I want to search for...

Permit #2021090717

Permit Details

Status: COED

Parcel Id: 08-12-31-5845-00000-0020
Block: 00000
Subdivision: 2146 - TOWN CENTER PHASE IV
Job Phone: 321-723-5661
Location Address: 5622 STATE HWY 100 E
Type: CSD - COMMERCIAL SITE DEVELOPMENT
Issue Date: 10/26/2021
NOC: Unknown
Applicant name: GARY HOWELL II NEAL
Owner: SKUSA PALM COAST LLC C/O ANDOVER PROPERTIES LLC

Address

150 E 52ND STREET 32ND FLOOR

NEW YORK, NY 10022

Lot: 0020
Job Description: SITE WORK: STORAGE KING
Type: CN

Contractor

M E CONSTRUCTION INC
Status Location Address State License Number Phone
ACTIVE

445 PINEDA CT

MELBOURNE, FL 32940

CGC1525425 (Exp: 08/31/2026) 321-723-5661

Inspection History

Type Request Date Result Inspector
CLOSE OUT DOCUMENTS 07/17/2024 FINAL APPROVED DRAMIREZ
U - UTILITY COMMERCIAL FINAL 07/17/2024 FINAL APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9240 *** NOTES ADDED BY LFITZGERALD 6/18/2024 9:54:22 AM *** added 2x2 grate/12in pipe to mes now installed in hope of helping drainage along west side property,all else appears satifactory 6/14/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/14/2024 11:08:12 AM *** waiting on revised as-builts regarding aditional pipe/grate for drainage along west side property 5/14/2024 - PREVIOUS INSPECTION NOTES Not ready
MAINT BOND ACCEPTANCE (OFFICE) 07/16/2024 APPROVED DRAMIREZ
Note: Bond was submitted under application #5879
LDSC- LANDSCAPE FINAL 07/12/2024 APPROVED RPICATAGI
Note: 7/10/2024 4:21:00 PM- PREVIOUS INSPECTION NOTES Backflow Preventer and assocated freestanig pipes need to be screened with plantings 30" min ht, 7 gal pots per LDC Sec 11.03.01 H
LDSC- LANDSCAPE FINAL 07/10/2024 Disapproved - NO FEE RPICATAGI
Note: Backflow Preventer and assocated freestanig pipes need to be screened with plantings 30" min ht, 7 gal pots per LDC Sec 11.03.01 H
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY 07/08/2024 APPROVED DRAMIREZ
LDSC-IRRIGATION FINAL 06/18/2024 FINAL APPROVED LFITZGERALD
UC-SUBSTANTIAL WALK-THRU 06/18/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 6/18/2024 8:05:07 AM *** walked with Austin-Jeff last week 6/14/2024 - PREVIOUS INSPECTION NOTES 5/14/2024 - PREVIOUS INSPECTION NOTES Not ready
UC- PRELIMINARY AS-BUILTS 06/18/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 6/18/2024 9:47:43 AM *** rec'd from Austin-hard copy while on site-need electronic
UROW - FINAL DRAINAGE 06/18/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 6/18/2024 9:54:22 AM *** added 2x2 grate/12in pipe to mes now installed in hope of helping drainage along west side property,all else appears satifactory 6/14/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/14/2024 11:08:12 AM *** waiting on revised as-builts regarding aditional pipe/grate for drainage along west side property 5/14/2024 - PREVIOUS INSPECTION NOTES Not ready
LDSC-IRRIGATION FINAL 06/17/2024 CANCELLED BY APPLICANT WEB
IRRIGATION AFFIDAVIT 06/14/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 6/14/2024 1:51:00 PM *** recieved by city staff
UC-SUBSTANTIAL WALK-THRU 06/14/2024 CANCELLED BY APPLICANT LFITZGERALD
Note: 5/14/2024 - PREVIOUS INSPECTION NOTES Not ready
UROW - FINAL DRAINAGE 06/14/2024 CANCELLED BY APPLICANT LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 6/14/2024 11:08:12 AM *** waiting on revised as-builts regarding aditional pipe/grate for drainage along west side property 5/14/2024 - PREVIOUS INSPECTION NOTES Not ready
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 06/13/2024 APPROVED RPICATAGI
PLAN - PRE-CON 386-986-3750 06/13/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 6/13/2024 2:30:30 PM *** performed by Jamey but not resulted?
BLD - UNDERGROUND SITE LIGHTING CONDUITS 05/16/2024 APPROVED RMARTIN
BLD - SITE LIGHTING-POLE SET/FIXTURE 05/16/2024 APPROVED RMARTIN
BLD - SITE LIGHTING-CONDUCTORS/CONNECTORS 05/16/2024 APPROVED RMARTIN
LDSC-PRE-PLANTING TREE QUALITY 05/16/2024 APPROVED RPICATAGI
LDSC-PRE-CLEARING 05/14/2024 CANCELLED BY INSPECTOR RPICATAGI
Note: Site has been cleared a long time ago - Nothing to inspect in regard to site clearing.
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 05/14/2024 APPROVED FWILLIS
BLD- ADA PARKING 05/14/2024 APPROVED FWILLIS
BLD- ADA SIGNAGECONTROL 05/14/2024 APPROVED FWILLIS
BLD- ADA VEHICULAR WAY 05/14/2024 APPROVED FWILLIS
U-WATER MAIN DISINFECTION 05/14/2024 APPROVED JHARDING
U-WATER MAIN DISINFECTION SAMPLING 05/14/2024 APPROVED JHARDING
UC-CONSTRUCTION ENTRANCE 05/14/2024 APPROVED JHARDING
UC-MOT MAINTENANCE OF TRAFFIC 05/14/2024 APPROVED JHARDING
UC-ASPHALT PRE PLACEMENT 05/14/2024 APPROVED JHARDING
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 05/14/2024 APPROVED JHARDING
UROW-RETENT/DETENT STABILI 05/14/2024 APPROVED JHARDING
UROW -FINAL GRADE PRIOR SOD 05/14/2024 APPROVED JHARDING
UROW- CURBING & GUTTER 05/14/2024 APPROVED JHARDING
UROW - FINAL DRAINAGE 05/14/2024 CANCELLED BY APPLICANT JHARDING
Note: Not ready
UC-FINAL SITE INSPECTION 05/14/2024 APPROVED JHARDING
U-WATER METER INSTALLATION/VERIFICATION 05/14/2024 APPROVED JHARDING
UC-SUBSTANTIAL WALK-THRU 05/14/2024 CANCELLED BY APPLICANT JHARDING
Note: Not ready
U - SEWER TIE IN 05/14/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS INSPECTED ALONG WITH SEWER BY JAMIE HARDING
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 05/14/2024 APPROVED JHARDING
UC-DRAINAGE PIPE PLACEMENT/LAMPING 01/09/2023 APPROVED JHARDING
U-WATER SERVICE INSTALLATION 01/05/2023 APPROVED JHARDING
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 12/28/2022 APPROVED JHARDING
Note: 9/23/2022 - PREVIOUS INSPECTION NOTES continue with water/fire line placements 9/22/2022 - PREVIOUS INSPECTION NOTES Continue with water/fire lines placements 9/21/2022 - PREVIOUS INSPECTION NOTES start placing 2inch poly with 8inch fire main from back of proposed building
U-WATER MAIN DISINFECTION 12/22/2022 CANCELLED BY APPLICANT WEB
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 09/23/2022 PARTIALLY APPROVED LFITZGERALD
Note: continue with water/fire line placements 9/22/2022 - PREVIOUS INSPECTION NOTES Continue with water/fire lines placements 9/21/2022 - PREVIOUS INSPECTION NOTES start placing 2inch poly with 8inch fire main from back of proposed building
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 09/22/2022 PARTIALLY APPROVED LFITZGERALD
Note: Continue with water/fire lines placements 9/21/2022 - PREVIOUS INSPECTION NOTES start placing 2inch poly with 8inch fire main from back of proposed building
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 09/21/2022 PARTIALLY APPROVED LFITZGERALD
Note: start placing 2inch poly with 8inch fire main from back of proposed building
U-GRAVITY SEWER INSTALL/TESTING 08/09/2022 APPROVED JHARDING
UC-ASPHALT PRE PLACEMENT 07/19/2022 CANCELLED BY APPLICANT WEB
UC-DRAINAGE STRUCT PLACMNT 07/18/2022 APPROVED JHARDING
Note: THIS IS A REINSPECTION 1 section has been installed
UC-DRAINAGE PIPE PLACEMENT/LAMPING 07/18/2022 APPROVED JHARDING
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1 section has been installed 7/15.
UC-DRAINAGE PIPE PLACEMENT/LAMPING 07/15/2022 PARTIALLY APPROVED DHANEY
Note: THIS IS A REINSPECTION 1 section has been installed 7/15.
UC-DRAINAGE STRUCT PLACMNT 07/15/2022 PARTIALLY APPROVED DHANEY
Note: 1 section has been installed
UC-DRAINAGE PIPE PLACEMENT/LAMPING 07/14/2022 CANCELLED BY APPLICANT DHANEY
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 03/28/2022 APPROVED JHARDING

Review History

Department Status Date In Date Out
BADMIN INFORMATION 06/14/2024 06/14/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents are not to be submitted to the site development permit. Please contact the planning division for information. The site develoment permit is only for inspection tracking.
BLD COMPLETE 09/16/2021 09/16/2021
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
ELEC COMPLETE 09/16/2021 09/21/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENG COMPLETE 09/16/2021 09/16/2021
Note: Released By: DENNIS R. LEAP, P.E. - - DLEAP@PALMCOASTGOV.COM
PLLA COMPLETE 09/16/2021 09/16/2021
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
UD1 COMPLETE 09/16/2021 09/17/2021
Note: Released By: CHRIS JOHNSON - - CJOHNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMINISTRATIVE- SITE DEVELOP ¤125.00 10/26/2021
INSPECTION - GENERAL ¤280.00 10/26/2021
SITE INSPECTION ¤840.00 10/26/2021
SITE PLAN 30 ¤30.00 10/26/2021
Fees Total Due: ¤0.00 Total Paid: ¤1,275.00