Permit #2021090231
Permit Details
Status: COED
| Parcel Id: 07-11-31-7015-00030-1470 |
| CONDITIONED SPACE: 2150 sqft |
| GARAGE: 699 sqft |
| OPENED PORCH (WITH ROOF) : 254 sqft |
| OPENED PORCH (WITH ROOF) : 64 sqft |
| Total Square Footage: 3167 sqft |
| Block: 00030 |
| Subdivision: 2194 - SECTION 15-COUNTRY CLUB COVE |
| Job Phone: (386) 672-8285 |
| Location Address: 74 COMANCHE CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/21/2021 |
| NOC: RECORDED |
| Applicant name: JOSEPH TODD VANACORE |
| Owner: RAGNO HEIDI A & JOHN S W&H |
|
Address 60 LESLIE LANE MASSAPEQUA, NY 11758 |
| Lot: 1470 |
| Contracted Stated Job Value: ¤239,999.00 |
| Job Description: BUILDING A SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
VANACORE CONSTRUCTION INC.
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1451 N US HIGHWAY 1 Ormond Beach, FL 32174 |
SUITE 13 Ormond Beach, FL 32174 |
CBC058991 (Exp: 08/31/2024) | (386) 672-8285 |
Sub Contractors
VERNON JACK SMITH III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
224 KIRKLAND ROAD NEW SMYRNA BEACH, FL 32169 |
EC13004432 (Exp: 08/31/2026) | 386-409-3616 | 386-409-3616 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
ALFRED N FYOCK JR
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
387 SAULS ORMOND BEACH, FL 32174 |
ST ORMOND BEACH, FL 32174 |
CCC1329075 (Exp: 08/31/2026) | 386-566-6112 | 386-673-4299 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 01/11/2023 | FINAL APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 01/10/2023 | FINAL APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/10/2023 | APPROVED | EMADISON |
| Note: 1/9/2023 - PREVIOUS INSPECTION NOTES ** 01/09/23 INSPECTOR IS UNABLE TO LOCATE A SUBMITTED FINAL SURVEY AS NEEDED TO CONDUCT THIS INSPECTION BUILDER NEEDS TO SUBMIT A FINAL SURVEY FOR REVIEW. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/10/2023 | APPROVED | EMADISON |
| ROW - STORMWATER FINAL | 01/10/2023 | FINAL APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/09/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 01/09/23 INSPECTOR IS UNABLE TO LOCATE A SUBMITTED FINAL SURVEY AS NEEDED TO CONDUCT THIS INSPECTION BUILDER NEEDS TO SUBMIT A FINAL SURVEY FOR REVIEW. | |||
| PLUMBING FINAL | 12/27/2022 | Approval - Private Provider | PPROVIDER |
| HVAC FINAL | 12/27/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 12/27/2022 | Approval - Private Provider | PPROVIDER |
| BLD - BUILDING FINAL | 12/27/2022 | Approval - Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 12/22/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/21/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 12/21/22 SEE NOTES FROM PRE-POUR INSPECTION THAT WAS RESULTED ON 09/30/22 THE INSPECTION WAS DISAPPROVED AS BUILDER DID NOT POUR AT THAT TIME PRIOR TO HURRICANE IAN. ARRIVED FOR TODAYS PRE-POUR AND THE DRIVEWAY IS COMPLETELY SET WITH PAVERS ** NO INSPECTION CONDUCTED TO CHECK PAVER BASE COMPACTION PRIOR TO PAVERS BEING SET. ** CM ON SITE SPOKE WITH HIM RE4SOLVED ISSUES CHECKED ELEVATION OF CULVERT IS WITHIN TOERANCE ** GENERATING A NEW INSPECTION TO APPROVE PRE-POUR 9/27/2022 - PREVIOUS INSPECTION NOTES ** 09/27/22 EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION READY TO POUR APRON AND PAVER RESTRAINTS . CM STATED THEY ARE POURING TODAY PRIOR TO HURRICANE IAN ** SCHEDULE NEXT PRE-POUR INSPECTION AFTER PAVER BASE IS SPREAD AND COMPACTED DO NOT SET PAVERS BEFORE THE NEXT PRE-POUR INSPECT. 9/23/2022 - PREVIOUS INSPECTION NOTES ** 09/23/22 YOUR SITE PLAN CALLS FOR A CONCRETE DRIVEWAY TO BE INSTALLED NOT A PAVER DRIVEWAY BUILDER NEEDS TO RESUBMIT A REVISED SITE PLAN WHICH ALSO INDICATES WHICH RESIDENTIAL PAVER DRIVEWAY DETAIL PLAN YOU WILL BE FOLLOWING. ** BUILODER ALSO NEEDS TO CHIP ALL OVERPOURED CONCRETE AT THE GARAGE OPENING 9/22/2022 - PREVIOUS INSPECTION NOTES Not railed and ready for inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/21/2022 | APPROVED | EMADISON |
| Note: ** 12/21/22 SEE NOTES FROM PRE-POUR INSPECTION THAT WAS RESULTED ON 09/30/22 THE INSPECTION WAS DISAPPROVED AS BUILDER DID NOT POUR AT THAT TIME PRIOR TO HURRICANE IAN. ARRIVED FOR TODAYS PRE-POUR AND THE DRIVEWAY IS COMPLETELY SET WITH PAVERS ** NO INSPECTION CONDUCTED TO CHECK PAVER BASE COMPACTION PRIOR TO PAVERS BEING SET. ** CM ON SITE SPOKE WITH HIM RE4SOLVED ISSUES CHECKED ELEVATION OF CULVERT IS WITHIN TOERANCE ** GENERATING A NEW INSPECTION TO APPROVE PRE-POUR 9/30/2022 7:53:39 AM- PREVIOUS INSPECTION NOTES ** 09/30/22 BUILDER DID NOT POUR ON DAY OF APPROVAL AS HE INDICATED PRIOR TO HURRICANE IAN SITE NEEDS TO BE RE-PREPED FOR A NEW INSPECTION ** 09/27/22 EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION READY TO POUR APRON AND PAVER RESTRAINTS . CM STATED THEY ARE POURING TODAY PRIOR TO HURRICANE IAN ** SCHEDULE NEXT PRE-POUR INSPECTION AFTER PAVER BASE IS SPREAD AND COMPACTED DO NOT SET PAVERS BEFORE THE NEXT PRE-POUR INSPECT. 9/23/2022 - PREVIOUS INSPECTION NOTES ** 09/23/22 YOUR SITE PLAN CALLS FOR A CONCRETE DRIVEWAY TO BE INSTALLED NOT A PAVER DRIVEWAY BUILDER NEEDS TO RESUBMIT A REVISED SITE PLAN WHICH ALSO INDICATES WHICH RESIDENTIAL PAVER DRIVEWAY DETAIL PLAN YOU WILL BE FOLLOWING. ** BUILODER ALSO NEEDS TO CHIP ALL OVERPOURED CONCRETE AT THE GARAGE OPENING 9/22/2022 - PREVIOUS INSPECTION NOTES Not railed and ready for inspection. | |||
| ROW- PAVER RESTRAINTS | 12/21/2022 | APPROVED | EMADISON |
| Note: ** 12/21/22 RESTRAINTS WERE APPROVED TO POUR PRIOR TO HURRICANE IAN. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/27/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/30/22 BUILDER DID NOT POUR ON DAY OF APPROVAL AS HE INDICATED PRIOR TO HURRICANE IAN SITE NEEDS TO BE RE-PREPED FOR A NEW INSPECTION ** 09/27/22 EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION READY TO POUR APRON AND PAVER RESTRAINTS . CM STATED THEY ARE POURING TODAY PRIOR TO HURRICANE IAN ** SCHEDULE NEXT PRE-POUR INSPECTION AFTER PAVER BASE IS SPREAD AND COMPACTED DO NOT SET PAVERS BEFORE THE NEXT PRE-POUR INSPECT. 9/23/2022 - PREVIOUS INSPECTION NOTES ** 09/23/22 YOUR SITE PLAN CALLS FOR A CONCRETE DRIVEWAY TO BE INSTALLED NOT A PAVER DRIVEWAY BUILDER NEEDS TO RESUBMIT A REVISED SITE PLAN WHICH ALSO INDICATES WHICH RESIDENTIAL PAVER DRIVEWAY DETAIL PLAN YOU WILL BE FOLLOWING. ** BUILODER ALSO NEEDS TO CHIP ALL OVERPOURED CONCRETE AT THE GARAGE OPENING 9/22/2022 - PREVIOUS INSPECTION NOTES Not railed and ready for inspection. | |||
| ROW- PAVER RESTRAINTS | 09/27/2022 | Disapproved - NO FEE | EMADISON |
| Note: ** 09/27/22 EVERYTHING LOOKS GOOD AT THE TIME OF THIS INSPECTION READY TO POUR PAVER RESTRAINTS, CM INDICTATED THEY WILL MPOUR TODAY PRIOR TO HURRICANE IAN IMPACTING AREA. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/23/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/23/22 YOUR SITE PLAN CALLS FOR A CONCRETE DRIVEWAY TO BE INSTALLED NOT A PAVER DRIVEWAY BUILDER NEEDS TO RESUBMIT A REVISED SITE PLAN WHICH ALSO INDICATES WHICH RESIDENTIAL PAVER DRIVEWAY DETAIL PLAN YOU WILL BE FOLLOWING. ** BUILODER ALSO NEEDS TO CHIP ALL OVERPOURED CONCRETE AT THE GARAGE OPENING 9/22/2022 - PREVIOUS INSPECTION NOTES Not railed and ready for inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/22/2022 | Disapproved -FEE REQUIRED | RGROSS |
| Note: Not railed and ready for inspection. | |||
| WATER METER INSTALLATION REQUEST | 09/19/2022 | APPROVED | CSTONE |
| U - SEWER TIE IN | 09/19/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 09/19/2022 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 08/10/2022 | CANCELLED BY APPLICANT | WEB |
| ELECTRIC - EARLY POWER | 08/10/2022 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 05/18/2022 | Approval - Private Provider | PPROVIDER |
| INSULATION | 05/12/2022 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 05/09/2022 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 03/11/2022 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 02/24/2022 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/24/2022 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 01/27/2022 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 12/28/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 12/13/2021 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/08/2021 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 11/04/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| PLFM | HOLD | 12/29/2022 | 12/29/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Please explain why a final survey showing the structure not in the SFHA was submitted and a Foundation Elevation Certificate showing it inside the SFHA. Is the elevation certificate incorrect or the survey? | |||
| PLFM | COMPLETE | 12/29/2022 | 01/03/2023 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Elevation certificates have been rejected as they are incorrectly stating the structure is in the AE flood zone when it is not. Floodplain review is not needed. | |||
| BADMIN | INFORMATION | 12/28/2022 | 12/28/2022 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Unable to process final surveys because there is an outstanding inspection needed. | |||
| BADMIN | INFORMATION | 12/09/2022 | 12/09/2022 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Missing site plan | |||
| ENGIN1 | COMPLETE | 09/26/2022 | 09/26/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/26/2022 | 10/05/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/26/2022 | 09/26/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Driveway was changed to Pavers. Please follow the process below. Pavers Please submit a Right of Way Utilization Agreement for the paver driveway. The Agreement must be completed, signed by all owners on property deed and notarized and original will need to be submitted to us once electronic copy has been approved | |||
| ENGIN1 | COMPLETE | 12/28/2021 | 12/28/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/28/2021 | 12/28/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 09/20/2021 | 09/20/2021 |
| Note: Released By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM According to the Site Plan submitted on 9/3/21, the structure will not fall within the Special Flood Hazard Area. No elevation certificates will be required. | |||
| ZON | COMPLETE | 09/20/2021 | 09/20/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/08/2021 | 09/08/2021 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM PRIVATE PROVIDER | |||
| BLD | HOLD | 09/07/2021 | 09/07/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM REVIEW COMMENTS: 1. Plan review was completed using Volusia County checklist and Volusia County Standards. A revision to reflect City of Palm Coast in which is located in Flagger Co is required. | |||
| CUSVC | COMPLETE | 09/07/2021 | 09/08/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ENGIN1 | COMPLETE | 09/07/2021 | 09/07/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/07/2021 | 09/08/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/07/2021 | 09/14/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/07/2021 | 09/08/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM site plan: Please provide with of sidewalk Eleveations Banding missing around windows and doors on the side of the right of way | |||
| SWALE | COMPLETE | 09/07/2021 | 11/17/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 01/11/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 01/11/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 01/11/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 01/11/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 01/11/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/21/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/21/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 09/21/2021 |
| SEWER CREDIT | (¤1,147.00) | 09/21/2021 |
| SEWER INSPECTION | ¤25.00 | 09/21/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 09/21/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 09/21/2021 |
| SITE PLAN 30 | ¤30.00 | 09/21/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 09/21/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/21/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 09/21/2021 |
| SURCHARGE FS 533.721 | ¤10.75 | 09/21/2021 |
| SURCHARGE - FS 468.631 | ¤16.13 | 09/21/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/21/2021 |
| SW ENG INSPECTION 60 | ¤60.00 | 09/21/2021 |
| SW ENG PRE APRON | ¤30.00 | 09/21/2021 |
| METER - DEPOSIT | ¤60.00 | 09/21/2021 |
| WATER- TURN ON | ¤25.00 | 09/21/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/21/2021 |
| INSPECTION - RESIDENTIAL | ¤770.00 | 09/21/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤218.40 | 09/21/2021 |
| CONNECTION FEES | ¤1,017.83 | 09/21/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 09/21/2021 |
| IMPACT FEE FIRE | ¤367.00 | 09/21/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 09/21/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/21/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,449.71 |