I want to search for...
Permit #2021091357
Permit Details
Status: COED
| Parcel Id: 07-11-31-7029-00640-0030 |
| CONDITIONED SPACE: 2085 sqft |
| GARAGE: 595 sqft |
| OPENED PORCH (WITH ROOF) : 134 sqft |
| OPENED PORCH (WITH ROOF) : 41 sqft |
| Total Square Footage: 2855 sqft |
| Block: 00640 |
| Subdivision: 2209 - SECTION 29-ROYAL PALMS |
| Job Phone: 321-271-9033 |
| Location Address: 84 RYAN DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/21/2022 |
| NOC: RECORDED |
| Applicant name: KEITH E TANNER |
| Owner: LS_VEH02, LLC |
|
Address 4885 WICKHAM ROAD MELBOURNE, FL 32940 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MERCEDES PREMIER HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
4885 N WICKHAM RD MELBOURNE, FL 32940 |
STE 101 MELBOURNE, FL 32940 |
CGC1516602 (Exp: 08/31/2024) | 321-610-3924 |
Sub Contractors
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CAC1820196 (Exp: 08/31/2026) | 407-404-4000 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/13/2022 | FINAL APPROVED | JWALKER |
| Note: 12/12/2022 - PREVIOUS INSPECTION NOTES Kitchen hood exhaust duct penetrating the ceiling has not been completed. | |||
| BLD - BUILDING FINAL | 12/12/2022 | Disapproved - NO FEE | JWALKER |
| Note: Kitchen hood exhaust duct penetrating the ceiling has not been completed. | |||
| ROW - STORMWATER FINAL | 12/12/2022 | FINAL APPROVED | PFLANAGAN |
| U -UTILITY RESIDENTIAL FINAL | 12/12/2022 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/09/2022 | APPROVED | GBERTOLA |
| Note: 12/09/22=correction were made 12/2/2022 - PREVIOUS INSPECTION NOTES 1) THE BACK YARDS DRAINAGE IS IMPACTING THE LOT BEHIND YOURS 2) THE RIGHT DRAINAGE CONVEYANCE DOESN'T HAVE POSITIVE FALL THE ELEVATIONS GO UP AND DONE SHOW IT WON'T LET THE WATER TO FLOW TO THE SWALE IN THE FRONT | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/09/2022 | APPROVED | GBERTOLA |
| ROW - FINAL APRON (AFTER POUR) | 12/09/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| U-CROSS CONNECTION | 12/08/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| WINDOW NAILING | 12/08/2022 | APPROVED | JWALKER |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/02/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) THE BACK YARDS DRAINAGE IS IMPACTING THE LOT BEHIND YOURS 2) THE RIGHT DRAINAGE CONVEYANCE DOESN'T HAVE POSITIVE FALL THE ELEVATIONS GO UP AND DONE SHOW IT WON'T LET THE WATER TO FLOW TO THE SWALE IN THE FRONT | |||
| ROW- PRE-APRON (PRE-POUR) | 11/17/2022 | APPROVED | PFLANAGAN |
| Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING THE CONCRETE FOR THE DRIVEWAY --------------------------------------------------------------------------------------------- 11/16/2022 - PREVIOUS INSPECTION NOTES 11'/16/22=Not ready for inspection. Not formed. 11/15/2022 - PREVIOUS INSPECTION NOTES CAN NOT DO A PM INSPECTION CALLED OFFICE OF THE COMPANY AND THEY SAID THEY WILL PUT IT IN FOR INSPECTION WHEN THE PRE POUR IS READY TO BE INSPECTED | |||
| ELECTRIC - EARLY POWER | 11/17/2022 | APPROVED | JMUNSON |
| ROW- PRE-APRON (PRE-POUR) | 11/16/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 11'/16/22=Not ready for inspection. Not formed. 11/15/2022 - PREVIOUS INSPECTION NOTES CAN NOT DO A PM INSPECTION CALLED OFFICE OF THE COMPANY AND THEY SAID THEY WILL PUT IT IN FOR INSPECTION WHEN THE PRE POUR IS READY TO BE INSPECTED | |||
| ROW- PRE-APRON (PRE-POUR) | 11/15/2022 | CANCELLED BY APPLICANT | PFLANAGAN |
| Note: CAN NOT DO A PM INSPECTION CALLED OFFICE OF THE COMPANY AND THEY SAID THEY WILL PUT IT IN FOR INSPECTION WHEN THE PRE POUR IS READY TO BE INSPECTED | |||
| U - SEWER TIE IN | 09/06/2022 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 08/12/2022 | APPROVED | CSTONE |
| INSULATION | 08/12/2022 | Disapproved - NO FEE | JWALKER |
| Note: The bearing wall at the dryer duct has not been corrected. Please refer to the first all rough inspection. | |||
| INSULATION | 08/12/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION The bearing wall at the dryer duct has not been corrected. Please refer to the first all rough. Contractor supplied engineer letter for fix. 8/12/22 | |||
| LATH/BRICK/ WATER BARRIER | 07/12/2022 | APPROVED - AS NOTED | KSANDOE |
| Note: Inspector Notes from Inspection 2420 1-Notching at bearing wall cannot exceed 25% of the lumber width. The dryer duct will need to be relocated and top plated fixed. 2-The floor cut out in the kitchen needs to be filled. Also the water supply in the left side bathroom. 3- Windows have not been installed adding a WINDOW NAILING INSPECTION. 7/12/22 Lath/Brick passed Hole in slab for water supply for toilet in guest bath needs to be filled Notching of top plate for dryer vent does not meet requirments as set below: NOTCHING/DRILLING WALL TOP PLATES, R602.2.3.1 ALSO FIGURE 602.6.1 WHEN DRILLING AND NOTCHING INTERIOR OR EXTERIOR LOAD BEARING WALL TOP PLATE BY MORE THAN 50% OF ITS WIDTH, A GLAVANIZED METAL PLATE NOT LESS THAN 16 GA. THICK AND 1.5 inches WIDE SHALL BE FASTENED ACROSS AND TO THE TOP PLATE WITH NOT LESS THAN 8-10d HAVING A MINIMUM LENGTH OF 1.5 inches AT EACH SIDE OR EQUIVALENT. THE METAL TIE MUST EXTEND A MINIMUM OF 6 inches PAST THE OPENING | |||
| ALL ROUGH | 06/21/2022 | APPROVED - AS NOTED | JWALKER |
| Note: 1-Notching at bearing wall cannot exceed 25% of the lumber width. The dryer duct will need to be relocated and top plated fixed. 2-The floor cut out in the kitchen needs to be filled. Also the water supply in the left side bathroom. 3- Windows have not been installed adding a WINDOW NAILING INSPECTION. | |||
| ROOF VALLEY & METAL | 05/04/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION | |||
| ROOF VALLEY & METAL | 04/28/2022 | CANCELLED BY APPLICANT | JWALKER |
| WALL SHEATHING | 04/26/2022 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/26/2022 | APPROVED - AS NOTED | JWALKER |
| Note: The HTT5 anchors at the bearing wall are missing nuts. Tighten all nuts at bearing wall bottom plates. | |||
| FOUND SURVEY APPROVED (OFFICE) | 04/14/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 03/30/2022 | APPROVED | KSANDOE |
| MONOLITHIC SLAB | 03/17/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION Remove excess soil at footing areas to allow for 3" ground clearance of rebar. | |||
| MONOLITHIC SLAB | 03/15/2022 | Disapproved - NO FEE | JWALKER |
| Note: Remove excess soil at footing areas to allow for 3" ground clearance of rebar. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/03/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 03/03/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 02/14/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 09/23/2022 | 09/23/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 08/16/2022 | 08/16/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Indoor design temp on heatload must be a minimum of 75 degrees per R302.1 FBC Energy Conservation 2020 7Th edition | |||
| BLD | COMPLETE | 08/16/2022 | 08/16/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/25/2022 | 07/26/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Design location on heatload needs to match the Energy calc. (St. Augustine). SECOND REQUEST | |||
| BLD | COMPLETE | 07/25/2022 | 07/26/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | CANCEL | 07/21/2022 | 07/22/2022 |
| MECH | HOLD | 07/21/2022 | 07/22/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Design location on heatload needs to match the Energy calc. (St. Augustine) | |||
| BLD | HOLD | 07/18/2022 | 07/19/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Provide the following; a. Percentage of top plate cut b. Provide if jack studs will be required | |||
| BLD | HOLD | 07/13/2022 | 07/13/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Provide the following; a. Percentage of top plate cut b. Provide if jack studs will be required | |||
| BLD | HOLD | 07/12/2022 | 07/13/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Engineers submitted detail calls for a sing 2 x 10. Provide the following; a. Percentage of top plate cut b. Single 2 x 10 per the 2018 WFCM is over spanned. c. Provide if jack studs will be required | |||
| ENGIN1 | COMPLETE | 04/13/2022 | 04/14/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/13/2022 | 04/13/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/18/2021 | 10/18/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/18/2021 | 10/18/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/18/2021 | 10/18/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/18/2021 | 10/25/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/29/2021 | 10/01/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 09/29/2021 | 10/06/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 09/29/2021 | 10/04/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/29/2021 | 09/29/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/29/2021 | 10/05/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 09/29/2021 | 09/30/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Indoor design temp on heatload must be a minimum of 75 degrees per R302.1 FBC Energy Conservation 2020 7Th edition | |||
| SW1 | COMPLETE | 09/29/2021 | 10/06/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/29/2021 | 10/06/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM site plane / survey : missing the drive way width Provide material and width of walkway on site plan | |||
| SWALE | COMPLETE | 09/29/2021 | 01/31/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 12/13/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 12/13/2022 |
| PLAN REVIEW - REVISION | ¤75.00 | 12/13/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 12/13/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 12/13/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 12/13/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤205.14 | 01/21/2022 |
| SW ENG PRE APRON | ¤30.00 | 01/21/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/21/2022 |
| SURCHARGE FS 533.721 | ¤10.14 | 01/21/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/21/2022 |
| SW ENG INSPECTION 60 | ¤60.00 | 01/21/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 01/21/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/21/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/21/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 01/21/2022 |
| SURCHARGE - FS 468.631 | ¤15.21 | 01/21/2022 |
| IMPACT FEE FIRE | ¤367.00 | 01/21/2022 |
| IMPACT FEE PARKS | ¤1,199.12 | 01/21/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/21/2022 |
| CONNECTION FEES | ¤1,077.88 | 01/21/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 01/21/2022 |
| INSPECTION - RESIDENTIAL | ¤723.25 | 01/21/2022 |
| METER - DEPOSIT | ¤60.00 | 01/21/2022 |
| WATER- TURN ON | ¤25.00 | 01/21/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/21/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 01/21/2022 |
| SEWER CREDIT | (¤1,466.00) | 01/21/2022 |
| SEWER INSPECTION | ¤25.00 | 01/21/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 01/21/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 01/21/2022 |
| SITE PLAN 30 | ¤30.00 | 01/21/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 01/12/2022 |
| SITE PLAN 30 | ¤30.00 | 01/12/2022 |
| SITE PLAN 30 | (¤30.00) | 01/12/2022 |
| WATER CAPITAL FACILITY FEE | (¤3,626.50) | 01/12/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 01/12/2022 |
| SEWER CAPITAL FACILITY | (¤4,939.76) | 01/12/2022 |
| SEWER CREDIT | (¤1,466.00) | 01/12/2022 |
| SEWER INSPECTION | ¤25.00 | 01/12/2022 |
| SEWER INSPECTION | (¤25.00) | 01/12/2022 |
| SEWER CREDIT | ¤1,466.00 | 01/12/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 01/12/2022 |
| 3% TRANS IMPACT FEE CREDIT | ¤51.54 | 01/12/2022 |
| WATER- TURN ON | ¤25.00 | 01/12/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/12/2022 |
| ADMINISTRATIVE RESIDENTIAL | (¤30.00) | 01/12/2022 |
| WATER- TURN ON | (¤25.00) | 01/12/2022 |
| METER - DEPOSIT | ¤60.00 | 01/12/2022 |
| METER - DEPOSIT | (¤60.00) | 01/12/2022 |
| INSPECTION - RESIDENTIAL | ¤723.25 | 01/12/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤205.14 | 01/12/2022 |
| PLAN REVIEW - RESIDENTIAL | (¤205.14) | 01/12/2022 |
| CONNECTION FEES | (¤1,077.88) | 01/12/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 01/12/2022 |
| IMPACT FEE FIRE | ¤367.00 | 01/12/2022 |
| IMPACT FEE FIRE | (¤367.00) | 01/12/2022 |
| CONNECTION FEES | ¤1,077.88 | 01/12/2022 |
| INSPECTION - RESIDENTIAL | (¤723.25) | 01/12/2022 |
| IMPACT FEE PARKS | ¤1,199.12 | 01/12/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/12/2022 |
| IMPACT FEE SCHOOL | (¤3,600.00) | 01/12/2022 |
| IMPACT FEE PARKS | (¤1,199.12) | 01/12/2022 |
| 3% FIRE IMPACT FEE CREDIT | ¤11.01 | 01/12/2022 |
| SURCHARGE - FS 468.631 | ¤15.21 | 01/12/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/12/2022 |
| SW ENG - FOUNDATION SURVEY | (¤20.00) | 01/12/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 01/12/2022 |
| SURCHARGE FS 533.721 | ¤10.14 | 01/12/2022 |
| SURCHARGE FS 533.721 | (¤10.14) | 01/12/2022 |
| 3% PARKS IMPACT FEE CREDIT | ¤35.97 | 01/12/2022 |
| IMPACT FEE TRANSPORTATION | (¤1,718.00) | 01/12/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 01/12/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/12/2022 |
| WATER -IRRIGATION INSPECTION | (¤25.00) | 01/12/2022 |
| SW ENG INSPECTION 60 | ¤60.00 | 01/12/2022 |
| SW ENG PRE APRON | ¤30.00 | 01/12/2022 |
| SW ENG PRE APRON | (¤30.00) | 01/12/2022 |
| SW ENG INSPECTION 60 | (¤60.00) | 01/12/2022 |
| SURCHARGE - FS 468.631 | (¤15.21) | 01/12/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/12/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/12/2022 |
| SW ENG RES REVIEW 200 | (¤200.00) | 01/12/2022 |
| SW ENG - REVIEW 20 | (¤20.00) | 01/12/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,692.48 |