
Note: NOT HOLDING 5' HEAD TEST, PRESSURE OK ON WATER DISTRIBUTION LINES
WATER METER INSTALLATION REQUEST 11/05/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 09/06/2022 09/06/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 08/16/2022 08/17/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Orientation of Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition 2. Indoor design temp on heatload must be a minimum of 75 degrees per R302.1 FBC Energy Conservation 2020 7Th edition (Second Request)
MECH HOLD 07/22/2022 07/22/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Orientation of Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition 2. Indoor design temp on heatload must be a minimum of 75 degrees per R302.1 FBC Energy Conservation 2020 7Th edition
ENGIN1 COMPLETE 12/21/2021 12/21/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/21/2021 12/21/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 09/03/2021 09/07/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 09/03/2021 09/03/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 09/03/2021 09/03/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/03/2021 09/03/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 09/03/2021 09/03/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 09/03/2021 09/03/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 09/03/2021 09/14/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON COMPLETE 09/03/2021 09/07/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
SWALE COMPLETE 09/03/2021 11/16/2021
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 01/23/2023
CONTRACTOR CHANGE ¤40.00 01/23/2023
SW ENG REINSPECTION 30 ¤30.00 01/23/2023
SW ENG REINSPECTION 30 ¤30.00 01/23/2023
SW ENG REINSPECTION 30 ¤30.00 01/23/2023
PLAN REVIEW - REVISION ¤65.00 01/23/2023
REINSPECTION RESIDENTIAL ¤40.00 01/23/2023
CONNECTION FEES ¤1,017.83 10/11/2021
METER - DEPOSIT ¤60.00 10/11/2021
WATER- TURN ON ¤25.00 10/11/2021
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/11/2021
INSPECTION - RESIDENTIAL ¤687.50 10/11/2021
PLAN REVIEW - RESIDENTIAL ¤195.00 10/11/2021
SW ENG - REVIEW 20 ¤20.00 10/11/2021
SW ENG RES REVIEW 200 ¤200.00 10/11/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 10/11/2021
SEWER CREDIT (¤1,466.00) 10/11/2021
SEWER INSPECTION ¤25.00 10/11/2021
SEWER CAPITAL FACILITY ¤4,664.55 10/11/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 10/11/2021
SITE PLAN 30 ¤30.00 10/11/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 10/11/2021
IMPACT FEE FIRE ¤367.00 10/11/2021
IMPACT FEE PARKS ¤1,199.12 10/11/2021
IMPACT FEE SCHOOL ¤3,600.00 10/11/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 10/11/2021
WATER -IRRIGATION INSPECTION ¤25.00 10/11/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 10/11/2021
SURCHARGE FS 533.721 ¤9.67 10/11/2021
SURCHARGE - FS 468.631 ¤14.50 10/11/2021
SW ENG - FOUNDATION SURVEY ¤20.00 10/11/2021
SW ENG INSPECTION 60 ¤60.00 10/11/2021
SW ENG PRE APRON ¤30.00 10/11/2021
Fees Total Due: ¤0.00 Total Paid: ¤16,133.10