Permit #2021090380
Permit Details
Status: COED
| Parcel Id: 07-11-31-7009-00100-0070 |
| CONDITIONED SPACE: 2170 sqft |
| OPENED PORCH (WITH ROOF) : 254 sqft |
| OPENED PORCH (WITH ROOF) : 64 sqft |
| GARAGE: 558 sqft |
| Total Square Footage: 3046 sqft |
| Block: 00100 |
| Subdivision: 2208 - SECTION 9-FLORIDA PARK |
| Job Phone: (386) 672-8285 |
| Location Address: 35 FARMSWORTH DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/27/2021 |
| NOC: RECORDED |
| Applicant name: JOSEPH TODD VANACORE |
| Owner: HEMELAAR, DAWN |
|
Address 5400 S WILLIAMSON BLVD PORT ORANGE, FL 32128 |
|
Address APT 110 PORT ORANGE, FL 32128 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤239,999.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
VANACORE CONSTRUCTION INC.
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1451 N US HIGHWAY 1 Ormond Beach, FL 32174 |
SUITE 13 Ormond Beach, FL 32174 |
CBC058991 (Exp: 08/31/2024) | (386) 672-8285 |
Sub Contractors
VERNON JACK SMITH III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
224 KIRKLAND ROAD NEW SMYRNA BEACH, FL 32169 |
EC13004432 (Exp: 08/31/2026) | 386-409-3616 | 386-409-3616 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
ALFRED N FYOCK JR
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
387 SAULS ORMOND BEACH, FL 32174 |
ST ORMOND BEACH, FL 32174 |
CCC1329075 (Exp: 08/31/2026) | 386-566-6112 | 386-673-4299 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 02/03/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO FIX ALL AREAS ACROSSED THE STREET WITH SOD -------------------------------------------------------------------------------------- Note: 2/2/23 (See Email dated 11/20/22 2:10pm. to Patrick Buckley from Conrad) Silt Fence can remain as part of the requirments for the needed Permits. 1) Regrade and 2) Goffer Tourtous Removal. When the builder has obtained these two permits and all other Stormwater related issues are completed, then the Final Stormwater Inspection can be approved. Any questions call Robert 386-986-5071. 2/2/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE THE SILT FENCE 2) NEED TO FIX ALL WASH OUTS ON THE LEFT SIDE OF HOUSE 3) NEED TO HAVE SOD ON THE LEFT SIDE OF HOUSE NOT SEED AND STRAW DO TO THE STEEP GRADE 4) NEED TO PICK UP ALL TRASH AROUND LOT AND VACANT ACROSSED THE STREET AND SURROUNDING YOUR LOT 5) NEED TO HAVE SOD LAID IN THE VACANT LOT ACROSSED THE STREET WHERE THE SWALE IS DISTURED ----------------------------------------------------------------------------------------------------------------- BEFORE THE ROW FINAL INSPECTION NEED TO FIX THE WASH OUT ON THE LEFT SIDE OF HOME AND NEED TO HAVE SOD ON ALL BARE AREAS ON LEFT SIDE OF HOME TO STABILICED BANK. NO SEED AND STRAW ALLOWED. ------------------------------------------------------------------------------------------------------------- 1/31/2023 - PREVIOUS INSPECTION NOTES | |||
| ROW - STORMWATER FINAL | 02/03/2023 | APPROVED - AS NOTED | RGROSS |
| Note: The Builder has pulled a seperate regrade permit. The ROW across the street for which this failed today will be inspected on the regrade permit to accomadate the builder to recieve a CO. See regrade permit 2022120061 note. 2/3/2023 - PREVIOUS INSPECTION NOTES NEED TO FIX ALL AREAS ACROSSED THE STREET WITH SOD -------------------------------------------------------------------------------------- Note: 2/2/23 (See Email dated 11/20/22 2:10pm. to Patrick Buckley from Conrad) Silt Fence can remain as part of the requirments for the needed Permits. 1) Regrade and 2) Goffer Tourtous Removal. When the builder has obtained these two permits and all other Stormwater related issues are completed, then the Final Stormwater Inspection can be approved. Any questions call Robert 386-986-5071. 2/2/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE THE SILT FENCE 2) NEED TO FIX ALL WASH OUTS ON THE LEFT SIDE OF HOUSE 3) NEED TO HAVE SOD ON THE LEFT SIDE OF HOUSE NOT SEED AND STRAW DO TO THE STEEP GRADE 4) NEED TO PICK UP ALL TRASH AROUND LOT AND VACANT ACROSSED THE STREET AND SURROUNDING YOUR LOT 5) NEED TO HAVE SOD LAID IN THE VACANT LOT ACROSSED THE STREET WHERE THE SWALE IS DISTURED ----------------------------------------------------------------------------------------------------------------- BEFORE THE ROW FINAL INSPECTION NEED TO FIX THE WASH OUT ON THE LEFT SIDE OF HOME AND NEED TO HAVE SOD ON ALL BARE AREAS ON LEFT SIDE OF HOME TO STABILICED BANK. NO SEED AND STRAW ALLOWED. ------------------------------------------------------------------------------------------------------------- 1/31/2023 - PREVIOUS INSPECTION NOTES | |||
| U -UTILITY RESIDENTIAL FINAL | 02/02/2023 | FINAL APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 02/02/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO REMOVE THE SILT FENCE 2) NEED TO FIX ALL WASH OUTS ON THE LEFT SIDE OF HOUSE 3) NEED TO HAVE SOD ON THE LEFT SIDE OF HOUSE NOT SEED AND STRAW DO TO THE STEEP GRADE 4) NEED TO PICK UP ALL TRASH AROUND LOT AND VACANT ACROSSED THE STREET AND SURROUNDING YOUR LOT 5) NEED TO HAVE SOD LAID IN THE VACANT LOT ACROSSED THE STREET WHERE THE SWALE IS DISTURED ----------------------------------------------------------------------------------------------------------------- BEFORE THE ROW FINAL INSPECTION NEED TO FIX THE WASH OUT ON THE LEFT SIDE OF HOME AND NEED TO HAVE SOD ON ALL BARE AREAS ON LEFT SIDE OF HOME TO STABILICED BANK. NO SEED AND STRAW ALLOWED. ------------------------------------------------------------------------------------------------------------- 1/31/2023 - PREVIOUS INSPECTION NOTES | |||
| U-CROSS CONNECTION | 02/02/2023 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 02/02/2023 | APPROVED | PFLANAGAN |
| Note: Inspector Notes from Inspection 9465 BEFORE THE ROW FINAL INSPECTION NEED TO FIX THE WASH OUT ON THE LEFT SIDE OF HOME AND NEED TO HAVE SOD ON ALL BARE AREAS ON LEFT SIDE OF HOME TO STABILICED BANK. NO SEED AND STRAW ALLOWED. ------------------------------------------------------------------------------------------------------------- 1/31/2023 - PREVIOUS INSPECTION NOTES | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/01/2023 | APPROVED - AS NOTED | PFLANAGAN |
| Note: BEFORE THE ROW FINAL INSPECTION NEED TO FIX THE WASH OUT ON THE LEFT SIDE OF HOME AND NEED TO HAVE SOD ON ALL BARE AREAS ON LEFT SIDE OF HOME TO STABILICED BANK. NO SEED AND STRAW ALLOWED. ------------------------------------------------------------------------------------------------------------- 1/31/2023 - PREVIOUS INSPECTION NOTES | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/31/2023 | APPROVED | GBERTOLA |
| Note: | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/31/2023 | CANCELLED BY APPLICANT | GBERTOLA |
| BLD - BUILDING FINAL | 01/27/2023 | Approval - Private Provider | PPROVIDER |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/26/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: 01/26/23= PLEASE CHECK THE INVERT NUMBER ON THE SWALE PLAN DETAIL CULVERT PIPE IS OUT OF TOLERANCE | |||
| WALL SHEATHING | 01/21/2023 | Approval - Private Provider | PPROVIDER |
| PLUMBING FINAL | 12/27/2022 | Approval - Private Provider | PPROVIDER |
| HVAC FINAL | 12/27/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 12/27/2022 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 11/28/2022 | APPROVED | EMADISON |
| Note: ** 11/28/22 MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** READY TO POUR IN THE EVENT OF RAIN RECHECK ELEVATIONS AND COMPACTION 10/27/2022 - PREVIOUS INSPECTION NOTES ** 10/27/22 CULVERT IS INDERWATER AREA AROUND CULVERT IS TOO SOFT WATER SEEPING FOOT SINKS INTO MUD ** APRON WILL NEED MORE COMPACTION ** SEE ATTACHED PHOTOS | |||
| WILDLIFE CHECK - ENVIRONMENTAL | 11/08/2022 | APPROVED | JMYERS |
| Note: Staff conducted a site visit per builder's request to check on abandoned Gopher Tortoise burrow. When staff arrived a Gopher Tortoise was occupying the burrow. Work may continue inside the house but any outside construction must be at least 25ft away from the burrow. Builder should begin working on relocation activities with an Authorized Gopher Tortoise Agent to relocate the tortoise. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/27/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 10/27/22 CULVERT IS INDERWATER AREA AROUND CULVERT IS TOO SOFT WATER SEEPING FOOT SINKS INTO MUD ** APRON WILL NEED MORE COMPACTION ** SEE ATTACHED PHOTOS | |||
| U - SEWER TIE IN | 10/12/2022 | APPROVED | AGAETANO |
| GRAVITY SEWER TEST | 10/12/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC - EARLY POWER | 08/30/2022 | Approval - Private Provider | PPROVIDER |
| Note: ok to release power | |||
| LATH/BRICK/ WATER BARRIER | 07/05/2022 | Approval - Private Provider | PPROVIDER |
| INSULATION | 06/21/2022 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 06/09/2022 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 03/03/2022 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/23/2022 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 01/28/2022 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 01/26/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 01/12/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/06/2022 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 11/18/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| PLENV | COMPLETE | 01/05/2023 | 01/05/2023 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Approved After Action Report has been accepted. | |||
| PLENV | HOLD | 12/19/2022 | 12/19/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Please provide Approved After Action Report once relocation activities have been completed. | |||
| ZON | COMPLETE | 01/25/2022 | 01/25/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 01/25/2022 | 01/25/2022 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Foundation survey anmd site plan both show slab elevation 10' +/- higher than centerline of road. Please confirm and resubmit. | |||
| ENGIN1 | COMPLETE | 01/25/2022 | 01/26/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/17/2021 | 09/17/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/17/2021 | 09/20/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/17/2021 | 09/24/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 09/10/2021 | 09/10/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Benchmark elevation on survey is 5.6' lower than CL of road elevation. | |||
| CUSVC | COMPLETE | 09/09/2021 | 09/14/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ENGIN1 | COMPLETE | 09/09/2021 | 09/09/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/09/2021 | 09/10/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/09/2021 | 09/16/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/09/2021 | 09/09/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Banding must wrap corners at least two foot Survey/site plan page 2 is for another lot. Please submit the correct one for this lot. | |||
| SWALE | COMPLETE | 09/09/2021 | 11/18/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 02/03/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 02/03/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 02/03/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/27/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/27/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 09/27/2021 |
| SEWER CREDIT | (¤1,147.00) | 09/27/2021 |
| SEWER INSPECTION | ¤25.00 | 09/27/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 09/27/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 09/27/2021 |
| SITE PLAN 30 | ¤30.00 | 09/27/2021 |
| METER - DEPOSIT | ¤60.00 | 09/27/2021 |
| WATER- TURN ON | ¤25.00 | 09/27/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/27/2021 |
| INSPECTION - RESIDENTIAL | ¤761.75 | 09/27/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤216.06 | 09/27/2021 |
| CONNECTION FEES | ¤1,017.83 | 09/27/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 09/27/2021 |
| IMPACT FEE FIRE | ¤367.00 | 09/27/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 09/27/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/27/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 09/27/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/27/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 09/27/2021 |
| SURCHARGE FS 533.721 | ¤10.64 | 09/27/2021 |
| SURCHARGE - FS 468.631 | ¤15.97 | 09/27/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/27/2021 |
| SW ENG INSPECTION 60 | ¤60.00 | 09/27/2021 |
| SW ENG PRE APRON | ¤30.00 | 09/27/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,344.85 |