I want to search for...

Permit #2021090170

Permit Details

Status: COED

Parcel Id: 07-11-31-7013-00220-0440
CONDITIONED SPACE: 1804 sqft
GARAGE: 389 sqft
OPENED PORCH (WITH ROOF) : 270 sqft
OPENED PORCH (WITH ROOF) : 28 sqft
Total Square Footage: 2491 sqft
Block: 00220
Subdivision: 2192 - SECTION 13-BELLE TERRE
Job Phone: 321-271-9033
Location Address: 60 BROOKLYN LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/29/2021
NOC: RECORDED
Applicant name: KEITH E TANNER
Owner: VINTAGE ESTATE HOMES, LLC

Address

4885 N. WICKHAM RD

MELBOURNE, FL 32940

Lot: 0440
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

MERCEDES PREMIER HOMES, LLC
Status Location Address Mailing Address State License Number Phone
INACTIVE

4885 N WICKHAM RD

MELBOURNE, FL 32940

STE 101

MELBOURNE, FL 32940

CGC1516602 (Exp: 08/31/2024) 321-610-3924

Sub Contractors

SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
JASON LEE JAMES
Status Location Address State License Number Phone
ACTIVE

217 N WESTMONTE DR SUITE 1007

ALTAMONTE SPRINGS, FL 32714

CAC1820196 (Exp: 08/31/2026) 407-404-4000

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 11/08/2022 FINAL APPROVED EMADISON
Note: ** 11/08/22 CORRECTIONS MADE EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION 11/3/2022 - PREVIOUS INSPECTION NOTES ** 11/02/22 ** RUTS ACROSS STREET IN SWALE WAS REPAIRED AND SODDED SOMEONE HAS SINCE DRIVEN THROUGH AND CREATED NEW RUTS ** RIGHT SIDE ROW BETWEEN DRIVEWAY AND POWER POLE NEEDS TO BE REPAIRED RAISE WITH FILL AND SOD DUE TO WASHOUT AND WHAT APPEARS TO BE MACHINE TRACKS ** CM ON SITE AT TIME OF INSPECTION SHOWED HIM WHAT NEEDS TO BE CORRECTED ** 10/26/22 PF: NOTE TO INSPECTOR NEED TO MAKE SURE THAT THEY SOD ACROSSED THE STREET WHERE THE DUMPSTER AND PORTER JOHN WAS AND FIX ALL RUTS
U -UTILITY RESIDENTIAL FINAL 11/03/2022 FINAL APPROVED DHANEY
ROW - STORMWATER FINAL 11/03/2022 CANCELLED BY APPLICANT EMADISON
Note: ** 11/02/22 ** RUTS ACROSS STREET IN SWALE WAS REPAIRED AND SODDED SOMEONE HAS SINCE DRIVEN THROUGH AND CREATED NEW RUTS ** RIGHT SIDE ROW BETWEEN DRIVEWAY AND POWER POLE NEEDS TO BE REPAIRED RAISE WITH FILL AND SOD DUE TO WASHOUT AND WHAT APPEARS TO BE MACHINE TRACKS ** CM ON SITE AT TIME OF INSPECTION SHOWED HIM WHAT NEEDS TO BE CORRECTED ** 10/26/22 PF: NOTE TO INSPECTOR NEED TO MAKE SURE THAT THEY SOD ACROSSED THE STREET WHERE THE DUMPSTER AND PORTER JOHN WAS AND FIX ALL RUTS
BLD - BUILDING FINAL 11/03/2022 FINAL APPROVED RMARTIN
U-CROSS CONNECTION 11/02/2022 APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 11/02/2022 APPROVED EMADISON
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/02/2022 APPROVED EMADISON
Note: 10/24/2022 - PREVIOUS INSPECTION NOTES THE LEFT SIDE DRAINAGE CONVEYANCE NEED TO BE ON THE LEFT PROPERTY LINE DO TO YOU PROPOSING IT AS A COMMON SWALE
ROW FIELD SURVEY /GRADING CERTIFICATION 11/02/2022 APPROVED EMADISON
Note: ** 11/02/22 RIGHT SIDE ROW BETWEEN DRIVEWAY AND POWER POLE NEEDS TO BE REPAIRED RAISE WITH FILL AND SOD DUE TO WASHOUT AND WHAT APPEARS TO BE MACHINE TRACKS ** CM ON SITE AT TIME OF INSPECTION SHOWED HIM WHAT NEEDS TO BE CORRECTED
ROW- PROJECT STATUS 10/26/2022 APPROVED PFLANAGAN
Note: I WAS GOING TO MEET WITH CM ON SITE BUT HE DIDNT SHOW THE APPOINTMENT WAS AT 2PM TO TALK ABOUT FAILED FINAL SURVEYS FOR 60 AND 56
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/24/2022 Disapproved - NO FEE PFLANAGAN
Note: 1) THE LEFT SIDE DRAINAGE CONVEYANCE NEED TO BE ON THE LEFT PROPERTY LINE DO TO YOU PROPOSING IT AS A COMMON SWALE 2) ALSO THE LEFT INVERT ON THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE SWALE DIAGRAM THAT WAS PROVIDED
ELECTRIC - EARLY POWER 10/05/2022 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 8:55 AM
ROW- PRE-APRON (PRE-POUR) 09/26/2022 APPROVED EMADISON
Note: ** 09/26/22 BUILDER NEEDS TO PUMP WATER FROM CULVERT AND FOOTERS PRIOR TO POUR ** CULVERT ELEVATION WITH TOERANCE AT THE TIME OF THIS INSPECTION
ROW- PRE-APRON (PRE-POUR) 09/22/2022 CANCELLED BY APPLICANT WEB
U - SEWER TIE IN 09/06/2022 APPROVED MGIBSON
LATH/BRICK/ WATER BARRIER 06/06/2022 APPROVED FWILLIS
INSULATION 06/03/2022 APPROVED FWILLIS
Note: THIS IS A REINSPECTION
INSULATION 05/27/2022 CANCELLED BY APPLICANT FWILLIS
ALL ROUGH 05/20/2022 APPROVED MKRASKI
ALL ROUGH 05/18/2022 Disapproved - NO FEE MKRASKI
Note: 1. Master bathroom plumbing needs nail plates 2. Outlet spacing in master bedroom is over 12' NEC 210.52 3. Outlet spacing on the sides of the slider are over 12' NEC 210.52
WALL SHEATHING 04/14/2022 APPROVED FWILLIS
Note: THIS IS A REINSPECTION NAILS MISSING ON SEAM RIGHT ABOVE ENTRYWAY.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/14/2022 APPROVED FWILLIS
Note: THIS IS A REINSPECTION DRAWINGS IN CONSTRUCTION BOX DO NOT MATCH THIS HOUSE. WRONG PLANS. 4/14/22 - CORRECTED
ROOF VALLEY & METAL 04/06/2022 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/06/2022 Disapproved - NO FEE FWILLIS
Note: DRAWINGS IN CONSTRUCTION BOX DO NOT MATCH THIS HOUSE. WRONG PLANS.
WALL SHEATHING 04/06/2022 Disapproved - NO FEE FWILLIS
Note: NAILS MISSING ON SEAM RIGHT ABOVE ENTRYWAY.
FOUND SURVEY APPROVED (OFFICE) 03/03/2022 APPROVED TBAKER
TIE BEAM / LINTEL 02/22/2022 APPROVED FWILLIS
MONOLITHIC SLAB 02/11/2022 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 02/02/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 02/02/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 12/14/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 09/15/2022 09/16/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 08/16/2022 08/17/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Indoor design temp on heatload must be a minimum of 75 degrees per R302.1 FBC Energy Conservation 2020 7Th edition
MECH HOLD 07/21/2022 07/22/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Design location on heatload needs to match the Energy Calc. (St. Augustine)
ENGIN1 COMPLETE 03/03/2022 03/03/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/03/2022 03/03/2022
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
ELEC COMPLETE 09/22/2021 09/22/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 09/07/2021 11/16/2021
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
BLD COMPLETE 09/03/2021 09/07/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 09/03/2021 09/03/2021
Note: Released By: HALEIGH HAND - -
ELEC HOLD 09/03/2021 09/03/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need outlet in bedroom 2 on exterior wall. NEC 2017 210.52
ENGIN1 COMPLETE 09/03/2021 09/07/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 09/03/2021 09/08/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 09/03/2021 09/03/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 09/03/2021 09/14/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON COMPLETE 09/03/2021 09/08/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 11/03/2022
CONTRACTOR CHANGE ¤40.00 11/03/2022
PLAN REVIEW - REVISION ¤32.50 11/03/2022
CONNECTION FEES ¤1,017.83 11/29/2021
METER - DEPOSIT ¤60.00 11/29/2021
WATER- TURN ON ¤25.00 11/29/2021
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/29/2021
INSPECTION - RESIDENTIAL ¤687.50 11/29/2021
PLAN REVIEW - RESIDENTIAL ¤195.00 11/29/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 11/29/2021
IMPACT FEE FIRE ¤367.00 11/29/2021
IMPACT FEE PARKS ¤1,199.12 11/29/2021
IMPACT FEE SCHOOL ¤3,600.00 11/29/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 11/29/2021
WATER -IRRIGATION INSPECTION ¤25.00 11/29/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 11/29/2021
SURCHARGE FS 533.721 ¤9.67 11/29/2021
SURCHARGE - FS 468.631 ¤14.50 11/29/2021
SW ENG - FOUNDATION SURVEY ¤20.00 11/29/2021
SW ENG INSPECTION 60 ¤60.00 11/29/2021
SW ENG PRE APRON ¤30.00 11/29/2021
SW ENG - REVIEW 20 ¤20.00 11/29/2021
SW ENG RES REVIEW 200 ¤200.00 11/29/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 11/29/2021
SEWER CREDIT (¤1,147.00) 11/29/2021
SEWER INSPECTION ¤25.00 11/29/2021
SEWER CAPITAL FACILITY ¤4,664.55 11/29/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 11/29/2021
SITE PLAN 30 ¤30.00 11/29/2021
Fees Total Due: ¤0.00 Total Paid: ¤16,289.60