Permit #2021090592
Permit Details
Status: COED
| Parcel Id: 14-11-30-5538-00000-0100 |
| Total Square Footage: 146336 sqft |
| Block: 00000 |
| Subdivision: - |
| Job Phone: 407-916-7235 |
| Location Address: 1 ADVENTHEALTH WAY |
| Type: BC - BUILDING COMMERCIAL |
| Issue Date: 12/14/2021 |
| NOC: RECORDED |
| Applicant name: BRUCE ROBERT ADAMS |
| Owner: MEMORIAL HOSPITAL-FLAGLER INC |
|
Address 60 MEMORIAL MEDICAL PKWY PALM COAST, FL 32164 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤75,800,000.00 |
| Job Description: Adventhealth 100 Bed Hospital |
| Type: CN |
Contractor
THE ROBINS & MORTON GROUP
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
423 S KELLER RD ORLANDO, FL 32810 |
#200 ORLANDO, FL 32810 |
CGC1523017 (Exp: 08/31/2026) | 407-916-7235 |
Sub Contractors
CLIFTON RYAN NASH
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 98 WILDWOOD, FL 34785 |
CMC1250561 (Exp: 08/31/2026) | 352-748-1454 | 352-748-2990 |
MARION CASEY DEAN
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
1765 GREENSBORO STATION PL TYSONS, VA 22102 |
EC0001830 (Exp: 08/31/2024) | 703-802-6231 | 703-421-4670 |
JOHN PATRICK MANZELLA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
4495 35TH STREET ORLANDO, FL 32811 |
CCC050475 (Exp: 08/31/2026) | (407)650-9541 | (407)650-9542 |
SHANE WIGHT
| Status | Location Address | State License Number | Phone |
| CANCEL |
936 RIDGEBROOK ROAD TAMPA, FL 33619 |
EC13011518 (Exp: 08/31/2024) | 813-386-2918 |
ANDREW BARNES
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
394 EAST DRIVE MELBOURNE, FL 32904 |
CFC1431602 (Exp: 08/31/2026) | 321-725-3061 | 321-984-0718 |
Inspection History
| Type | Request Date | Result | Inspector |
| BUILDING FINAL | 06/06/2023 | Approval - Private Provider | PPROVIDER |
| BUILDING FINAL | 06/06/2023 | Approval - Private Provider | PPROVIDER |
| EXTERIOR ARCHITECTURAL FEATURES | 06/05/2023 | FINAL APPROVED | RPICATAGI |
| U - UTILITY COMMERCIAL FINAL | 06/05/2023 | FINAL APPROVED | LFITZGERALD |
| ABOVE CEILING | 06/05/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 06/05/2023 | Approval - Private Provider | PPROVIDER |
| Note: 06/02/2023 is to resolve any remaining items for the full approval Victoria A Valley 06/05/2023 Approved for Temporary CO, additional inspections required when new elevator drive for cab 3 is installed, and to verify additional labels required Frank D. Godawa | |||
| FIRE FINAL | 06/02/2023 | APPROVED | RMARTIN |
| Note: 6/1/2023 - PREVIOUS INSPECTION NOTES 6/1/23 2nd floor, needs certified Fire extinguishers 5/30/2023 - PREVIOUS INSPECTION NOTES 5/30/23 first floor 5/24/2023 - PREVIOUS INSPECTION NOTES | |||
| FIRE FINAL | 06/01/2023 | PARTIALLY APPROVED | RMARTIN |
| Note: 6/1/23 2nd floor, needs certified Fire extinguishers 5/30/2023 - PREVIOUS INSPECTION NOTES 5/30/23 first floor 5/24/2023 - PREVIOUS INSPECTION NOTES | |||
| PLUMBING FINAL | 05/31/2023 | Approval - Private Provider | PPROVIDER |
| HVAC FINAL | 05/31/2023 | Approval - Private Provider | PPROVIDER |
| Note: 5/30/2023 8:44:32 AM- PREVIOUS INSPECTION NOTES 05/24/2023 Boiler relief on sidewalk Eric D. Reinertsen | |||
| FIRE FINAL | 05/30/2023 | PARTIALLY APPROVED | RMARTIN |
| Note: 5/30/23 first floor 5/24/2023 - PREVIOUS INSPECTION NOTES | |||
| HVAC FINAL | 05/24/2023 | PARTIALLY APPROVED | PPROVIDER |
| Note: 05/24/2023 Boiler relief on sidewalk Eric D. Reinertsen | |||
| PLUMBING FINAL | 05/24/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 05/24/2023 | Approval - Private Provider | PPROVIDER |
| Note: 05/24/2023 Many exterior rms level one south side, highlighted on plans Frank D. Godawa | |||
| BLD - GREASE INTERCEPTOR PLUMBING & VENTING | 05/23/2023 | Approval - Private Provider | PPROVIDER |
| FIRE FINAL | 05/23/2023 | CANCELLED BY APPLICANT | RMARTIN |
| U-GREASE INTERCEPTOR INSTALLED/PLUMBED | 05/23/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: see same inspection on the site permit-approved | |||
| U-GREASE INTERCEPTOR FLOW/DYE TESTED | 05/23/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: see this same inspection on the site permit, was approved | |||
| ELECTRIC FINAL | 05/22/2023 | Approval - Private Provider | PPROVIDER |
| Note: 3rd floor final, bed areas, corridor | |||
| ELECTRIC FINAL | 05/22/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 05/15/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 05/11/2023 | Approval - Private Provider | PPROVIDER |
| Note: 05/05/2023 OH Brittany A. Gerow 05/11/2023 Level 3 highlighted on plans Frank D. Godawa | |||
| ELECTRIC FINAL | 05/10/2023 | Approval - Private Provider | PPROVIDER |
| Note: 05/05/2023 OH Brittany A. Gerow 05/10/2023 Highlighted on plans Frank D. Godawa | |||
| ELECTRIC FINAL | 05/09/2023 | Approval - Private Provider | PPROVIDER |
| Note: 05/05/2023 OH Brittany A. Gerow 05/09/2023 3rd floor highlighted on plans Frank D. Godawa I | |||
| ELECTRIC FINAL | 05/08/2023 | Approval - Private Provider | PPROVIDER |
| Note: 05/05/2023 OH Brittany A. Gerow 05/08/2023 Second level Frank D. Godawa | |||
| ELECTRIC FINAL | 05/05/2023 | Approval - Private Provider | PPROVIDER |
| Note: 05/05/2023 Doing electric finals level 1, highlighted on plans Frank D. Godawa 05/05/2023 Doing electric finals level 1 highlighted on plans Frank D. Godawa | |||
| ELECTRIC OTHER | 05/05/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC OTHER | 05/03/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC OTHER | 05/02/2023 | Approval - Private Provider | PPROVIDER |
| Note: 05/02/2023 Going thru 1st floor all rms for final highlighted on plans Frank D. Godawa | |||
| ELECTRIC OTHER | 04/28/2023 | Approval - Private Provider | PPROVIDER |
| Note: oh electrical level 1 materials management area level 4 area 2 N4DPLA N4LA3 N4LA4 | |||
| ELECTRIC OTHER | 04/27/2023 | Approval - Private Provider | PPROVIDER |
| Note: 04/24/2023 • OH electrical level 1 materials management area Victoria A Valley 04/27/2023 Highlighted on plans Frank D. Godawa | |||
| GRAVITY SEWER | 04/26/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC OTHER | 04/25/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC OTHER | 04/21/2023 | Approval - Private Provider | PPROVIDER |
| Note: 04/14/2023 • OH electrical Brittany A. Gerow 04/21/2023 Level 4 highlighted on plans Frank D. Godawa | |||
| STEMWALL FOOTING | 04/20/2023 | Approval - Private Provider | PPROVIDER |
| Note: 04/19/2023 rebar inspection for retaining wall footing per RFI 779 Brittany A. Gerow 04/20/2023 MRI Chiller Stem wall Footing RFI 760 William A. Ruzycky | |||
| ELECTRIC OTHER | 04/20/2023 | Approval - Private Provider | PPROVIDER |
| Note: 04/14/2023 • OH electrical Brittany A. Gerow 04/20/2023 Electric pnl Q4LA2, & transformer Q4LA2 Frank D. Godawa | |||
| ELECTRIC OTHER | 04/20/2023 | Approval - Private Provider | PPROVIDER |
| Note: 04/14/2023 • OH electrical Brittany A. Gerow 04/20/2023 4th floor above ceiling, highlighted on plans Frank D. Godawa | |||
| ELECTRIC OTHER | 04/19/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC OTHER | 04/19/2023 | Approval - Private Provider | PPROVIDER |
| Note: 4th floor above ceilings, north west corner, 3rd floor elec rm pnls, & transformer, xcr3DPLA, CRDPLA, CR3L, 1, 2, 4, 5, 6 | |||
| ELECTRIC OTHER | 03/17/2023 | Approval - Private Provider | PPROVIDER |
| FIREWALL PENETRATIONS | 03/06/2023 | Approval - Private Provider | PPROVIDER |
| FRAMING | 02/28/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC OTHER | 02/28/2023 | Approval - Private Provider | PPROVIDER |
| FIREWALL PENETRATIONS | 02/27/2023 | APPROVED | PPROVIDER |
| INSULATION | 02/27/2023 | Approval - Private Provider | PPROVIDER |
| FIREWALL PENETRATIONS | 02/24/2023 | Approval - Private Provider | PPROVIDER |
| Note: Fire penetrations above ACT area 2 fire and smoke walls | |||
| ELECTRIC OTHER | 02/23/2023 | Approval - Private Provider | PPROVIDER |
| Note: 02/23/2023 OR Panels COR 5B 1/2 COR 4B 1/2 COR 3B 1/2 COR 2A 1/2 COR 1A 1/2 Victoria A Valley 02/23/2023 Highlighted on plans Frank D. Godawa | |||
| ELECTRIC OTHER | 02/23/2023 | Approval - Private Provider | PPROVIDER |
| Note: Date Note User Name 02/23/2023 OR Panels COR 5B 1/2 COR 4B 1/2 COR 3B 1/2 COR 2A 1/2 COR 1A 1/2 Victoria A Valley 02/23/2023 Highlighted on plans Frank D. Godawa | |||
| ELECTRIC OTHER | 02/22/2023 | Approval - Private Provider | PPROVIDER |
| Note: 02/21/2023 Level 2 Panel CR2DPLA Panel CR2LA1 Panel CR2LA2 Panel CR2LA3 Panel CR2LA4 Dakota L. Hilton I | |||
| ELECTRIC OTHER | 02/15/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC OTHER | 02/14/2023 | Approval - Private Provider | PPROVIDER |
| Note: Date Note User Name 02/13/2023 Level 1 Cath Equipment Room- ECB-CB2 and ECB CB1 Level 2 Panel CR2DPLA Panel CR2LA1 Panel CR2LA2 Panel CR2LA3 Panel CR2LA4 Transformer T-Q2KLC Panel Q2KLC-ECB Transformer T-CR2DPHB Panel CR2DPLB Q2KLC (Section 1, 2, 3) Main Electrical Room Panel Q2HA1 Transformer T-Q2LA1 Panel Q2LA1 Mechanical Room Rough-in Level 4 Area 1 Electrical In-wall Rough-in Thanks! Dakota L. Hilton 02/14/2023 Highlighted on plans Frank D. Godawa | |||
| FRAMING | 02/09/2023 | Approval - Private Provider | PPROVIDER |
| INSULATION | 02/09/2023 | Approval - Private Provider | PPROVIDER |
| Note: 02/08/2023 Roof level stair 1 Dakota L. Hilton 02/09/2023 Passed Stairway 1 exterior walls and fireproof on metal welds level 5 and 4 William A. Ruzycky | |||
| PLUMBING OTHER | 01/31/2023 | Approval - Private Provider | PPROVIDER |
| Note: 01/30/2023 Level 4 Med Gas Mains The Whole floor Victoria A Valley 01/31/2023 Level 4 Eric D. Reinertsen | |||
| ELECTRIC OTHER | 01/30/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC OTHER | 01/25/2023 | Approval - Private Provider | PPROVIDER |
| Note: 01/24/2023 Level 2 area 3 main electrical room 2022 • Main Distribution Panel CR2DPHA Level 1 Area 1 Electrical room - Transformer T-CR1DPLA - Main panel CR1DPLA - Panel CR1LA1, CR1LA2, CR1LA3 Level 1 Area 2 Electrical room • CR1LA4. CR1LA5, CR1LA6 Victoria A Valley 01/25/2023 Highlighted on plans Frank D. Godawa | |||
| ELECTRIC OTHER | 01/24/2023 | Approval - Private Provider | PPROVIDER |
| Note: 12/15/2022 11:37:57 AM- PREVIOUS INSPECTION NOTES 12/13/2022 electrical in walls for MRI room Victoria A Valley 12/14/2022 Level 1, highlighted on plans Frank D. Godawa - Level 2 Area 3 Electrical room - Panel CR2DPHB - Panel MRI- IEC - MRI CHILLER/ Exterior disconnect | |||
| FRAMING | 12/22/2022 | Approval - Private Provider | BBEMBRY |
| Note: framing leve 4 area 1 framing 1 reinspection all rooms and corridors except 4101, 4102, 4116, and 4730 | |||
| ELECTRIC 1ST ROUGH | 12/15/2022 | Approval - Private Provider | PPROVIDER |
| Note: partial pass - elec in walls for level 4 area 1 | |||
| ELECTRIC 1ST ROUGH | 12/15/2022 | Approval - Private Provider | PPROVIDER |
| Note: partial pass chiller # 1 | |||
| ELECTRIC OTHER | 12/14/2022 | PARTIALLY APPROVED | PPROVIDER |
| Note: 12/13/2022 electrical in walls for MRI room Victoria A Valley 12/14/2022 Level 1, highlighted on plans Frank D. Godawa | |||
| ELECTRIC OTHER | 12/09/2022 | Approval - Private Provider | PPROVIDER |
| Note: 12/12/2022 2:20:04 PM- PREVIOUS INSPECTION NOTES 12/12/2022 2:16:24 PM- PREVIOUS INSPECTION NOTES | |||
| PLUMBING OTHER | 12/08/2022 | PARTIALLY APPROVED | PPROVIDER |
| Note: 12/07/2022 Level 4 Area 1 Water Inwall Dakota L. Hilton | |||
| PLUMBING OTHER | 12/08/2022 | Approval - Private Provider | PPROVIDER |
| Note: 12/12/2022 1:59:18 PM- PREVIOUS INSPECTION NOTES 12/07/2022 Level 4 Area 1 Water Inwall Dakota L. Hilton | |||
| ELECTRIC OTHER | 12/07/2022 | Approval - Private Provider | PPROVIDER |
| Note: 12/07/2022 Heli Pad underground rough-in Victoria A Valley 12/07/2022 Heli pad underground conduit Frank D. Godawa | |||
| ELECTRIC OTHER | 12/07/2022 | PARTIALLY APPROVED | PPROVIDER |
| Note: 12/06/2022 Level 4 area 2 Remaining in-wall rough-in Dakota L. Hilton 12/07/2022 Highlighted on plans Frank D. Godawa | |||
| ELECTRIC OTHER | 12/07/2022 | PARTIALLY APPROVED | PPROVIDER |
| Note: 12/12/2022 2:16:24 PM- PREVIOUS INSPECTION NOTES 12/06/2022 Level 1 Area 2 Electrical Room Normal panel/ Transformer inspection (T-N1DPLA, N1DPLA, N1LA4, N1LA3) Dakota L. Hilton I | |||
| INSULATION | 12/07/2022 | Approval - Private Provider | PPROVIDER |
| Note: 12/06/2022 Level 4 Ext. Wall Dakota L. Hilton 12/07/2022 Insulation Exterior Rm 4204 to 4236 William A. Ruzycky | |||
| PLUMBING OTHER | 12/05/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC - EARLY POWER | 11/17/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC OTHER | 11/15/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 11/15/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC OTHER | 11/14/2022 | Approval - Private Provider | PPROVIDER |
| Note: 11/11/2022 Level 1 Area 1 OH ceiling inspection. Level 2 Area 2 OH ceiling inspection Victoria A Valley | |||
| ELECTRIC OTHER | 11/11/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC OTHER | 11/11/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 11/11/2022 | Approval - Private Provider | PPROVIDER |
| EXTERIOR WALL SHEATHING / SHEARWALL | 11/11/2022 | Approval - Private Provider | PPROVIDER |
| HVAC OTHER | 11/09/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC OTHER | 11/08/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC OTHER | 11/08/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 11/08/2022 | Approval - Private Provider | PPROVIDER |
| BUILDING OTHER | 11/01/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC OTHER | 10/25/2022 | Approval - Private Provider | PPROVIDER |
| Note: partial pass | |||
| ELECTRIC 1ST ROUGH | 10/20/2022 | Approval - Private Provider | PPROVIDER |
| SECOND FLOOR SLAB | 10/20/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC 2ND ROUGH | 10/18/2022 | Approval - Private Provider | PPROVIDER |
| Note: partial pass | |||
| HVAC OTHER | 10/13/2022 | Approval - Private Provider | PPROVIDER |
| Note: partial pass | |||
| PLUMBING OTHER | 10/13/2022 | Approval - Private Provider | PPROVIDER |
| INSULATION | 10/13/2022 | Approval - Private Provider | PPROVIDER |
| HVAC OTHER | 10/10/2022 | Approval - Private Provider | PPROVIDER |
| STOREFRONT | 10/07/2022 | Approval - Private Provider | PPROVIDER |
| HVAC OTHER | 10/06/2022 | Approval - Private Provider | PPROVIDER |
| HVAC OTHER | 10/06/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING OTHER | 10/06/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC OTHER | 10/03/2022 | Approval - Private Provider | PPROVIDER |
| HVAC OTHER | 09/26/2022 | Approval - Private Provider | PPROVIDER |
| Note: 09.26.22 4th floor return air | |||
| FIREWALL DRYWALL NAILING | 09/26/2022 | Approval - Private Provider | PPROVIDER |
| HVAC OTHER | 09/23/2022 | Approval - Private Provider | PPROVIDER |
| HVAC OTHER | 09/23/2022 | Approval - Private Provider | PPROVIDER |
| Note: 09232022 4th floor supply and return | |||
| HVAC OTHER | 09/22/2022 | Approval - Private Provider | PPROVIDER |
| Note: 09/22/22 light test and return pressure test | |||
| HVAC OTHER | 09/22/2022 | Approval - Private Provider | PPROVIDER |
| Note: 09/22/2022 light test and RETURN PRESSURE TEST Victoria A Valley | |||
| HVAC OTHER | 09/22/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING OTHER | 09/22/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING OTHER | 09/22/2022 | Approval - Private Provider | PPROVIDER |
| Note: 09/22/2022 level 3 area 1 overheard | |||
| FRAMING | 09/22/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 09/22/2022 | Approval - Private Provider | PPROVIDER |
| Note: drywall nailing inspection for paraper wall | |||
| STOREFRONT | 09/22/2022 | Approval - Private Provider | PPROVIDER |
| Note: 9/22/2022 slab edge fire proofing at roo & progress inspection for cap sheet at the roof 9/26/2022 2 upper areas in storefront east side slab edge, cap sheet west half of main roof | |||
| FRAMING | 09/21/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 09/21/2022 | Approval - Private Provider | PPROVIDER |
| Note: 09/21/2022 level 3 area 2 Victoria A Valley 09/26/2022 Framing 3rd floor, rooms 3238 through 3224, area 2. Dakota L. Hilton | |||
| FRAMING | 09/21/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC OTHER | 09/21/2022 | Approval - Private Provider | PPROVIDER |
| Note: 09212022 level 3 area 2 in wall rough 09252022 elec wall rough level 3 area 2 | |||
| PLUMBING OTHER | 09/20/2022 | Approval - Private Provider | PPROVIDER |
| Note: 09/20/2022 level 3 exhaust pressure test, level 2 light test | |||
| PLUMBING OTHER | 09/19/2022 | Approval - Private Provider | PPROVIDER |
| Note: Medical gas rough level 3 area 2 overhead med gas | |||
| ELECTRIC OTHER | 09/19/2022 | Approval - Private Provider | PPROVIDER |
| Note: elec wall rough, level 2, aera 3, ms 2016 & 2018 | |||
| HVAC OTHER | 09/19/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 09/19/2022 | Approval - Private Provider | PPROVIDER |
| Note: 2nd FL FM 2024a rated wall 2nd layer 3rd fl shaft walls interior lier RMS 3223a 3225 3233 | |||
| ELECTRIC OTHER | 09/16/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC OTHER | 09/15/2022 | Approval - Private Provider | PPROVIDER |
| Note: 9/15/22 level 2 area 3 inwall electrical 9/15/22 8am 9/18/22 elec wall rough leve 2, area 3, rms 2016 & 2018 | |||
| ELECTRIC OTHER | 09/15/2022 | Approval - Private Provider | PPROVIDER |
| Note: 9/15/2022 level 2 area 3 inwall electrical 9/15/2022 8am 9/18/2022 elec. wall rough, level 2, area 3, rms 2016 & 2018 | |||
| HVAC OTHER | 09/15/2022 | Approval - Private Provider | PPROVIDER |
| Note: 9/15/2022 pressure test exhaust and return 9/15/2022 8am and 3pm | |||
| HVAC OTHER | 09/15/2022 | Approval - Private Provider | PPROVIDER |
| STOREFRONT | 09/15/2022 | Approval - Private Provider | PPROVIDER |
| Note: 9.15.2022 CURTAIN WALL INSPECTION 9.15.22 9AM 9.18.22 4 BRACKETS PER STORE FRONT | |||
| ELECTRIC OTHER | 09/14/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 09/14/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 09/08/2022 | Approval - Private Provider | PPROVIDER |
| COLUMN | 09/08/2022 | Approval - Private Provider | PPROVIDER |
| HVAC OTHER | 09/08/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING OTHER | 09/08/2022 | Approval - Private Provider | PPROVIDER |
| STOREFRONT | 08/30/2022 | Approval - Private Provider | PPROVIDER |
| Note: curtain wall window at stair #2 | |||
| FIREWALL PENETRATIONS | 08/26/2022 | Approval - Private Provider | PPROVIDER |
| ROOF IN PROGRESS | 08/25/2022 | Approval - Private Provider | PPROVIDER |
| Note: Notes: Date Note User Name 08/25/2022 roof cap sheet/ drying for CEP roof Victoria A Valley 08/25/2022 9AM Victoria A Valley | |||
| ROOF IN PROGRESS | 08/24/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 08/24/2022 | Approval - Private Provider | PPROVIDER |
| Note: drywall screw inspection level 4 area 1 | |||
| PLUMBING OTHER | 08/24/2022 | Approval - Private Provider | PPROVIDER |
| Note: level 2 dwv level 3 h20 overhead area 3 8am | |||
| HVAC OTHER | 08/24/2022 | Approval - Private Provider | PPROVIDER |
| Note: Pressure test for risers | |||
| HVAC OTHER | 08/22/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 08/11/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 08/11/2022 | Approval - Private Provider | PRPOVIDER |
| Note: cor 4120 4147 to 4129 4130 to 4122 4129 to 4137 A | |||
| INSULATION | 08/11/2022 | Approval - Private Provider | PPROVIDER |
| Note: Exterior walls area 2 | |||
| INSULATION | 08/11/2022 | Approval - Private Provider | PPROVIDER |
| Note: level 1 area 1 | |||
| FRAMING | 08/10/2022 | Approval - Private Provider | PPROVIDER |
| Note: 08/10/2022 framing for firewall 8AM Victoria A Valley | |||
| FRAMING | 08/09/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 08/09/2022 | Approval - Private Provider | PPROVIDER |
| Note: level 1, aera 3 level 2 area 2 | |||
| PLUMBING OTHER | 08/08/2022 | Approval - Private Provider | PPROVIDER |
| HVAC OTHER | 08/04/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 08/04/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 08/01/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 07/27/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 07/22/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 07/07/2022 | Approval - Private Provider | PPROVIDER |
| HVAC OTHER | 07/07/2022 | Approval - Private Provider | PPROVIDER |
| Note: 07/06/2022 Electrical Inwall Rough (Level 2, Area 2) Inspection passed. Dakota Hilton | |||
| FIREWALL DRYWALL NAILING | 07/07/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 07/07/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC OTHER | 07/06/2022 | Approval - Private Provider | PPROVIDER |
| Note: 07/06/2022 Electrical Inwall Rough (Level 2, Area 2) Inspection passed. Dakota Hilton | |||
| ELECTRIC 2ND ROUGH | 07/06/2022 | Approval - Private Provider | PPROVIDER |
| Note: 07/06/2022 Electrical Inwall Rough (Level 2, Area 2) Inspection passed. Dakota Hilton | |||
| HVAC OTHER | 07/05/2022 | Approval - Private Provider | PPROVIDER |
| HVAC OTHER | 07/01/2022 | Approval - Private Provider | PPROVIDER |
| Note: 07/01/2022 Return and Supply Pressure test (Level 2, Area 2) Inspection passed. Dakota Hilton | |||
| PLUMBING OTHER | 07/01/2022 | Approval - Private Provider | PPROVIDER |
| Note: 07/01/2022 DWV (Level 3, Area 1) Inspection passed. Dakota Hilton | |||
| PLUMBING PRESSURE TEST | 07/01/2022 | Approval - Private Provider | PPROVIDER |
| Note: 07/01/2022 DWV (Level 3, Area 1) Inspection passed. Dakota Hilton | |||
| PLUMBING PRESSURE TEST | 06/30/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/30/2022 Overhead and Inwall Domestic Water (Level 2, Area 2) Inspection passed. Dakota Hilton | |||
| PLUMBING OTHER | 06/30/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/30/2022 DWV (Level 3, Area 2) Inspection passed. Dakota Hilton | |||
| PLUMBING OTHER | 06/30/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/30/2022 Overhead and Inwall Domestic Water (Level 2, Area 2) Inspection passed. Dakota Hilton | |||
| BUILDING OTHER | 06/30/2022 | Approval - Private Provider | PPROVIDER |
| Note: THIS IS A REINSPECTION ADDED ON 6/1/2022 1:57:44 PM 06/30/2022 Anchor Embedment for Steel Support for the Chiller Inspection passed. Dakota Hilton | |||
| FRAMING | 06/30/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/30/2022 Framing and Drywall Inspection passed. Dakota Hilton | |||
| FIREWALL DRYWALL NAILING | 06/30/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/30/2022 Framing and Drywall Inspection passed. Dakota Hilton | |||
| HVAC OTHER | 06/29/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/29/2022 Return and Supply Pressure Test (Level 2, Area 2) Inspection passed. Dakota Hilton | |||
| HVAC OTHER | 06/29/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/29/2022 Exhaust Pressure Test (Level 1, Area 3) Inspection passed. Dakota Hilton | |||
| FRAMING | 06/28/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/28/2022 Framing Inspection passed. Area 2. | |||
| FRAMING | 06/28/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/28/2022 Window Install (Punch Opening Windows) Inspection passed. Dakota Hilton | |||
| FRAMING | 06/27/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/27/2022 Framing Inspection passed. From room 2205 to north stairs 2502. Dakota Hilton | |||
| PLUMBING 2ND ROUGH | 06/27/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH | 06/27/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC 2ND ROUGH | 06/24/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/24/2022 In Wall Electrical (Level 1, Area 1) Inspection passed. Dakota Hilton | |||
| ELECTRIC 1ST ROUGH | 06/24/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/24/2022 In Wall Electrical (Level 1, Area 1) Inspection passed. Dakota Hilton | |||
| FRAMING | 06/24/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/24/2022 Framing and Drywall Inspection - Partial Pass. All framing in Area 2, exception of three rooms, no soffits. Dakota Hilton | |||
| FIREWALL DRYWALL NAILING | 06/24/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/24/2022 Framing and Drywall Inspection - Partial Pass. All framing in Area 2, exception of three rooms, no soffits. Dakota Hilton | |||
| FIREWALL DRYWALL NAILING | 06/23/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 06/23/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 06/22/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/22/2022 Framing and Drywall Inspection passed. Drywall Top Out corridor 3240 from room 3267 corridor 3250 from room 3221, SM Firewall, and second Firewall 3249, 3239. 2nd floor DW corridor 2004 from room 2003 A and 2003 B. Dakota Hilton | |||
| ELECTRIC OTHER | 06/22/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/22/2022 Electrical Roof Penetrations Inspection passed. Area 1, highlighted on plans. Dakota Hilton | |||
| PLUMBING PRESSURE TEST | 06/22/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 06/22/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/22/2022 Framing and Drywall Inspection passed. Drywall Top Out corridor 3240 from room 3267 corridor 3250 from room 3221, SM Firewall, and second Firewall 3249, 3239. 2nd floor DW corridor 2004 from room 2003 A and 2003 B. Dakota Hilton | |||
| FIREWALL DRYWALL NAILING | 06/21/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/21/2022 Framing and Drywall Inspection passed. Framing corridor 3270 from firewall to room 3267, roof ext. parapet wall. Also, 2nd floor rooms 2150 and 2152. Dakota Hilton | |||
| PLUMBING PRESSURE TEST | 06/21/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/21/2022 Plumbing 2nd rough - Plumbing Pressure Test - Domestic Water Pressure (Level 1, Area 1/ level 2 DWV) Inspection passed. Dakota Hilton I | |||
| PLUMBING 2ND ROUGH | 06/21/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/21/2022 Plumbing 2nd rough - Plumbing Pressure Test - Domestic Water Pressure (Level 1, Area 1/ level 2 DWV) Inspection passed. Dakota Hilton I | |||
| HVAC OTHER | 06/21/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/21/2022 Return Duct Pressure Test and Rough-in (Level 2, Area 1) Inspection passed. Dakota Hilton | |||
| FRAMING | 06/21/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/21/2022 Framing and Drywall Inspection passed. Framing corridor 3270 from firewall to room 3267, roof ext. parapet wall. Also, 2nd floor rooms 2150 and 2152. Dakota Hilton | |||
| PLUMBING OTHER | 06/17/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/17/2022 Med Gas Main / Branches / Inwall / Headwall (Level 1, Area 1) Inspection passed. Dakota Hilton | |||
| PLUMBING PRESSURE TEST | 06/17/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 06/16/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 06/16/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 06/10/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 06/10/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING PRESSURE TEST | 06/10/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING OTHER | 06/10/2022 | Approval - Private Provider | PPROVIDER |
| HVAC OTHER | 06/10/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC OTHER | 06/09/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/09/2022 ELECTRIC OTHER - Electrical Roof Penetrations / Tie-ins Inspection passed. Area #2, highlighted on plans. | |||
| FRAMING | 06/09/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/09/2022 Framing (Level 3) Inspection passed. Dakota Hilton | |||
| FRAMING | 06/06/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/06/2022 Task Note Framing (1st and 2nd Floor) Inspection passed. Rooms 2128 through 2122A, and soffit above room 2126A sink area. Dakota Hilton | |||
| HVAC ROUGH | 06/06/2022 | Approval - Private Provider | PPROVIDER |
| HOOD ROUGH | 06/06/2022 | Approval - Private Provider | PPROVIDER |
| HVAC OTHER | 06/06/2022 | Approval - Private Provider | PPROVIDER |
| HVAC OTHER | 06/06/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING OTHER | 06/06/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 06/06/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/06/2022 Drywall (1st and 2nd Floor) Inspection passed. Top of wall at room 2135, inside only. Dakota Hilton | |||
| FIREWALL DRYWALL NAILING | 06/02/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING OTHER | 06/02/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/02/2022 Med Gas (Level 1, Area 1) Inspection passed. | |||
| PLUMBING PRESSURE TEST | 06/02/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/30/2022 DWV (Level 3, Area 2) Inspection passed. Dakota Hilton | |||
| FRAMING | 06/02/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/02/2022 Framing (1st and 2nd Floor) Inspection passed. Rooms 2129 and 2135. Dakota Hilton | |||
| BUILDING OTHER | 06/01/2022 | PARTIALLY APPROVED | PPROVIDER |
| Note: 06/01/2022 Window Installation (punch opening, level 1) Inspection - Partial Pass. All windows on 1st floor, except 3 with louvers. | |||
| PLUMBING OTHER | 05/31/2022 | Approval - Private Provider | PPROVIDER |
| Note: 05/31/2022 Med Gas Inspection (Area 1) passed. | |||
| BUILDING OTHER | 05/27/2022 | Approval - Private Provider | PPROVIDER |
| Note: Window installation at punch opening level 1 | |||
| FRAMING | 05/27/2022 | Approval - Private Provider | PPROVIDER |
| Note: Level 1 and 2 - 2nd floor room 2105 | |||
| FIREWALL DRYWALL NAILING | 05/27/2022 | Approval - Private Provider | PPROVIDER |
| Note: Leven 1 and 2 - 2nd floor room 2105 | |||
| FIREWALL DRYWALL NAILING | 05/26/2022 | Approval - Private Provider | PPROVIDER |
| Note: 05/26/2022 Framing and Drywall (Level 1 and 2) Inspection passed. | |||
| FRAMING | 05/26/2022 | Approval - Private Provider | PPROVIDER |
| Note: 05/26/2022 Framing and Drywall (Level 1 and 2) Inspection passed. | |||
| HVAC ROUGH | 05/25/2022 | Approval - Private Provider | PPROVIDER |
| Note: 05/25/2022 HVAC Rough - Pressure test for exhaust duct (Level 1 Area 2 and Level 1 Area 3) Inspection passed. | |||
| FRAMING | 05/24/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 05/24/2022 | Approval - Private Provider | PPROVIDER |
| SECOND FLOOR SLAB | 05/24/2022 | Approval - Private Provider | PPROVIDER |
| SECOND FLOOR SLAB | 05/24/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 05/24/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 05/23/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 05/23/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH | 05/23/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC TEMP POLE | 05/23/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC TEMP POLE | 05/20/2022 | Approval - Private Provider | PPROVIDER |
| FOUNDATION SURVEY - OFFICE USE ONLY | 05/20/2022 | APPROVED | DLEAP |
| HVAC ROUGH | 05/20/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 05/20/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 05/20/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 05/20/2022 | Approval - Private Provider | PPROVIDER |
| SECOND FLOOR SLAB | 05/20/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 05/20/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 05/18/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 05/18/2022 | Approval - Private Provider | PPROVIDER |
| HVAC ROUGH | 05/13/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 05/12/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 05/11/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC OTHER | 05/11/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 05/11/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 05/10/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 05/10/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 05/05/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL FRAMING | 05/05/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 05/05/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 05/04/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL FRAMING | 05/04/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 05/04/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH | 05/04/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING 2ND ROUGH | 05/04/2022 | Approval - Private Provider | PPROVIDER |
| HVAC ROUGH | 05/02/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL FRAMING | 05/02/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 04/26/2022 | Approval - Private Provider | PPROVIDER |
| COLUMN | 04/26/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 04/26/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 04/26/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 04/22/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING OTHER | 04/22/2022 | Approval - Private Provider | PPROVIDER |
| WATER SERVICE | 04/20/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC 1ST ROUGH | 04/20/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH | 04/19/2022 | Approval - Private Provider | PPROVIDER |
| SECOND FLOOR SLAB | 04/19/2022 | Approval - Private Provider | PPROVIDER |
| COLUMN | 04/18/2022 | Approval - Private Provider | PPROVIDER |
| SECOND FLOOR SLAB | 04/15/2022 | Approval - Private Provider | PPROVIDER |
| COLUMN | 04/14/2022 | Approval - Private Provider | PPROVIDER |
| COLUMN | 04/14/2022 | Approval - Private Provider | PPROVIDER |
| COLUMN | 04/13/2022 | Approval - Private Provider | PPROVIDER |
| COLUMN | 04/13/2022 | Approval - Private Provider | PPROVIDER |
| BLD - SEWER TIE IN | 04/13/2022 | Approval - Private Provider | PPROVIDER |
| BLD - SEWER TIE IN | 04/13/2022 | Approval - Private Provider | PPROVIDER |
| COLUMN | 04/12/2022 | Approval - Private Provider | PPROVIDER |
| Note: 04/12/2022 Column (Level 4) Inspection passed. Two round columns - Front GL-1. Dakota Hilton | |||
| COLUMN | 04/12/2022 | Approval - Private Provider | PPROVIDER |
| Note: 04/12/2022 Column Inspection passed. Columns (4) - GL 3 - P, R, S, and T. 4th floor, 83A. Dakota Hilton | |||
| SECOND FLOOR SLAB | 04/12/2022 | Approval - Private Provider | PPROVIDER |
| Note: 04/12/2022 Elevated Slab Pre-Pour (4th Floor, Sec. 2) / Drill and Epoxy Inspection passed. Slab - Section 2, from column P to M and N, Southside. Drill and Epoxy from M to H, Southside. | |||
| FRAMING | 04/07/2022 | Approval - Private Provider | PPROVIDER |
| Note: 04/07/2022 CEP Roof Structural and Mechanical Stands and Curbs Partial Inspection passed. | |||
| FIREWALL DRYWALL NAILING | 04/06/2022 | Approval - Private Provider | PPROVIDER |
| SECOND FLOOR SLAB | 04/06/2022 | Approval - Private Provider | PPROVIDER |
| SECOND FLOOR SLAB | 04/04/2022 | Approval - Private Provider | PPROVIDER |
| COLUMN | 04/04/2022 | Approval - Private Provider | PPROVIDER |
| COLUMN | 03/30/2022 | Approval - Private Provider | PPROVIDER |
| Note: 03/30/2022 Column Reinforcement (Level 3) Inspection passed. Preform Columns GL 1/J Round and GL 3/C, D, E, F, G, H, and I Square. Dakota Hilton | |||
| FRAMING | 03/29/2022 | Approval - Private Provider | PPROVIDER |
| Note: 03/29/2022 Framing / Screw Inspection passed. Area 2, corridor 1200/1230. Dakota Hilton | |||
| COLUMN | 03/25/2022 | Approval - Private Provider | PPROVIDER |
| SECOND FLOOR SLAB | 03/25/2022 | Approval - Private Provider | PPROVIDER |
| COLUMN | 03/23/2022 | Approval - Private Provider | PPROVIDER |
| Note: column level 3 | |||
| FRAMING | 03/23/2022 | Approval - Private Provider | BBEMBRY |
| Note: screw inspection on drwyall - 2 corridors from units 1248 - 1250, 1246, 1248, 1230, 1268a - 1264, 1262 and first layers past unit 1262 | |||
| COLUMN | 03/21/2022 | Approval - Private Provider | PPROVIDER |
| Note: Level 3 - four columns GL 2 Q R S T , Two round columns GL 1 - Q and R | |||
| SECOND FLOOR SLAB | 03/18/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 03/18/2022 | Approval - Private Provider | PPROVIDER |
| Note: partial framing/screw - metal framing - top of wall screws in corridors from room 1262, 1264, 1260 A and room 1266 A through 1237 | |||
| COLUMN | 03/17/2022 | Approval - Private Provider | PPROVIDER |
| Note: 03/17/2022 Columns (Level 2) Inspection passed. Columns O, P, Q, R, and S/3, 0.3, 0.8, P.5, and Q.5/2. Dakota Hilton | |||
| COLUMN | 03/16/2022 | Approval - Private Provider | PPROVIDER |
| Note: 03/16/2022 Columns Inspection Level 2 passed. Columns C-3 2nd to 3rd and T-3 3rd to 4th. Dakota Hilton | |||
| FRAMING | 03/16/2022 | Approval - Private Provider | PPROVIDER |
| Note: 03/16/2022 Framing Partial and Drywall Screw Inspection passed. Units 1252, 1254, 1246 A, and 1261 to 1267. Drywall at top on one side. Dakota Hilton | |||
| FIREWALL DRYWALL NAILING | 03/16/2022 | Approval - Private Provider | PPROVIDER |
| Note: 03/16/2022 Framing Partial and Drywall Screw Inspection passed. Units 1252, 1254, 1246 A, and 1261 to 1267. Drywall at top on one side. Dakota Hilton | |||
| COLUMN | 03/11/2022 | Approval - Private Provider | PPROVIDER |
| Note: 03/11/2022 Column Inspection passed. Columns D, E, F and G. Dakota Hilton | |||
| COLUMN | 03/08/2022 | Approval - Private Provider | PPROVIDER |
| Note: 03/08/2022 Column Level 2 Inspection passed. Pre-form 5 columns GL2. Dakota Hilton | |||
| SECOND FLOOR SLAB | 03/08/2022 | Approval - Private Provider | PPROVIDER |
| Note: 03/08/2022 Level 3 Floor Inspection passed. Dakota Hilton | |||
| COLUMN | 03/04/2022 | Approval - Private Provider | PPROVIDER |
| Note: 03/04/2022 Column Inspection passed. Pre-inspection of 4 columns. Dakota Hilton | |||
| COLUMN | 03/04/2022 | Approval - Private Provider | PPROVIDER |
| Note: 03/04/2022 Column Inspection passed. Three columns for pour. One round, G1 TWO square GL 3. Dakota Hilton | |||
| COLUMN | 03/01/2022 | Approval - Private Provider | PPROVIDER |
| Note: column 1 BB X 2 | |||
| SECOND FLOOR SLAB | 03/01/2022 | Approval - Private Provider | PPROVIDER |
| SECOND FLOOR SLAB | 02/23/2022 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 02/23/2022 | APPROVED | PPROVIDER |
| COLUMN | 02/23/2022 | Approval - Private Provider | PPROVIDER |
| COLUMN | 02/23/2022 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 02/22/2022 | Approval - Private Provider | PPROVIDER |
| Note: 02/22/2022 Rebar - Monolithic Slab Inspection passed. | |||
| SECOND FLOOR SLAB | 02/16/2022 | Approval - Private Provider | PPROVIDER |
| Note: 02/16/2022 Second Floor Slab - Rebar Pre-Inspection Partial Pass. Pre-Inspection Rebar Slab area 3, missing sections between elevators and stair 1, downs on perimeter and bulkheads on east side 2nd floor, area 3. | |||
| SECOND FLOOR SLAB | 02/16/2022 | Approval - Private Provider | PPROVIDER |
| Note: 02/16/2022 Second Floor Slab - Soffit Beam Inspection passed. | |||
| SECOND FLOOR SLAB | 02/16/2022 | Approval - Private Provider | PPROVIDER |
| Note: 02/16/2022 Second Floor Slab - Rebar Inspection passed. Rebar elevated slab - 2nd floor, section 3, bulk headed at stair 1 and elevator. Dakota Hilton I | |||
| COLUMN | 02/09/2022 | Approval - Private Provider | PPROVIDER |
| Note: 02/09/2022 Rebar Inspection on Column passed. Rebar on 3 columns, CC2 (2) and CC1 (1). Dakota Hilton | |||
| COLUMN | 02/07/2022 | Approval - Private Provider | PPROVIDER |
| Note: 02/07/2022 Rebar Inspection on Columns passed. Columns CC2 (2), CC1(5), GL 2 & 3. Dakota Hilton | |||
| SECOND FLOOR SLAB | 02/03/2022 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 01/31/2022 | Approval - Private Provider | PPROVIDER |
| Note: slab SOG GL O J 1-4 | |||
| COLUMN | 01/31/2022 | Approval - Private Provider | PPROVIDER |
| Note: rebar -columns GL 3 XXBB.3 and M2 | |||
| COLUMN | 01/28/2022 | Approval - Private Provider | PPROVIDER |
| Note: rebar on column | |||
| FOOTER | 01/28/2022 | Approval - Private Provider | PPROVIDER |
| Note: rebar - M2 and M1 | |||
| MONOLITHIC SLAB | 01/28/2022 | Approval - Private Provider | PPROVIDER |
| Note: rebar inspection on slab - elevators | |||
| MONOLITHIC SLAB | 01/28/2022 | Approval - Private Provider | PPROVIDER |
| Note: rebar - slab at stair # 2 | |||
| ELECTRIC UNDERGROUND | 01/21/2022 | Approval - Private Provider | PPROVIDER |
| Note: 01/21/2022 Electrical Underground Inspection - Partial Pass. Site lighting underground conduit east side. Dakota Hilton |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 05/31/2023 | 05/31/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM SUBMIT PLANS INDIVIDUALLY | |||
| FI1 | COMPLETE | 01/30/2023 | 02/02/2023 |
| Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM The City of Palm Coast is only responsible for the fire protection features of this project. All other components are reviewed by a private provider therefore, all recently uploaded plans documents were rejected. Please upload only the fire protection changes for review. All other pages should not be uploaded until they bare the stamp of the private provider and are approved by them. | |||
| FI1 | COMPLETE | 06/28/2022 | 07/12/2022 |
| Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM | |||
| PLENG | CANCEL | 06/28/2022 | 06/28/2022 |
| PLENG | COMPLETE | 05/19/2022 | 05/20/2022 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| PLENG | HOLD | 05/16/2022 | 05/17/2022 |
| Note: Held By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM Foundation Survey to be signed and sealed. | |||
| FI1 | COMPLETE | 05/10/2022 | 05/20/2022 |
| Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/18/2022 | 04/19/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| FI1 | COMPLETE | 04/18/2022 | 04/29/2022 |
| Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM | |||
| FI1 | COMPLETE | 11/19/2021 | 12/03/2021 |
| Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM | |||
| FI1 | HOLD | 10/19/2021 | 11/02/2021 |
| Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM All comments below per the 2020 Florida Fire Prevention Code. Please provide a written response to each comment below in a response letter and provide clouded response changes on plan sheets. Please place the following notes on the cover sheets The Fire Protection sheets received a limited curtesy review (these will be looked at in detail when the separate permits have been submitted, these notes need to be resolved. The plans for the fire protection features in this set may not be used for construction under this permit. Additional comments are possible at time of Fire Protection Submittals. 1. Still need to correct the code year for NFPA numbers. 75 should be 2016 2. Please note, the site plane FP 011 does not include all required hydrants.and the stand pipes supply is required to be within 100 feet of the FDC per NFPA 14. 3. Provide note on G101 Project Data sheet. All fire extinguishers comply width FFPC 7Th edition Chapter 13 and NFPA 10 4. Pleease provide all Fire Alarm, Fire Protection, Life Safety, and Fire Suppression sheets without Universal Engineering approval stamp. 5. Could not locate Life Safety Plan, (please upload for review and or advise location. | |||
| ARCHR | COMPLETE | 10/19/2021 | 11/11/2021 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| UD1 | COMPLETE | 09/24/2021 | 09/27/2021 |
| Note: Released By: CHRIS JOHNSON - - CJOHNSON@PALMCOASTGOV.COM | |||
| ARCHR | HOLD | 09/14/2021 | 09/22/2021 |
| Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM Elevation plans exterior finishes legend does not match with the colors that were approved with the DO. Please revise either sheet with the correct information for consistency. | |||
| DSD | COMPLETE | 09/14/2021 | 09/20/2021 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| FI1 | HOLD | 09/14/2021 | 09/30/2021 |
| Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM All comments below per the 2020 Florida Fire Prevention Code. Please provide a written response to each comment below in a response letter and provide clouded response changes on plan sheets. Please place the following notes on the cover sheets SAPARATE PERMITS REQUIRED FOR: Automatic fire suppression systems per FFPC, NFPA 1, Fire Code section 1.12.8 Fire Underground per FFPC, NFPA 1, Fire Code section 1.12.8 Fire alarms and detection systems and related equipment per FFPC, NFPA 1, Fire Code section 1.12.8 Standpipe systems per FFPC, NFPA 1, Fire Code section 1.12.8 Hood Suppression per FFPC, NFPA 1, Fire Code section 1.12.8 The Fire Protection sheets received a limited curtesy review (these will be looked at in detail when the separate permits have been submitted, these notes need to be resolved. The plans for the fire protection features in this set may not be used for construction under this permit. Additional comments are possible at time of Fire Protection Submittals. 1. Need to correct the code years for NFPA numbers. • 31 should be 2016 • 75 should be 2016 • 259 should be 2013 • 720 should be 2015 • 1963 should be 2014 • 2001 should be 2015 2. Please note, the site plane FP 011 does not include all required hydrants.and the stand pipes supply is required to be within 100 feet of the FDC per NFPA 14. 3. Please provide location of UL Listing for elevator meeting UL62 and UL1581 due to removal of sprinkler in elevator shaft in regards to notes on FP 141 and FP 142. 4. Notes are overlaid on Pages E321, E313, E323 please adjust notes for review 5. There are callouts on the nurse call plans that are not identified in the legends. 6. Check Tamper switch locations. 7. Provide note on G101 Project Data sheet. All fire extinguishers comply width FFPC 7Th edition Chapter 13 and NFPA 10 8. All corrected Fire Alarm, Fire Protection, Life Safety, and Fire Suppression need to be resubmitted without Universal Engineering approval stamp. | |||
| UD1 | HOLD | 09/14/2021 | 09/23/2021 |
| Note: Held By: CHRIS JOHNSON - - CJOHNSON@PALMCOASTGOV.COM Sheet P-402. Replace grease interceptor detail with City details. Include grease interceptor and notes. Details SS-29A and SS-29. Details can be found on City website https://www.palmcoastgov.com/government/utility/design-standards The maximum size grease interceptror per device should be 1500 gallon. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 04/21/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 03/13/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 03/13/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 03/13/2023 |
| ADMINISTRATIVE - COMMERCIAL PP | ¤3,000.00 | 12/14/2021 |
| PLAN REVIEW - COMMERCIAL | ¤1,625.00 | 12/14/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤2,743.50) | 12/14/2021 |
| IMPACT FEE FIRE | ¤91,450.00 | 12/14/2021 |
| IMPACT FEE TRANSPORTATION | ¤588,690.00 | 12/14/2021 |
| SURCHARGE FS 533.721 | ¤31.08 | 12/14/2021 |
| SURCHARGE - FS 468.631 | ¤46.62 | 12/14/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤17,660.70) | 12/14/2021 |
| SITE PLAN 30 | ¤30.00 | 12/14/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤664,581.00 |