Permit #2021090166
Permit Details
Status: COED
| Parcel Id: 16-11-31-1260-00000-0520 |
| CONDITIONED SPACE: 3042 sqft |
| GARAGE: 697 sqft |
| OPENED PORCH (WITH ROOF) : 84 sqft |
| OPENED PORCH (WITH ROOF) : 449 sqft |
| Total Square Footage: 4272 sqft |
| Block: 00000 |
| Subdivision: 2081 - Creekside Village at Grand Haven |
| Job Phone: 386-445-2012 |
| Location Address: 6 MIDDEN LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/15/2021 |
| NOC: RECORDED |
| Applicant name: JOHN NICHOLAS CORDASCI |
| Owner: BASILE RENEE |
|
Address 8 AUTUMN WAY MONTVALE, NJ 07645 |
| Lot: 0520 |
| Contracted Stated Job Value: ¤536,474.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SKYWAY BUILDERS INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 354786 PALM COAST, FL 32135 |
CBC1263769 (Exp: 08/31/2024) | 386-445-2012 |
Sub Contractors
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
MARK JOHN LUTCZA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
26 ROYAL LEAF LANE PALM COAST, FL 32164 |
EC13005145 (Exp: 08/31/2026) | 386-586-0770 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
MARK B SOWERS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
609 FOURTH ST BUNNELL, FL 32110 |
35616 (Exp: 08/31/2026) | 386-225-1753 |
Inspection History
| Type | Request Date | Result | Inspector |
| GAS ROUGH | 09/05/2023 | APPROVED | MGIBSON |
| Note: 10/4/2022 - PREVIOUS INSPECTION NOTES 9/26/2022 - PREVIOUS INSPECTION NOTES not matching riser diagram (calls for galv pipe for buth down drops (range has CSST) (match plans or obtain approved revision and have on site) ANOTHER GAS ROUGH INSPECTION WILL BE NEED FOR A/G TANK OR U/G TANK WHEN LINE IS RAN FROM HOUSE TO TANK | |||
| GAS FINAL | 09/05/2023 | APPROVED | MGIBSON |
| BLD - BUILDING FINAL | 09/05/2023 | FINAL APPROVED | BTAYLOR |
| ROW - STORMWATER FINAL | 09/01/2023 | FINAL APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ------------------------------------------------------------------------------------------- 8/30/2023 10:35:20 AM- PREVIOUS INSPECTION NOTES DUE TO HURRICANE IDALIA, ALL STORMWATER INSPECTIONS IN THE CITY OF PALM COAST ARE CANCELLED UNTIL FRIDAY, SEPTEMBER 1, 2023. BUILDERS SHOULD RESCHEDULE THE INSPECTIONS FOR NORMAL OPERATIONS ON FRIDAY SEPTEMBER 1, 2023. THANK YOU. 8/29/2023 11:47:16 AM- PREVIOUS INSPECTION NOTES City Hall and City Facilities will be closed Wednesday August 30th. Inspections will not be performed Wednesday; August 30th. Inspections scheduled for Wednesday will cancelled. Please reschedule when you are ready for the inspection. Please be advised, if our community experiences damage, Building Inspectors priority will be providing damage assessment of the area and inspections will be postponed. Please monitor your emails to stay informed. you are mssing sod in the front yard and the row | |||
| ROW - STORMWATER FINAL | 08/31/2023 | Disapproved - NO FEE | JMYERS |
| Note: DUE TO HURRICANE IDALIA, ALL STORMWATER INSPECTIONS IN THE CITY OF PALM COAST ARE CANCELLED UNTIL FRIDAY, SEPTEMBER 1, 2023. BUILDERS SHOULD RESCHEDULE THE INSPECTIONS FOR NORMAL OPERATIONS ON FRIDAY SEPTEMBER 1, 2023. THANK YOU. 8/29/2023 11:47:16 AM- PREVIOUS INSPECTION NOTES City Hall and City Facilities will be closed Wednesday August 30th. Inspections will not be performed Wednesday; August 30th. Inspections scheduled for Wednesday will cancelled. Please reschedule when you are ready for the inspection. Please be advised, if our community experiences damage, Building Inspectors priority will be providing damage assessment of the area and inspections will be postponed. Please monitor your emails to stay informed. you are mssing sod in the front yard and the row | |||
| U -UTILITY RESIDENTIAL FINAL | 08/31/2023 | FINAL APPROVED | DHANEY |
| Note: 8/29/2023 11:47:49 AM- PREVIOUS INSPECTION NOTES City Hall and City Facilities will be closed Wednesday August 30th. Inspections will not be performed Wednesday; August 30th. Inspections scheduled for Wednesday will cancelled. Please reschedule when you are ready for the inspection. Please be advised, if our community experiences damage, Building Inspectors priority will be providing damage assessment of the area and inspections will be postponed. Please monitor your emails to stay informed. | |||
| U-CROSS CONNECTION | 08/31/2023 | APPROVED | DHANEY |
| Note: 8/29/2023 11:47:28 AM- PREVIOUS INSPECTION NOTES City Hall and City Facilities will be closed Wednesday August 30th. Inspections will not be performed Wednesday; August 30th. Inspections scheduled for Wednesday will cancelled. Please reschedule when you are ready for the inspection. Please be advised, if our community experiences damage, Building Inspectors priority will be providing damage assessment of the area and inspections will be postponed. Please monitor your emails to stay informed. | |||
| U-CROSS CONNECTION | 08/30/2023 | CANCELLED BY APPLICANT | BBEMBRY |
| Note: City Hall and City Facilities will be closed Wednesday August 30th. Inspections will not be performed Wednesday; August 30th. Inspections scheduled for Wednesday will cancelled. Please reschedule when you are ready for the inspection. Please be advised, if our community experiences damage, Building Inspectors priority will be providing damage assessment of the area and inspections will be postponed. Please monitor your emails to stay informed. | |||
| ROW - STORMWATER FINAL | 08/30/2023 | CANCELLED BY APPLICANT | BBEMBRY |
| Note: City Hall and City Facilities will be closed Wednesday August 30th. Inspections will not be performed Wednesday; August 30th. Inspections scheduled for Wednesday will cancelled. Please reschedule when you are ready for the inspection. Please be advised, if our community experiences damage, Building Inspectors priority will be providing damage assessment of the area and inspections will be postponed. Please monitor your emails to stay informed. you are mssing sod in the front yard and the row | |||
| U -UTILITY RESIDENTIAL FINAL | 08/30/2023 | CANCELLED BY APPLICANT | BBEMBRY |
| Note: City Hall and City Facilities will be closed Wednesday August 30th. Inspections will not be performed Wednesday; August 30th. Inspections scheduled for Wednesday will cancelled. Please reschedule when you are ready for the inspection. Please be advised, if our community experiences damage, Building Inspectors priority will be providing damage assessment of the area and inspections will be postponed. Please monitor your emails to stay informed. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/25/2023 | APPROVED | GBERTOLA |
| Note: At the time of the inspection, all minimum city requirements were met. The builder is responsible for ensuring that nothing changes after this Inspection is approved. | |||
| ROW - FINAL APRON (AFTER POUR) | 08/25/2023 | APPROVED | GBERTOLA |
| Note: At the time of the inspection, all minimum city requirements were met. The builder is responsible for ensuring that nothing changes after this Inspection is approved. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 08/25/2023 | APPROVED | GBERTOLA |
| Note: At the time of the inspection, all minimum city requirements were met. The builder is responsible for ensuring that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/14/2023 | APPROVED - AS NOTED | RGROSS |
| Note: Small area at the center needs a little more compaction. On site with GM to ensure it get done before pavers. 4/25/2023 - PREVIOUS INSPECTION NOTES READY TO POUR PAVER RESTRAINTS, SIDEWALK, AND APRON ONLY BEFORE THE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO THE CITY STANDARTS WITH NO PAVERS LAID. -------------------------------------------------------------------------------------------------- 4/24/2023 - PREVIOUS INSPECTION NOTES THIS IS NOT READY FOR INSPECTION AT THIS TIME OF 8:01AM | |||
| ROW- PRE-APRON (PRE-POUR) | 04/25/2023 | PARTIALLY APPROVED | PFLANAGAN |
| Note: READY TO POUR PAVER RESTRAINTS, SIDEWALK, AND APRON ONLY BEFORE THE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO THE CITY STANDARTS WITH NO PAVERS LAID. -------------------------------------------------------------------------------------------------- 4/24/2023 - PREVIOUS INSPECTION NOTES THIS IS NOT READY FOR INSPECTION AT THIS TIME OF 8:01AM | |||
| ROW- PAVER RESTRAINTS | 04/25/2023 | APPROVED | PFLANAGAN |
| Note: PAVER RESTRAINTS LOOKS GOOD AT THE TIME OF THE INSECTION ------------------------------------------------------------- 4/24/2023 - PREVIOUS INSPECTION NOTES | |||
| ROW- PAVER RESTRAINTS | 04/24/2023 | Disapproved - NO FEE | PFLANAGAN |
| ROW- PRE-APRON (PRE-POUR) | 04/24/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THIS IS NOT READY FOR INSPECTION AT THIS TIME OF 8:01AM | |||
| ELECTRIC - EARLY POWER | 11/22/2022 | APPROVED | RMARTIN |
| INSULATION | 10/04/2022 | APPROVED | DCUSHING |
| Note: 9/27/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 will check the following at Insulation 1. master bath duct has been pulled loose and needs to be reconnected 2. FIREBLOCKING REQUIRED R302.11 (1-6) 3. Electric service needs suport max 30 inches (neer service entry) 10.4.22 - all previous discrepancies were addressed | |||
| GAS ROUGH | 10/04/2022 | PARTIALLY APPROVED | MGIBSON |
| Note: 9/26/2022 - PREVIOUS INSPECTION NOTES not matching riser diagram (calls for galv pipe for buth down drops (range has CSST) (match plans or obtain approved revision and have on site) ANOTHER GAS ROUGH INSPECTION WILL BE NEED FOR A/G TANK OR U/G TANK WHEN LINE IS RAN FROM HOUSE TO TANK | |||
| INSULATION | 09/27/2022 | CANCELLED BY APPLICANT | LMILLER |
| Note: Inspector Notes from Inspection 2420 will check the following at Insulation 1. master bath duct has been pulled loose and needs to be reconnected 2. FIREBLOCKING REQUIRED R302.11 (1-6) 3. Electric service needs suport max 30 inches (neer service entry) | |||
| GAS ROUGH | 09/26/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: not matching riser diagram (calls for galv pipe for buth down drops (range has CSST) (match plans or obtain approved revision and have on site) | |||
| ALL ROUGH | 09/22/2022 | APPROVED - AS NOTED | LMILLER |
| Note: will check the following at Insulation 1. master bath duct has been pulled loose and needs to be reconnected 2. FIREBLOCKING REQUIRED R302.11 (1-6) 3. Electric service needs suport max 30 inches (neer service entry) | |||
| LATH/BRICK/ WATER BARRIER | 08/22/2022 | APPROVED | DCUSHING |
| WALL SHEATHING | 07/05/2022 | APPROVED | DCUSHING |
| GRAVITY SEWER TEST | 06/13/2022 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 06/13/2022 | APPROVED | MGIBSON |
| ELECTRIC-TUG | 03/28/2022 | APPROVED - AS NOTED | LMILLER |
| Note: FPL notified at 10:10a.m. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/09/2022 | APPROVED | RMARTIN |
| ROOF VALLEY & METAL | 02/09/2022 | APPROVED | RMARTIN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/08/2022 | CANCELLED BY APPLICANT | WEB |
| FOUND SURVEY APPROVED (OFFICE) | 02/07/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 01/24/2022 | APPROVED | LMILLER |
| MONOLITHIC SLAB | 12/13/2021 | APPROVED | LMILLER |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/10/2021 | APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION JOHN FROM SKYWAY CANCEALED INSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/09/2021 | CANCELLED BY APPLICANT | MGIBSON |
| Note: JOHN FROM SKYWAY CANCEALED INSPECTION | |||
| WATER METER INSTALLATION REQUEST | 10/27/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 07/11/2023 | 07/12/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/11/2023 | 07/12/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 09/27/2022 | 09/27/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/07/2022 | 02/07/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/07/2022 | 02/07/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/08/2021 | 10/08/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/16/2021 | 09/16/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 09/15/2021 | 09/15/2021 |
| Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RESUBMIT ROOFING WORKSHEET https://docs.palmcoastgov.com/db/633/roofing-worksheet-asphalt-metal-photovoltaic-mineral-rolled-and-slate.pdf | |||
| BADMIN | COMPLETE | 09/15/2021 | 09/15/2021 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | HOLD | 09/03/2021 | 09/07/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM REVIEW COMMENTS: 1. Provide an updated and completed City of Palm Coast Roofing Worksheet. 2. ASCE 7-10 is noted on the Title Sheet of the submitted plans. ASCE 7-10 is an older Code reference. A revision to reflect the current Code references is required. | |||
| CUSVC | COMPLETE | 09/03/2021 | 09/08/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 09/03/2021 | 09/03/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/03/2021 | 09/07/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/03/2021 | 09/08/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/03/2021 | 09/03/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/03/2021 | 09/14/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/03/2021 | 09/07/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Driveway must be at least 16ft wide |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 09/11/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 09/11/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/11/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 09/11/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 09/11/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/15/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/15/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤94.17) | 10/15/2021 |
| SEWER INSPECTION | ¤25.00 | 10/15/2021 |
| SITE PLAN 30 | ¤30.00 | 10/15/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 10/15/2021 |
| IMPACT FEE FIRE | ¤367.00 | 10/15/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 10/15/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/15/2021 |
| IMPACT FEE TRANSPORTATION | ¤3,139.00 | 10/15/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 10/15/2021 |
| SURCHARGE FS 533.721 | ¤20.06 | 10/15/2021 |
| SURCHARGE - FS 468.631 | ¤30.09 | 10/15/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/15/2021 |
| SW ENG INSPECTION 60 | ¤60.00 | 10/15/2021 |
| SW ENG PRE APRON | ¤30.00 | 10/15/2021 |
| CONNECTION FEES | ¤25.00 | 10/15/2021 |
| METER - DEPOSIT | ¤60.00 | 10/15/2021 |
| WATER-METER | ¤441.07 | 10/15/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/15/2021 |
| INSPECTION - RESIDENTIAL | ¤1,476.75 | 10/15/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤418.86 | 10/15/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤11,205.80 |