I want to search for...
Permit #2021090308
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00840-0090 |
| CONDITIONED SPACE: 1800 sqft |
| GARAGE: 428 sqft |
| OPENED PORCH (WITH ROOF) : 270 sqft |
| OPENED PORCH (WITH ROOF) : 32 sqft |
| Total Square Footage: 2530 sqft |
| Block: 00840 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 321-271-9033 |
| Location Address: 17 BUFFALO BERRY PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/29/2021 |
| NOC: RECORDED |
| Applicant name: KEITH E TANNER |
| Owner: VINTAGE ESTATE HOMES LLC |
|
Address 4885 NWICKHAM ROAD MELBOURNE, FL 32940 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MERCEDES PREMIER HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
4885 N WICKHAM RD MELBOURNE, FL 32940 |
STE 101 MELBOURNE, FL 32940 |
CGC1516602 (Exp: 08/31/2024) | 321-610-3924 |
Sub Contractors
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CAC1820196 (Exp: 08/31/2026) | 407-404-4000 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/20/2022 | Disapproved - NO FEE | MKRASKI |
| Note: 1. AHU condisation line needs to be min of 3'' off home 2. Attic light not working properly 3. Trim missing on washing maching hook up 4. Over head service riser needs to be sealed at soffit | |||
| BLD - BUILDING FINAL | 10/20/2022 | FINAL APPROVED | MKRASKI |
| U-CROSS CONNECTION | 10/20/2022 | APPROVED | DHANEY |
| U -UTILITY RESIDENTIAL FINAL | 10/20/2022 | FINAL APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 10/19/2022 | APPROVED - AS NOTED | RGROSS |
| Note: Hot patch scheduled to be done. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/19/2022 | Disapproved - NO FEE | RGROSS |
| Note: Outside grade on the right rear corner must be 4 inches below the FFE. Compare 31.80 FFE to 31.80 outside grade. On site with super. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/19/2022 | APPROVED | RGROSS |
| Note: 10/19/2022 - PREVIOUS INSPECTION NOTES Outside grade on the right rear corner must be 4 inches below the FFE. Compare 31.80 FFE to 31.80 outside grade. On site with super. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/19/2022 | APPROVED | RGROSS |
| ROW - STORMWATER FINAL | 10/19/2022 | APPROVED | RGROSS |
| Note: Inspector Notes from Inspection 9272 Hot patch scheduled to be done. | |||
| WINDOW NAILING | 10/07/2022 | APPROVED | MKRASKI |
| ELECTRIC - EARLY POWER | 09/09/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 9:00 AM | |||
| ROW- PRE-APRON (PRE-POUR) | 09/09/2022 | APPROVED | EMADISON |
| Note: THIS IS A REINSPECTION ** 09/09/22 ALL CORRECTIONS HAVE BEEN MADE READY TO POUR THIS IS A REINSPECTION 9/1/22 - Adding rock was great! But you must compensate for extra depth needed at the road edge. No well defined 5 inches thick with a face board along the road edge. No fee for effort to stabilize with rock. Photo attached. ** 08/29/22 APRON AREA HAS TOO MJUCH WATER FLOWING THROUGH PIPE AREA AROUND CULVERT IS BUTTER SOFT FOOT SINKS 4-6 INCHES INTO MUD WATER COMMING OUT FROM AROUND PIPE | |||
| ROW- PRE-APRON (PRE-POUR) | 09/01/2022 | Disapproved - NO FEE | RGROSS |
| Note: THIS IS A REINSPECTION 9/1/22 - Adding rock was great! But you must compensate for extra depth needed at the road edge. No well defined 5 inches thick with a face board along the road edge after rock was added. No fee added for the effort to stabilize with rock. Photo attached. Culvert elevation was good at the time of this inspection. ** 08/29/22 APRON AREA HAS TOO MJUCH WATER FLOWING THROUGH PIPE AREA AROUND CULVERT IS BUTTER SOFT FOOT SINKS 4-6 INCHES INTO MUD WATER COMMING OUT FROM AROUND PIPE | |||
| ROW- PRE-APRON (PRE-POUR) | 08/29/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/29/22 APRON AREA HAS TOO MJUCH WATER FLOWING THROUGH PIPE AREA AROUND CULVERT IS BUTTER SOFT FOOT SINKS 4-6 INCHES INTO MUD WATER COMMING OUT FROM AROUND PIPE | |||
| U - SEWER TIE IN | 06/22/2022 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 05/26/2022 | APPROVED | CSTONE |
| INSULATION | 05/26/2022 | APPROVED | FWILLIS |
| LATH/BRICK/ WATER BARRIER | 04/29/2022 | APPROVED | FWILLIS |
| ALL ROUGH | 04/12/2022 | APPROVED - AS NOTED | KSANDOE |
| Note: HVAC install incomplete. Missing trunk line. Window nailing inspection added | |||
| WALL SHEATHING | 03/18/2022 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/18/2022 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 03/18/2022 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 03/03/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 02/15/2022 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 01/27/2022 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/18/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 01/18/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 12/07/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 10/05/2022 | 10/05/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/03/2022 | 03/03/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/03/2022 | 03/03/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/08/2021 | 09/09/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 09/08/2021 | 09/09/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 09/08/2021 | 09/09/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/08/2021 | 09/08/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/08/2021 | 09/10/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/08/2021 | 09/09/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/08/2021 | 09/15/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/08/2021 | 09/09/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 09/08/2021 | 11/17/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 10/20/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 10/20/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 10/20/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 10/20/2022 |
| CONNECTION FEES | ¤1,017.83 | 11/29/2021 |
| METER - DEPOSIT | ¤60.00 | 11/29/2021 |
| WATER- TURN ON | ¤25.00 | 11/29/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/29/2021 |
| INSPECTION - RESIDENTIAL | ¤687.50 | 11/29/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤195.00 | 11/29/2021 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/29/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/29/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 11/29/2021 |
| SEWER CREDIT | (¤850.00) | 11/29/2021 |
| SEWER INSPECTION | ¤25.00 | 11/29/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 11/29/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 11/29/2021 |
| SITE PLAN 30 | ¤30.00 | 11/29/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 11/29/2021 |
| IMPACT FEE FIRE | ¤367.00 | 11/29/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 11/29/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/29/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 11/29/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/29/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 11/29/2021 |
| SURCHARGE FS 533.721 | ¤9.67 | 11/29/2021 |
| SURCHARGE - FS 468.631 | ¤14.50 | 11/29/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/29/2021 |
| SW ENG INSPECTION 60 | ¤60.00 | 11/29/2021 |
| SW ENG PRE APRON | ¤30.00 | 11/29/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,596.60 |