I want to search for...
Permit #2021090297
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7024-00540-0220 |
| CONDITIONED SPACE: 1478 sqft |
| CONDITIONED SPACE: 1478 sqft |
| GARAGE: 444 sqft |
| GARAGE: 444 sqft |
| OPENED PORCH (WITH ROOF) : 70 sqft |
| OPENED PORCH (WITH ROOF) : 70 sqft |
| OPENED PORCH (WITH ROOF) : 65 sqft |
| OPENED PORCH (WITH ROOF) : 65 sqft |
| Total Square Footage: 4114 sqft |
| Block: 00540 |
| Subdivision: 2167 - SECTION 24-PINE GROVE |
| Job Phone: 386-237-5837 |
| Location Address: 51 PROVIDENCE LN |
| Type: DU - DUPLEX |
| Issue Date: 10/06/2021 |
| NOC: RECORDED |
| Applicant name: MARSEL GILMANSHIN |
| Owner: GILMANS DEVELOPMENT CORP |
|
Address 3100 STREET RAIL DR STE 4 BUNNELL, FL 32110 |
| Lot: 0220 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
GILMANS DEVELOPMENT CORP
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4873 PALM COAST PARKWAY NW #4 PALM COAST, FL 32137 |
CBC1263180 (Exp: 08/31/2026) | 386-237-5837 |
Sub Contractors
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
MAXIM BUDNIK
| Status | Location Address | State License Number |
| ACTIVE |
3 WAVECREST PL PALM COAST, FL 32164 |
CAC1818445 (Exp: 08/31/2026) |
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/08/2024 | FINAL APPROVED | AGAETANO |
| Note: 3/19/2024 - PREVIOUS INSPECTION NOTES 3/19/23 1. E-cals onsite are not stamped for code complaince from Building Dept. stamped set must be onsite for inspection 2. Range outlet has exposed romex and is not secured 3. Kitchen penisula missing outlet per plans 4. Garage door bucks not per detail on plans 5. Some detector missing outside master bedroom 5. Hose bibs shear pin not sheared offf 6. No hot water 7. Conduit for ufer ground where it goes into ground must be protected with ridgid conduit flex is not acceptiable 8. Suction line going into AHU must be sealed Stopped inspection did not walk into A side only B side looked at 3/13/2024 - PREVIOUS INSPECTION NOTES Both units have residents. This is not authorized and should never happen until a CO is issued. Energy calcs missing manual S report Disconnect for ODU cannot be located behind the unit. MOCP for IDU not indicated. Inspection stopped 3/5/2024 - PREVIOUS INSPECTION NOTES 1. No plans on site FBC 107.3.1 2. No energy cals on site FBC 107.3.1 3. Missing termite sticker on electrical panel Stopped inspection not ready | |||
| BLD - BUILDING FINAL | 03/19/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 3/19/23 1. E-cals onsite are not stamped for code complaince from Building Dept. stamped set must be onsite for inspection 2. Range outlet has exposed romex and is not secured 3. Kitchen penisula missing outlet per plans 4. Garage door bucks not per detail on plans 5. Some detector missing outside master bedroom 5. Hose bibs shear pin not sheared offf 6. No hot water 7. Conduit for ufer ground where it goes into ground must be protected with ridgid conduit flex is not acceptiable 8. Suction line going into AHU must be sealed Stopped inspection did not walk into A side only B side looked at 3/13/2024 - PREVIOUS INSPECTION NOTES Both units have residents. This is not authorized and should never happen until a CO is issued. Energy calcs missing manual S report Disconnect for ODU cannot be located behind the unit. MOCP for IDU not indicated. Inspection stopped 3/5/2024 - PREVIOUS INSPECTION NOTES 1. No plans on site FBC 107.3.1 2. No energy cals on site FBC 107.3.1 3. Missing termite sticker on electrical panel Stopped inspection not ready | |||
| BLD - BUILDING FINAL | 03/13/2024 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Both units have residents. This is not authorized and should never happen until a CO is issued. Energy calcs missing manual S report Disconnect for ODU cannot be located behind the unit. MOCP for IDU not indicated. Inspection stopped 3/5/2024 - PREVIOUS INSPECTION NOTES 1. No plans on site FBC 107.3.1 2. No energy cals on site FBC 107.3.1 3. Missing termite sticker on electrical panel Stopped inspection not ready | |||
| BLD - BUILDING FINAL | 03/05/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 1. No plans on site FBC 107.3.1 2. No energy cals on site FBC 107.3.1 3. Missing termite sticker on electrical panel Stopped inspection not ready | |||
| ROW - FINAL APRON (AFTER POUR) | 03/05/2024 | APPROVED | EMADISON |
| U -UTILITY RESIDENTIAL FINAL | 03/05/2024 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL INSPECTION | 03/04/2024 | APPROVED | PFLANAGAN |
| Note: 2/21/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAN ALL DIRT OUT OF CULVERT NOT JUST THE ENDS OF CULVERTS ------------------------------------------------------------------------- 2/20/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN ALL DIRT OUT OF CULVERT PIPES 2) NEED TO PICK UP ALL TRASH FROM THE VACANT ACROSSED THE STREET | |||
| ROW - FINAL INSPECTION | 02/21/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL NEED TO CLEAN ALL DIRT OUT OF CULVERT NOT JUST THE ENDS OF CULVERTS ------------------------------------------------------------------------- 2/20/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN ALL DIRT OUT OF CULVERT PIPES 2) NEED TO PICK UP ALL TRASH FROM THE VACANT ACROSSED THE STREET | |||
| ROW - FINAL INSPECTION | 02/20/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO CLEAN ALL DIRT OUT OF CULVERT PIPES 2) NEED TO PICK UP ALL TRASH FROM THE VACANT ACROSSED THE STREET | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/16/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ----------------------------------------------------------------------------------- 1/23/2024 - PREVIOUS INSPECTION NOTES WATER IS STILL IMPACTING THE ADJACENT LOT TO THE LET OF YOUR NEED TO FIX SO NO WATER WILL IMPACT THE ADJACENT LOT ------------------------------------------------------------------------------------- 1/18/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO FIX ROADSIDE SWALE ON LEFT SIDE PROPERTY LINE IT DOESN'T MATCH EXISTING GRADE NEXT DOOR 2) WATER IS IMPACTING THE ADJACENT LOT TO THE LEFT NEED TO REGRADE SO WATER WILL NOT IMPACT THE LOT -------------------------------------------------------------------------------------------------- 6/9/2023 - PREVIOUS INSPECTION NOTES 06/09/23 NEED TO FILL IN WASHOUT AND SOD AREA BY LEFT SIDE PROPERTY LINE POWER POLE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/23/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: WATER IS STILL IMPACTING THE ADJACENT LOT TO THE LET OF YOUR NEED TO FIX SO NO WATER WILL IMPACT THE ADJACENT LOT ------------------------------------------------------------------------------------- 1/18/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO FIX ROADSIDE SWALE ON LEFT SIDE PROPERTY LINE IT DOESN'T MATCH EXISTING GRADE NEXT DOOR 2) WATER IS IMPACTING THE ADJACENT LOT TO THE LEFT NEED TO REGRADE SO WATER WILL NOT IMPACT THE LOT -------------------------------------------------------------------------------------------------- 6/9/2023 - PREVIOUS INSPECTION NOTES 06/09/23 NEED TO FILL IN WASHOUT AND SOD AREA BY LEFT SIDE PROPERTY LINE POWER POLE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/18/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) NEED TO FIX ROADSIDE SWALE ON LEFT SIDE PROPERTY LINE IT DOESN'T MATCH EXISTING GRADE NEXT DOOR 2) WATER IS IMPACTING THE ADJACENT LOT TO THE LEFT NEED TO REGRADE SO WATER WILL NOT IMPACT THE LOT -------------------------------------------------------------------------------------------------- 6/9/2023 - PREVIOUS INSPECTION NOTES 06/09/23 NEED TO FILL IN WASHOUT AND SOD AREA BY LEFT SIDE PROPERTY LINE POWER POLE. | |||
| WALL SHEATHING | 09/06/2023 | APPROVED - AS NOTED | RMARTIN |
| Note: 9/6/23 went to job where contractor opened up ceiling to view nailing 3/13/2023 - PREVIOUS INSPECTION NOTES Unable to inspect. Interior and exterior finishes have been completed. Submit stamped, sealed engineers letter to building department certifying work has been completed according to building plans | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/09/2023 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/09/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 06/09/23 NEED TO FILL IN WASHOUT AND SOD AREA BY LEFT SIDE PROPERTY LINE POWER POLE. OUTLINED IN WHITE PAINT. | |||
| ROW - FINAL INSPECTION | 05/25/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 05/25/23 YOU CANNOT SCHEDULE A FINAL ROW INSPECTION BEFORE A FINAL SURVEY AND FIELD SURVEY HAVE BEEN SCHEDULED AND COMPLETED. MUST SCHEDULE FINAL SURVEY INSPECTION FIRST. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/21/2023 | APPROVED | RGROSS |
| Note: READY TO POUR AT THE TIME OF INSPECTION. | |||
| WALL SHEATHING | 03/13/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Unable to inspect. Interior and exterior finishes have been completed. Submit stamped, sealed engineers letter to building department certifying work has been completed according to building plans | |||
| ELECTRIC - EARLY POWER | 03/13/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1016. Release Power 11/15/2022 - PREVIOUS INSPECTION NOTES NOT READY FOR INSPECTION | |||
| ROW- PROJECT STATUS | 03/13/2023 | APPROVED | GBERTOLA |
| ROW- PROJECT STATUS | 02/07/2023 | APPROVED | GBERTOLA |
| Note: meeting with the Lemon grading | |||
| U-CROSS CONNECTION | 01/18/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| GRAVITY SEWER TEST | 01/18/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 provide portablr restroom before monolithic slab inspection THIS WAQS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 01/18/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| FIREWALL DRYWALL NAILING | 12/16/2022 | APPROVED | KSANDOE |
| Note: 12/6/2022 - PREVIOUS INSPECTION NOTES 12/6/22 Drywall has not been replaced Inspector Notes from Inspection 2460 12/5/22 Firewall drywall nailing inspection added for left side only. 11/23/2022 - PREVIOUS INSPECTION NOTES 11/23/22 Common supported gable truss has been exposed and revealed engineered bracing has not been installed per plan. 11/16/2022 - PREVIOUS INSPECTION NOTES 11/15/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION THIS IS A REINSPECTION Job box needs attention. Must have plans and permits on site for inspector use 7/25/22 Roof sheathing and ddown cells passed. Need truss packet on site for ties and bracing. 11/15/22 MUST HAVE TRUSS PACKET AND BUILDING PLANS ON SITE FOR INSPECTOR USE 11/16/22 Inspection was partially approved on 7/25/22 due to truss packet not on site. Common supported truss has been covered with drywall. Provide certified engineering letter verifying placement of bracing on truss webbing to building department for review. Or remove drywall from truss webbing for inspection. | |||
| INSULATION | 12/16/2022 | APPROVED | KSANDOE |
| ALL ROUGH | 12/06/2022 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2460 12/5/22 Firewall drywall nailing inspection added for left side only. 11/23/2022 - PREVIOUS INSPECTION NOTES 11/23/22 Common supported gable truss has been exposed and revealed engineered bracing has not been installed per plan. 11/16/2022 - PREVIOUS INSPECTION NOTES 11/15/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION THIS IS A REINSPECTION Job box needs attention. Must have plans and permits on site for inspector use 7/25/22 Roof sheathing and ddown cells passed. Need truss packet on site for ties and bracing. 11/15/22 MUST HAVE TRUSS PACKET AND BUILDING PLANS ON SITE FOR INSPECTOR USE 11/16/22 Inspection was partially approved on 7/25/22 due to truss packet not on site. Common supported truss has been covered with drywall. Provide certified engineering letter verifying placement of bracing on truss webbing to building department for review. Or remove drywall from truss webbing for inspection. | |||
| FIREWALL DRYWALL NAILING | 12/06/2022 | Disapproved - NO FEE | KSANDOE |
| Note: 12/6/22 Drywall has not been replaced Inspector Notes from Inspection 2460 12/5/22 Firewall drywall nailing inspection added for left side only. 11/23/2022 - PREVIOUS INSPECTION NOTES 11/23/22 Common supported gable truss has been exposed and revealed engineered bracing has not been installed per plan. 11/16/2022 - PREVIOUS INSPECTION NOTES 11/15/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION THIS IS A REINSPECTION Job box needs attention. Must have plans and permits on site for inspector use 7/25/22 Roof sheathing and ddown cells passed. Need truss packet on site for ties and bracing. 11/15/22 MUST HAVE TRUSS PACKET AND BUILDING PLANS ON SITE FOR INSPECTOR USE 11/16/22 Inspection was partially approved on 7/25/22 due to truss packet not on site. Common supported truss has been covered with drywall. Provide certified engineering letter verifying placement of bracing on truss webbing to building department for review. Or remove drywall from truss webbing for inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/05/2022 | APPROVED - AS NOTED | KSANDOE |
| Note: 12/5/22 Firewall drywall nailing inspection added for left side only. 11/23/2022 - PREVIOUS INSPECTION NOTES 11/23/22 Common supported gable truss has been exposed and revealed engineered bracing has not been installed per plan. 11/16/2022 - PREVIOUS INSPECTION NOTES 11/15/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION THIS IS A REINSPECTION Job box needs attention. Must have plans and permits on site for inspector use 7/25/22 Roof sheathing and ddown cells passed. Need truss packet on site for ties and bracing. 11/15/22 MUST HAVE TRUSS PACKET AND BUILDING PLANS ON SITE FOR INSPECTOR USE 11/16/22 Inspection was partially approved on 7/25/22 due to truss packet not on site. Common supported truss has been covered with drywall. Provide certified engineering letter verifying placement of bracing on truss webbing to building department for review. Or remove drywall from truss webbing for inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/23/2022 | Disapproved - NO FEE | KSANDOE |
| Note: 11/23/22 Common supported gable truss has been exposed and revealed engineered bracing has not been installed per plan. 11/16/2022 - PREVIOUS INSPECTION NOTES 11/15/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION THIS IS A REINSPECTION Job box needs attention. Must have plans and permits on site for inspector use 7/25/22 Roof sheathing and ddown cells passed. Need truss packet on site for ties and bracing. 11/15/22 MUST HAVE TRUSS PACKET AND BUILDING PLANS ON SITE FOR INSPECTOR USE 11/16/22 Inspection was partially approved on 7/25/22 due to truss packet not on site. Common supported truss has been covered with drywall. Provide certified engineering letter verifying placement of bracing on truss webbing to building department for review. Or remove drywall from truss webbing for inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/16/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: 11/15/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION THIS IS A REINSPECTION Job box needs attention. Must have plans and permits on site for inspector use 7/25/22 Roof sheathing and ddown cells passed. Need truss packet on site for ties and bracing. 11/15/22 MUST HAVE TRUSS PACKET AND BUILDING PLANS ON SITE FOR INSPECTOR USE 11/16/22 Inspection was partially approved on 7/25/22 due to truss packet not on site. Common supported truss has been covered with drywall. Provide certified engineering letter verifying placement of bracing on truss webbing to building department for review. Or remove drywall from truss webbing for inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/15/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Job box needs attention. Must have plans and permits on site for inspector use 7/25/22 Roof sheathing and ddown cells passed. Need truss packet on site for ties and bracing. 11/15/22 MUST HAVE TRUSS PACKET AND BUILDING PLANS ON SITE FOR INSPECTOR USE | |||
| ELECTRIC - EARLY POWER | 11/15/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: NOT READY FOR INSPECTION | |||
| ROW - DRAINAGE | 09/16/2022 | APPROVED | GBERTOLA |
| Note: correction were made 9/15/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Drainage still not open. Next inspection 9/15/22. ** 09/08/22 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE NEED TO PICK UP THE TRASH IN THE SWALE ** NEXT INSPECTION ON 09/09/22 ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE NEED TO PICK UP THE TRASH IN THE SWALE INSPECTOR BEBACK ON 09/08/22 | |||
| ROW - DRAINAGE | 09/15/2022 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Drainage still not open. Next inspection 9/15/22. ** 09/08/22 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE NEED TO PICK UP THE TRASH IN THE SWALE ** NEXT INSPECTION ON 09/09/22 ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE NEED TO PICK UP THE TRASH IN THE SWALE INSPECTOR BEBACK ON 09/08/22 | |||
| ROW - DRAINAGE | 09/09/2022 | CANCELLED BY APPLICANT | GBERTOLA |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION ** 09/08/22 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE NEED TO PICK UP THE TRASH IN THE SWALE ** NEXT INSPECTION ON 09/09/22 ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE NEED TO PICK UP THE TRASH IN THE SWALE INSPECTOR BEBACK ON 09/08/22 | |||
| ROW - DRAINAGE | 09/08/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: THIS IS A REINSPECTION ** 09/08/22 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE NEED TO PICK UP THE TRASH IN THE SWALE ** NEXT INSPECTION ON 09/09/22 ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE NEED TO PICK UP THE TRASH IN THE SWALE INSPECTOR BEBACK ON 09/08/22 | |||
| ROW - DRAINAGE | 09/01/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE NEED TO PICK UP THE TRASH IN THE SWALE INSPECTOR BEBACK ON 09/08/22 | |||
| LATH/BRICK/ WATER BARRIER | 08/30/2022 | APPROVED | KSANDOE |
| FIREWALL FINAL | 07/29/2022 | APPROVED | KSANDOE |
| FIREWALL DRYWALL NAILING | 07/27/2022 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/25/2022 | PARTIALLY APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION Job box needs attention. Must have plans and permits on site for inspector use 7/25/22 Roof sheathing and ddown cells passed. Need truss packet on site for ties and bracing. | |||
| ROOF VALLEY & METAL | 07/25/2022 | APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION Job box needs attention. Must have plans and permits on site for inspector use | |||
| ROOF VALLEY & METAL | 07/21/2022 | Disapproved - NO FEE | KSANDOE |
| Note: Job box needs attention. Must have plans and permits on site for inspector use | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/21/2022 | Disapproved - NO FEE | KSANDOE |
| Note: Job box needs attention. Must have plans and permits on site for inspector use | |||
| FOUND SURVEY APPROVED (OFFICE) | 07/20/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 05/09/2022 | APPROVED | KSANDOE |
| MONOLITHIC SLAB | 12/16/2021 | APPROVED | KSANDOE |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/09/2021 | APPROVED - AS NOTED | MGIBSON |
| Note: provide portablr restroom before monolithic slab inspection | |||
| WATER METER INSTALLATION REQUEST | 12/09/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 04/29/2024 | 05/02/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/23/2024 | 04/25/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition | |||
| ENGIN1 | COMPLETE | 01/17/2023 | 01/18/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/17/2023 | 01/25/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/17/2023 | 01/17/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/25/2022 | 07/26/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/20/2022 | 07/20/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/20/2022 | 07/20/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/06/2021 | 10/06/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/06/2021 | 10/06/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| BLD | HOLD | 09/30/2021 | 10/04/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM 1. OK 2. Provide/clariy Product Approval of the following items below per F.S. 553.842 and Administrative Code 9B - 72: a. OK b. OK c. OK d. FL 26351 - for mullion - the number cannot be found on approved listing. Verify the number. e. FL166-38 for roofing – the number cannot be found on approved listing. Verify the number. | |||
| MECH | HOLD | 09/30/2021 | 09/30/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy calcs and heatload does not match the site plan. (Second Request). | |||
| BLD | HOLD | 09/27/2021 | 09/27/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM 1. OK 2. Provide/clariy Product Approval of the following items below per F.S. 553.842 and Administrative Code 9B - 72: a. OK b. OK c. OK d. FL 26351 - for mullion - the number cannot be found on approved listing. Verify the number. e. FL166-38 for roofing – the number cannot be found on approved listing. Verify the number. | |||
| MECH | HOLD | 09/27/2021 | 09/27/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Submit updated heatload and duct layout | |||
| BLD | HOLD | 09/08/2021 | 09/08/2021 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM 1. Provide updated Roofing Worksheet from City's website and coordinate roofing underlayment with Product Approval Specification Sheet for clarity per FBC 7th Ed. Sec. 107.2.1. 2. Provide/clariy Product Approval of the following items below per F.S. 553.842 and Administrative Code 9B - 72: a. FL 742 - R10 - for garage door. Use Code Version 2020 and identify specific number for size and design pressure. b. FL 1435.4 - for single hung window - Use Code Version 2020 and identify specific number for design pressure and for impact or non- impact use. c. FL 501.3 - for fixed glass window - use Code Version 2020. d. FL 26351 - for mullion - the number cannot be found on approved listing. Verify the number. | |||
| CUSVC | COMPLETE | 09/08/2021 | 09/09/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 09/08/2021 | 09/09/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/08/2021 | 09/08/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/08/2021 | 09/09/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 09/08/2021 | 09/08/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy Calcs does not match the site plan. Revise to match | |||
| SW1 | COMPLETE | 09/08/2021 | 09/15/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/08/2021 | 09/09/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 09/08/2021 | 11/17/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 07/01/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 07/01/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/01/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/01/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/01/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/01/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/01/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/01/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/01/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/01/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/01/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/01/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/01/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 07/01/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 07/01/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 07/01/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 07/01/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 07/01/2024 |
| SW ENG INSPECTION 60 | ¤60.00 | 10/06/2021 |
| SW ENG PRE APRON | ¤30.00 | 10/06/2021 |
| SITE PLAN 30 | ¤30.00 | 10/06/2021 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/06/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/06/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤131.52) | 10/06/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/06/2021 |
| INSPECTION - RESIDENTIAL | ¤1,031.25 | 10/06/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤292.50 | 10/06/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤107.92) | 10/06/2021 |
| SURCHARGE FS 533.721 | ¤14.19 | 10/06/2021 |
| SURCHARGE - FS 468.631 | ¤21.29 | 10/06/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/06/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤33.03) | 10/06/2021 |
| IMPACT FEE FIRE | ¤367.00 | 10/06/2021 |
| IMPACT FEE FIRE | ¤734.00 | 10/06/2021 |
| IMPACT FEE PARKS | ¤2,398.24 | 10/06/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 10/06/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/06/2021 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 10/06/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 10/06/2021 |
| IMPACT FEE TRANSPORTATION | ¤2,666.00 | 10/06/2021 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 09/30/2021 |
| CONNECTION FEES | ¤2,035.66 | 09/30/2021 |
| METER - DEPOSIT | ¤120.00 | 09/30/2021 |
| WATER- TURN ON | ¤50.00 | 09/30/2021 |
| SEWER CREDIT | (¤1,806.00) | 09/30/2021 |
| SEWER INSPECTION | ¤25.00 | 09/30/2021 |
| SEWER CAPITAL FACILITY | ¤9,329.10 | 09/30/2021 |
| WATER CAPITAL FACILITY FEE | ¤6,848.90 | 09/30/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤38,516.78 |