Permit #2021090285
Permit Details
Status: COED
| Parcel Id: 07-11-31-7009-00210-0210 |
| CONDITIONED SPACE: 2291 sqft |
| GARAGE: 592 sqft |
| OPENED PORCH (WITH ROOF) : 197 sqft |
| OPENED PORCH (WITH ROOF) : 87 sqft |
| Total Square Footage: 3167 sqft |
| Block: 00210 |
| Subdivision: 2208 - SECTION 9-FLORIDA PARK |
| Job Phone: 321-271-9033 |
| Location Address: 58 FALLEN OAK LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/09/2021 |
| NOC: RECORDED |
| Applicant name: KEITH E TANNER |
| Owner: VINTAGE ESTATE HOMES LLC A FLORIDA LIMITED |
|
Address 4885 N WIKCHAM RD MELBOURNE, FL 32940 |
| Lot: 0210 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MERCEDES PREMIER HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
4885 N WICKHAM RD MELBOURNE, FL 32940 |
STE 101 MELBOURNE, FL 32940 |
CGC1516602 (Exp: 08/31/2024) | 321-610-3924 |
Sub Contractors
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CAC1820196 (Exp: 08/31/2026) | 407-404-4000 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/08/2022 | FINAL APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION 09-07-2022 1. No hot water. 2. Master bedroom has two outlets not working. Under the window and the USB outlet. | |||
| BLD - BUILDING FINAL | 09/07/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 09-07-2022 1. No hot water. 2. Master bedroom has two outlets not working. Under the window and the USB outlet. | |||
| ROW - STORMWATER FINAL | 09/02/2022 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION 9/2/22 - Builder to add another row of sod on the edge of the swale (road side) before the building final. Will also remove the sediment from the street at the end of the driveway. Inspector will check later. Inspector will add another Stormwater if work is not completed. Approving as-noted as a courtesy to get the Bldg Final Scheduled. 8/31/22 - NOTE TO INSPECTOR: Photo's were taken of the attempted swale repair at house 60 on 8/31/22 and attached to this inspection. If the swale still looks like this at the time of inspection then they did not bring in enough fill to match the preexisting grade. 8/30/22 - *Swale regraded at 60 needs finished. Fill and sod needed to match the original grade. *Due to the history of washout and flooding that house # 60 experienced during the construction and the sharp slope from the large rear lawn, the burm on the left side from the rear of the house to the rear property line needs to be much higher and defined so as not to flood the neighbor. *All bare earth areas just outside the left property line needs to be sodded at the Inspectors discression that seed and straw will not hold during rainy season. New inspection due to canceled inspection Inspector Notes from Inspection 9465 Note to Builder: BEFORE the Final Row inspection house number 60 needs the ENTIRE front swale regraded and re-soded. Wahout sand and silt from this new constructions has ruined her swale grade. The Culvert at house 60 also needs cleaned of silt. | |||
| ROW - STORMWATER FINAL | 08/30/2022 | Disapproved -FEE REQUIRED | RGROSS |
| Note: 8/30/22 - *Swale regraded at 60 needs finished. Fill and sod needed to match the original grade. *Due to the history of washout and flooding that house # 60 experienced during the construction and the sharp slope from the large rear lawn, the burm on the left side from the rear of the house to the rear property line needs to be much higher and defined so as not to flood the neighbor. *All bare earth areas just outside the left property line needs to be sodded at the Inspectors discression that seed and straw will not hold during rainy season. New inspection due to canceled inspection Inspector Notes from Inspection 9465 Note to Builder: BEFORE the Final Row inspection house number 60 needs the ENTIRE front swale regraded and re-soded. Wahout sand and silt from this new constructions has ruined her swale grade. The Culvert at house 60 also needs cleaned of silt. | |||
| ROW - FINAL APRON (AFTER POUR) | 08/30/2022 | APPROVED | RGROSS |
| Note: New inspection due to canceled inspection Inspector Notes from Inspection 9465 Note to Builder: BEFORE the Final Row inspection house number 60 needs the ENTIRE front swale regraded and re-soded. Wahout sand and silt from this new constructions has ruined her swale grade. The Culvert at house 60 also needs cleaned of silt. | |||
| ROW - FINAL APRON (AFTER POUR) | 08/26/2022 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 9465 Note to Builder: BEFORE the Final Row inspection house number 60 needs the ENTIRE front swale regraded and re-soded. Wahout sand and silt from this new constructions has ruined her swale grade. The Culvert at house 60 also needs cleaned of silt. | |||
| U-CROSS CONNECTION | 08/26/2022 | APPROVED | DHANEY |
| U -UTILITY RESIDENTIAL FINAL | 08/26/2022 | FINAL APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 08/26/2022 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 9465 Note to Builder: BEFORE the Final Row inspection house number 60 needs the ENTIRE front swale regraded and re-soded. Wahout sand and silt from this new constructions has ruined her swale grade. The Culvert at house 60 also needs cleaned of silt. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/24/2022 | APPROVED | EMADISON |
| Note: Inspector Notes from Inspection 9270 THIS IS A REINSPECTION THIS IS A REINSPECTION **08/04/22 SITE NOT READY TOO WET AND PIPE BURIED BY WASHED OUT MATERIAL ** SEE ATTACHED PHOTOS ** 08/03/22 SITE NOT READY FOR INSPECTION 8/4/22 - 11:24am. This was rescheduled and approved the same day by Robert as a courtesy because of the infamous road on which the builder was trying to pour. Notoreous for difficulty with ground water. Photo attached showing the length of effort put forth by the builder to bring the pre-pour up to code. Phot attached. READY TO POUR | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/24/2022 | APPROVED - AS NOTED | RGROSS |
| Note: Note to Builder: BEFORE the Final Row inspection house number 60 needs the ENTIRE front swale regraded and re-soded. Wahout sand and silt from this new constructions has ruined her swale grade. The Culvert at house 60 also needs cleaned of silt. | |||
| ELECTRIC - EARLY POWER | 08/23/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION House needs to be unlocked 08-23-2022. FPL notified at 10:52 | |||
| ELECTRIC - EARLY POWER | 08/19/2022 | Disapproved -FEE REQUIRED | JMUNSON |
| Note: House needs to be unlocked | |||
| ROW- PRE-APRON (PRE-POUR) | 08/04/2022 | CANCELLED BY APPLICANT | EMADISON |
| Note: THIS IS A REINSPECTION **08/04/22 SITE NOT READY TOO WET AND PIPE BURIED BY WASHED OUT MATERIAL ** SEE ATTACHED PHOTOS ** 08/03/22 SITE NOT READY FOR INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 08/04/2022 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION **08/04/22 SITE NOT READY TOO WET AND PIPE BURIED BY WASHED OUT MATERIAL ** SEE ATTACHED PHOTOS ** 08/03/22 SITE NOT READY FOR INSPECTION 8/4/22 - 11:24am. This was rescheduled and approved the same day by Robert as a courtesy because of the infamous road on which the builder was trying to pour. Notoreous for difficulty with ground water. Photo attached showing the length of effort put forth by the builder to bring the pre-pour up to code. Phot attached. READY TO POUR | |||
| ROW- PRE-APRON (PRE-POUR) | 08/03/2022 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** 08/03/22 SITE NOT READY FOR INSPECTION | |||
| U - SEWER TIE IN | 07/21/2022 | APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION Cannot see connection at the street. Area has been backfilled. | |||
| U - SEWER TIE IN | 07/13/2022 | CANCELLED BY APPLICANT | WEB |
| U - SEWER TIE IN | 07/13/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Cannot see connection at the street. Area has been backfilled. | |||
| INSULATION | 05/31/2022 | APPROVED | LMILLER |
| ALL ROUGH | 05/20/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION missing too much a/c duct | |||
| LATH/BRICK/ WATER BARRIER | 05/20/2022 | APPROVED | AGAETANO |
| ALL ROUGH | 04/22/2022 | Disapproved - NO FEE | RMARTIN |
| Note: missing too much a/c duct | |||
| ROW - DRAINAGE | 03/21/2022 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION the silt fences have failed and flooded both neighbors and let alot of dirt go onto adjacent properties this needs to be fixed today next inspection 3/14 nothing done dirt in the road is causing dangerous road hazards needs to be removed or the city will do it next inspection 3/15/22 | |||
| ROW - DRAINAGE | 03/18/2022 | Disapproved -FEE REQUIRED | KRUTH |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION the silt fences have failed and flooded both neighbors and let alot of dirt go onto adjacent properties this needs to be fixed today next inspection 3/14 nothing done dirt in the road is causing dangerous road hazards needs to be removed or the city will do it next inspection 3/15/22 | |||
| ROW - DRAINAGE | 03/15/2022 | Disapproved -FEE REQUIRED | KRUTH |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION the silt fences have failed and flooded both neighbors and let alot of dirt go onto adjacent properties this needs to be fixed today next inspection 3/14 nothing done dirt in the road is causing dangerous road hazards needs to be removed or the city will do it next inspection 3/15/22 | |||
| ROW - DRAINAGE | 03/14/2022 | Disapproved -FEE REQUIRED | KRUTH |
| Note: THIS IS A REINSPECTION the silt fences have failed and flooded both neighbors and let alot of dirt go onto adjacent properties this needs to be fixed today next inspection 3/14 nothing done dirt in the road is causing dangerous road hazards needs to be removed or the city will do it next inspection 3/15/22 | |||
| ROW - DRAINAGE | 03/11/2022 | Disapproved -FEE REQUIRED | KRUTH |
| Note: the silt fences have failed and flooded both neighbors and let alot of dirt go onto adjacent properties this needs to be fixed today next inspection 3/14 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/10/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: 1. Truss A3 calls for 2 Heta 20. Check at insulation. 2. Please have a dry set of approved drawings on site for future inspections. | |||
| ROOF VALLEY & METAL | 03/10/2022 | APPROVED | AGAETANO |
| WALL SHEATHING | 03/09/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION Wall sheathing not nailed properly on the left side of the entry. | |||
| WALL SHEATHING | 03/08/2022 | CANCELLED BY APPLICANT | WEB |
| WALL SHEATHING | 03/08/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Wall sheathing not nailed properly on the left side of the entry. | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/08/2022 | APPROVED | AMOBLEY |
| ROW - DRAINAGE | 03/01/2022 | APPROVED | KRUTH |
| Note: THIS IS A REINSPECTION Inspect for swale obstructions Establish a consistant flow line swale is blocked and needs a drainage pipe pipe is clear and free of obstruction | |||
| ROW - DRAINAGE | 02/25/2022 | Disapproved -FEE REQUIRED | KRUTH |
| Note: Inspect for swale obstructions Establish a consistant flow line swale is blocked and needs a drainage pipe | |||
| TIE BEAM / LINTEL | 02/22/2022 | APPROVED | AGAETANO |
| MONOLITHIC SLAB | 01/31/2022 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/27/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 01/27/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 12/29/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 09/06/2022 | 09/06/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 09/02/2022 | 09/02/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide entire energy calc and heatload with duct layout | |||
| MECH | HOLD | 08/24/2022 | 08/24/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Indoor design temp on heatload must be a minimum of 75 degrees per R302.1 FBC Energy Conservation 2020 7Th edition | |||
| ENGIN1 | COMPLETE | 03/08/2022 | 03/08/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/08/2022 | 03/08/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/04/2022 | 03/07/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/04/2022 | 03/07/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 02/22/2022 | 02/23/2022 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Slab elevation on foundation survey is 10' higher than approved site plan. Please revise and resubmit. | |||
| ZON | COMPLETE | 02/22/2022 | 02/22/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/28/2021 | 10/29/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/25/2021 | 10/26/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Please compare all three together landscape plan still doesn't match | |||
| SW1 | COMPLETE | 10/25/2021 | 10/28/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/25/2021 | 10/26/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/22/2021 | 09/22/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM 2nd request: lanscape plan to match site plan and survey still missing | |||
| ENGIN1 | COMPLETE | 09/22/2021 | 09/22/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 09/22/2021 | 09/30/2021 |
| Note: Held By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM Check the site plan for detail See uploaded Stormwater checklist in attachments for correction. Make corrections on all unchecked items. | |||
| SWALE | COMPLETE | 09/08/2021 | 11/17/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/07/2021 | 09/08/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 09/07/2021 | 09/13/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 09/07/2021 | 09/08/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/07/2021 | 09/08/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/07/2021 | 09/09/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/07/2021 | 09/08/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/07/2021 | 09/14/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/07/2021 | 09/08/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Site Plan and landscape and floor plan do not match. Please compare all three together you will find that the patio levels with house on site plan but the floor plan bedroom 4 sticks out of patio area and on lanscape the 4th bedroom is behind patio. These plans need to all match. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 09/06/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 09/06/2022 |
| PLAN REVIEW - REVISION | ¤65.00 | 09/06/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/06/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 09/06/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/06/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/06/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/06/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/06/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/06/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 03/08/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 03/08/2022 |
| CONNECTION FEES | ¤1,017.83 | 12/09/2021 |
| METER - DEPOSIT | ¤60.00 | 12/09/2021 |
| WATER- TURN ON | ¤25.00 | 12/09/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/09/2021 |
| INSPECTION - RESIDENTIAL | ¤797.50 | 12/09/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤226.20 | 12/09/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 12/09/2021 |
| IMPACT FEE FIRE | ¤367.00 | 12/09/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 12/09/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 12/09/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 12/09/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 12/09/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 12/09/2021 |
| SURCHARGE FS 533.721 | ¤11.11 | 12/09/2021 |
| SURCHARGE - FS 468.631 | ¤16.67 | 12/09/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 12/09/2021 |
| SW ENG INSPECTION 60 | ¤60.00 | 12/09/2021 |
| SW ENG PRE APRON | ¤30.00 | 12/09/2021 |
| SW ENG - REVIEW 20 | ¤20.00 | 12/09/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 12/09/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 12/09/2021 |
| SEWER INSPECTION | ¤25.00 | 12/09/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 12/09/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 12/09/2021 |
| SITE PLAN 30 | ¤30.00 | 12/09/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,813.91 |