Permit #2021091148

Permit Details

Status: COED

Parcel Id: 07-11-31-7013-00210-0760
CONDITIONED SPACE: 2300 sqft
GARAGE: 408 sqft
OPENED PORCH (WITH ROOF) : 140 sqft
OPENED PORCH (WITH ROOF) : 34 sqft
Total Square Footage: 2882 sqft
Block: 00210
Subdivision: 2192 - SECTION 13-BELLE TERRE
Job Phone: 321-271-9033
Location Address: 94 BROOKSIDE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/21/2022
NOC: RECORDED
Applicant name: KEITH E TANNER
Owner: VINTAGE ESTATES HOMES

Address

4885 NORTH WICKHAM ROAD

MELBOURNE, FL 32940

Lot: 0760
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

MERCEDES PREMIER HOMES, LLC
Status Location Address Mailing Address State License Number Phone
INACTIVE

4885 N WICKHAM RD

MELBOURNE, FL 32940

STE 101

MELBOURNE, FL 32940

CGC1516602 (Exp: 08/31/2024) 321-610-3924

Sub Contractors

JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
KENNETH WAYNE CAMBELL JR
Status Location Address Mailing Address State License Number Phone
CANCEL

4885 N WICKHAM RD

MELBOURNE, FL 32940

SUITE 101

MELBOURNE, FL 32940

CBC058803 (Exp: 08/31/2022) 321-610-3924
ROBERT CRAIG KULP
Status Location Address State License Number Phone
CANCEL

5401 ENERGY AIR CT

ORLANDO, FL 32810

CAC1816317 (Exp: 08/31/2022) 407-886-3729

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/05/2023 FINAL APPROVED JSTEWART
ROW - STORMWATER FINAL 04/25/2023 APPROVED GBERTOLA
Note: 4/25/23= CORRECTION WERE MADE ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/19/2023 - PREVIOUS INSPECTION NOTES 4/19/23= IN THE BACK OF THE PROPERTY BY THE SLOPE BUILDER DIDN'T REMOVE THE SILT FENCE JUST BURIED . SILT FENCE NEED TO BE REMOVED FROM THE CITY PROPERTY AND BARE EARTH AREAS NEED TO BE SODDED Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. SEC 300.02 E4 PICTURES ATTACHED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/14/2023 - PREVIOUS INSPECTION NOTES 04/14/23 NEED TO CLEAN OUT SWALE AND REPAIR SWALE SLOPE ON RIGHT SIDE BETWEEN CULVERT PIPE ENDS. SEE ATTACHED PHOTO FOR REFERENCE. __________________________________________________________________________________________________________________________ 2/22/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO FIX THE RIGHT SIDE OF HOUSE SLOP IS TO STEEP 2) NEED PICK UP ALL TRASH AND CONSTRUCTION DEBRIS AROUND LOT AND RESERVED PARCEL 3) NEED TO FIX WASH OUT BY CLEAN OUT FOR THE SEWER ----------------------------------------------------------------------------------------- 1/11/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE THE DRIVEWAY PATCH DONE BEFORE THIS INSPECTION 2) NEED TO REMOVE ALL CONSTRUCTION TRASH FROM THE RESERVED PARCEL BEHIND YOUR LOT 3) NEED TO MAKE THE RIGHT SIDE WHERE YOUR LOT MEETS THE OTHER LOT A 4:1 SLOP ------------------------------------------------------------------------------------------------------ 1/10/2023 - PREVIOUS INSPECTION NOTES SITE ADDRESS: This is a reminder; the permit project site address must be posted on the job site upon issuance of the building permit and maintained for the duration of construction and until the final address numbers are posted on the completed building. Address identification numbers shall be on a contrasting background, plainly visible from the street and 4 inches tall, and 1/2-inch minimum stroke width. The primary purposes of posting the site address is to ensure first responders are able to locate the property in the event of an emergency and to assist building inspectors in locating properties for inspection. Numbers shall be posted on near the street fronting the property and maintained for the duration of the permit. Numbers can also be placed on the exterior wall of the home facing the street. Posting the legal description or lot and block is not an acceptable substitute. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 PERMIT DOCUMENTS: This is a reminder, the permit documents issued with the building permit, including, but not limited to; the issued building permit, City approved plans, Inspection Record Card, Product Approval and Roofing Worksheets and all other City issued documents are the property of the City of Palm Coast. Documents shall be kept clean and dry and, on the site, and made available to Building Inspectors for all inspections. CITY APPROVED PERMIT DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSES BY CONTRACTORS OR SUB-CONTRACTORS. PERMIT DOCUMENTS THAT ARE FADED, ILLEGIBLE, WRINKLED, WATER DAMAGED OR STAINED OR FOR WHATEVER REASON ARE OTHERWISE UNUSABLE MUST BE RELACED BY THE CONTRACTOR BEFORE INSPECTION. INSPECTIONS WILL NOT BE PERFORMED WHERE CITY APPROVED PERMIT DOCUMENTS ARE NOT PRESENT OR IN AN UNUSABLE CONDITION. Florida Building Code-Building Section 105.7 and Florida Statute 468.604(1)
ROW - STORMWATER FINAL 04/19/2023 Disapproved -FEE REQUIRED GBERTOLA
Note: 4/19/23= IN THE BACK OF THE PROPERTY BY THE SLOPE BUILDER DIDN'T REMOVE THE SILT FENCE JUST BURIED . SILT FENCE NEED TO BE REMOVED FROM THE CITY PROPERTY AND BARE EARTH AREAS NEED TO BE SODDED Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. SEC 300.02 E4 PICTURES ATTACHED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/14/2023 - PREVIOUS INSPECTION NOTES 04/14/23 NEED TO CLEAN OUT SWALE AND REPAIR SWALE SLOPE ON RIGHT SIDE BETWEEN CULVERT PIPE ENDS. SEE ATTACHED PHOTO FOR REFERENCE. __________________________________________________________________________________________________________________________ 2/22/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO FIX THE RIGHT SIDE OF HOUSE SLOP IS TO STEEP 2) NEED PICK UP ALL TRASH AND CONSTRUCTION DEBRIS AROUND LOT AND RESERVED PARCEL 3) NEED TO FIX WASH OUT BY CLEAN OUT FOR THE SEWER ----------------------------------------------------------------------------------------- 1/11/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE THE DRIVEWAY PATCH DONE BEFORE THIS INSPECTION 2) NEED TO REMOVE ALL CONSTRUCTION TRASH FROM THE RESERVED PARCEL BEHIND YOUR LOT 3) NEED TO MAKE THE RIGHT SIDE WHERE YOUR LOT MEETS THE OTHER LOT A 4:1 SLOP ------------------------------------------------------------------------------------------------------ 1/10/2023 - PREVIOUS INSPECTION NOTES SITE ADDRESS: This is a reminder; the permit project site address must be posted on the job site upon issuance of the building permit and maintained for the duration of construction and until the final address numbers are posted on the completed building. Address identification numbers shall be on a contrasting background, plainly visible from the street and 4 inches tall, and 1/2-inch minimum stroke width. The primary purposes of posting the site address is to ensure first responders are able to locate the property in the event of an emergency and to assist building inspectors in locating properties for inspection. Numbers shall be posted on near the street fronting the property and maintained for the duration of the permit. Numbers can also be placed on the exterior wall of the home facing the street. Posting the legal description or lot and block is not an acceptable substitute. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 PERMIT DOCUMENTS: This is a reminder, the permit documents issued with the building permit, including, but not limited to; the issued building permit, City approved plans, Inspection Record Card, Product Approval and Roofing Worksheets and all other City issued documents are the property of the City of Palm Coast. Documents shall be kept clean and dry and, on the site, and made available to Building Inspectors for all inspections. CITY APPROVED PERMIT DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSES BY CONTRACTORS OR SUB-CONTRACTORS. PERMIT DOCUMENTS THAT ARE FADED, ILLEGIBLE, WRINKLED, WATER DAMAGED OR STAINED OR FOR WHATEVER REASON ARE OTHERWISE UNUSABLE MUST BE RELACED BY THE CONTRACTOR BEFORE INSPECTION. INSPECTIONS WILL NOT BE PERFORMED WHERE CITY APPROVED PERMIT DOCUMENTS ARE NOT PRESENT OR IN AN UNUSABLE CONDITION. Florida Building Code-Building Section 105.7 and Florida Statute 468.604(1)
ROW - STORMWATER FINAL 04/14/2023 Disapproved -FEE REQUIRED FSLADISH
Note: 04/14/23 NEED TO CLEAN OUT SWALE AND REPAIR SWALE SLOPE ON RIGHT SIDE BETWEEN CULVERT PIPE ENDS. SEE ATTACHED PHOTO FOR REFERENCE. __________________________________________________________________________________________________________________________ 2/22/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO FIX THE RIGHT SIDE OF HOUSE SLOP IS TO STEEP 2) NEED PICK UP ALL TRASH AND CONSTRUCTION DEBRIS AROUND LOT AND RESERVED PARCEL 3) NEED TO FIX WASH OUT BY CLEAN OUT FOR THE SEWER ----------------------------------------------------------------------------------------- 1/11/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE THE DRIVEWAY PATCH DONE BEFORE THIS INSPECTION 2) NEED TO REMOVE ALL CONSTRUCTION TRASH FROM THE RESERVED PARCEL BEHIND YOUR LOT 3) NEED TO MAKE THE RIGHT SIDE WHERE YOUR LOT MEETS THE OTHER LOT A 4:1 SLOP ------------------------------------------------------------------------------------------------------ 1/10/2023 - PREVIOUS INSPECTION NOTES SITE ADDRESS: This is a reminder; the permit project site address must be posted on the job site upon issuance of the building permit and maintained for the duration of construction and until the final address numbers are posted on the completed building. Address identification numbers shall be on a contrasting background, plainly visible from the street and 4 inches tall, and 1/2-inch minimum stroke width. The primary purposes of posting the site address is to ensure first responders are able to locate the property in the event of an emergency and to assist building inspectors in locating properties for inspection. Numbers shall be posted on near the street fronting the property and maintained for the duration of the permit. Numbers can also be placed on the exterior wall of the home facing the street. Posting the legal description or lot and block is not an acceptable substitute. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 PERMIT DOCUMENTS: This is a reminder, the permit documents issued with the building permit, including, but not limited to; the issued building permit, City approved plans, Inspection Record Card, Product Approval and Roofing Worksheets and all other City issued documents are the property of the City of Palm Coast. Documents shall be kept clean and dry and, on the site, and made available to Building Inspectors for all inspections. CITY APPROVED PERMIT DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSES BY CONTRACTORS OR SUB-CONTRACTORS. PERMIT DOCUMENTS THAT ARE FADED, ILLEGIBLE, WRINKLED, WATER DAMAGED OR STAINED OR FOR WHATEVER REASON ARE OTHERWISE UNUSABLE MUST BE RELACED BY THE CONTRACTOR BEFORE INSPECTION. INSPECTIONS WILL NOT BE PERFORMED WHERE CITY APPROVED PERMIT DOCUMENTS ARE NOT PRESENT OR IN AN UNUSABLE CONDITION. Florida Building Code-Building Section 105.7 and Florida Statute 468.604(1)
ROW - STORMWATER FINAL 02/22/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) STILL NEED TO FIX THE RIGHT SIDE OF HOUSE SLOP IS TO STEEP 2) NEED PICK UP ALL TRASH AND CONSTRUCTION DEBRIS AROUND LOT AND RESERVED PARCEL 3) NEED TO FIX WASH OUT BY CLEAN OUT FOR THE SEWER ----------------------------------------------------------------------------------------- 1/11/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE THE DRIVEWAY PATCH DONE BEFORE THIS INSPECTION 2) NEED TO REMOVE ALL CONSTRUCTION TRASH FROM THE RESERVED PARCEL BEHIND YOUR LOT 3) NEED TO MAKE THE RIGHT SIDE WHERE YOUR LOT MEETS THE OTHER LOT A 4:1 SLOP ------------------------------------------------------------------------------------------------------ 1/10/2023 - PREVIOUS INSPECTION NOTES SITE ADDRESS: This is a reminder; the permit project site address must be posted on the job site upon issuance of the building permit and maintained for the duration of construction and until the final address numbers are posted on the completed building. Address identification numbers shall be on a contrasting background, plainly visible from the street and 4 inches tall, and 1/2-inch minimum stroke width. The primary purposes of posting the site address is to ensure first responders are able to locate the property in the event of an emergency and to assist building inspectors in locating properties for inspection. Numbers shall be posted on near the street fronting the property and maintained for the duration of the permit. Numbers can also be placed on the exterior wall of the home facing the street. Posting the legal description or lot and block is not an acceptable substitute. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 PERMIT DOCUMENTS: This is a reminder, the permit documents issued with the building permit, including, but not limited to; the issued building permit, City approved plans, Inspection Record Card, Product Approval and Roofing Worksheets and all other City issued documents are the property of the City of Palm Coast. Documents shall be kept clean and dry and, on the site, and made available to Building Inspectors for all inspections. CITY APPROVED PERMIT DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSES BY CONTRACTORS OR SUB-CONTRACTORS. PERMIT DOCUMENTS THAT ARE FADED, ILLEGIBLE, WRINKLED, WATER DAMAGED OR STAINED OR FOR WHATEVER REASON ARE OTHERWISE UNUSABLE MUST BE RELACED BY THE CONTRACTOR BEFORE INSPECTION. INSPECTIONS WILL NOT BE PERFORMED WHERE CITY APPROVED PERMIT DOCUMENTS ARE NOT PRESENT OR IN AN UNUSABLE CONDITION. Florida Building Code-Building Section 105.7 and Florida Statute 468.604(1)
ROW - STORMWATER FINAL 01/11/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) NEED TO HAVE THE DRIVEWAY PATCH DONE BEFORE THIS INSPECTION 2) NEED TO REMOVE ALL CONSTRUCTION TRASH FROM THE RESERVED PARCEL BEHIND YOUR LOT 3) NEED TO MAKE THE RIGHT SIDE WHERE YOUR LOT MEETS THE OTHER LOT A 4:1 SLOP ------------------------------------------------------------------------------------------------------ 1/10/2023 - PREVIOUS INSPECTION NOTES SITE ADDRESS: This is a reminder; the permit project site address must be posted on the job site upon issuance of the building permit and maintained for the duration of construction and until the final address numbers are posted on the completed building. Address identification numbers shall be on a contrasting background, plainly visible from the street and 4 inches tall, and 1/2-inch minimum stroke width. The primary purposes of posting the site address is to ensure first responders are able to locate the property in the event of an emergency and to assist building inspectors in locating properties for inspection. Numbers shall be posted on near the street fronting the property and maintained for the duration of the permit. Numbers can also be placed on the exterior wall of the home facing the street. Posting the legal description or lot and block is not an acceptable substitute. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 PERMIT DOCUMENTS: This is a reminder, the permit documents issued with the building permit, including, but not limited to; the issued building permit, City approved plans, Inspection Record Card, Product Approval and Roofing Worksheets and all other City issued documents are the property of the City of Palm Coast. Documents shall be kept clean and dry and, on the site, and made available to Building Inspectors for all inspections. CITY APPROVED PERMIT DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSES BY CONTRACTORS OR SUB-CONTRACTORS. PERMIT DOCUMENTS THAT ARE FADED, ILLEGIBLE, WRINKLED, WATER DAMAGED OR STAINED OR FOR WHATEVER REASON ARE OTHERWISE UNUSABLE MUST BE RELACED BY THE CONTRACTOR BEFORE INSPECTION. INSPECTIONS WILL NOT BE PERFORMED WHERE CITY APPROVED PERMIT DOCUMENTS ARE NOT PRESENT OR IN AN UNUSABLE CONDITION. Florida Building Code-Building Section 105.7 and Florida Statute 468.604(1)
U -UTILITY RESIDENTIAL FINAL 01/11/2023 FINAL APPROVED DHANEY
Note: 1/10/2023 - PREVIOUS INSPECTION NOTES Sewer clean out needs lowerd to ground level .
U -UTILITY RESIDENTIAL FINAL 01/10/2023 Disapproved - NO FEE DHANEY
Note: Sewer clean out needs lowerd to ground level .
ROW - STORMWATER FINAL 01/10/2023 Disapproved -FEE REQUIRED GBERTOLA
Note: SITE ADDRESS: This is a reminder; the permit project site address must be posted on the job site upon issuance of the building permit and maintained for the duration of construction and until the final address numbers are posted on the completed building. Address identification numbers shall be on a contrasting background, plainly visible from the street and 4 inches tall, and 1/2-inch minimum stroke width. The primary purposes of posting the site address is to ensure first responders are able to locate the property in the event of an emergency and to assist building inspectors in locating properties for inspection. Numbers shall be posted on near the street fronting the property and maintained for the duration of the permit. Numbers can also be placed on the exterior wall of the home facing the street. Posting the legal description or lot and block is not an acceptable substitute. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 PERMIT DOCUMENTS: This is a reminder, the permit documents issued with the building permit, including, but not limited to; the issued building permit, City approved plans, Inspection Record Card, Product Approval and Roofing Worksheets and all other City issued documents are the property of the City of Palm Coast. Documents shall be kept clean and dry and, on the site, and made available to Building Inspectors for all inspections. CITY APPROVED PERMIT DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSES BY CONTRACTORS OR SUB-CONTRACTORS. PERMIT DOCUMENTS THAT ARE FADED, ILLEGIBLE, WRINKLED, WATER DAMAGED OR STAINED OR FOR WHATEVER REASON ARE OTHERWISE UNUSABLE MUST BE RELACED BY THE CONTRACTOR BEFORE INSPECTION. INSPECTIONS WILL NOT BE PERFORMED WHERE CITY APPROVED PERMIT DOCUMENTS ARE NOT PRESENT OR IN AN UNUSABLE CONDITION. Florida Building Code-Building Section 105.7 and Florida Statute 468.604(1)
U-CROSS CONNECTION 01/10/2023 APPROVED DHANEY
ELECTRIC - EARLY POWER 01/03/2023 APPROVED JMUNSON
Note: 12/28/2022 - PREVIOUS INSPECTION NOTES
ELECTRIC - EARLY POWER 12/28/2022 CANCELLED BY APPLICANT MKRASKI
FINAL SURVEY (OFFICE USE ONLY) 12/21/2022 APPROVED EMADISON
ROW - FINAL APRON (AFTER POUR) 12/21/2022 FINAL APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 12/21/2022 APPROVED EMADISON
U - SEWER TIE IN 12/06/2022 APPROVED - AS NOTED MGIBSON
Note: This was a virtual inspection
ROW- PRE-APRON (PRE-POUR) 11/21/2022 APPROVED EMADISON
Note: ** 11/21/22 ALL CORRECTIONS HAVE BEEN MADE READY TO POUR ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL 11/18/2022 - PREVIOUS INSPECTION NOTES ** 11/18/22 LEFT SIDE APRON WING MEASURES 33 INCHES NEEDS TO BE AT 36 INCHES ** OVER POUR AT GARAGE DOOR OPENING NEEDS TO BE CHIPPED AWAY NEED A MINIMUM OF 4 INCHES OF CONCRETE IN DRIVEWAY ABOVE ROW. ** NEED COMPACTION OF MATERIAL ON SLOPE IN ROW.
ROW- PRE-APRON (PRE-POUR) 11/18/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 11/18/22 LEFT SIDE APRON WING MEASURES 33 INCHES NEEDS TO BE AT 36 INCHES ** OVER POUR AT GARAGE DOOR OPENING NEEDS TO BE CHIPPED AWAY NEED A MINIMUM OF 4 INCHES OF CONCRETE IN DRIVEWAY ABOVE ROW. ** NEED COMPACTION OF MATERIAL ON SLOPE IN ROW.
ROW - DRAINAGE 11/15/2022 APPROVED EMADISON
Note: ** 11/15/22 CORRECTIONS MADE IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ONA DAILY BASIS TO PREVENT A NEGATIVE IMPACT ON ADJACENT PROPERTIES AND THE ROADWAY. 11/14/2022 - PREVIOUS INSPECTION NOTES ** 11/14/22 CORRECTIONS BEING MADE AT THE TIME OF THE INSPECTION. ** FOLLOW UP INSPECTION ON 11/15/22 11/10/2022 - PREVIOUS INSPECTION NOTES ****11/08/22 NOTE TO BUILDER CITY OF PALM COAST IS CLOSED FOR VETERANS DAY THIS INSPECTION WILL BE DONE ON 11/10/22 **** 11/8/2022 - PREVIOUS INSPECTION NOTES ** 11/08/22 BUILDER HAS DONE NOTHING TO CORRECT THE DRAINAGE ISSUES AT PROPERTY ENTRANCE AND SWALE. ** WASHOUTS CONTINUE TO NEGATIVELY IMPACT BROOKSIDE LN CREATING A SAFETY HAZARD BUILDER WILL HAVE UNTIL 11/11/22 WHICH WILL RESULT INA STOP WORK ORDER FOR THE PROPERTTY ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 11/11/22 **** SEE ATTACHED PHOTOS **** 10/6/2022 - PREVIOUS INSPECTION NOTES Drainage still blocked. Looks like the temporary pipe is in there somewhere. Needs cleaned and reset. 10/5/2022 - PREVIOUS INSPECTION NOTES 10/4/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** IF CORRECTIONS ARE NOT MADE A STOP WORK ORDER WILL BE IMPOSED FOR JOB SITE FOLLOW UP INSPECTION ON 10/06/22 PREVIOUS INSPECTION NOTES ** 10/04/22 NO CORRECTIONS HAVE BEEN MADE ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 10/05/22 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 NO CORRECTIONS HAVE BEEN MADE BUILDER NEEDS TO OPEN THE DRAINAGE CONVEYANCE SWALE IMMEDIATELY ** FOLLOW UP INSPECTION ON 10/04/22 9/29/2022 - PREVIOUS INSPECTION NOTES ** 09/29/22 BUILDER NEEDS TO TAKE IMMEDIATE BACTION AND CORRECT THE NOTED PROBLEMS FROM PREVIOUS INSPECTIONS. ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. ii IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP ON 10/03/22 CORRECTIONS NEED TO BE MADE.... THIS IS A REINSPECTION 06/02/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ............................................................................................................................................................................................................................... 06/01/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE .............................................................................................................................................................................................................................. ** NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION BUILDER NEEDS TO READ INSPETOR NOTES. * SILT FENCE AT REAR OF PROPERTY IS DOWN ALLOWING FOR SEDIMENT TO NEGATIVELY IMPACT THE CANAL IN THE REAR OF THE PROPERTY THIS NEEDS TO BE CORRECTED IMMEDIATELY. * CULVERT PIPE NEEDS TO BE CLEANED OUT * TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALEAND NEEDS TO BE OPEND. * ROADWAY NEEDS TO BE CLEARED OF SAND AND SEDIMENT.
ROW - DRAINAGE 11/14/2022 PARTIALLY APPROVED EMADISON
Note: ** 11/14/22 CORRECTIONS BEING MADE AT THE TIME OF THE INSPECTION. ** FOLLOW UP INSPECTION ON 11/15/22 11/10/2022 - PREVIOUS INSPECTION NOTES ****11/08/22 NOTE TO BUILDER CITY OF PALM COAST IS CLOSED FOR VETERANS DAY THIS INSPECTION WILL BE DONE ON 11/10/22 **** 11/8/2022 - PREVIOUS INSPECTION NOTES ** 11/08/22 BUILDER HAS DONE NOTHING TO CORRECT THE DRAINAGE ISSUES AT PROPERTY ENTRANCE AND SWALE. ** WASHOUTS CONTINUE TO NEGATIVELY IMPACT BROOKSIDE LN CREATING A SAFETY HAZARD BUILDER WILL HAVE UNTIL 11/11/22 WHICH WILL RESULT INA STOP WORK ORDER FOR THE PROPERTTY ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 11/11/22 **** SEE ATTACHED PHOTOS **** 10/6/2022 - PREVIOUS INSPECTION NOTES Drainage still blocked. Looks like the temporary pipe is in there somewhere. Needs cleaned and reset. 10/5/2022 - PREVIOUS INSPECTION NOTES 10/4/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** IF CORRECTIONS ARE NOT MADE A STOP WORK ORDER WILL BE IMPOSED FOR JOB SITE FOLLOW UP INSPECTION ON 10/06/22 PREVIOUS INSPECTION NOTES ** 10/04/22 NO CORRECTIONS HAVE BEEN MADE ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 10/05/22 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 NO CORRECTIONS HAVE BEEN MADE BUILDER NEEDS TO OPEN THE DRAINAGE CONVEYANCE SWALE IMMEDIATELY ** FOLLOW UP INSPECTION ON 10/04/22 9/29/2022 - PREVIOUS INSPECTION NOTES ** 09/29/22 BUILDER NEEDS TO TAKE IMMEDIATE BACTION AND CORRECT THE NOTED PROBLEMS FROM PREVIOUS INSPECTIONS. ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. ii IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP ON 10/03/22 CORRECTIONS NEED TO BE MADE.... THIS IS A REINSPECTION 06/02/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ............................................................................................................................................................................................................................... 06/01/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE .............................................................................................................................................................................................................................. ** NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION BUILDER NEEDS TO READ INSPETOR NOTES. * SILT FENCE AT REAR OF PROPERTY IS DOWN ALLOWING FOR SEDIMENT TO NEGATIVELY IMPACT THE CANAL IN THE REAR OF THE PROPERTY THIS NEEDS TO BE CORRECTED IMMEDIATELY. * CULVERT PIPE NEEDS TO BE CLEANED OUT * TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALEAND NEEDS TO BE OPEND. * ROADWAY NEEDS TO BE CLEARED OF SAND AND SEDIMENT.
ROW - DRAINAGE 11/11/2022 CANCELLED BY INSPECTOR EMADISON
Note: ****11/08/22 NOTE TO BUILDER CITY OF PALM COAST IS CLOSED FOR VETERANS DAY THIS INSPECTION WILL BE DONE ON 11/10/22 **** 11/8/2022 - PREVIOUS INSPECTION NOTES ** 11/08/22 BUILDER HAS DONE NOTHING TO CORRECT THE DRAINAGE ISSUES AT PROPERTY ENTRANCE AND SWALE. ** WASHOUTS CONTINUE TO NEGATIVELY IMPACT BROOKSIDE LN CREATING A SAFETY HAZARD BUILDER WILL HAVE UNTIL 11/11/22 WHICH WILL RESULT INA STOP WORK ORDER FOR THE PROPERTTY ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 11/11/22 **** SEE ATTACHED PHOTOS **** 10/6/2022 - PREVIOUS INSPECTION NOTES Drainage still blocked. Looks like the temporary pipe is in there somewhere. Needs cleaned and reset. 10/5/2022 - PREVIOUS INSPECTION NOTES 10/4/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** IF CORRECTIONS ARE NOT MADE A STOP WORK ORDER WILL BE IMPOSED FOR JOB SITE FOLLOW UP INSPECTION ON 10/06/22 PREVIOUS INSPECTION NOTES ** 10/04/22 NO CORRECTIONS HAVE BEEN MADE ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 10/05/22 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 NO CORRECTIONS HAVE BEEN MADE BUILDER NEEDS TO OPEN THE DRAINAGE CONVEYANCE SWALE IMMEDIATELY ** FOLLOW UP INSPECTION ON 10/04/22 9/29/2022 - PREVIOUS INSPECTION NOTES ** 09/29/22 BUILDER NEEDS TO TAKE IMMEDIATE BACTION AND CORRECT THE NOTED PROBLEMS FROM PREVIOUS INSPECTIONS. ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. ii IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP ON 10/03/22 CORRECTIONS NEED TO BE MADE.... THIS IS A REINSPECTION 06/02/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ............................................................................................................................................................................................................................... 06/01/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE .............................................................................................................................................................................................................................. ** NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION BUILDER NEEDS TO READ INSPETOR NOTES. * SILT FENCE AT REAR OF PROPERTY IS DOWN ALLOWING FOR SEDIMENT TO NEGATIVELY IMPACT THE CANAL IN THE REAR OF THE PROPERTY THIS NEEDS TO BE CORRECTED IMMEDIATELY. * CULVERT PIPE NEEDS TO BE CLEANED OUT * TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALEAND NEEDS TO BE OPEND. * ROADWAY NEEDS TO BE CLEARED OF SAND AND SEDIMENT.
ROW - DRAINAGE 11/10/2022 CANCELLED BY APPLICANT RGROSS
Note: ****11/08/22 NOTE TO BUILDER CITY OF PALM COAST IS CLOSED FOR VETERANS DAY THIS INSPECTION WILL BE DONE ON 11/10/22 **** 11/8/2022 - PREVIOUS INSPECTION NOTES ** 11/08/22 BUILDER HAS DONE NOTHING TO CORRECT THE DRAINAGE ISSUES AT PROPERTY ENTRANCE AND SWALE. ** WASHOUTS CONTINUE TO NEGATIVELY IMPACT BROOKSIDE LN CREATING A SAFETY HAZARD BUILDER WILL HAVE UNTIL 11/11/22 WHICH WILL RESULT INA STOP WORK ORDER FOR THE PROPERTTY ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 11/11/22 **** SEE ATTACHED PHOTOS **** 10/6/2022 - PREVIOUS INSPECTION NOTES Drainage still blocked. Looks like the temporary pipe is in there somewhere. Needs cleaned and reset. 10/5/2022 - PREVIOUS INSPECTION NOTES 10/4/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** IF CORRECTIONS ARE NOT MADE A STOP WORK ORDER WILL BE IMPOSED FOR JOB SITE FOLLOW UP INSPECTION ON 10/06/22 PREVIOUS INSPECTION NOTES ** 10/04/22 NO CORRECTIONS HAVE BEEN MADE ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 10/05/22 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 NO CORRECTIONS HAVE BEEN MADE BUILDER NEEDS TO OPEN THE DRAINAGE CONVEYANCE SWALE IMMEDIATELY ** FOLLOW UP INSPECTION ON 10/04/22 9/29/2022 - PREVIOUS INSPECTION NOTES ** 09/29/22 BUILDER NEEDS TO TAKE IMMEDIATE BACTION AND CORRECT THE NOTED PROBLEMS FROM PREVIOUS INSPECTIONS. ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. ii IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP ON 10/03/22 CORRECTIONS NEED TO BE MADE.... THIS IS A REINSPECTION 06/02/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ............................................................................................................................................................................................................................... 06/01/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE .............................................................................................................................................................................................................................. ** NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION BUILDER NEEDS TO READ INSPETOR NOTES. * SILT FENCE AT REAR OF PROPERTY IS DOWN ALLOWING FOR SEDIMENT TO NEGATIVELY IMPACT THE CANAL IN THE REAR OF THE PROPERTY THIS NEEDS TO BE CORRECTED IMMEDIATELY. * CULVERT PIPE NEEDS TO BE CLEANED OUT * TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALEAND NEEDS TO BE OPEND. * ROADWAY NEEDS TO BE CLEARED OF SAND AND SEDIMENT.
ROW - DRAINAGE 11/08/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 11/08/22 BUILDER HAS DONE NOTHING TO CORRECT THE DRAINAGE ISSUES AT PROPERTY ENTRANCE AND SWALE. ** WASHOUTS CONTINUE TO NEGATIVELY IMPACT BROOKSIDE LN CREATING A SAFETY HAZARD BUILDER WILL HAVE UNTIL 11/11/22 WHICH WILL RESULT INA STOP WORK ORDER FOR THE PROPERTTY ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 11/11/22 **** SEE ATTACHED PHOTOS **** 10/6/2022 - PREVIOUS INSPECTION NOTES Drainage still blocked. Looks like the temporary pipe is in there somewhere. Needs cleaned and reset. 10/5/2022 - PREVIOUS INSPECTION NOTES 10/4/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** IF CORRECTIONS ARE NOT MADE A STOP WORK ORDER WILL BE IMPOSED FOR JOB SITE FOLLOW UP INSPECTION ON 10/06/22 PREVIOUS INSPECTION NOTES ** 10/04/22 NO CORRECTIONS HAVE BEEN MADE ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 10/05/22 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 NO CORRECTIONS HAVE BEEN MADE BUILDER NEEDS TO OPEN THE DRAINAGE CONVEYANCE SWALE IMMEDIATELY ** FOLLOW UP INSPECTION ON 10/04/22 9/29/2022 - PREVIOUS INSPECTION NOTES ** 09/29/22 BUILDER NEEDS TO TAKE IMMEDIATE BACTION AND CORRECT THE NOTED PROBLEMS FROM PREVIOUS INSPECTIONS. ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. ii IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP ON 10/03/22 CORRECTIONS NEED TO BE MADE.... THIS IS A REINSPECTION 06/02/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ............................................................................................................................................................................................................................... 06/01/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE .............................................................................................................................................................................................................................. ** NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION BUILDER NEEDS TO READ INSPETOR NOTES. * SILT FENCE AT REAR OF PROPERTY IS DOWN ALLOWING FOR SEDIMENT TO NEGATIVELY IMPACT THE CANAL IN THE REAR OF THE PROPERTY THIS NEEDS TO BE CORRECTED IMMEDIATELY. * CULVERT PIPE NEEDS TO BE CLEANED OUT * TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALEAND NEEDS TO BE OPEND. * ROADWAY NEEDS TO BE CLEARED OF SAND AND SEDIMENT.
ROW - DRAINAGE 11/08/2022 CANCELLED BY INSPECTOR EMADISON
Note: 11/8/2022 - PREVIOUS INSPECTION NOTES ** 11/08/22 BUILDER HAS DONE NOTHING TO CORRECT THE DRAINAGE ISSUES AT PROPERTY ENTRANCE AND SWALE. ** WASHOUTS CONTINUE TO NEGATIVELY IMPACT BROOKSIDE LN CREATING A SAFETY HAZARD BUILDER WILL HAVE UNTIL 11/11/22 WHICH WILL RESULT INA STOP WORK ORDER FOR THE PROPERTTY ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 11/11/22 **** SEE ATTACHED PHOTOS **** 10/6/2022 - PREVIOUS INSPECTION NOTES Drainage still blocked. Looks like the temporary pipe is in there somewhere. Needs cleaned and reset. 10/5/2022 - PREVIOUS INSPECTION NOTES 10/4/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** IF CORRECTIONS ARE NOT MADE A STOP WORK ORDER WILL BE IMPOSED FOR JOB SITE FOLLOW UP INSPECTION ON 10/06/22 PREVIOUS INSPECTION NOTES ** 10/04/22 NO CORRECTIONS HAVE BEEN MADE ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 10/05/22 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 NO CORRECTIONS HAVE BEEN MADE BUILDER NEEDS TO OPEN THE DRAINAGE CONVEYANCE SWALE IMMEDIATELY ** FOLLOW UP INSPECTION ON 10/04/22 9/29/2022 - PREVIOUS INSPECTION NOTES ** 09/29/22 BUILDER NEEDS TO TAKE IMMEDIATE BACTION AND CORRECT THE NOTED PROBLEMS FROM PREVIOUS INSPECTIONS. ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. ii IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP ON 10/03/22 CORRECTIONS NEED TO BE MADE.... THIS IS A REINSPECTION 06/02/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ............................................................................................................................................................................................................................... 06/01/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE .............................................................................................................................................................................................................................. ** NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION BUILDER NEEDS TO READ INSPETOR NOTES. * SILT FENCE AT REAR OF PROPERTY IS DOWN ALLOWING FOR SEDIMENT TO NEGATIVELY IMPACT THE CANAL IN THE REAR OF THE PROPERTY THIS NEEDS TO BE CORRECTED IMMEDIATELY. * CULVERT PIPE NEEDS TO BE CLEANED OUT * TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALEAND NEEDS TO BE OPEND. * ROADWAY NEEDS TO BE CLEARED OF SAND AND SEDIMENT.
ROW - DRAINAGE 10/06/2022 Disapproved -FEE REQUIRED RGROSS
Note: Drainage still blocked. Looks like the temporary pipe is in there somewhere. Needs cleaned and reset. 10/5/2022 - PREVIOUS INSPECTION NOTES 10/4/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** IF CORRECTIONS ARE NOT MADE A STOP WORK ORDER WILL BE IMPOSED FOR JOB SITE FOLLOW UP INSPECTION ON 10/06/22 PREVIOUS INSPECTION NOTES ** 10/04/22 NO CORRECTIONS HAVE BEEN MADE ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 10/05/22 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 NO CORRECTIONS HAVE BEEN MADE BUILDER NEEDS TO OPEN THE DRAINAGE CONVEYANCE SWALE IMMEDIATELY ** FOLLOW UP INSPECTION ON 10/04/22 9/29/2022 - PREVIOUS INSPECTION NOTES ** 09/29/22 BUILDER NEEDS TO TAKE IMMEDIATE BACTION AND CORRECT THE NOTED PROBLEMS FROM PREVIOUS INSPECTIONS. ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. ii IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP ON 10/03/22 CORRECTIONS NEED TO BE MADE.... THIS IS A REINSPECTION 06/02/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ............................................................................................................................................................................................................................... 06/01/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE .............................................................................................................................................................................................................................. ** NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION BUILDER NEEDS TO READ INSPETOR NOTES. * SILT FENCE AT REAR OF PROPERTY IS DOWN ALLOWING FOR SEDIMENT TO NEGATIVELY IMPACT THE CANAL IN THE REAR OF THE PROPERTY THIS NEEDS TO BE CORRECTED IMMEDIATELY. * CULVERT PIPE NEEDS TO BE CLEANED OUT * TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALEAND NEEDS TO BE OPEND. * ROADWAY NEEDS TO BE CLEARED OF SAND AND SEDIMENT.
ROW - DRAINAGE 10/05/2022 Disapproved -FEE REQUIRED EMADISON
Note: PREVIOUS INSPECTION NOTES ** 10/04/22 NO CORRECTIONS HAVE BEEN MADE ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 10/05/22 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 NO CORRECTIONS HAVE BEEN MADE BUILDER NEEDS TO OPEN THE DRAINAGE CONVEYANCE SWALE IMMEDIATELY ** FOLLOW UP INSPECTION ON 10/04/22 9/29/2022 - PREVIOUS INSPECTION NOTES ** 09/29/22 BUILDER NEEDS TO TAKE IMMEDIATE BACTION AND CORRECT THE NOTED PROBLEMS FROM PREVIOUS INSPECTIONS. ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. ii IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP ON 10/03/22 CORRECTIONS NEED TO BE MADE.... THIS IS A REINSPECTION 06/02/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ............................................................................................................................................................................................................................... 06/01/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE .............................................................................................................................................................................................................................. ** NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION BUILDER NEEDS TO READ INSPETOR NOTES. * SILT FENCE AT REAR OF PROPERTY IS DOWN ALLOWING FOR SEDIMENT TO NEGATIVELY IMPACT THE CANAL IN THE REAR OF THE PROPERTY THIS NEEDS TO BE CORRECTED IMMEDIATELY. * CULVERT PIPE NEEDS TO BE CLEANED OUT * TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALEAND NEEDS TO BE OPEND. * ROADWAY NEEDS TO BE CLEARED OF SAND AND SEDIMENT.
ROW - DRAINAGE 10/05/2022 Disapproved -FEE REQUIRED EMADISON
Note: 10/4/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS FOLLOW UP INSPECTION OIN 10/06/22 PREVIOUS INSPECTION NOTES ** 10/04/22 NO CORRECTIONS HAVE BEEN MADE ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 10/05/22 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 NO CORRECTIONS HAVE BEEN MADE BUILDER NEEDS TO OPEN THE DRAINAGE CONVEYANCE SWALE IMMEDIATELY ** FOLLOW UP INSPECTION ON 10/04/22 9/29/2022 - PREVIOUS INSPECTION NOTES ** 09/29/22 BUILDER NEEDS TO TAKE IMMEDIATE BACTION AND CORRECT THE NOTED PROBLEMS FROM PREVIOUS INSPECTIONS. ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. ii IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP ON 10/03/22 CORRECTIONS NEED TO BE MADE.... THIS IS A REINSPECTION 06/02/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ............................................................................................................................................................................................................................... 06/01/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE .............................................................................................................................................................................................................................. ** NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION BUILDER NEEDS TO READ INSPETOR NOTES. * SILT FENCE AT REAR OF PROPERTY IS DOWN ALLOWING FOR SEDIMENT TO NEGATIVELY IMPACT THE CANAL IN THE REAR OF THE PROPERTY THIS NEEDS TO BE CORRECTED IMMEDIATELY. * CULVERT PIPE NEEDS TO BE CLEANED OUT * TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALEAND NEEDS TO BE OPEND. * ROADWAY NEEDS TO BE CLEARED OF SAND AND SEDIMENT.
ROW - DRAINAGE 10/04/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 10/05/22 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 NO CORRECTIONS HAVE BEEN MADE BUILDER NEEDS TO OPEN THE DRAINAGE CONVEYANCE SWALE IMMEDIATELY ** FOLLOW UP INSPECTION ON 10/04/22 9/29/2022 - PREVIOUS INSPECTION NOTES ** 09/29/22 BUILDER NEEDS TO TAKE IMMEDIATE BACTION AND CORRECT THE NOTED PROBLEMS FROM PREVIOUS INSPECTIONS. ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. ii IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP ON 10/03/22 CORRECTIONS NEED TO BE MADE.... THIS IS A REINSPECTION 06/02/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ............................................................................................................................................................................................................................... 06/01/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE .............................................................................................................................................................................................................................. ** NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION BUILDER NEEDS TO READ INSPETOR NOTES. * SILT FENCE AT REAR OF PROPERTY IS DOWN ALLOWING FOR SEDIMENT TO NEGATIVELY IMPACT THE CANAL IN THE REAR OF THE PROPERTY THIS NEEDS TO BE CORRECTED IMMEDIATELY. * CULVERT PIPE NEEDS TO BE CLEANED OUT * TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALEAND NEEDS TO BE OPEND. * ROADWAY NEEDS TO BE CLEARED OF SAND AND SEDIMENT.
ROW - DRAINAGE 10/03/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/03/22 NO CORRECTIONS HAVE BEEN MADE BUILDER NEEDS TO OPEN THE DRAINAGE CONVEYANCE SWALE IMMEDIATELY ** FOLLOW UP INSPECTION ON 10/04/22 9/29/2022 - PREVIOUS INSPECTION NOTES ** 09/29/22 BUILDER NEEDS TO TAKE IMMEDIATE BACTION AND CORRECT THE NOTED PROBLEMS FROM PREVIOUS INSPECTIONS. ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. ii IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP ON 10/03/22 CORRECTIONS NEED TO BE MADE.... THIS IS A REINSPECTION 06/02/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ............................................................................................................................................................................................................................... 06/01/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE .............................................................................................................................................................................................................................. ** NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION BUILDER NEEDS TO READ INSPETOR NOTES. * SILT FENCE AT REAR OF PROPERTY IS DOWN ALLOWING FOR SEDIMENT TO NEGATIVELY IMPACT THE CANAL IN THE REAR OF THE PROPERTY THIS NEEDS TO BE CORRECTED IMMEDIATELY. * CULVERT PIPE NEEDS TO BE CLEANED OUT * TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALEAND NEEDS TO BE OPEND. * ROADWAY NEEDS TO BE CLEARED OF SAND AND SEDIMENT.
ROW - DRAINAGE 09/29/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 09/29/22 BUILDER NEEDS TO TAKE IMMEDIATE BACTION AND CORRECT THE NOTED PROBLEMS FROM PREVIOUS INSPECTIONS. ** BUILDER NEEDS TO CLEAR BLOCKAGE FROM TEMPORARY CULVERT PIPE AS IT IS CAUSING SERIOUS FLOODING NEGATIVELY IMPACTING THE ROADWAY AND ADJACENT PROPERTIES. ii IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP ON 10/03/22 CORRECTIONS NEED TO BE MADE.... THIS IS A REINSPECTION 06/02/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ............................................................................................................................................................................................................................... 06/01/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE .............................................................................................................................................................................................................................. ** NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION BUILDER NEEDS TO READ INSPETOR NOTES. * SILT FENCE AT REAR OF PROPERTY IS DOWN ALLOWING FOR SEDIMENT TO NEGATIVELY IMPACT THE CANAL IN THE REAR OF THE PROPERTY THIS NEEDS TO BE CORRECTED IMMEDIATELY. * CULVERT PIPE NEEDS TO BE CLEANED OUT * TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALEAND NEEDS TO BE OPEND. * ROADWAY NEEDS TO BE CLEARED OF SAND AND SEDIMENT.
INSULATION 09/15/2022 APPROVED FWILLIS
Note: Inspector Notes from Inspection 2420 NEED TO HAVE PANEL FRAMED OUT AND WATER TEST PRESSURE AT INSULATION
ALL ROUGH 09/02/2022 APPROVED - AS NOTED RMARTIN
Note: NEED TO HAVE PANEL FRAMED OUT AND WATER TEST PRESSURE AT INSULATION
LATH/BRICK/ WATER BARRIER 08/31/2022 APPROVED MKRASKI
LATH/BRICK/ WATER BARRIER 08/12/2022 Disapproved - NO FEE MKRASKI
Note: Lath in back corner of house is not attached.
ROW - DRAINAGE 06/02/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 06/02/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ............................................................................................................................................................................................................................... 06/01/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE .............................................................................................................................................................................................................................. ** NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION BUILDER NEEDS TO READ INSPETOR NOTES. * SILT FENCE AT REAR OF PROPERTY IS DOWN ALLOWING FOR SEDIMENT TO NEGATIVELY IMPACT THE CANAL IN THE REAR OF THE PROPERTY THIS NEEDS TO BE CORRECTED IMMEDIATELY. * CULVERT PIPE NEEDS TO BE CLEANED OUT * TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALEAND NEEDS TO BE OPEND. * ROADWAY NEEDS TO BE CLEARED OF SAND AND SEDIMENT.
ROW - DRAINAGE 06/01/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 06/01/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE .............................................................................................................................................................................................................................. ** NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION BUILDER NEEDS TO READ INSPETOR NOTES. * SILT FENCE AT REAR OF PROPERTY IS DOWN ALLOWING FOR SEDIMENT TO NEGATIVELY IMPACT THE CANAL IN THE REAR OF THE PROPERTY THIS NEEDS TO BE CORRECTED IMMEDIATELY. * CULVERT PIPE NEEDS TO BE CLEANED OUT * TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALEAND NEEDS TO BE OPEND. * ROADWAY NEEDS TO BE CLEARED OF SAND AND SEDIMENT.
ROW - DRAINAGE 05/27/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION BUILDER NEEDS TO READ INSPETOR NOTES. * SILT FENCE AT REAR OF PROPERTY IS DOWN ALLOWING FOR SEDIMENT TO NEGATIVELY IMPACT THE CANAL IN THE REAR OF THE PROPERTY THIS NEEDS TO BE CORRECTED IMMEDIATELY. * CULVERT PIPE NEEDS TO BE CLEANED OUT * FOLLOW UP INSPECTION WILL BE ON 06/01/22 * TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALEAND NEEDS TO BE OPEND. * ROADWAY NEEDS TO BE CLEARED OF SAND AND SEDIMENT.
WALL SHEATHING 05/05/2022 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/05/2022 APPROVED FWILLIS
ROOF VALLEY & METAL 05/05/2022 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 04/21/2022 APPROVED TDOAK
TIE BEAM / LINTEL 04/08/2022 APPROVED FWILLIS
MONOLITHIC SLAB 03/17/2022 APPROVED FWILLIS
WATER METER INSTALLATION REQUEST 03/17/2022 APPROVED CSTONE
PLUMBING 1ST ROUGH UNDERGROUND 03/07/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 03/07/2022 APPROVED MGIBSON

Review History

Department Status Date In Date Out
MECH COMPLETE 07/14/2022 07/15/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/20/2022 04/21/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/20/2022 04/21/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
MECH COMPLETE 11/02/2021 11/02/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SWALE COMPLETE 10/26/2021 11/22/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 10/26/2021 10/26/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
MECH HOLD 10/26/2021 10/26/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Minimum design temp on heatload for st. augustine at 1% per wrightsoft is 89 degrees
ENGIN1 COMPLETE 10/26/2021 10/26/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 10/26/2021 11/01/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
MECH HOLD 09/28/2021 09/29/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Design location on heatload needs to match design location on Energy Calcs. Cannot be Melbourne. 2. Minimun indoor design temperature needs to be 75 degrees for cooling per R302.1 FBC Energy conservation 2020 7Th edition
BLD COMPLETE 09/27/2021 09/27/2021
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
CUSVC COMPLETE 09/27/2021 09/30/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 09/27/2021 09/28/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/27/2021 09/27/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 09/27/2021 09/28/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
SW1 COMPLETE 09/27/2021 10/04/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
ZON HOLD 09/27/2021 09/28/2021
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Site plan /Survey is missing second fllood map panel number 0128E & 0136E. Please add

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 05/16/2023
SW ENG - INSPECTION 20 ¤20.00 05/16/2023
SW ENG - INSPECTION 20 ¤20.00 05/16/2023
SW ENG - INSPECTION 20 ¤20.00 05/16/2023
SW ENG - INSPECTION 20 ¤20.00 05/16/2023
SW ENG - INSPECTION 20 ¤20.00 05/16/2023
SW ENG - INSPECTION 20 ¤20.00 05/16/2023
SW ENG - INSPECTION 20 ¤20.00 05/16/2023
SW ENG - INSPECTION 20 ¤20.00 05/16/2023
SW ENG - INSPECTION 20 ¤20.00 05/16/2023
SW ENG - INSPECTION 20 ¤20.00 05/16/2023
SW ENG - INSPECTION 20 ¤20.00 05/16/2023
SW ENG REINSPECTION 20 ¤20.00 05/16/2023
SW ENG REINSPECTION 20 ¤20.00 05/16/2023
SW ENG REINSPECTION 20 ¤20.00 05/16/2023
SW ENG REINSPECTION 20 ¤20.00 05/16/2023
SW ENG REINSPECTION 20 ¤20.00 05/16/2023
SW ENG REINSPECTION 30 ¤30.00 05/16/2023
PLAN REVIEW - REVISION ¤32.50 05/16/2023
CONTRACTOR CHANGE ¤40.00 07/14/2022
SW ENG - INSPECTION 20 ¤20.00 07/14/2022
SW ENG - INSPECTION 20 ¤20.00 07/14/2022
SW ENG - INSPECTION 20 ¤20.00 07/14/2022
SW ENG - INSPECTION 20 ¤20.00 07/14/2022
METER - DEPOSIT ¤60.00 01/21/2022
WATER- TURN ON ¤25.00 01/21/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/21/2022
INSPECTION - RESIDENTIAL ¤767.25 01/21/2022
PLAN REVIEW - RESIDENTIAL ¤217.62 01/21/2022
3% FIRE IMPACT FEE CREDIT (¤11.01) 01/21/2022
IMPACT FEE FIRE ¤367.00 01/21/2022
IMPACT FEE PARKS ¤1,199.12 01/21/2022
IMPACT FEE SCHOOL ¤3,600.00 01/21/2022
IMPACT FEE TRANSPORTATION ¤1,718.00 01/21/2022
WATER -IRRIGATION INSPECTION ¤25.00 01/21/2022
3% PARKS IMPACT FEE CREDIT (¤35.97) 01/21/2022
SURCHARGE FS 533.721 ¤10.72 01/21/2022
SURCHARGE - FS 468.631 ¤16.08 01/21/2022
SW ENG - FOUNDATION SURVEY ¤20.00 01/21/2022
SW ENG - REVIEW 20 ¤20.00 01/21/2022
SW ENG RES REVIEW 200 ¤200.00 01/21/2022
3% TRANS IMPACT FEE CREDIT (¤51.54) 01/21/2022
SEWER CREDIT (¤2,465.75) 01/21/2022
SEWER INSPECTION ¤25.00 01/21/2022
SEWER CAPITAL FACILITY ¤4,939.76 01/21/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 01/21/2022
SITE PLAN 30 ¤30.00 01/21/2022
SW ENG INSPECTION 60 ¤60.00 01/21/2022
SW ENG PRE APRON ¤30.00 01/21/2022
CONNECTION FEES ¤1,077.88 01/21/2022
Fees Total Due: ¤0.00 Total Paid: ¤16,023.16