I want to search for...
Permit #2021090415
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-01470-0090 |
| CONDITIONED SPACE: 2023 sqft |
| GARAGE: 724 sqft |
| OPENED PORCH (WITH ROOF) : 260 sqft |
| OPENED PORCH (WITH ROOF) : 60 sqft |
| Total Square Footage: 3067 sqft |
| Block: 01470 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-445-3405 |
| Location Address: 151 ERIC DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/20/2021 |
| NOC: RECORDED |
| Applicant name: JAY DARREN CURBOW |
| Owner: SWEARINGEN ROBERT C & JUDY A H&W |
|
Address 9 ZEBRA COURT PALM COAST, FL 32164 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤242,587.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
BLUE WATER HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4881 PALM COAST PARKWAY NW UNIT 1 PALM COAST, FL 32137 |
CBC1258679 (Exp: 08/31/2026) | 386-445-3405 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
GREGG A MCANALLY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE PALM COAST, FL 32092 |
CAC1815760 (Exp: 08/31/2022) | 904-829-8898 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/13/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION No hot water 07-12-2022 - Above issue has not been resolved. 7/13/22 No hot water to kitchen sink. Dishwasher drain line routed incorrectly. Route per manufacturer specifications. | |||
| BLD - BUILDING FINAL | 07/13/2022 | FINAL APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION No hot water 07-12-2022 - Above issue has not been resolved. 7/13/22 No hot water to kitchen sink. Dishwasher drain line routed incorrectly. Route per manufacturer specifications. | |||
| BLD - BUILDING FINAL | 07/12/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: THIS IS A REINSPECTION No hot water 07-12-2022 - Above issue has not been resolved. | |||
| BLD - BUILDING FINAL | 07/11/2022 | Disapproved - NO FEE | MKRASKI |
| Note: No hot water | |||
| U-CROSS CONNECTION | 07/07/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections | |||
| U -UTILITY RESIDENTIAL FINAL | 07/07/2022 | FINAL APPROVED | JHARDING |
| ROW - FINAL APRON (AFTER POUR) | 07/06/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/06/2022 | APPROVED | GBERTOLA |
| ROW - STORMWATER FINAL | 07/06/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| FINAL SURVEY (OFFICE USE ONLY) | 07/06/2022 | APPROVED | GBERTOLA |
| ELECTRIC - EARLY POWER | 06/07/2022 | APPROVED - AS NOTED | JWALKER |
| Note: Emailed FPL 1:29 pm | |||
| ROW- PRE-APRON (PRE-POUR) | 05/19/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: 5/19/22 ITS THE CONTRACTORS RESPONSIBILITY TO CHECK CULVERT PIPE ELEVATION BEFORE POURING CONCRETE FACE FORM BOARD IS BELOW EDGE OF PAVEMENT DO TO NOT NAILED NEED TO FIX BEFORE POURING CONCRETE THE CULVERT IS OUT OF TOLERANCE ON LEFT INVERT IF YOUR FACEING HOUSE FROM ROAD | |||
| U - SEWER TIE IN | 05/18/2022 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 05/17/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THE CULVERT IS OUT OF TOLERANCE ON LEFT INVERT IF YOUR FACEING HOUSE FROM ROAD | |||
| PEP TANK INSTALLATION REQUEST | 04/14/2022 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 3/24/2022 2:55:55 PM Interior & Exterior (sheet rock and stucco/siding not installed) email rhand@palmcoastgov.com with questions | |||
| LATH/BRICK/ WATER BARRIER | 04/01/2022 | APPROVED | JWALKER |
| INSULATION | 03/24/2022 | APPROVED | JWALKER |
| PEP TANK INSTALLATION REQUEST | 03/24/2022 | Disapproved - NO FEE | CSTONE |
| Note: Interior & Exterior (sheet rock and stucco/siding not installed) email rhand@palmcoastgov.com with questions | |||
| ALL ROUGH | 03/18/2022 | APPROVED - AS NOTED | JWALKER |
| Note: The 2 inch drain line half in and half out of the concrete in the master bath is not sloping down ward. | |||
| ROOF VALLEY & METAL | 02/14/2022 | APPROVED | JWALKER |
| WALL SHEATHING | 02/04/2022 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/04/2022 | APPROVED | JWALKER |
| TIE BEAM / LINTEL | 01/04/2022 | APPROVED | JWALKER |
| FOUND SURVEY APPROVED (OFFICE) | 12/01/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 11/16/2021 | APPROVED | JWALKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/02/2021 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 11/02/2021 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 09/28/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 12/01/2021 | 12/01/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/01/2021 | 12/01/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/17/2021 | 09/17/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 09/10/2021 | 11/17/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| BLD | HOLD | 09/09/2021 | 09/10/2021 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Provide corrrect/missing product approval of the following items per F.S. 553.842: 1. FL 1170.6 for garage door, 16' x 7' does not comply with the required design pressure. 2. Product approval of structural components such as wood connectors and wood anchors are missing. | |||
| CUSVC | COMPLETE | 09/09/2021 | 09/16/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 09/09/2021 | 09/10/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/09/2021 | 09/10/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/09/2021 | 09/13/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/09/2021 | 09/10/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/09/2021 | 09/16/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/09/2021 | 09/10/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/13/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/13/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 07/13/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/20/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/20/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 09/20/2021 |
| SEWER CREDIT | (¤850.00) | 09/20/2021 |
| SEWER INSPECTION | ¤25.00 | 09/20/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 09/20/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 09/20/2021 |
| SITE PLAN 30 | ¤30.00 | 09/20/2021 |
| METER - DEPOSIT | ¤60.00 | 09/20/2021 |
| METER - DEPOSIT | ¤60.00 | 09/20/2021 |
| WATER-METER | ¤441.07 | 09/20/2021 |
| WATER- TURN ON | ¤25.00 | 09/20/2021 |
| WATER- TURN ON | ¤25.00 | 09/20/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/20/2021 |
| INSPECTION - RESIDENTIAL | ¤737.00 | 09/20/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤209.04 | 09/20/2021 |
| CONNECTION FEES | ¤1,017.83 | 09/20/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 09/20/2021 |
| IMPACT FEE FIRE | ¤367.00 | 09/20/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 09/20/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/20/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 09/20/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/20/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/20/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 09/20/2021 |
| SURCHARGE FS 533.721 | ¤10.32 | 09/20/2021 |
| SURCHARGE - FS 468.631 | ¤15.48 | 09/20/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/20/2021 |
| SW ENG INSPECTION 60 | ¤60.00 | 09/20/2021 |
| SW ENG PRE APRON | ¤30.00 | 09/20/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,200.34 |