I want to search for...
Permit #2021090138
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00490-0120 |
| CONDITIONED SPACE: 2551 sqft |
| GARAGE: 428 sqft |
| OPENED PORCH (WITH ROOF) : 160 sqft |
| OPENED PORCH (WITH ROOF) : 33 sqft |
| Total Square Footage: 3172 sqft |
| Block: 00490 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 321-271-9033 |
| Location Address: 32 ESSEX LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/04/2021 |
| NOC: RECORDED |
| Applicant name: KEITH E TANNER |
| Owner: LS- VEH LLC |
|
Address 4885 N WICKHAM RD MELBOURNE, FL 32940 |
| Lot: 0120 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MERCEDES PREMIER HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
4885 N WICKHAM RD MELBOURNE, FL 32940 |
STE 101 MELBOURNE, FL 32940 |
CGC1516602 (Exp: 08/31/2024) | 321-610-3924 |
Sub Contractors
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CAC1820196 (Exp: 08/31/2026) | 407-404-4000 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 09/27/2022 | FINAL APPROVED | PFLANAGAN |
| BLD - BUILDING FINAL | 09/26/2022 | FINAL APPROVED | KSANDOE |
| Note: 9/23/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2425 Rear bedroom left side of building. left side of window jamb missing fasteners. Check at final 9-23-22 1. Ground wire needs protectionNEC 250.62 2. Energy cals don't match. 3. Master bath sink leaking. 4. Master bath toilet light not working. 5. Garbage disposal tripping breaker. 6. Smoke alarms not working. | |||
| BLD - BUILDING FINAL | 09/23/2022 | Disapproved - NO FEE | BTAYLOR |
| Note: Inspector Notes from Inspection 2425 Rear bedroom left side of building. left side of window jamb missing fasteners. Check at final 9-23-22 1. Ground wire needs protectionNEC 250.62 2. Energy cals don't match. 3. Master bath sink leaking. 4. Master bath toilet light not working. 5. Garbage disposal tripping breaker. 6. Smoke alarms not working. | |||
| U -UTILITY RESIDENTIAL FINAL | 09/21/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: please lower sewer clean out to be flush with grades-call inspector to verify-Larry at 386-214-3376 | |||
| U-CROSS CONNECTION | 09/21/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ELECTRIC - EARLY POWER | 08/31/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Ground wire emerging from grade needs to be protected by final. NEC 2017 250.64 | |||
| WINDOW NAILING | 08/22/2022 | APPROVED - AS NOTED | JWALKER |
| Note: Rear bedroom left side of building. left side of window jamb missing fasteners. Check at final | |||
| TUB SET | 08/15/2022 | APPROVED | MGIBSON |
| FINAL SURVEY (OFFICE USE ONLY) | 08/12/2022 | APPROVED | PFLANAGAN |
| ROW - FINAL APRON (AFTER POUR) | 08/12/2022 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/12/2022 | APPROVED | PFLANAGAN |
| ROW- PRE-APRON (PRE-POUR) | 07/05/2022 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. | |||
| U - SEWER TIE IN | 06/22/2022 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 06/09/2022 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 5/25/2022 8:17:45 AM Exterior (stucco and or siding not applied EMAIL RHAND@PALMCOASTGOV.COM with questions | |||
| PEP TANK INSTALLATION REQUEST | 05/24/2022 | Disapproved - NO FEE | CSTONE |
| Note: Exterior (stucco and or siding not applied EMAIL RHAND@PALMCOASTGOV.COM with questions | |||
| LATH/BRICK/ WATER BARRIER | 05/24/2022 | APPROVED | MKRASKI |
| Note: THIS IS A REINSPECTION The furring strips around the windows used to seal off opening needs to be removed. | |||
| INSULATION | 05/18/2022 | APPROVED | JWALKER |
| LATH/BRICK/ WATER BARRIER | 05/12/2022 | Disapproved - NO FEE | JWALKER |
| Note: The furring strips around the windows used to seal off opening needs to be removed. | |||
| ALL ROUGH | 04/20/2022 | APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION Window and door openings not secure Trades approved/ do not insulate Shingles not installed. Check at insulation | |||
| ALL ROUGH | 04/19/2022 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Window and door openings not secure Trades approved/ do not insulate | |||
| WALL SHEATHING | 03/03/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION | |||
| ROOF VALLEY & METAL | 03/03/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/03/2022 | APPROVED - AS NOTED | JWALKER |
| Note: 3/3/22 Valley over framing hold downs not nailed rear slider area. Install L brace at front gable and 2x4 flat block 48" o.c. detail 1201 The piggy back trusses are missing 1 of 4 optional hold down methods. IN ADDITION to the 2x4 at 2' o.c. The details can be found on engineering packet DRWG PB16010118. I left the drawing in the job box zip lock bag | |||
| ROOF VALLEY & METAL | 03/01/2022 | CANCELLED BY APPLICANT | RMARTIN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/01/2022 | CANCELLED BY APPLICANT | RMARTIN |
| WALL SHEATHING | 03/01/2022 | CANCELLED BY APPLICANT | RMARTIN |
| FOUND SURVEY APPROVED (OFFICE) | 02/18/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 02/01/2022 | APPROVED | JWALKER |
| MONOLITHIC SLAB | 01/11/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 01/10/2022: Dowel rod missing in back left footing pad Pipes passing through interior load bearing footing footing not sleeved or have re-bar bridge Plans in box are not approved set | |||
| MONOLITHIC SLAB | 01/10/2022 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION 01/10/2022: Dowel rod missing in back left footing pad Pipes passing through interior load bearing footing footing not sleeved or have re-bar bridge Plans in box are not approved set | |||
| MONOLITHIC SLAB | 01/06/2022 | CANCELLED BY APPLICANT | JWALKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/28/2021 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 12/28/2021 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 11/24/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 09/23/2022 | 09/23/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/16/2022 | 08/17/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/21/2022 | 07/22/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Design location on heatload needs to match the Energy calc. (St. Augustine) | |||
| ENGIN1 | COMPLETE | 02/17/2022 | 02/18/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/17/2022 | 02/17/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/03/2021 | 09/03/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 09/03/2021 | 09/08/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 09/03/2021 | 09/03/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/03/2021 | 09/03/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/03/2021 | 09/07/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/03/2021 | 09/03/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/03/2021 | 09/14/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/03/2021 | 09/07/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 09/03/2021 | 11/16/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 09/27/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 09/27/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 09/27/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 09/27/2022 |
| CONNECTION FEES | ¤1,017.83 | 11/04/2021 |
| METER - DEPOSIT | ¤60.00 | 11/04/2021 |
| WATER- TURN ON | ¤25.00 | 11/04/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/04/2021 |
| INSPECTION - RESIDENTIAL | ¤847.00 | 11/04/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤240.24 | 11/04/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 11/04/2021 |
| IMPACT FEE FIRE | ¤367.00 | 11/04/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 11/04/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/04/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 11/04/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/04/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 11/04/2021 |
| SURCHARGE FS 533.721 | ¤11.77 | 11/04/2021 |
| SURCHARGE - FS 468.631 | ¤17.65 | 11/04/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/04/2021 |
| SW ENG INSPECTION 60 | ¤60.00 | 11/04/2021 |
| SW ENG PRE APRON | ¤30.00 | 11/04/2021 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/04/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/04/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 11/04/2021 |
| SEWER CREDIT | (¤850.00) | 11/04/2021 |
| SEWER INSPECTION | ¤25.00 | 11/04/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 11/04/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 11/04/2021 |
| SITE PLAN 30 | ¤30.00 | 11/04/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,829.09 |