I want to search for...
Permit #2021090414
Permit Details
Status: COED
| Parcel Id: 07-11-31-7012-00160-0080 |
| CONDITIONED SPACE: 2129 sqft |
| GARAGE: 595 sqft |
| OPENED PORCH (WITH ROOF) : 199 sqft |
| OPENED PORCH (WITH ROOF) : 41 sqft |
| Total Square Footage: 2964 sqft |
| Block: 00160 |
| Subdivision: 2187 - SECTION 12-BELLE TERRE |
| Job Phone: 321-271-9033 |
| Location Address: 75 BAINBRIDGE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/04/2021 |
| NOC: RECORDED |
| Applicant name: KEITH E TANNER |
| Owner: LS-VEH 2 LLC |
|
Address 4885 WICKHAM ROAD MELBOURNE, FL 32940 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MERCEDES PREMIER HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
4885 N WICKHAM RD MELBOURNE, FL 32940 |
STE 101 MELBOURNE, FL 32940 |
CGC1516602 (Exp: 08/31/2024) | 321-610-3924 |
Sub Contractors
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CAC1820196 (Exp: 08/31/2026) | 407-404-4000 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/22/2022 | FINAL APPROVED | RMARTIN |
| Note: 9/21/2022 - PREVIOUS INSPECTION NOTES 9/20/2022 - PREVIOUS INSPECTION NOTES 1. Bi-fold doors not hung up in spare bedrooms 2. Exhaust fan light does not work in master bath 3. Microwave outlet not trimmed 4. Bubble cover loose at front entry 5. Outside outlets not working 6. Ceiling penitrations needs to be sealed where EMT meets ceiling for front garage lights 7. T stat wiring needs to be sealed @ ceiling in AHU closet 8. Vanity light does not work in spare bathroom | |||
| BLD - BUILDING FINAL | 09/21/2022 | CANCELLED BY APPLICANT | MKRASKI |
| Note: 9/20/2022 - PREVIOUS INSPECTION NOTES 1. Bi-fold doors not hung up in spare bedrooms 2. Exhaust fan light does not work in master bath 3. Microwave outlet not trimmed 4. Bubble cover loose at front entry 5. Outside outlets not working 6. Ceiling penitrations needs to be sealed where EMT meets ceiling for front garage lights 7. T stat wiring needs to be sealed @ ceiling in AHU closet 8. Vanity light does not work in spare bathroom | |||
| BLD - BUILDING FINAL | 09/20/2022 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Bi-fold doors not hung up in spare bedrooms 2. Exhaust fan light does not work in master bath 3. Microwave outlet not trimmed 4. Bubble cover loose at front entry 5. Outside outlets not working 6. Ceiling penitrations needs to be sealed where EMT meets ceiling for front garage lights 7. T stat wiring needs to be sealed @ ceiling in AHU closet 8. Vanity light does not work in spare bathroom | |||
| BLD - BUILDING FINAL | 09/19/2022 | CANCELLED BY APPLICANT | MKRASKI |
| ROW - STORMWATER FINAL | 09/15/2022 | FINAL APPROVED | EMADISON |
| Note: ** 09/15/22 CORRECTIONS MADE ** 09/02/22 LEFT REAR CORNER OF HOUSE ALONG PROPERTY LINE HAS ALOW SPOT NEED TO RAISE IT FOR THE POSITIVE FLOW OF STORMWATER FORWARD. | |||
| U -UTILITY RESIDENTIAL FINAL | 09/13/2022 | FINAL APPROVED | DHANEY |
| U-CROSS CONNECTION | 09/13/2022 | APPROVED | DHANEY |
| TUB SET | 09/02/2022 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 09/02/2022 | APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/02/2022 | APPROVED | EMADISON |
| Note: Inspector Notes from Inspection 9270 ** AT THE TIME OF NTHE INSPECTION EVERYTHING LOOKS GOOD, | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/02/2022 | APPROVED | EMADISON |
| Note: ** 09/02/22 LEFT REAR CORNER OF HOUSE ALONG PROPERTY LINE HAS ALOW SPOT NEED TO RAISE IT FOR THE POSITIVE FLOW OF STORMWATER FORWARD. | |||
| ELECTRIC - EARLY POWER | 08/31/2022 | APPROVED | JMUNSON |
| TUB SET | 08/31/2022 | CANCELLED BY APPLICANT | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 06/27/2022 | APPROVED - AS NOTED | EMADISON |
| Note: ** AT THE TIME OF NTHE INSPECTION EVERYTHING LOOKS GOOD, | |||
| U - SEWER TIE IN | 06/01/2022 | APPROVED | MGIBSON |
| LATH/BRICK/ WATER BARRIER | 05/10/2022 | APPROVED | RMARTIN |
| INSULATION | 04/26/2022 | APPROVED | FWILLIS |
| ALL ROUGH | 04/25/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION 4/21/22 1. Broken window left of front door 2. Missing outlet on large slider wall marked on print Per NEC 210.52 3. Outlet needed on smaller slider wall for outlet spacing marked on print Per NEC 210.52 3. Tub Set inspection added. Master bath 4/22/22 1. Outlet still missing on large slider wall, It was marked on print on first inspection wall space can not be more then 12' from corner to outlet is 14' NEC 210.52 2. Broken window left of front door , Needs to be fixed before final 4/25/22 need to add outlet per plan on right side of slider by next inspection | |||
| ALL ROUGH | 04/22/2022 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 4/21/22 1. Broken window left of front door 2. Missing outlet on large slider wall marked on print Per NEC 210.52 3. Outlet needed on smaller slider wall for outlet spacing marked on print Per NEC 210.52 3. Tub Set inspection added. Master bath 4/22/22 1. Outlet still missing on large slider wall, It was marked on print on first inspection wall space can not be more then 12' from corner to outlet is 14' NEC 210.52 2. Broken window left of front door , Needs to be fixed before final | |||
| ALL ROUGH | 04/21/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: THIS IS A REINSPECTION 4/21/22 1. Broken window left of front door 2. Missing outlet on large slider wall marked on print Per NEC 210.52 3. Outlet needed on smaller slider wall for outlet spacing marked on print Per NEC 210.52 3. Tub Set inspection added. Master bath | |||
| ALL ROUGH | 04/20/2022 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. Broken window left of front door 2. Drain line needs to be sealed in master bath 3. Master bath vanity supply lines need to be moved inside wall 4. Refridgerator supply line needs to be sealed at floor 5. Missing outlet on large slider wall marked on print Per NEC 210.52 6. Outlet needed on smaller slider wall for outlet spacing marked on print Per NEC 210.52 | |||
| ROOF VALLEY & METAL | 04/19/2022 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Missing nailing Rear left hip first row near hip not nailed. The blocking that is to be installed at both right and left hips will need to be installed and the plywood ends nailed to the blocking at 4" o.c. These note can be found on roof, truss inspection also. 4/6/22 - Cancelled as per your request. 4/8/22 - ROOF IS COMPLETELY COVERED. IT FAILED INSPECTION 3/23/22 (J.WALKER) AND DID NOT HAVE A RE-INSPECT BEFORE COVERING. 4/12/22 - OPENING UP SOME AREAS FOR INSPECTION, RESCHEDULING. 4/14/22 - Canceled as per your request. 4/19/22 - ROOF OPENED IN AREAS AND INSPECTED. | |||
| ROOF VALLEY & METAL | 04/14/2022 | CANCELLED BY APPLICANT | FWILLIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Missing nailing Rear left hip first row near hip not nailed. The blocking that is to be installed at both right and left hips will need to be installed and the plywood ends nailed to the blocking at 4" o.c. These note can be found on roof, truss inspection also. 4/6/22 - Cancelled as per your request. 4/8/22 - ROOF IS COMPLETELY COVERED. IT FAILED INSPECTION 3/23/22 (J.WALKER) AND DID NOT HAVE A RE-INSPECT BEFORE COVERING. 4/12/22 - OPENING UP SOME AREAS FOR INSPECTION, RESCHEDULING. 4/14/22 - Canceled as per your request. | |||
| ROOF VALLEY & METAL | 04/13/2022 | Disapproved - NO FEE | FWILLIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Missing nailing Rear left hip first row near hip not nailed. The blocking that is to be installed at both right and left hips will need to be installed and the plywood ends nailed to the blocking at 4" o.c. These note can be found on roof, truss inspection also. 4/6/22 - Cancelled as per your request. 4/8/22 - ROOF IS COMPLETELY COVERED. IT FAILED INSPECTION 3/23/22 (J.WALKER) AND DID NOT HAVE A RE-INSPECT BEFORE COVERING. 4/12/22 - OPENING UP SOME AREAS FOR INSPECTION, RESCHEDULING. | |||
| ROOF VALLEY & METAL | 04/12/2022 | CANCELLED BY APPLICANT | FWILLIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Missing nailing Rear left hip first row near hip not nailed. The blocking that is to be installed at both right and left hips will need to be installed and the plywood ends nailed to the blocking at 4" o.c. These note can be found on roof, truss inspection also. 4/6/22 - Cancelled as per your request. 4/8/22 - ROOF IS COMPLETELY COVERED. IT FAILED INSPECTION 3/23/22 (J.WALKER) AND DID NOT HAVE A RE-INSPECT BEFORE COVERING. 4/12/22 - OPENING UP SOME AREAS FOR INSPECTION, RESCHEDULING. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/12/2022 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION The valley over framing where the length of the rafter is 8' or over a 2x6 must be used. Install H4,anchors where rafters meet the ridges. The rear 2 x beams have been cover with plywood and tyvex concealing anchors. Please remove so anchors can be verified. Front entry has also been plywooded and tyvex conceiling beams and anchors.' Moisture barrier is to be installed where wood is set on top of CMU. unless P.T. The bolts at all bearing wall ends where the meet the CMU walls are to be 2' o.c. Missing simpson MSTA straps at the garage header. The Bolts at bearing wall bottom plate garage are to be 2' o.c. Details for bearing walls can be found on page S301 Blocking is to be installed where the vetical roof decking meet the horizontal roof decking at both right and left hip roof decking will also need to be nailed 4" o.c. to the blocking installed. 4/6/22 - Cancelled as per your request. 4/8/22 - CAN NOT INSPECT ROOF SHEATHING BECAUSE ROOF IS COVERED. 4/12/22 - ITEMS CORRECTED | |||
| ROOF VALLEY & METAL | 04/08/2022 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Missing nailing Rear left hip first row near hip not nailed. The blocking that is to be installed at both right and left hips will need to be installed and the plywood ends nailed to the blocking at 4" o.c. These note can be found on roof, truss inspection also. 4/6/22 - Cancelled as per your request. 4/8/22 - ROOF IS COMPLETELY COVERED. IT FAILED INSPECTION 3/23/22 (J.WALKER) AND DID NOT HAVE A RE-INSPECT BEFORE COVERING. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/08/2022 | Disapproved - NO FEE | FWILLIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION The valley over framing where the length of the rafter is 8' or over a 2x6 must be used. Install H4,anchors where rafters meet the ridges. The rear 2 x beams have been cover with plywood and tyvex concealing anchors. Please remove so anchors can be verified. Front entry has also been plywooded and tyvex conceiling beams and anchors.' Moisture barrier is to be installed where wood is set on top of CMU. unless P.T. The bolts at all bearing wall ends where the meet the CMU walls are to be 2' o.c. Missing simpson MSTA straps at the garage header. The Bolts at bearing wall bottom plate garage are to be 2' o.c. Details for bearing walls can be found on page S301 Blocking is to be installed where the vetical roof decking meet the horizontal roof decking at both right and left hip roof decking will also need to be nailed 4" o.c. to the blocking installed. 4/6/22 - Cancelled as per your request. 4/8/22 - CAN NOT INSPECT ROOF SHEATHING BECAUSE ROOF IS COVERED. | |||
| ROOF VALLEY & METAL | 04/06/2022 | CANCELLED BY APPLICANT | FWILLIS |
| Note: THIS IS A REINSPECTION Missing nailing Rear left hip first row near hip not nailed. The blocking that is to be installed at both right and left hips will need to be installed and the plywood ends nailed to the blocking at 4" o.c. These note can be found on roof, truss inspection also. 4/6/22 - Cancelled as per your request. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/06/2022 | CANCELLED BY APPLICANT | FWILLIS |
| Note: THIS IS A REINSPECTION The valley over framing where the length of the rafter is 8' or over a 2x6 must be used. Install H4,anchors where rafters meet the ridges. The rear 2 x beams have been cover with plywood and tyvex concealing anchors. Please remove so anchors can be verified. Front entry has also been plywooded and tyvex conceiling beams and anchors.' Moisture barrier is to be installed where wood is set on top of CMU. unless P.T. The bolts at all bearing wall ends where the meet the CMU walls are to be 2' o.c. Missing simpson MSTA straps at the garage header. The Bolts at bearing wall bottom plate garage are to be 2' o.c. Details for bearing walls can be found on page S301 Blocking is to be installed where the vetical roof decking meet the horizontal roof decking at both right and left hip roof decking will also need to be nailed 4" o.c. to the blocking installed. 4/6/22 - Cancelled as per your request. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/23/2022 | Disapproved - NO FEE | JWALKER |
| Note: The valley over framing where the length of the rafter is 8' or over a 2x6 must be used. Install H4,anchors where rafters meet the ridges. The rear 2 x beams have been cover with plywood and tyvex concealing anchors. Please remove so anchors can be verified. Front entry has also been plywooded and tyvex conceiling beams and anchors.' Moisture barrier is to be installed where wood is set on top of CMU. unless P.T. The bolts at all bearing wall ends where the meet the CMU walls are to be 2' o.c. Missing simpson MSTA straps at the garage header. The Bolts at bearing wall bottom plate garage are to be 2' o.c. Details for bearing walls can be found on page S301 Blocking is to be installed where the vetical roof decking meet the horizontal roof decking at both right and left hip roof decking will also need to be nailed 4" o.c. to the blocking installed. | |||
| ROOF VALLEY & METAL | 03/23/2022 | Disapproved - NO FEE | JWALKER |
| Note: Missing nailing Rear left hip first row near hip not nailed. The blocking that is to be installed at both right and left hips will need to be installed and the plywood ends nailed to the blocking at 4" o.c. These note can be found on roof, truss inspection also. | |||
| FOUND SURVEY APPROVED (OFFICE) | 02/23/2022 | APPROVED | TBAKER |
| WALL SHEATHING | 02/16/2022 | APPROVED | FWILLIS |
| Note: Neighbor complained about the construction garbage and workers lunch garbage not thrown in dumpster. Instead piled up in front of the site. | |||
| TIE BEAM / LINTEL | 01/19/2022 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 12/27/2021 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/13/2021 | APPROVED | MGIBSON |
| Note: PROVIDE PORTABLE RESTROOM BEFORE MONOLITHIC SLAB INSPECTION | |||
| GRAVITY SEWER TEST | 12/13/2021 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 11/24/2021 | APPROVED | CSTONE |
| WATER METER INSTALLATION REQUEST | 11/08/2021 | CANCELLED BY APPLICANT | WEB |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 09/14/2022 | 09/15/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/21/2022 | 07/22/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide entire heatload including manual J summary page. Upload Energy Calc and heatload as one file. | |||
| ENGIN1 | COMPLETE | 02/22/2022 | 02/23/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/22/2022 | 02/22/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 09/10/2021 | 11/17/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/09/2021 | 09/09/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 09/09/2021 | 09/16/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 09/09/2021 | 09/10/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/09/2021 | 09/10/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/09/2021 | 09/13/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/09/2021 | 09/10/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/09/2021 | 09/16/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/09/2021 | 09/10/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 09/27/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 09/27/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 09/27/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/27/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/27/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/27/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/27/2022 |
| CONNECTION FEES | ¤1,017.83 | 11/04/2021 |
| METER - DEPOSIT | ¤60.00 | 11/04/2021 |
| WATER- TURN ON | ¤25.00 | 11/04/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/04/2021 |
| INSPECTION - RESIDENTIAL | ¤742.50 | 11/04/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤210.60 | 11/04/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 11/04/2021 |
| IMPACT FEE FIRE | ¤367.00 | 11/04/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 11/04/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/04/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 11/04/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/04/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 11/04/2021 |
| SURCHARGE FS 533.721 | ¤10.39 | 11/04/2021 |
| SURCHARGE - FS 468.631 | ¤15.59 | 11/04/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/04/2021 |
| SW ENG INSPECTION 60 | ¤60.00 | 11/04/2021 |
| SW ENG PRE APRON | ¤30.00 | 11/04/2021 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/04/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/04/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 11/04/2021 |
| SEWER CREDIT | (¤2,161.99) | 11/04/2021 |
| SEWER INSPECTION | ¤25.00 | 11/04/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 11/04/2021 |
| WATER CREDIT | (¤456.46) | 11/04/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 11/04/2021 |
| SITE PLAN 30 | ¤30.00 | 11/04/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,050.56 |