I want to search for...
Permit #2021090170
Permit Details
Status: COED
| Parcel Id: 07-11-31-7013-00220-0440 |
| CONDITIONED SPACE: 1804 sqft |
| GARAGE: 389 sqft |
| OPENED PORCH (WITH ROOF) : 270 sqft |
| OPENED PORCH (WITH ROOF) : 28 sqft |
| Total Square Footage: 2491 sqft |
| Block: 00220 |
| Subdivision: 2192 - SECTION 13-BELLE TERRE |
| Job Phone: 321-271-9033 |
| Location Address: 60 BROOKLYN LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/29/2021 |
| NOC: RECORDED |
| Applicant name: KEITH E TANNER |
| Owner: VINTAGE ESTATE HOMES, LLC |
|
Address 4885 N. WICKHAM RD MELBOURNE, FL 32940 |
| Lot: 0440 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MERCEDES PREMIER HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
4885 N WICKHAM RD MELBOURNE, FL 32940 |
STE 101 MELBOURNE, FL 32940 |
CGC1516602 (Exp: 08/31/2024) | 321-610-3924 |
Sub Contractors
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CAC1820196 (Exp: 08/31/2026) | 407-404-4000 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 11/08/2022 | FINAL APPROVED | EMADISON |
| Note: ** 11/08/22 CORRECTIONS MADE EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION 11/3/2022 - PREVIOUS INSPECTION NOTES ** 11/02/22 ** RUTS ACROSS STREET IN SWALE WAS REPAIRED AND SODDED SOMEONE HAS SINCE DRIVEN THROUGH AND CREATED NEW RUTS ** RIGHT SIDE ROW BETWEEN DRIVEWAY AND POWER POLE NEEDS TO BE REPAIRED RAISE WITH FILL AND SOD DUE TO WASHOUT AND WHAT APPEARS TO BE MACHINE TRACKS ** CM ON SITE AT TIME OF INSPECTION SHOWED HIM WHAT NEEDS TO BE CORRECTED ** 10/26/22 PF: NOTE TO INSPECTOR NEED TO MAKE SURE THAT THEY SOD ACROSSED THE STREET WHERE THE DUMPSTER AND PORTER JOHN WAS AND FIX ALL RUTS | |||
| U -UTILITY RESIDENTIAL FINAL | 11/03/2022 | FINAL APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 11/03/2022 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** 11/02/22 ** RUTS ACROSS STREET IN SWALE WAS REPAIRED AND SODDED SOMEONE HAS SINCE DRIVEN THROUGH AND CREATED NEW RUTS ** RIGHT SIDE ROW BETWEEN DRIVEWAY AND POWER POLE NEEDS TO BE REPAIRED RAISE WITH FILL AND SOD DUE TO WASHOUT AND WHAT APPEARS TO BE MACHINE TRACKS ** CM ON SITE AT TIME OF INSPECTION SHOWED HIM WHAT NEEDS TO BE CORRECTED ** 10/26/22 PF: NOTE TO INSPECTOR NEED TO MAKE SURE THAT THEY SOD ACROSSED THE STREET WHERE THE DUMPSTER AND PORTER JOHN WAS AND FIX ALL RUTS | |||
| BLD - BUILDING FINAL | 11/03/2022 | FINAL APPROVED | RMARTIN |
| U-CROSS CONNECTION | 11/02/2022 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 11/02/2022 | APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/02/2022 | APPROVED | EMADISON |
| Note: 10/24/2022 - PREVIOUS INSPECTION NOTES THE LEFT SIDE DRAINAGE CONVEYANCE NEED TO BE ON THE LEFT PROPERTY LINE DO TO YOU PROPOSING IT AS A COMMON SWALE | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/02/2022 | APPROVED | EMADISON |
| Note: ** 11/02/22 RIGHT SIDE ROW BETWEEN DRIVEWAY AND POWER POLE NEEDS TO BE REPAIRED RAISE WITH FILL AND SOD DUE TO WASHOUT AND WHAT APPEARS TO BE MACHINE TRACKS ** CM ON SITE AT TIME OF INSPECTION SHOWED HIM WHAT NEEDS TO BE CORRECTED | |||
| ROW- PROJECT STATUS | 10/26/2022 | APPROVED | PFLANAGAN |
| Note: I WAS GOING TO MEET WITH CM ON SITE BUT HE DIDNT SHOW THE APPOINTMENT WAS AT 2PM TO TALK ABOUT FAILED FINAL SURVEYS FOR 60 AND 56 | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/24/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) THE LEFT SIDE DRAINAGE CONVEYANCE NEED TO BE ON THE LEFT PROPERTY LINE DO TO YOU PROPOSING IT AS A COMMON SWALE 2) ALSO THE LEFT INVERT ON THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE SWALE DIAGRAM THAT WAS PROVIDED | |||
| ELECTRIC - EARLY POWER | 10/05/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 8:55 AM | |||
| ROW- PRE-APRON (PRE-POUR) | 09/26/2022 | APPROVED | EMADISON |
| Note: ** 09/26/22 BUILDER NEEDS TO PUMP WATER FROM CULVERT AND FOOTERS PRIOR TO POUR ** CULVERT ELEVATION WITH TOERANCE AT THE TIME OF THIS INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 09/22/2022 | CANCELLED BY APPLICANT | WEB |
| U - SEWER TIE IN | 09/06/2022 | APPROVED | MGIBSON |
| LATH/BRICK/ WATER BARRIER | 06/06/2022 | APPROVED | FWILLIS |
| INSULATION | 06/03/2022 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 05/27/2022 | CANCELLED BY APPLICANT | FWILLIS |
| ALL ROUGH | 05/20/2022 | APPROVED | MKRASKI |
| ALL ROUGH | 05/18/2022 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Master bathroom plumbing needs nail plates 2. Outlet spacing in master bedroom is over 12' NEC 210.52 3. Outlet spacing on the sides of the slider are over 12' NEC 210.52 | |||
| WALL SHEATHING | 04/14/2022 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION NAILS MISSING ON SEAM RIGHT ABOVE ENTRYWAY. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/14/2022 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION DRAWINGS IN CONSTRUCTION BOX DO NOT MATCH THIS HOUSE. WRONG PLANS. 4/14/22 - CORRECTED | |||
| ROOF VALLEY & METAL | 04/06/2022 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/06/2022 | Disapproved - NO FEE | FWILLIS |
| Note: DRAWINGS IN CONSTRUCTION BOX DO NOT MATCH THIS HOUSE. WRONG PLANS. | |||
| WALL SHEATHING | 04/06/2022 | Disapproved - NO FEE | FWILLIS |
| Note: NAILS MISSING ON SEAM RIGHT ABOVE ENTRYWAY. | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/03/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 02/22/2022 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 02/11/2022 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/02/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 02/02/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 12/14/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 09/15/2022 | 09/16/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 08/16/2022 | 08/17/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Indoor design temp on heatload must be a minimum of 75 degrees per R302.1 FBC Energy Conservation 2020 7Th edition | |||
| MECH | HOLD | 07/21/2022 | 07/22/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Design location on heatload needs to match the Energy Calc. (St. Augustine) | |||
| ENGIN1 | COMPLETE | 03/03/2022 | 03/03/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/03/2022 | 03/03/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/22/2021 | 09/22/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 09/07/2021 | 11/16/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/03/2021 | 09/07/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 09/03/2021 | 09/03/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 09/03/2021 | 09/03/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need outlet in bedroom 2 on exterior wall. NEC 2017 210.52 | |||
| ENGIN1 | COMPLETE | 09/03/2021 | 09/07/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/03/2021 | 09/08/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/03/2021 | 09/03/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/03/2021 | 09/14/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/03/2021 | 09/08/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 11/03/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 11/03/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 11/03/2022 |
| CONNECTION FEES | ¤1,017.83 | 11/29/2021 |
| METER - DEPOSIT | ¤60.00 | 11/29/2021 |
| WATER- TURN ON | ¤25.00 | 11/29/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/29/2021 |
| INSPECTION - RESIDENTIAL | ¤687.50 | 11/29/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤195.00 | 11/29/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 11/29/2021 |
| IMPACT FEE FIRE | ¤367.00 | 11/29/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 11/29/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/29/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 11/29/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/29/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 11/29/2021 |
| SURCHARGE FS 533.721 | ¤9.67 | 11/29/2021 |
| SURCHARGE - FS 468.631 | ¤14.50 | 11/29/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/29/2021 |
| SW ENG INSPECTION 60 | ¤60.00 | 11/29/2021 |
| SW ENG PRE APRON | ¤30.00 | 11/29/2021 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/29/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/29/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 11/29/2021 |
| SEWER CREDIT | (¤1,147.00) | 11/29/2021 |
| SEWER INSPECTION | ¤25.00 | 11/29/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 11/29/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 11/29/2021 |
| SITE PLAN 30 | ¤30.00 | 11/29/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,289.60 |