I want to search for...
Permit #2021100066
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00090-0060 |
| CONDITIONED SPACE: 2443 sqft |
| CONDITIONED SPACE: 269 sqft |
| GARAGE: 764 sqft |
| OPENED PORCH (WITH ROOF) : 91 sqft |
| OPENED PORCH (WITH ROOF) : 442 sqft |
| Total Square Footage: 4009 sqft |
| Block: 00090 |
| Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA |
| Job Phone: 863-420-2100 |
| Location Address: 82 NEW LEATHERWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/19/2021 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/07/2022 | FINAL APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION Cancelled per Mason | |||
| BLD - BUILDING FINAL | 09/06/2022 | CANCELLED BY APPLICANT | LMILLER |
| Note: Cancelled per Mason | |||
| U -UTILITY RESIDENTIAL FINAL | 09/06/2022 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/30/2022 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/30/2022 | APPROVED | RGROSS |
| ROW - STORMWATER FINAL | 08/30/2022 | APPROVED | RGROSS |
| ROW - FINAL APRON (AFTER POUR) | 08/30/2022 | APPROVED | RGROSS |
| U-CROSS CONNECTION | 08/30/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has reclaim irrigation-no cross connection(please remove soils covering reclaim meter pit for Final Inspection) | |||
| TIE BEAM / LINTEL | 08/03/2022 | APPROVED | LMILLER |
| ROW- PRE-APRON (PRE-POUR) | 08/01/2022 | APPROVED | PFLANAGAN |
| ELECTRIC - EARLY POWER | 07/28/2022 | APPROVED - AS NOTED | LMILLER |
| Note: THIS IS A REINSPECTION Power was already on NO Power is to be on until Early Power Inspection has been performed and approved 7-28-22 notes above resolved FPL notified at 12:01pm | |||
| ELECTRIC - EARLY POWER | 07/27/2022 | Disapproved -FEE REQUIRED | DCUSHING |
| Note: Power was already on NO Power is to be on until Early Power Inspection has been performed and approved | |||
| ROW- PAVER RESTRAINTS | 07/26/2022 | APPROVED | PFLANAGAN |
| Note: Inspector Notes from Inspection 9270 READY TO POUR SIDEWALK AND PAVER RESTRAINTS AND APRON ONLY | |||
| ROW- PRE-APRON (PRE-POUR) | 07/26/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: READY TO POUR SIDEWALK AND PAVER RESTRAINTS AND APRON ONLY | |||
| LATH/BRICK/ WATER BARRIER | 05/13/2022 | APPROVED | RMARTIN |
| INSULATION | 04/27/2022 | APPROVED | TSTAUFFACHER |
| Note: need the following by insulation 1. nail plates on low voltage (check all) 2. SER SUPPORT STRAPPING FBC R E 3605.7 AND NEC.334 NEEDS TO BE STRAPPED PER NEC 334 (WITHIN 12 INCHES AND AT 30 INCH ENTERVALS ) 3. Need to properly terminate exhaust ducts on the roof and repair areas where the ducts were moved from (check all) 4. need 5ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 (1) and | |||
| ALL ROUGH | 04/22/2022 | APPROVED - AS NOTED | LMILLER |
| Note: need the following by insulation... 1. nail plates on low voltage (check all) 2. SER SUPPORT STRAPPING FBC R E 3605.7 AND NEC.334 NEEDS TO BE STRAPPED PER NEC 334 (WITHIN 12 INCHES AND AT 30 INCH ENTERVALS ) 3' Need to properly terminate exhaust ducts on the roof and repair areas where the ducts were moved from (check all | |||
| GRAVITY SEWER TEST | 04/21/2022 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 04/21/2022 | APPROVED | MGIBSON |
| WALL SHEATHING | 03/11/2022 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION missing fastiners Check all | |||
| ROOF VALLEY & METAL | 03/09/2022 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION missing valley metal 3-9-22 notes above resolved | |||
| ROOF VALLEY & METAL | 03/04/2022 | Disapproved - NO FEE | LMILLER |
| Note: missing valley metal | |||
| WALL SHEATHING | 03/04/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: missing fastiners Check all | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/22/2022 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION this is for entryway beams only per notes... conditions at site do not match plans, make the project match the plans or obtain an approved revision 01/28/2022: Please get approved letter from engineer that describes and states that exactly what is built is acceptable. UNderstanding it is a non-load bearing wall, the as built does not meet what is on plans. Have letter be specific to include any tie downs, framing members,etc. Continue to proceed with home, entry will be re-checked at next inspection. 2-22-22 notes above resolved | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/28/2022 | PARTIALLY APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION this is for entryway beams only per notes... conditions at site do not match plans, make the project match the plans or obtain an approved revision 01/28/2022: Please get approved letter from engineer that describes and states that exactly what is built is acceptable. UNderstanding it is a non-load bearing wall, the as built does not meet what is on plans. Have letter be specific to include any tie downs, framing members,etc. Continue to proceed with home, entry will be re-checked at next inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/18/2022 | Disapproved - NO FEE | LMILLER |
| Note: this is for entryway beams only per notes... conditions at site do not match plans, make the project match the plans or obtain an approved revision | |||
| FOUND SURVEY APPROVED (OFFICE) | 01/05/2022 | APPROVED | TBAKER |
| ELECTRIC-TUG | 01/03/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:10 am | |||
| TIE BEAM / LINTEL | 12/28/2021 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION need to drill and epoxy at orange paint by front 12-28-21... notes above resolved | |||
| TIE BEAM / LINTEL | 12/27/2021 | Disapproved -FEE REQUIRED | LMILLER |
| Note: need to drill and epoxy at orange paint by front entry | |||
| MONOLITHIC SLAB | 12/06/2021 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION Not ready, loose dowels around perimeter n12-06-21... otes above resolved | |||
| MONOLITHIC SLAB | 12/03/2021 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: Not ready, loose dowels around perimeter | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 11/30/2021 | APPROVED | MGIBSON |
| FOOTER | 11/01/2021 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: Finish cleaning up footings around perimeter//corners/back porch/garage entry Sleeve water pipes passing through footings Provide plans that are not wadded up in a wrinkled mess | |||
| FOOTER | 11/01/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Finish cleaning up footings around perimeter//corners/back porch/garage entry Sleeve water pipes passing through footings Provide plans that are not wadded up in a wrinkled mess NOTE::PRIOR NOTES ARE FROM ANOTHER INSPECTION ACCIDENTALLY APPLIED TO THIS JOB | |||
| WATER METER INSTALLATION REQUEST | 10/25/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 02/08/2022 | 02/09/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/01/2022 | 02/02/2022 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Revision: Provide revised plan sheet A-3 and identify the changes made with a "clouded" symbol based on the latest revision dated 1-25-22 for clarity per FBC 7th Ed. Sec. 107.3. | |||
| BLD | COMPLETE | 01/25/2022 | 01/25/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/05/2022 | 01/05/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/05/2022 | 01/05/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 10/11/2021 | 10/11/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/11/2021 | 10/11/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/11/2021 | 10/11/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 10/06/2021 | 10/08/2021 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - | |||
| BLD | HOLD | 10/01/2021 | 10/05/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Residential PLAN REVIEW COMMENTS: 1. Product Approval Specification Sheet; a. Properly identify ALL Exterior Doors with the specific Florida Product Approval Number (i.e. 11218.# & 14218.#); there are various types of approved doors under these numbers provided. b. Submitted plans have different approval numbers. Provide which components will be install and a revision the Product Approval will be installed. Per F.S. 471.025 and F.A.C. 61 G15-23.005. | |||
| CUSVC | COMPLETE | 10/01/2021 | 10/06/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 10/01/2021 | 10/04/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit electric plans | |||
| ENGIN1 | COMPLETE | 10/01/2021 | 10/04/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 10/01/2021 | 10/05/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/01/2021 | 10/04/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/01/2021 | 10/08/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/01/2021 | 10/06/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide color of garage door on color sheet |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 09/06/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 09/06/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/06/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/06/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/06/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/06/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/06/2022 |
| CONNECTION FEES | ¤25.00 | 10/19/2021 |
| METER - DEPOSIT | ¤60.00 | 10/19/2021 |
| WATER-METER | ¤441.07 | 10/19/2021 |
| WATER-METER | ¤366.42 | 10/19/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/19/2021 |
| INSPECTION - RESIDENTIAL | ¤973.50 | 10/19/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤276.12 | 10/19/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 10/19/2021 |
| IMPACT FEE FIRE | ¤367.00 | 10/19/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 10/19/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/19/2021 |
| IMPACT FEE TRANSPORTATION | ¤3,139.00 | 10/19/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 10/19/2021 |
| SURCHARGE FS 533.721 | ¤13.43 | 10/19/2021 |
| SURCHARGE - FS 468.631 | ¤20.15 | 10/19/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/19/2021 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/19/2021 |
| SW ENG PRE APRON | ¤30.00 | 10/19/2021 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/19/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/19/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤94.17) | 10/19/2021 |
| SEWER INSPECTION | ¤25.00 | 10/19/2021 |
| SITE PLAN 30 | ¤30.00 | 10/19/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤11,047.16 |