Permit #2021100365

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-0120
CONDITIONED SPACE: 2901 sqft
GARAGE: 599 sqft
OPENED PORCH (WITH ROOF) : 749 sqft
OPENED PORCH (WITH ROOF) : 62 sqft
Total Square Footage: 4311 sqft
Block: 00000
Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH
Job Phone: 386-447-4400
Location Address: 809 LOBLOLLY CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/08/2021
NOC: RECORDED
Applicant name: DAVID PAUL CROCKETT
Owner: BLAKE JOHN F & JANET M LUISI

Address

130 SUNSET HARBOR WAY, A-202

ST AUGUSTINE, FL 32080

Lot: 0120
Contracted Stated Job Value: ¤543,500.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SALTWATER HOMES INC
Status Location Address Mailing Address State License Number Phone Fax
DECEASED

138 PALM COAST PARKWAY

PALM COAST, FL 32137

SUITE 328

PALM COAST, FL 32137

RG0041345 (Exp: 08/31/2025) 386-447-4400 866-244-9639

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
DENNIS GENE GAINEY
Status Location Address State License Number Phone Fax
INACTIVE

P.O. BOX 1203

Bunnell, FL 32110

CFC046004 (Exp: 08/31/2026) (386) 437-5637 386-437-3012
ERIC FRANCO
Status Location Address Mailing Address State License Number Phone
INACTIVE

840 DELTONA BLVD

DELTONA, FL 32725

STE F2

DELTONA, FL 32725

CCC1327280 (Exp: 08/31/2026) 386-575-4007
KEN DEPRINZIO
Status Location Address State License Number Phone Fax
ACTIVE

325 WALKER STREET

HOLLY HILL, FL 32117

11351 (Exp: 08/31/2026) 386-672-8494 386-673-7856

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/28/2023 FINAL APPROVED AGAETANO
U-CROSS CONNECTION 07/21/2023 APPROVED - AS NOTED JHARDING
Note: No cross connections.
U -UTILITY RESIDENTIAL FINAL 07/21/2023 FINAL APPROVED JHARDING
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/20/2023 APPROVED EMADISON
Note: * 7/19/2023 - PREVIOUS INSPECTION NOTES ** 07/19/23 NEED TO SUBMIT A NEW FINAL SURVEY ONE THAT IS NOT BLURRY AND OBSCURED NEED TO BE CLEAR
ROW FIELD SURVEY /GRADING CERTIFICATION 07/20/2023 APPROVED EMADISON
ROW - STORMWATER FINAL 07/20/2023 FINAL APPROVED EMADISON
ROW - FINAL APRON (AFTER POUR) 07/20/2023 FINAL APPROVED EMADISON
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/19/2023 Disapproved - NO FEE EMADISON
Note: ** 07/19/23 NEED TO SUBMIT A NEW FINAL SURVEY ONE THAT IS NOT BLURRY AND OBSCURED NEED TO BE CLEAR
ROW- PRE-APRON (PRE-POUR) 06/16/2023 APPROVED EMADISON
Note: ** 06/16/23 READY TO SET PAVERS __________________________________________________________________________________________________________________________ 4/11/2023 - PREVIOUS INSPECTION NOTES ** 04/11/23 READY TO POUR APRON AND PAVER RESTRAINTS ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL __________________________________________________________________________________________________________________________ 4/10/2023 - PREVIOUS INSPECTION NOTES
TIE BEAM / LINTEL 04/21/2023 APPROVED AGAETANO
Note: 04-21-2023 Garage opening raised from 7' to 8'.
ROW- PAVER RESTRAINTS 04/11/2023 APPROVED EMADISON
Note: ** 04/11/23 READY TO POUR APRON AND PAVER RESTRAINTS ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
ROW- PRE-APRON (PRE-POUR) 04/11/2023 PARTIALLY APPROVED EMADISON
Note: ** 04/11/23 READY TO POUR APRON AND PAVER RESTRAINTS ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL __________________________________________________________________________________________________________________________ 4/10/2023 - PREVIOUS INSPECTION NOTES
ROW- PRE-APRON (PRE-POUR) 04/10/2023 CANCELLED BY APPLICANT EMADISON
ELECTRIC - EARLY POWER 02/22/2023 APPROVED AGAETANO
GRAVITY SEWER TEST 02/08/2023 APPROVED MGIBSON
U - SEWER TIE IN 02/08/2023 APPROVED MGIBSON
LATH/BRICK/ WATER BARRIER 12/15/2022 APPROVED AGAETANO
INSULATION 10/19/2022 APPROVED AGAETANO
ELECTRIC-TUG 10/14/2022 APPROVED AGAETANO
ALL ROUGH 10/12/2022 APPROVED AGAETANO
ROOF VALLEY & METAL 08/16/2022 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/12/2022 APPROVED LMILLER
TIE BEAM / LINTEL 05/27/2022 APPROVED AGAETANO
FOUND SURVEY APPROVED (OFFICE) 04/08/2022 APPROVED TBAKER
MONOLITHIC SLAB 03/03/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION Termite bond and compaction test not posted. 03-01-2022 - Drawings state 4" slab. Pulled test line and recorded 2 1/2". Dig slab out and tap to maintain 4". Superintendent on site for test line inspection.
MONOLITHIC SLAB 03/01/2022 Disapproved -FEE REQUIRED AGAETANO
Note: New inspection due to canceled inspection THIS IS A REINSPECTION Termite bond and compaction test not posted. 03-01-2022 - Drawings state 4" slab. Pulled test line and recorded 2 1/2". Dig slab out and tap to maintain 4". Superintendent on site for test line inspection.
MONOLITHIC SLAB 02/24/2022 CANCELLED BY APPLICANT WEB
Note: THIS IS A REINSPECTION Termite bond and compaction test not posted.
MONOLITHIC SLAB 02/22/2022 Disapproved - NO FEE AGAETANO
Note: Termite bond and compaction test not posted.
PLUMBING 1ST ROUGH UNDERGROUND 02/16/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 01/13/2022 APPROVED TCHURCHILL

Review History

Department Status Date In Date Out
MECH COMPLETE 07/26/2023 07/27/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 07/19/2023 07/20/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 03/14/2023 03/16/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/07/2022 04/08/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/07/2022 04/07/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 COMPLETE 11/15/2021 11/18/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/15/2021 11/16/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 11/15/2021 11/17/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH COMPLETE 10/20/2021 10/20/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 10/20/2021 10/26/2021
Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM read the notes from the previous failed site plan
ENGIN1 COMPLETE 10/20/2021 10/20/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 10/20/2021 10/20/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
URB COMPLETE 10/11/2021 10/13/2021
Note: Released By: JOHN BEAUDET - (386)986-2456 -
BLD COMPLETE 10/08/2021 10/11/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 10/08/2021 10/12/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 10/08/2021 10/11/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/08/2021 10/08/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 10/08/2021 10/11/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 10/08/2021 10/11/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the builder
SW1 HOLD 10/08/2021 10/13/2021
Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM See SW1 Checklist highlighted sentence in attachments dated 10/13/21. There is not enough slope/ fall away from the house along the left side property line. Right front corner is higher at the property line i.e. Compare 25.10 at property line to 25.00 outside building foundation sod grade. Also drainage should run down the property line when next to a vacant, not inside the property line.
ZON COMPLETE 10/08/2021 10/11/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 07/31/2023
CONTRACTOR CHANGE ¤40.00 07/31/2023
PLAN REVIEW - REVISION ¤32.50 07/31/2023
PLAN REVIEW - REVISION ¤32.50 07/31/2023
REINSPECTION RESIDENTIAL ¤40.00 07/31/2023
CONNECTION FEES ¤25.00 12/08/2021
METER - DEPOSIT ¤60.00 12/08/2021
WATER-METER ¤441.07 12/08/2021
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/08/2021
INSPECTION - RESIDENTIAL ¤1,496.00 12/08/2021
PLAN REVIEW - RESIDENTIAL ¤424.32 12/08/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 12/08/2021
IMPACT FEE FIRE ¤367.00 12/08/2021
IMPACT FEE PARKS ¤1,199.12 12/08/2021
IMPACT FEE SCHOOL ¤3,600.00 12/08/2021
IMPACT FEE TRANSPORTATION ¤3,139.00 12/08/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 12/08/2021
SURCHARGE FS 533.721 ¤20.31 12/08/2021
SURCHARGE - FS 468.631 ¤30.47 12/08/2021
SW ENG - FOUNDATION SURVEY ¤20.00 12/08/2021
SW ENG INSPECTION 80 ¤80.00 12/08/2021
SW ENG PRE APRON ¤30.00 12/08/2021
SW ENG - REVIEW 20 ¤20.00 12/08/2021
SW ENG RES REVIEW 200 ¤200.00 12/08/2021
3% TRANS IMPACT FEE CREDIT (¤94.17) 12/08/2021
SEWER INSPECTION ¤25.00 12/08/2021
SITE PLAN 30 ¤30.00 12/08/2021
Fees Total Due: ¤0.00 Total Paid: ¤11,281.14