I want to search for...

Permit #2021091200

Permit Details

Status: COED

Parcel Id: 07-11-31-7009-00450-0210
CONDITIONED SPACE: 2004 sqft
GARAGE: 396 sqft
OPENED PORCH (WITH ROOF) : 208 sqft
OPENED PORCH (WITH ROOF) : 86 sqft
Total Square Footage: 2694 sqft
Block: 00450
Subdivision: 2208 - SECTION 9-FLORIDA PARK
Job Phone: 386-447-4400
Location Address: 56 FENIMORE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/15/2021
NOC: RECORDED
Applicant name: DAVID PAUL CROCKETT
Owner: JOSE & ISABEL FERNANDES

Address

10 RAYMOND

ST LINCOLN, RI 02865

Lot: 0210
Contracted Stated Job Value: ¤353,700.00
Job Description: Single Family Residence
Type: CN

Contractor

SALTWATER HOMES INC
Status Location Address Mailing Address State License Number Phone Fax
DECEASED

138 PALM COAST PARKWAY

PALM COAST, FL 32137

SUITE 328

PALM COAST, FL 32137

RG0041345 (Exp: 08/31/2025) 386-447-4400 866-244-9639

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
ERIC FRANCO
Status Location Address Mailing Address State License Number Phone
INACTIVE

840 DELTONA BLVD

DELTONA, FL 32725

STE F2

DELTONA, FL 32725

CCC1327280 (Exp: 08/31/2026) 386-575-4007

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/04/2023 FINAL APPROVED MKRASKI
BLD - BUILDING FINAL 03/27/2023 Disapproved - NO FEE AGAETANO
Note: 03-27-2023 1. Cook top hood not installed. 2. AHU breaker does not match electrical panel breaker.
ROW - STORMWATER FINAL 03/13/2023 FINAL APPROVED PFLANAGAN
U -UTILITY RESIDENTIAL FINAL 03/07/2023 FINAL APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 03/06/2023 APPROVED PFLANAGAN
FINAL SURVEY (OFFICE USE ONLY) 03/06/2023 APPROVED PFLANAGAN
Note: 3/3/2023 - PREVIOUS INSPECTION NOTES 2/27/2023 - PREVIOUS INSPECTION NOTES ALL DRAINAGE IN THE BACK IS FLOW TO THE UNPLATED AREA IN THE BACK NEED TO REGRADE SO WATER FLOWS TO THE ROAD SIDE SWALE OR IF THE GRADING IS RIGHT SERVEYORS NEED TO SHOW THAT THE WATER DONT FLOW TO THAT AREA IN THE BACK
FINAL SURVEY (OFFICE USE ONLY) 03/03/2023 CANCELLED BY APPLICANT PFLANAGAN
Note: 2/27/2023 - PREVIOUS INSPECTION NOTES ALL DRAINAGE IN THE BACK IS FLOW TO THE UNPLATED AREA IN THE BACK NEED TO REGRADE SO WATER FLOWS TO THE ROAD SIDE SWALE OR IF THE GRADING IS RIGHT SERVEYORS NEED TO SHOW THAT THE WATER DONT FLOW TO THAT AREA IN THE BACK
U-CROSS CONNECTION 02/28/2023 APPROVED DHANEY
FINAL SURVEY (OFFICE USE ONLY) 02/27/2023 Disapproved - NO FEE PFLANAGAN
Note: ALL DRAINAGE IN THE BACK IS FLOW TO THE UNPLATED AREA IN THE BACK NEED TO REGRADE SO WATER FLOWS TO THE ROAD SIDE SWALE OR IF THE GRADING IS RIGHT SERVEYORS NEED TO SHOW THAT THE WATER DONT FLOW TO THAT AREA IN THE BACK
GRAVITY SEWER TEST 01/10/2023 APPROVED MGIBSON
U - SEWER TIE IN 01/10/2023 APPROVED MGIBSON
ROW- PAVER RESTRAINTS 12/28/2022 APPROVED GBERTOLA
Note: this inspection pass already
ROW- PRE-APRON (PRE-POUR) 12/28/2022 APPROVED GBERTOLA
Note: 12/28/22= READY FOR PAVERS 11/17/2022 - PREVIOUS INSPECTION NOTES ** 11/17/22 READY TO POUR AND PAVER RESTRAINTS ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
ELECTRIC - EARLY POWER 12/07/2022 APPROVED RMARTIN
Note: Inspector Notes from Inspection 2170 Emailed FPL @ 2:45 PM
ROW- PAVER RESTRAINTS 11/17/2022 APPROVED EMADISON
Note: ** 11/17/22 PAVER RESTRAINTS READY TO POUR WITH APRON
ROW- PRE-APRON (PRE-POUR) 11/17/2022 PARTIALLY APPROVED EMADISON
Note: ** 11/17/22 READY TO POUR AND PAVER RESTRAINTS ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
LATH/BRICK/ WATER BARRIER 10/14/2022 APPROVED AGAETANO
INSULATION 10/04/2022 APPROVED DCUSHING
ELECTRIC TEMP POLE 09/21/2022 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 2:45 PM
ALL ROUGH 09/20/2022 APPROVED AGAETANO
Note: Please provide a letter to the building department stating concerning the Piggy Back trusses are not needed to be strapped. DRWG PB160160118.
WALL SHEATHING 05/10/2022 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/10/2022 APPROVED - AS NOTED AGAETANO
Note: Please provide a letter to the building department stating concerning the Piggy Back trusses are not needed to be strapped. DRWG PB160160118.
ROOF VALLEY & METAL 05/10/2022 APPROVED AGAETANO
TIE BEAM / LINTEL 03/17/2022 APPROVED DCUSHING
FOUND SURVEY APPROVED (OFFICE) 02/10/2022 APPROVED TBAKER
MONOLITHIC SLAB 01/24/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION Plumbing line at left of foundation needs to be sleeved.
MONOLITHIC SLAB 01/21/2022 Disapproved - NO FEE AGAETANO
Note: Plumbing line at left of foundation needs to be sleeved.
PLUMBING 1ST ROUGH UNDERGROUND 01/18/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 12/09/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
BADMIN INFORMATION 05/13/2022 05/13/2022
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM TRUSS DETAIL MISSING DIGITAL SIGNATURE
BLD COMPLETE 05/13/2022 05/16/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/10/2022 02/10/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 02/10/2022 02/10/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 12/08/2021 12/08/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 11/12/2021 11/12/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON HOLD 10/25/2021 10/25/2021
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM landscape plan : please indicate the sod being used and if it will need irrigation.
ENGIN1 COMPLETE 10/25/2021 10/26/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 10/25/2021 10/28/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
BLD COMPLETE 09/27/2021 09/29/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 09/27/2021 09/29/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 09/27/2021 09/28/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/27/2021 09/27/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 09/27/2021 09/28/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 09/27/2021 09/28/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 09/27/2021 10/04/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
ZON HOLD 09/27/2021 09/29/2021
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Right of way agreement: will be needed if doing pavers to the apron. Please have owners sign and notarize the agreement and submit at your earliest conveinance. Landscape plan: code requires 4 shrubs on eachside of home. The shrubs at the corner count as a foundation shrub so please add one more shrub to each side of the house as there are only three on each side. Please provide proposed sod and if it will require an irrigation system.
SWALE COMPLETE 09/27/2021 11/23/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 04/03/2023
CONTRACTOR CHANGE ¤40.00 04/03/2023
CONTRACTOR CHANGE ¤40.00 04/03/2023
PLAN REVIEW - REVISION ¤32.50 04/03/2023
CONNECTION FEES ¤1,017.83 11/15/2021
METER - DEPOSIT ¤60.00 11/15/2021
WATER- TURN ON ¤25.00 11/15/2021
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/15/2021
INSPECTION - RESIDENTIAL ¤973.50 11/15/2021
PLAN REVIEW - RESIDENTIAL ¤276.12 11/15/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 11/15/2021
IMPACT FEE FIRE ¤367.00 11/15/2021
IMPACT FEE PARKS ¤1,199.12 11/15/2021
IMPACT FEE SCHOOL ¤3,600.00 11/15/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 11/15/2021
WATER -IRRIGATION INSPECTION ¤25.00 11/15/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 11/15/2021
SURCHARGE FS 533.721 ¤13.43 11/15/2021
SURCHARGE - FS 468.631 ¤20.15 11/15/2021
SW ENG - FOUNDATION SURVEY ¤20.00 11/15/2021
SW ENG INSPECTION 60 ¤60.00 11/15/2021
SW ENG PRE APRON ¤30.00 11/15/2021
SW ENG - REVIEW 20 ¤20.00 11/15/2021
SW ENG RES REVIEW 200 ¤200.00 11/15/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 11/15/2021
SEWER INSPECTION ¤25.00 11/15/2021
SEWER CAPITAL FACILITY ¤4,664.55 11/15/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 11/15/2021
SITE PLAN 30 ¤30.00 11/15/2021
Fees Total Due: ¤0.00 Total Paid: ¤17,853.13