I want to search for...

Permit #2021091310

Permit Details

Status: COED

Parcel Id: 07-11-31-7033-00490-0110
CONDITIONED SPACE: 2052 sqft
GARAGE: 407 sqft
OPENED PORCH (WITH ROOF) : 16 sqft
Total Square Footage: 2475 sqft
Block: 00490
Subdivision: 2184 - SECTION 33-ROYAL PALMS
Job Phone: 904-268-7730
Location Address: 82 RENSHAW DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/12/2021
NOC: RECORDED
Applicant name: DALE ALAN DUBBERLY
Owner: MARONDA HOMES LLC

Address

5220 SHAD ROAD SUITE 202

JACKSONVILLE, FL 32257

Lot: 0110
Contracted Stated Job Value: ¤175,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN

Contractor

MARONDA HOMES INC
Status Location Address State License Number Phone
CANCEL

5220 SHAD ROAD

JACKSONVILLE , FL 32257

CGC1504922 (Exp: 08/31/2022) 904-268-7730

Sub Contractors

ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063
RONALD KEVIN HAUPT
Status Location Address State License Number Phone
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CAC058534 (Exp: 08/31/2026) 407-321-0064
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
JAMES M GREENSLADE
Status Location Address State License Number Phone Fax
ACTIVE

311 S BAY ST

BUNNELL, FL 32110

EC13006083 (Exp: 08/31/2026) 386-263-2960 386-263-2980

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/29/2022 FINAL APPROVED JWALKER
U -UTILITY RESIDENTIAL FINAL 08/23/2022 FINAL APPROVED JHARDING
ROW - FINAL APRON (AFTER POUR) 08/22/2022 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/22/2022 APPROVED GBERTOLA
Note: 08/22/22=CORRECTION WERE MADE AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD .................................................................................................................................................................................................................................... 08/16/22=YOU PROPOSE A COMMON SWALE ON THE PROPERTY LINE YOU DIDN'T BUILDED AS YOU PROPOSE ON THE SITE PLAN NEED TO BUILD A COMMON SWALE CHECK SITE PLAN AND FINAL SURVEY ........................................................................................................................................................................................................................................
ROW FIELD SURVEY /GRADING CERTIFICATION 08/22/2022 APPROVED GBERTOLA
ROW - STORMWATER FINAL 08/22/2022 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
FINAL SURVEY (OFFICE USE ONLY) 08/22/2022 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION ADDED ON 8/15/2022 1:38:32 PM
FINAL SURVEY (OFFICE USE ONLY) 08/16/2022 CANCELLED BY APPLICANT MRAMOS
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/16/2022 Disapproved - NO FEE GBERTOLA
Note: 08/16/22=YOU PROPOSE A COMMON SWALE ON THE PROPERTY LINE YOU DIDN'T BUILDED AS YOU PROPOSE ON THE SITE PLAN NEED TO BUILD A COMMON SWALE CHECK SITE PLAN AND FINAL SURVEY ........................................................................................................................................................................................................................................
ELECTRIC - EARLY POWER 08/15/2022 APPROVED JMUNSON
Note: THIS IS A REINSPECTION Mirowave out let not installed wire hanging out of cabinet. Dish washer / garbage disposal outlets not safed off. Exterior garage right side box not safed off. 8/15/22 Above items were fixed
ELECTRIC - EARLY POWER 08/04/2022 Disapproved -FEE REQUIRED JWALKER
Note: Mirowave out let not installed wire hanging out of cabinet. Dish washer / garbage disposal outlets not safed off. Exterior garage right side box not safed off.
U - SEWER TIE IN 07/28/2022 APPROVED MGIBSON
U-CROSS CONNECTION 07/28/2022 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation-no cross connection
ROW- PRE-APRON (PRE-POUR) 07/27/2022 APPROVED RGROSS
Note: READY TO POUR
PEP TANK INSTALLATION REQUEST 06/30/2022 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 06/24/2022 APPROVED JWALKER
INSULATION 06/22/2022 APPROVED JWALKER
ALL ROUGH 06/02/2022 APPROVED JWALKER
Note: THIS IS A REINSPECTION This was noted at roof brace inspection. Front entry bearing wall missing top plate and bottom plate SP4 anchors. not installed. Missing nail plated at water heater supply line bottom track. Secure the water heater supply line running in the metal stud and install nail plates if necessary. The hole punch outs in the panel box need to have approve plugs installed. The service wire, Water heater wiring, HVAC and Oven wiring have not been run. Left side bathroom the water supply line is out of the wall an unprotected by nail plate.
ALL ROUGH 05/16/2022 Disapproved - NO FEE JWALKER
Note: This was noted at roof brace inspection. Front entry bearing wall missing top plate and bottom plate SP4 anchors. not installed. Missing nail plated at water heater supply line bottom track. Secure the water heater supply line running in the metal stud and install nail plates if necessary. The hole punch outs in the panel box need to have approve plugs installed. The service wire, Water heater wiring, HVAC and Oven wiring have not been run. Left side bathroom the water supply line is out of the wall an unprotected by nail plate.
ELECTRIC-TUG 05/12/2022 APPROVED - AS NOTED JWALKER
Note: Emailed FPL 8:06 am
ROOF VALLEY & METAL 05/10/2022 APPROVED JWALKER
WALL SHEATHING 04/21/2022 APPROVED MKRASKI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/11/2022 APPROVED - AS NOTED JWALKER
Note: Front entry bearing wall missing top plate and bottom plate SP4 anchors.
TIE BEAM / LINTEL 03/24/2022 APPROVED JWALKER
Note: THIS IS A REINSPECTION The print calls for pre cast lintels. Lintels that have been installed are H- steel Please submitt a revision to the building department for the change of lintels. Down cells were inspected. Lintel rebar was not.
TIE BEAM / LINTEL 03/22/2022 Disapproved - NO FEE JWALKER
Note: The print calls for pre cast lintels. Lintels that have been installed are H- steel Please submitt a revision to the building department for the change of lintels. Down cells were inspected. Lintel rebar was not.
FOUND SURVEY APPROVED (OFFICE) 03/01/2022 APPROVED TBAKER
MONOLITHIC SLAB 01/14/2022 APPROVED JWALKER
Note: First stop at appx 10am. Roots were in the footing that needed removed. Workers on site started to remove roots. Returned at 12 noon. Roots were removed
PLUMBING 1ST ROUGH UNDERGROUND 01/12/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 01/12/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 12/08/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
BADMIN INFORMATION 08/26/2022 08/26/2022
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM
BADMIN HOLD 08/22/2022 08/22/2022
Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM SUBMIT BLOWER DOOR TEST SEPARATELY. DUCT LEAKAGE NOT NEEDED FOR SUBMITTAL.
BLD COMPLETE 03/23/2022 03/23/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/28/2022 03/01/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 02/28/2022 02/28/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 09/29/2021 10/01/2021
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
CUSVC COMPLETE 09/29/2021 10/04/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 09/29/2021 09/29/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/29/2021 09/29/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 09/29/2021 10/05/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 09/29/2021 09/30/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 09/29/2021 10/05/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
ZON COMPLETE 09/29/2021 09/30/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SWALE COMPLETE 09/29/2021 11/24/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 08/23/2022
CONTRACTOR CHANGE ¤40.00 08/23/2022
PLAN REVIEW - REVISION ¤32.50 08/23/2022
REINSPECTION RESIDENTIAL ¤40.00 08/23/2022
CONNECTION FEES ¤1,017.83 10/12/2021
METER - DEPOSIT ¤60.00 10/12/2021
WATER- TURN ON ¤25.00 10/12/2021
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/12/2021
INSPECTION - RESIDENTIAL ¤673.75 10/12/2021
PLAN REVIEW - RESIDENTIAL ¤191.10 10/12/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 10/12/2021
IMPACT FEE FIRE ¤367.00 10/12/2021
IMPACT FEE PARKS ¤1,199.12 10/12/2021
IMPACT FEE SCHOOL ¤3,600.00 10/12/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 10/12/2021
WATER -IRRIGATION INSPECTION ¤25.00 10/12/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 10/12/2021
SURCHARGE FS 533.721 ¤9.49 10/12/2021
SURCHARGE - FS 468.631 ¤14.23 10/12/2021
SW ENG - FOUNDATION SURVEY ¤20.00 10/12/2021
SW ENG INSPECTION 60 ¤60.00 10/12/2021
SW ENG PRE APRON ¤30.00 10/12/2021
SW ENG - REVIEW 20 ¤20.00 10/12/2021
SW ENG RES REVIEW 200 ¤200.00 10/12/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 10/12/2021
SEWER CREDIT (¤1,466.00) 10/12/2021
SEWER INSPECTION ¤25.00 10/12/2021
SEWER CAPITAL FACILITY ¤4,664.55 10/12/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 10/12/2021
SITE PLAN 30 ¤30.00 10/12/2021
Fees Total Due: ¤0.00 Total Paid: ¤15,992.50