I want to search for...
Permit #2021091274
Permit Details
Status: COED
| Parcel Id: 07-11-31-7033-00490-0120 |
| CONDITIONED SPACE: 1867 sqft |
| GARAGE: 409 sqft |
| OPENED PORCH (WITH ROOF) : 28 sqft |
| Total Square Footage: 2304 sqft |
| Block: 00490 |
| Subdivision: 2184 - SECTION 33-ROYAL PALMS |
| Job Phone: 904-268-7730 |
| Location Address: 80 RENSHAW DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/12/2021 |
| NOC: RECORDED |
| Applicant name: DALE ALAN DUBBERLY |
| Owner: MARONDA HOMES LLC OF FLORIDA |
|
Address 5220 SHAD ROAD SUITE 202 JACKSONVILLE, FL 32257 |
| Lot: 0120 |
| Contracted Stated Job Value: ¤175,000.00 |
| Job Description: NEW SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
MARONDA HOMES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
5220 SHAD ROAD JACKSONVILLE , FL 32257 |
CGC1504922 (Exp: 08/31/2022) | 904-268-7730 |
Sub Contractors
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
RONALD KEVIN HAUPT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CAC058534 (Exp: 08/31/2026) | 407-321-0064 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/29/2022 | FINAL APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION New inspection due to canceled inspection Check for air admittance for left bathroom double sink at final due to the lines not being out of the wall and not vented. P-3105 | |||
| BLD - BUILDING FINAL | 08/26/2022 | CANCELLED BY APPLICANT | JWALKER |
| Note: New inspection due to canceled inspection Check for air admittance for left bathroom double sink at final due to the lines not being out of the wall and not vented. P-3105 | |||
| BLD - BUILDING FINAL | 08/24/2022 | CANCELLED BY APPLICANT | WEB |
| Note: Check for air admittance for left bathroom double sink at final due to the lines not being out of the wall and not vented. P-3105 | |||
| U -UTILITY RESIDENTIAL FINAL | 08/23/2022 | FINAL APPROVED | JHARDING |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/18/2022 | APPROVED | GBERTOLA |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/18/2022 | APPROVED | GBERTOLA |
| ROW - STORMWATER FINAL | 08/18/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - FINAL APRON (AFTER POUR) | 08/18/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/16/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: FINAL SURVEY WON'T MATCH SITE PLAN flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. SECTION 300.01 ROADSIDE SWALE AND CULVERT # | |||
| FINAL SURVEY (OFFICE USE ONLY) | 08/16/2022 | CANCELLED BY APPLICANT | MRAMOS |
| ELECTRIC - EARLY POWER | 08/15/2022 | APPROVED | JMUNSON |
| U - SEWER TIE IN | 07/28/2022 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 07/27/2022 | APPROVED | RGROSS |
| Note: READY TO POUR | |||
| PEP TANK INSTALLATION REQUEST | 06/30/2022 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 6/14/2022 8:28:04 AM cement pile of sand in way | |||
| PEP TANK INSTALLATION REQUEST | 06/10/2022 | Disapproved - NO FEE | CSTONE |
| Note: cement pile of sand in way | |||
| INSULATION | 06/02/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION Dryer duct fitting has not been sealed as was listed on ALL Rough. M1502.4.,2 | |||
| LATH/BRICK/ WATER BARRIER | 06/01/2022 | APPROVED | JWALKER |
| INSULATION | 05/19/2022 | Disapproved - NO FEE | JWALKER |
| Note: Dryer duct fitting has not been sealed as was listed on ALL Rough. M1502.4.,2 | |||
| ALL ROUGH | 05/16/2022 | APPROVED - AS NOTED | JWALKER |
| Note: Check for air admittance for left bathroom double sink at final due to the lines not being out of the wall and not vented. P-3105 Seal dryer duct. | |||
| ELECTRIC-TUG | 05/12/2022 | APPROVED - AS NOTED | JWALKER |
| Note: Emailed FPL 8:03 am | |||
| ROOF VALLEY & METAL | 04/25/2022 | APPROVED | JWALKER |
| WALL SHEATHING | 04/21/2022 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/11/2022 | APPROVED | JWALKER |
| TIE BEAM / LINTEL | 03/23/2022 | APPROVED | JWALKER |
| U-CROSS CONNECTION | 03/23/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/01/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 01/31/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION There are 3 waded up torn muddy drawings in the job box. Please have a full set of approved drawing on site for inspections. 1/12/22 The slab needs to be tamped down where soil has been over thrown at plumbing Reseal the plastic at the garage. 1/31`/22 THIS SLAB INSPECTION WAS APPROVED | |||
| MONOLITHIC SLAB | 01/13/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION There are 3 waded up torn muddy drawings in the job box. Please have a full set of approved drawing on site for inspections. 1/12/22 The slab needs to be tamped down where soil has been over thrown at plumbing Reseal the plastic at the garage. | |||
| MONOLITHIC SLAB | 01/12/2022 | Disapproved - NO FEE | JWALKER |
| Note: THIS IS A REINSPECTION There are 3 waded up torn muddy drawings in the job box. Please have a full set of approved drawing on site for inspections. 1/12/22 The slab needs to be tamped down where soil has been over thrown at plumbing Reseal the plastic at the garage. | |||
| MONOLITHIC SLAB | 01/11/2022 | Disapproved -FEE REQUIRED | JWALKER |
| Note: There are 3 waded up torn muddy drawings in the job box. Please have a full set of approved drawing on site for inspections. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/06/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 01/06/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 12/08/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 03/23/2022 | 03/23/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/28/2022 | 03/01/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/28/2022 | 02/28/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/08/2021 | 10/11/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 09/29/2021 | 11/24/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/28/2021 | 10/01/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 09/28/2021 | 09/30/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 09/28/2021 | 09/29/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/28/2021 | 09/29/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/28/2021 | 10/05/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 09/28/2021 | 09/29/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Design Location on Energy Calcs needs to be closer to Palm Coast. IE, Daytona Beach or ST. Augustine. 2. Design Location on heatload needs to be closer to Palm Coast | |||
| SW1 | COMPLETE | 09/28/2021 | 10/05/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/28/2021 | 09/30/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 08/23/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 08/23/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 08/23/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/23/2022 |
| CONNECTION FEES | ¤1,017.83 | 10/12/2021 |
| METER - DEPOSIT | ¤60.00 | 10/12/2021 |
| WATER- TURN ON | ¤25.00 | 10/12/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/12/2021 |
| INSPECTION - RESIDENTIAL | ¤618.75 | 10/12/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤175.50 | 10/12/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 10/12/2021 |
| IMPACT FEE FIRE | ¤367.00 | 10/12/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 10/12/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/12/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 10/12/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/12/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 10/12/2021 |
| SURCHARGE FS 533.721 | ¤8.76 | 10/12/2021 |
| SURCHARGE - FS 468.631 | ¤13.14 | 10/12/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/12/2021 |
| SW ENG INSPECTION 60 | ¤60.00 | 10/12/2021 |
| SW ENG PRE APRON | ¤30.00 | 10/12/2021 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/12/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/12/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 10/12/2021 |
| SEWER CREDIT | (¤1,466.00) | 10/12/2021 |
| SEWER INSPECTION | ¤25.00 | 10/12/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 10/12/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 10/12/2021 |
| SITE PLAN 30 | ¤30.00 | 10/12/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,920.08 |