Permit #2021090152

Permit Details

Status: COED

Parcel Id: 07-11-31-7060-00350-0030
CONDITIONED SPACE: 2670 sqft
GARAGE: 581 sqft
OPENED PORCH (WITH ROOF) : 162 sqft
OPENED PORCH (WITH ROOF) : 33 sqft
Total Square Footage: 3446 sqft
Block: 00350
Subdivision: -
Job Phone: 321-271-9033
Location Address: 43 SLOW DRIFT TURN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/29/2021
NOC: RECORDED
Applicant name: KEITH E TANNER
Owner: VINTAGE ESTATE HOMES

Address

6905 NWICKHAM RD

MELBOURNE, FL 32940

Lot: 0030
Contracted Stated Job Value: ¤300,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

MERCEDES PREMIER HOMES, LLC
Status Location Address Mailing Address State License Number Phone
INACTIVE

4885 N WICKHAM RD

MELBOURNE, FL 32940

STE 101

MELBOURNE, FL 32940

CGC1516602 (Exp: 08/31/2024) 321-610-3924

Sub Contractors

JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JASON LEE JAMES
Status Location Address State License Number Phone
ACTIVE

217 N WESTMONTE DR SUITE 1007

ALTAMONTE SPRINGS, FL 32714

CAC1820196 (Exp: 08/31/2026) 407-404-4000

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/17/2023 FINAL APPROVED BTAYLOR
Note: 1/24/2023 - PREVIOUS INSPECTION NOTES
U -UTILITY RESIDENTIAL FINAL 01/24/2023 FINAL APPROVED JHARDING
Note: 1/20/2023 - PREVIOUS INSPECTION NOTES need access to garage in order to inspect pep circuit breaker 1/10/2023 - PREVIOUS INSPECTION NOTES No power. Need power to checck pep
BLD - BUILDING FINAL 01/24/2023 CANCELLED BY APPLICANT BTAYLOR
U -UTILITY RESIDENTIAL FINAL 01/20/2023 Disapproved -FEE REQUIRED LFITZGERALD
Note: need access to garage in order to inspect pep circuit breaker 1/10/2023 - PREVIOUS INSPECTION NOTES No power. Need power to checck pep
ROW - STORMWATER FINAL 01/20/2023 FINAL APPROVED PFLANAGAN
ELECTRIC - EARLY POWER 01/11/2023 APPROVED - AS NOTED BTAYLOR
Note: 10/5/2022 - PREVIOUS INSPECTION NOTES 10-5-22 House not ready. House locked. Light fixtures outside not safed off. 1-11-23 Emailed FPL at 12:18.
U -UTILITY RESIDENTIAL FINAL 01/10/2023 Disapproved - NO FEE JHARDING
Note: No power. Need power to checck pep
U-CROSS CONNECTION 01/10/2023 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
ROW- PROJECT STATUS 01/05/2023 APPROVED PFLANAGAN
ROW - FINAL APRON (AFTER POUR) 01/05/2023 APPROVED PFLANAGAN
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/05/2023 APPROVED PFLANAGAN
Note: 12/15/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE 5% FALL OUT 10' OFF THE OF STUCTURE THEN WATER NEED TO FLOW TO THE FRONT OF PROPERTY Florida Building Code, Residential, Chapter 4, R401.3F
ROW FIELD SURVEY /GRADING CERTIFICATION 01/05/2023 APPROVED PFLANAGAN
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/15/2022 Disapproved - NO FEE PFLANAGAN
Note: NEED TO HAVE 5% FALL OUT 10' OFF THE OF STUCTURE THEN WATER NEED TO FLOW TO THE FRONT OF PROPERTY Florida Building Code, Residential, Chapter 4, R401.3F
ROW- PRE-APRON (PRE-POUR) 10/06/2022 APPROVED PFLANAGAN
Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE -------------------------------------------------------------------------------------------------------------------------- 9/26/2022 - PREVIOUS INSPECTION NOTES THE FORM BOARDS ON THE RIGHT SIDE OF DRIVEWAY NEED TO BE FIXED. SOME ARE MISSING AND SOME HAS BE PULLED OUT. ALSO NEED TO DIG OUT THE FOOTER ON RIGHT SIDE OF CULVERT MITER END. CHECKED ELEVATIONS AND THE ELEVATIONS ARE GOOD AT TIME OF THIS INSPECTION. ---------------------------------------------------------------------------------------------------------------------------- 9/21/2022 - PREVIOUS INSPECTION NOTES THE PIPE HAS FLOATED UP AND WHEN YOU TOUCH IT WITH THE GRADE ROD IT MOVES TO MUCH NEED TO FILL DIRT AROUND CULVERT PIPE HALF WAY UP ON CULVERT AND COMPACT IT SO CULVERT DONT MOVE
ELECTRIC - EARLY POWER 10/05/2022 Disapproved - NO FEE BTAYLOR
Note: 10-5-22 House not ready. House locked. Light fixtures outside not safed off.
ROW- PRE-APRON (PRE-POUR) 09/26/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: THE FORM BOARDS ON THE RIGHT SIDE OF DRIVEWAY NEED TO BE FIXED. SOME ARE MISSING AND SOME HAS BE PULLED OUT. ALSO NEED TO DIG OUT THE FOOTER ON RIGHT SIDE OF CULVERT MITER END. CHECKED ELEVATIONS AND THE ELEVATIONS ARE GOOD AT TIME OF THIS INSPECTION. ---------------------------------------------------------------------------------------------------------------------------- 9/21/2022 - PREVIOUS INSPECTION NOTES THE PIPE HAS FLOATED UP AND WHEN YOU TOUCH IT WITH THE GRADE ROD IT MOVES TO MUCH NEED TO FILL DIRT AROUND CULVERT PIPE HALF WAY UP ON CULVERT AND COMPACT IT SO CULVERT DONT MOVE
ROW- PRE-APRON (PRE-POUR) 09/21/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: THE PIPE HAS FLOATED UP AND WHEN YOU TOUCH IT WITH THE GRADE ROD IT MOVES TO MUCH NEED TO FILL DIRT AROUND CULVERT PIPE HALF WAY UP ON CULVERT AND COMPACT IT SO CULVERT DONT MOVE DID NOT CHECK PIPE ELEVATION DO TO PIPE MOVING WHEN SHOTING IT WITH LASER
U - SEWER TIE IN 08/08/2022 APPROVED MGIBSON
PEP TANK INSTALLATION REQUEST 07/27/2022 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 07/06/2022 APPROVED TSTAUFFACHER
INSULATION 07/05/2022 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION fire blocking and fireblocking materials marked on plans FIREBLOCKING MATERIALS R302.11.1 (1-8) (marked on plans)
INSULATION 06/29/2022 Disapproved -FEE REQUIRED LMILLER
Note: fire blocking and fireblocking materials marked on plans FIREBLOCKING MATERIALS R302.11.1 (1-8) (marked on plans)
ALL ROUGH 06/21/2022 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION From tie down: Add H4 to conventional framing at valley per "general valley notes" item 4--will check at all rough the note above was not resolved from tie downs inspection.
ALL ROUGH 06/14/2022 Disapproved -FEE REQUIRED LMILLER
Note: From tie down: Add H4 to conventional framing at valley per "general valley notes" item 4--will check at all rough the note above was not resolved from tie downs inspection.
WALL SHEATHING 04/20/2022 APPROVED TSTAUFFACHER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/20/2022 APPROVED - AS NOTED TSTAUFFACHER
Note: Add H4 to conventional framing at valley per "general valley notes" item 4--will check at all rough
ROOF VALLEY & METAL 04/20/2022 APPROVED TSTAUFFACHER
TIE BEAM / LINTEL 03/22/2022 APPROVED TSTAUFFACHER
FOUND SURVEY APPROVED (OFFICE) 03/22/2022 APPROVED TBAKER
TIE BEAM / LINTEL 03/18/2022 CANCELLED BY APPLICANT WEB
MONOLITHIC SLAB 02/18/2022 APPROVED TSTAUFFACHER
PLUMBING 1ST ROUGH UNDERGROUND 02/14/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 02/14/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 01/13/2022 APPROVED TCHURCHILL

Review History

Department Status Date In Date Out
BADMIN INFORMATION 12/02/2022 12/02/2022
Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM NEED THE NOC TO BE ABLE TO SCHEDULE THE FINAL SURVEY YOUR NOC HAS EXPIRED.
MECH COMPLETE 11/22/2022 11/22/2022
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 10/13/2022 10/13/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide Entire Energy calc and heatload including manual J summary page
MECH HOLD 10/06/2022 10/06/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM R403.7.1.2.1 FBC Energy Conservation 2020 7TH Edition- Chosen equipment exceeds the maximum of 1.15 times the load calculated.
MECH HOLD 08/16/2022 08/16/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide energy Calcs from updated contractor (Second Request)
MECH HOLD 08/15/2022 08/15/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Design location on heatload needs to match the Energy Calc.(St. Augustine) 2. Provide energy Calcs from updated contractor
ENGIN1 COMPLETE 03/21/2022 03/22/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/21/2022 03/21/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 09/03/2021 09/07/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 09/03/2021 09/03/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 09/03/2021 09/03/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/03/2021 09/03/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 09/03/2021 09/07/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 09/03/2021 09/03/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 09/03/2021 09/14/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON COMPLETE 09/03/2021 09/08/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
SWALE COMPLETE 09/03/2021 11/16/2021
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤75.00 02/24/2023
REINSPECTION RESIDENTIAL ¤40.00 02/24/2023
REINSPECTION RESIDENTIAL ¤40.00 02/24/2023
CONTRACTOR CHANGE ¤40.00 02/24/2023
CONTRACTOR CHANGE ¤40.00 02/24/2023
SW ENG REINSPECTION 20 ¤20.00 02/24/2023
SW ENG REINSPECTION 30 ¤30.00 02/24/2023
SW ENG REINSPECTION 30 ¤30.00 02/24/2023
REINSPECTION FEE ¤40.00 02/24/2023
SURCHARGE FS 533.721 ¤12.49 11/29/2021
SURCHARGE - FS 468.631 ¤18.74 11/29/2021
SW ENG - FOUNDATION SURVEY ¤20.00 11/29/2021
SW ENG INSPECTION 60 ¤60.00 11/29/2021
SW ENG PRE APRON ¤30.00 11/29/2021
SW ENG - REVIEW 20 ¤20.00 11/29/2021
SW ENG RES REVIEW 200 ¤200.00 11/29/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 11/29/2021
SEWER CREDIT (¤1,763.98) 11/29/2021
SEWER INSPECTION ¤25.00 11/29/2021
SEWER CAPITAL FACILITY ¤4,664.55 11/29/2021
WATER CREDIT (¤907.90) 11/29/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 11/29/2021
SITE PLAN 30 ¤30.00 11/29/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 11/29/2021
IMPACT FEE FIRE ¤367.00 11/29/2021
IMPACT FEE PARKS ¤1,199.12 11/29/2021
IMPACT FEE SCHOOL ¤3,600.00 11/29/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 11/29/2021
WATER -IRRIGATION INSPECTION ¤25.00 11/29/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 11/29/2021
CONNECTION FEES ¤1,017.83 11/29/2021
METER - DEPOSIT ¤60.00 11/29/2021
WATER- TURN ON ¤25.00 11/29/2021
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/29/2021
INSPECTION - RESIDENTIAL ¤902.00 11/29/2021
PLAN REVIEW - RESIDENTIAL ¤255.84 11/29/2021
Fees Total Due: ¤0.00 Total Paid: ¤15,289.62