I want to search for...

Permit #2021090942

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00090-0040
CONDITIONED SPACE: 2443 sqft
CONDITIONED SPACE: 269 sqft
GARAGE: 764 sqft
OPENED PORCH (WITH ROOF) : 442 sqft
OPENED PORCH (WITH ROOF) : 91 sqft
Total Square Footage: 4009 sqft
Block: 00090
Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA
Job Phone: 863-420-2100
Location Address: 78 NEW LEATHERWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/19/2021
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0040
Contracted Stated Job Value: ¤300,000.00
Job Description: single family residence
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
DAVID MILLER
Status Location Address State License Number Phone
CANCEL

2659 MERCY DRIVE

ORLANDO, FL 32808

06157 (Exp: 08/31/2024) 407-466-6514
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
NICHOLAS KEITH REX
Status Location Address State License Number Phone
ACTIVE

1408 HAMLIN UNIT B

SAINT CLOUD, FL 34771

EC13006779 (Exp: 08/31/2026) 407-873-2231

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 01/23/2023 FINAL APPROVED TSTAUFFACHER
Note:
U-CROSS CONNECTION 01/18/2023 APPROVED - AS NOTED LFITZGERALD
Note: has reclaim irrigation- no cross connection
U -UTILITY RESIDENTIAL FINAL 01/18/2023 FINAL APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 01/17/2023 APPROVED GBERTOLA
ROW FIELD SURVEY /GRADING CERTIFICATION 01/17/2023 APPROVED GBERTOLA
ROW - STORMWATER FINAL 01/17/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
FINAL SURVEY (OFFICE USE ONLY) 01/17/2023 APPROVED GBERTOLA
ELECTRIC - EARLY POWER 01/10/2023 APPROVED JMUNSON
ROW- PRE-APRON (PRE-POUR) 01/05/2023 APPROVED PFLANAGAN
Note: READY FOR PAVERS ---------------------------------------------------------------- READY TO POUR CONCRETE FOR 1. SIDEWALK 2. APRON 3. PAVER RESTRAINTS BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS AT THE TIME OF THE INSPECTIION. ALSO NEED TO FIXS THE CHIPS IN THE CURB
ROW- PRE-APRON (PRE-POUR) 12/28/2022 APPROVED - AS NOTED PFLANAGAN
Note: READY TO POUR CONCRETE FOR 1. SIDEWALK 2. APRON 3. PAVER RESTRAINTS BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS AT THE TIME OF THE INSPECTIION. ALSO NEED TO FIXS THE CHIPS IN THE CURB
U - SEWER TIE IN 12/02/2022 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 12/02/2022 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 10/12/2022 APPROVED DCUSHING
Note: Inspector Notes from Inspection 2490 9/20/2022 - PREVIOUS INSPECTION NOTES Foam used as fireblocking in annular holes appears to be standard gap foam. Remove and replace with a firestop rated system as listed below R302.4.1.2 Penetration firestop system. Penetrations shall be protected by an approved penetration firestop system installed as tested in accordance with ASTM E814 or UL 1479, with a positive pressure differential of not less than 0.01 inch of water (3 Pa) and shall have an F rating of not less than the required fire-resistance rating of the wall or floor-ceiling assembly penetrated. R302.4.1 Through penetrations. The material used to fill the annular space shall prevent the passage of flame and hot gases sufficient to ignite cotton waste where subjected to ASTM E119 or UL 263 time temperature fire conditions under a positive pressure differential of not less than 0.01 inch of water (3 Pa) at the location of the penetration for the time period equivalent to the fire-resistance rating of the construction penetrated. 9/22/22 contractor had letter from insulation company, material is approved
INSULATION 09/22/2022 APPROVED - AS NOTED RMARTIN
Note: 9/20/2022 - PREVIOUS INSPECTION NOTES Foam used as fireblocking in annular holes appears to be standard gap foam. Remove and replace with a firestop rated system as listed below R302.4.1.2 Penetration firestop system. Penetrations shall be protected by an approved penetration firestop system installed as tested in accordance with ASTM E814 or UL 1479, with a positive pressure differential of not less than 0.01 inch of water (3 Pa) and shall have an F rating of not less than the required fire-resistance rating of the wall or floor-ceiling assembly penetrated. R302.4.1 Through penetrations. The material used to fill the annular space shall prevent the passage of flame and hot gases sufficient to ignite cotton waste where subjected to ASTM E119 or UL 263 time temperature fire conditions under a positive pressure differential of not less than 0.01 inch of water (3 Pa) at the location of the penetration for the time period equivalent to the fire-resistance rating of the construction penetrated. 9/22/22 contractor had letter from insulation company, material is approved
INSULATION 09/20/2022 Disapproved - NO FEE KSANDOE
Note: Foam used as fireblocking in annular holes appears to be standard gap foam. Remove and replace with a firestop rated system as listed below R302.4.1.2 Penetration firestop system. Penetrations shall be protected by an approved penetration firestop system installed as tested in accordance with ASTM E814 or UL 1479, with a positive pressure differential of not less than 0.01 inch of water (3 Pa) and shall have an F rating of not less than the required fire-resistance rating of the wall or floor-ceiling assembly penetrated. R302.4.1 Through penetrations. The material used to fill the annular space shall prevent the passage of flame and hot gases sufficient to ignite cotton waste where subjected to ASTM E119 or UL 263 time temperature fire conditions under a positive pressure differential of not less than 0.01 inch of water (3 Pa) at the location of the penetration for the time period equivalent to the fire-resistance rating of the construction penetrated.
ALL ROUGH 09/16/2022 APPROVED LMILLER
Note: 9/15/2022 - PREVIOUS INSPECTION NOTES 9/14/2022 - PREVIOUS INSPECTION NOTES not ready, plumbers still working, Inpesction Stopped 9/15/22 Need to phase out electric in panel box. Fire blocking throughout fire blocking integrity must be maintained (broken in half at romex) Nail plates for plumbing supply lines at top plates throughout. 9-16-22 notes above resolved
ALL ROUGH 09/15/2022 Disapproved -FEE REQUIRED RSIMS
Note: 9/14/2022 - PREVIOUS INSPECTION NOTES not ready, plumbers still working, Inpesction Stopped 9/15/22 Need to phase out electric in panel box. Fire blocking throughout fire blocking integrity must be maintained (broken in half at romex) Nail plates for plumbing supply lines at top plates throughout.
ALL ROUGH 09/14/2022 Disapproved - NO FEE LMILLER
Note: not ready, plumbers still working, Inpesction Stopped
ROOF VALLEY & METAL 06/28/2022 APPROVED LMILLER
WALL SHEATHING 06/23/2022 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/22/2022 APPROVED MKRASKI
Note:
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/28/2022 PARTIALLY APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION this is for entryway beams only per notes... conditions at site do not match plans, make the project match the plans or obtain an approved revision 01/28/2022: Please get approved letter from engineer that describes and states that exactly what is built is acceptable. UNderstanding it is a non-load bearing wall, the as built does not meet what is on plans. Have letter be specific to include any tie downs, framing members,etc. Continue to proceed with home, entry will be re-checked at next inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/18/2022 Disapproved - NO FEE LMILLER
Note: this is for entryway beams only per notes... conditions at site do not match plans, make the project match the plans or obtain an approved revision
FOUND SURVEY APPROVED (OFFICE) 01/05/2022 APPROVED TBAKER
ELECTRIC-TUG 01/03/2022 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 9:10 am
TIE BEAM / LINTEL 12/17/2021 APPROVED LMILLER
MONOLITHIC SLAB 12/06/2021 APPROVED LMILLER
Note: THIS IS A REINSPECTION Not ready, dowels not set n12-06-21... otes above resolved
MONOLITHIC SLAB 12/03/2021 Disapproved -FEE REQUIRED TSTAUFFACHER
Note: Not ready, dowels not set
PLUMBING 1ST ROUGH UNDERGROUND 11/29/2021 APPROVED MGIBSON
FOOTER 11/01/2021 APPROVED TSTAUFFACHER
WATER METER INSTALLATION REQUEST 10/25/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
ELEC COMPLETE 08/25/2022 08/25/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 07/05/2022 07/05/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD COMPLETE 02/08/2022 02/09/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD HOLD 02/01/2022 02/02/2022
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Revision: Provide revised plan sheet A-3 and identify the changes made with a "clouded" symbol based on the latest revision dated 1-25-22 for clarity per FBC 7th Ed. Sec. 107.3.
BLD COMPLETE 01/25/2022 01/25/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/05/2022 01/05/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/05/2022 01/05/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 10/04/2021 10/04/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 10/04/2021 10/05/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
SW1 COMPLETE 10/04/2021 10/11/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
BLD COMPLETE 09/21/2021 09/22/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 09/21/2021 09/24/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 09/21/2021 09/22/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/21/2021 09/21/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 09/21/2021 09/28/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 09/21/2021 09/22/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 09/21/2021 09/29/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON HOLD 09/21/2021 09/21/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Windows facing right of way must be wrapped with banding
URB COMPLETE 09/21/2021 09/23/2021
Note: Released By: JOHN BEAUDET - (386)986-2456 -

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 01/13/2023
PLAN REVIEW - REVISION ¤32.50 09/14/2022
PLAN REVIEW - REVISION ¤32.50 09/14/2022
REINSPECTION RESIDENTIAL ¤40.00 09/14/2022
CONTRACTOR CHANGE ¤40.00 09/14/2022
CONTRACTOR CHANGE ¤40.00 09/14/2022
3% FIRE IMPACT FEE CREDIT (¤11.01) 10/19/2021
IMPACT FEE FIRE ¤367.00 10/19/2021
IMPACT FEE PARKS ¤1,199.12 10/19/2021
IMPACT FEE SCHOOL ¤3,600.00 10/19/2021
IMPACT FEE TRANSPORTATION ¤3,139.00 10/19/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 10/19/2021
SURCHARGE FS 533.721 ¤13.43 10/19/2021
SURCHARGE - FS 468.631 ¤20.15 10/19/2021
SW ENG - FOUNDATION SURVEY ¤20.00 10/19/2021
SW ENG INSPECTION 60 ¤60.00 10/19/2021
SW ENG PRE APRON ¤30.00 10/19/2021
SW ENG - REVIEW 20 ¤20.00 10/19/2021
SW ENG RES REVIEW 200 ¤200.00 10/19/2021
3% TRANS IMPACT FEE CREDIT (¤94.17) 10/19/2021
SEWER INSPECTION ¤25.00 10/19/2021
SITE PLAN 30 ¤30.00 10/19/2021
CONNECTION FEES ¤25.00 10/19/2021
METER - DEPOSIT ¤60.00 10/19/2021
WATER-METER ¤441.07 10/19/2021
WATER-METER ¤366.42 10/19/2021
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/19/2021
INSPECTION - RESIDENTIAL ¤973.50 10/19/2021
PLAN REVIEW - RESIDENTIAL ¤276.12 10/19/2021
Fees Total Due: ¤0.00 Total Paid: ¤10,979.66