I want to search for...

Permit #2021090960

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7030-00440-0060
CONDITIONED SPACE: 2138 sqft
GARAGE: 743 sqft
OPENED PORCH (WITH ROOF) : 242 sqft
PATIO/DECK (NO ROOF) : 84 sqft
Total Square Footage: 3207 sqft
Block: 00440
Subdivision: 2154 - SECTION 30-ROYAL PALMS
Job Phone: 386-263-8272
Location Address: 2 RANGER PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/14/2021
NOC: RECORDED
Applicant name: ROY CHARLES WALDHAUER
Owner: BARBOSA JOMALDO

Address

34 RICHMOND DRIVE

PALM COAST, FL 32164

Lot: 0060
Contracted Stated Job Value: ¤292,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

BY THE SHORE INC.
Status Location Address State License Number Phone Fax
ACTIVE

1600 N STATE STREET # 102

,

CRC1327300 (Exp: 08/31/2026) 386-263-8272 386-263-8289

Sub Contractors

DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488
CHARLES K DAVIS
Status Location Address State License Number Phone
ACTIVE

3000 E MOODY BLVD BLDG 2

BUNNELL , FL 32110

EC13004270 (Exp: 08/31/2026) 386-931-6614

Inspection History

Type Request Date Result Inspector
U-CROSS CONNECTION 09/20/2023 APPROVED - AS NOTED LFITZGERALD
Note: no irrigatin-no cross connection
BLD - BUILDING FINAL 04/10/2023 FINAL APPROVED KSANDOE
Note: 4/5/2023 - PREVIOUS INSPECTION NOTES 1. The spary form in the attic needs to have the thermal barrier properly installed. If using approved paint please leave the used paint can onsite for reinspection. 2. Arch fault circut breakers are to be installed at the electrical panel for Kitchen circuts. NEC 201.12 3. Rear porch light not working off the switch. 4. Master bedroom needs to have a light or a switched outlet. NEC 210.70
BLD - BUILDING FINAL 04/05/2023 Disapproved - NO FEE JWALKER
Note: 1. The spary form in the attic needs to have the thermal barrier properly installed. If using approved paint please leave the used paint can onsite for reinspection. 2. Arch fault circut breakers are to be installed at the electrical panel for Kitchen circuts. NEC 201.12 3. Rear porch light not working off the switch. 4. Master bedroom needs to have a light or a switched outlet. NEC 210.70
U -UTILITY RESIDENTIAL FINAL 03/31/2023 FINAL APPROVED LFITZGERALD
Note: 3/22/2023 - PREVIOUS INSPECTION NOTES still power not hooked up to pep panel 3/3/2023 - PREVIOUS INSPECTION NOTES no power to pep panel/circuit breaker in garage for pep tank not identified
U -UTILITY RESIDENTIAL FINAL 03/22/2023 Disapproved -FEE REQUIRED LFITZGERALD
Note: still power not hooked up to pep panel 3/3/2023 - PREVIOUS INSPECTION NOTES no power to pep panel/circuit breaker in garage for pep tank not identified
ROW - STORMWATER FINAL 03/09/2023 FINAL APPROVED EMADISON
Note: ** 03/29/23 CORRECTIONS MADE _________________________________________________________________________________________________________________________ New inspection due to canceled inspection NEED TO REMOVE THE POTTY FROM THE SWALE REPAIR THE SWALE WHERE THE POTTY WAS, WITH SOD
U -UTILITY RESIDENTIAL FINAL 03/03/2023 Disapproved -FEE REQUIRED LFITZGERALD
Note: no power to pep panel/circuit breaker in garage for pep tank not identified
ROW - STORMWATER FINAL 03/03/2023 CANCELLED BY APPLICANT WEB
Note: NEED TO REMOVE THE POTTY FROM THE SWALE REPAIR THE SWALE WHERE THE POTTY WAS, WITH SOD
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/02/2023 APPROVED GBERTOLA
ROW FIELD SURVEY /GRADING CERTIFICATION 03/02/2023 APPROVED GBERTOLA
ROW - FINAL APRON (AFTER POUR) 03/02/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ELECTRIC - EARLY POWER 03/02/2023 APPROVED JWALKER
Note: 3/1/2023 - PREVIOUS INSPECTION NOTES 3/1/23 The outlet must be removed. It is not readily accessible in that location wether it will be used or not. 2/28/2023 - PREVIOUS INSPECTION NOTES 2/28/23 1. Item 2 listed below has not been corrected. A set of orange Allen keys were left on the meter can likely from the service wire change. I placed the allen keys on the kitchen sink. 2/27/2023 - PREVIOUS INSPECTION NOTES 1. The sevice wire at the weather head do not have SUNLIGHT RESISTANT MARKINGS. Please install approved conductors. 2. The outlet installed behind the dishwasher will need to be removed as it is not readily accessible. 3. The outlet under the kitchen sink is not safed off.
ELECTRIC - EARLY POWER 03/01/2023 Disapproved - NO FEE JWALKER
Note: 3/1/23 The outlet must be removed. It is not readily accessible in that location wether it will be used or not. 2/28/2023 - PREVIOUS INSPECTION NOTES 2/28/23 1. Item 2 listed below has not been corrected. A set of orange Allen keys were left on the meter can likely from the service wire change. I placed the allen keys on the kitchen sink. 2/27/2023 - PREVIOUS INSPECTION NOTES 1. The sevice wire at the weather head do not have SUNLIGHT RESISTANT MARKINGS. Please install approved conductors. 2. The outlet installed behind the dishwasher will need to be removed as it is not readily accessible. 3. The outlet under the kitchen sink is not safed off.
ELECTRIC - EARLY POWER 02/28/2023 Disapproved - NO FEE JWALKER
Note: 2/28/23 1. Item 2 listed below has not been corrected. A set of orange Allen keys were left on the meter can likely from the service wire change. I placed the allen keys on the kitchen sink. 2/27/2023 - PREVIOUS INSPECTION NOTES 1. The sevice wire at the weather head do not have SUNLIGHT RESISTANT MARKINGS. Please install approved conductors. 2. The outlet installed behind the dishwasher will need to be removed as it is not readily accessible. 3. The outlet under the kitchen sink is not safed off.
ELECTRIC - EARLY POWER 02/27/2023 Disapproved - NO FEE JWALKER
Note: 1. The sevice wire at the weather head do not have SUNLIGHT RESISTANT MARKINGS. Please install approved conductors. 2. The outlet installed behind the dishwasher will need to be removed as it is not readily accessible. 3. The outlet under the kitchen sink is not safed off.
ROW- PRE-APRON (PRE-POUR) 01/18/2023 APPROVED GBERTOLA
Note: 118/23= CORRECTION WERE MADE AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL _____________________________________________________________________________________________________________________ 1/17/2023 - PREVIOUS INSPECTION NOTES WINGS ON THE APRON NEED TO BE 36 INCH THE WAY IS FORM IS WRONG. CULVERT PIPE IS GOOD. NEED TO REMOVE THE FORM BOARD DIVIDING THE 2 DRIVEWAYS
ROW- PRE-APRON (PRE-POUR) 01/17/2023 Disapproved -FEE REQUIRED GBERTOLA
Note: WINGS ON THE APRON NEED TO BE 36 INCH THE WAY IS FORM IS WRONG. CULVERT PIPE IS GOOD. NEED TO REMOVE THE FORM BOARD DIVIDING THE 2 DRIVEWAYS
U - SEWER TIE IN 12/08/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 12/08/2022 APPROVED MGIBSON
PEP TANK INSTALLATION REQUEST 11/15/2022 APPROVED CSTONE
Note: 10/20/2022 11:36:50 AM- PREVIOUS INSPECTION NOTES – Interior ( sheet rock must be hung or at least on site) & Exterior (stucco, stone, brick, or siding must be applied)
LATH/BRICK/ WATER BARRIER 10/28/2022 APPROVED - AS NOTED JWALKER
Note: 10/27/22 The sevice wire at the weather head do not have SUNLIGHT RESISTANT MARKINGS. Please install approved conductors. Check at final inspection for wire change.
INSULATION 10/25/2022 APPROVED - AS NOTED JWALKER
Note: Spray foam in garage attic will need to have a thremal barrier installed over it. Due to it being used for storage. R-316.5.3 HVAC line set at garage wall needs to be protected. Check items above at Final
PEP TANK INSTALLATION REQUEST 10/20/2022 Disapproved - NO FEE CSTONE
Note: – Interior ( sheet rock must be hung or at least on site) & Exterior (stucco, stone, brick, or siding must be applied)
ALL ROUGH 10/19/2022 APPROVED - AS NOTED JWALKER
Note: HVAC line set at garage wall needs to be protected. Dryer duct and kitchen exhaust duct. Seal the snap locks. Seal the concrete floor right side bath 2" PVC drain line
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/05/2022 APPROVED BTAYLOR
Note: THIS IS A REINSPECTION 1 The structure of the roof does not appear to be sound 2 Have engineer walk the job. 3 All ridge beams appear to need to have support. A contious load path. Two wall ends where 2x4s double were used to support the ridge ends are buckled and bowing. Have engineer supply a letter to the building department stating the roof is structually approved or provide a revison showing bearing supports and anchorage. 4 Have engineer provide a ceiling framing drawing showing size of materail to be used any beams to be installed. 5 5 Show all ceiling joist hangers as built. Several areas of the ceiling have been framed with 2x6 being spliced together. Have engineer letter showing the splice are acceptable and a detail showing how the splices are to be constructed. 2 x 12 rafters common and jack rafters have been spliced together. Have engineer povide a revised detail showing how these rafters are to be spliced togeth and constructed. Intall moisture barriers on all not P.T. lumber in contact with the cmu walls. where missing. Install missing anchors on hip rafter ends where missing. Circled areas on the print. Due to miters not being cut at jack to hip rafter please have engineer show anchors needed to secure the jack to the hip. A seprate rood sheating inspection has already been approved. Stopped inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/15/2022 Disapproved - NO FEE JWALKER
Note: 1 The structure of the roof does not appear to be sound 2 Have engineer walk the job. 3 All ridge beams appear to need to have support. A contious load path. Two wall ends where 2x4s double were used to support the ridge ends are buckled and bowing. Have engineer supply a letter to the building department stating the roof is structually approved or provide a revison showing bearing supports and anchorage. 4 Have engineer provide a ceiling framing drawing showing size of materail to be used any beams to be installed. 5 5 Show all ceiling joist hangers as built. Several areas of the ceiling have been framed with 2x6 being spliced together. Have engineer letter showing the splice are acceptable and a detail showing how the splices are to be constructed. 2 x 12 rafters common and jack rafters have been spliced together. Have engineer povide a revised detail showing how these rafters are to be spliced togeth and constructed. Intall moisture barriers on all not P.T. lumber in contact with the cmu walls. where missing. Install missing anchors on hip rafter ends where missing. Circled areas on the print. Due to miters not being cut at jack to hip rafter please have engineer show anchors needed to secure the jack to the hip. A seprate rood sheating inspection has already been approved. Stopped inspection.
ROOF VALLEY & METAL 08/02/2022 APPROVED JWALKER
ROOF SHEATHING 07/14/2022 APPROVED JWALKER
Note: THIS IS A REINSPECTION ADDED ON 6/14/2022 8:04:55 AM
WALL SHEATHING 07/14/2022 APPROVED JWALKER
ROOF SHEATHING 06/14/2022 CANCELLED BY APPLICANT MRAMOS
TIE BEAM / LINTEL 05/02/2022 APPROVED JWALKER
Note: THIS IS A REINSPECTION The precast lintel above the 2 car opening calls for 2 # 5 rebar in the lintel. Detail on page 5 of 6 of the prints. Please install second bar.
TIE BEAM / LINTEL 04/27/2022 Disapproved - NO FEE JWALKER
Note: The precast lintel above the 2 car opening calls for 2 # 5 rebar in the lintel. Detail on page 5 of 6 of the prints. Please install second bar.
FOUND SURVEY APPROVED (OFFICE) 03/14/2022 APPROVED TBAKER
MONOLITHIC SLAB 02/24/2022 APPROVED JWALKER
PLUMBING 1ST ROUGH UNDERGROUND 02/04/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 12/28/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
BLD COMPLETE 10/03/2022 10/03/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD HOLD 09/07/2022 09/08/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: Repeat Comments All comments are from the Building Inspectors inspection on 8/15/2022 1. All ridge beams appear to need to have support. A continues load path. Two wall ends where 2x4s double were used to support the ridge ends are buckled and bowing. Have engineer supply a letter to the building department stating the roof is structurally approved or provide a revision showing bearing supports and anchorage. 2. Have engineer provide a ceiling framing drawing showing size of material to be used any beams to be installed. 5 5 Show all ceiling joist hangers as built. Several areas of the ceiling have been framed with 2x6 being spliced together. Have engineer revise plans to show the splices are acceptable and a detail showing how the splices are to be constructed. 3. 2 x 12 rafters common and jack rafters have been spliced together. Have engineer provide a revised detail showing how these rafters are to be spliced together and constructed. Submitted plan corrected several issues but, the ones mentioned above were not corrected
BLD COMPLETE 05/09/2022 05/09/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD HOLD 04/25/2022 04/26/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code – Residential REVIEW COMMENTS: 1. Multiple Span tales and methods have been submitted. Provide if the Engineered or Prescriptive Method is to be used. FBC [A]107. 2. Option #2, 2x4 SP, Total Span of 2x6 is noted for 2x4 span. Revise to reflect the correct span. FBC [A]107.
BLD HOLD 03/30/2022 03/31/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: Repeat Comment 1. Proposed 2 x 10 rafters appear over spanned per the 2018 Wood Frame Construction Manual. A revision is required. FC 107
BLD HOLD 03/15/2022 03/16/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Proposed 2 x 10 rafters appear over spanned per the 2018 Wood Frame Construction Manual. A revision is required. FC 107
ENGIN1 COMPLETE 03/14/2022 03/14/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/14/2022 03/14/2022
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM no zoning changes
BLD COMPLETE 11/09/2021 11/10/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/09/2021 11/09/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 11/09/2021 11/16/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
SW1 COMPLETE 11/09/2021 11/17/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
ELEC COMPLETE 11/09/2021 11/09/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 11/09/2021 11/10/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SWALE COMPLETE 10/27/2021 12/01/2021
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/26/2021 10/27/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
MECH COMPLETE 10/26/2021 10/27/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 10/26/2021 10/26/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
BLD HOLD 10/26/2021 10/27/2021
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM Provide species of lumber to be used.Repeat Comment
ELEC COMPLETE 10/26/2021 10/26/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 10/26/2021 11/01/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
BLD HOLD 09/21/2021 09/22/2021
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Building Residential REVIEW COMMENTS: 1. Provide a completed and up to date City of Palm Coast Roofing Worksheet. 2. Provide species of lumber to be used. 3. Openings from a private garage directly into a room used for sleeping purposes shall not be permitted. Other openings between the garage and residence shall be equipped with solid wood doors not less than 13/8 inches (35 mm) in thickness, solid or honeycombcore steel doors not less than 13/8 inches (35 mm) thick, or 20-minute fire-rated doors.
CUSVC COMPLETE 09/21/2021 09/24/2021
Note: Released By: HALEIGH HAND - -
ELEC HOLD 09/21/2021 09/22/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit floor plan Submit electric load calcs
ENGIN1 HOLD 09/21/2021 09/22/2021
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM No survey in submittal package.
LOCATE COMPLETE 09/21/2021 09/27/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 09/21/2021 09/22/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide Floor Plan 2. Plans show R30 insulation in attic with vented soffit. Energy calcs show R20 on roof deck with non vented soffit. Revise to match
SW1 HOLD 09/21/2021 09/28/2021
Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM look at the sample site plan in the stormwater informational packet there are no elevations or drainage features please look at the sample and the checklist and revise your site plan
ZON HOLD 09/21/2021 09/22/2021
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Please provide a floor plan with square footage of home.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 04/04/2023
REINSPECTION FEE ¤40.00 04/04/2023
REINSPECTION FEE ¤40.00 04/04/2023
SW ENG REINSPECTION 30 ¤30.00 04/04/2023
PLAN REVIEW - REVISION ¤32.50 04/04/2023
PLAN REVIEW - REVISION ¤32.50 04/04/2023
CONNECTION FEES ¤1,017.83 12/14/2021
SW ENG - REVIEW 20 ¤20.00 12/14/2021
SW ENG RES REVIEW 200 ¤200.00 12/14/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 12/14/2021
SEWER CREDIT (¤1,342.00) 12/14/2021
SEWER INSPECTION ¤25.00 12/14/2021
SEWER CAPITAL FACILITY ¤4,664.55 12/14/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 12/14/2021
SITE PLAN 30 ¤30.00 12/14/2021
SURCHARGE FS 533.721 ¤11.19 12/14/2021
SURCHARGE - FS 468.631 ¤16.78 12/14/2021
SW ENG - FOUNDATION SURVEY ¤20.00 12/14/2021
SW ENG INSPECTION 60 ¤60.00 12/14/2021
SW ENG PRE APRON ¤30.00 12/14/2021
METER - DEPOSIT ¤60.00 12/14/2021
WATER- TURN ON ¤25.00 12/14/2021
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/14/2021
INSPECTION - RESIDENTIAL ¤803.00 12/14/2021
PLAN REVIEW - RESIDENTIAL ¤227.76 12/14/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 12/14/2021
IMPACT FEE FIRE ¤367.00 12/14/2021
IMPACT FEE PARKS ¤1,199.12 12/14/2021
IMPACT FEE SCHOOL ¤3,600.00 12/14/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 12/14/2021
WATER -IRRIGATION INSPECTION ¤25.00 12/14/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 12/14/2021
Fees Total Due: ¤0.00 Total Paid: ¤16,329.16