Permit #2021100388

Permit Details

Status: COED

Parcel Id: 48-11-31-1710-00000-0920
GARAGE: 628 sqft
CONDITIONED SPACE: 2709 sqft
OPENED PORCH (WITH ROOF) : 600 sqft
OPENED PORCH (WITH ROOF) : 56 sqft
CONDITIONED SPACE: 40 sqft
Total Square Footage: 4033 sqft
Block: 00000
Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II
Job Phone: 386-445-2012
Location Address: 12 BLUE OAK LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/10/2021
NOC: RECORDED
Applicant name: JOHN NICHOLAS CORDASCI
Owner: RONALD B & SHARON L RAGSDALE

Address

7432 DUNSAYCT

WAKE FOREST , NC 27587

Lot: 0920
Contracted Stated Job Value: ¤437,772.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SKYWAY BUILDERS INC
Status Location Address State License Number Phone
INACTIVE

PO BOX 354786

PALM COAST, FL 32135

CBC1263769 (Exp: 08/31/2024) 386-445-2012

Sub Contractors

MARK JOHN LUTCZA
Status Location Address State License Number Phone
ACTIVE

26 ROYAL LEAF LANE

PALM COAST, FL 32164

EC13005145 (Exp: 08/31/2026) 386-586-0770
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
MARK B SOWERS
Status Location Address State License Number Phone
ACTIVE

609 FOURTH ST

BUNNELL, FL 32110

35616 (Exp: 08/31/2026) 386-225-1753
BOB BELL
Status Location Address State License Number Phone Fax
ACTIVE

3200 PARKER DRIVE

ST AUGUSTINE, FL 32084

LG35711 (Exp: 08/31/2027) 904-417-6470 877-566-4016

Inspection History

Type Request Date Result Inspector
GAS FINAL 02/21/2023 APPROVED MGIBSON
Note: 2/17/2023 - PREVIOUS INSPECTION NOTES GAS LINE NOT BONDED
GAS ROUGH 02/17/2023 APPROVED MGIBSON
GAS FINAL 02/17/2023 Disapproved - NO FEE MGIBSON
Note: GAS LINE NOT BONDED
FINAL SURVEY (OFFICE USE ONLY) 02/17/2023 APPROVED PFLANAGAN
BLD - BUILDING FINAL 02/17/2023 FINAL APPROVED TSTAUFFACHER
U-CROSS CONNECTION 02/16/2023 APPROVED - AS NOTED LFITZGERALD
Note: has reclaim irrigation-no cross connection
ELEVATION CERTIFICATE-FINAL APPROVAL 02/16/2023 APPROVED JMYERS
U -UTILITY RESIDENTIAL FINAL 02/16/2023 FINAL APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 02/15/2023 FINAL APPROVED EMADISON
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/15/2023 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 02/15/2023 APPROVED EMADISON
ROW - STORMWATER FINAL 02/15/2023 FINAL APPROVED EMADISON
ROW- PRE-APRON (PRE-POUR) 01/19/2023 APPROVED PFLANAGAN
ROW- PRE-APRON (PRE-POUR) 12/22/2022 APPROVED GBERTOLA
Note: ready to pour
ELECTRIC - EARLY POWER 11/02/2022 APPROVED RMARTIN
INSULATION 09/12/2022 APPROVED LMILLER
Note: THIS IS A REINSPECTION need fire blocking at soffits over electric panel, dryer vent, fireplace, range vent, and both sides of entry to main suite. 9-12-22 notes above resolved
INSULATION 09/09/2022 Disapproved - NO FEE LMILLER
Note: need fire blocking at soffits over electric panel, dryer vent, fireplace, range vent, and both sides of entry to main suite.
GAS ROUGH 09/08/2022 APPROVED MGIBSON
LATH/BRICK/ WATER BARRIER 09/01/2022 APPROVED LMILLER
GRAVITY SEWER TEST 08/29/2022 APPROVED MGIBSON
U - SEWER TIE IN 08/29/2022 APPROVED MGIBSON
ALL ROUGH 08/26/2022 APPROVED DCUSHING
WALL SHEATHING 07/05/2022 APPROVED DCUSHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/21/2022 APPROVED LMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 4-13-22... Incomplete inspection, not ready for inspection, too many items wrong.... partial list follows... 1. need complete details for stairs (connections and support), (aslo header has no jacks under it) 2. need details for stud packs under girders R301,2.1 3. overframing connections missing R301,2.1 4. missing nails in overframing R301,2.1 6-21-22 notes above resolved
ELECTRIC-TUG 05/06/2022 APPROVED - AS NOTED LMILLER
Note: notified FPL at 9:58am
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/13/2022 Disapproved -FEE REQUIRED LMILLER
Note: THIS IS A REINSPECTION 4-13-22... Incomplete inspection, not ready for inspection, too many items wrong.... partial list follows... 1. need complete details for stairs (connections and support), (aslo header has no jacks under it) 2. need details for stud packs under girders R301,2.1 3. overframing connections missing R301,2.1 4. missing nails in overframing R301,2.1
ROOF VALLEY & METAL 04/13/2022 APPROVED LMILLER
Note: THIS IS A REINSPECTION 34-13-22... approved
ROOF VALLEY & METAL 04/12/2022 CANCELLED BY APPLICANT AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/12/2022 CANCELLED BY APPLICANT AGAETANO
ELEV CERT-FOUNDATION APPROVAL 03/24/2022 APPROVED JMYERS
FOUND SURVEY APPROVED (OFFICE) 03/21/2022 APPROVED TBAKER
TIE BEAM / LINTEL 03/09/2022 APPROVED LMILLER
MONOLITHIC SLAB 02/14/2022 APPROVED LMILLER
PLUMBING 1ST ROUGH UNDERGROUND 02/07/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 01/31/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
PLFM COMPLETE 02/16/2023 02/16/2023
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved.
PLFM HOLD 02/14/2023 02/15/2023
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM B9 needs to be 8.00'. In Section D the date in the seal box is 3/23/22 but the date on the signature row is 2/14/23, these need to be the same date. The Final Survey is missing the elevation of the garage, please revise.
BLD COMPLETE 02/03/2023 02/09/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
PLUM HOLD 09/07/2022 09/07/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Gas Riser is t be signed by the gas contractor and provide license number.
PLUM COMPLETE 09/07/2022 09/08/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD COMPLETE 04/19/2022 04/20/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
PLFM HOLD 03/24/2022 03/24/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The construction elevation certificate was submitted again. The Foundation elevation certificate is required with the following corrections: A1 needs to have a building owner listed. A8 a,b,c and A9 b,c need to be N/A not 0. B9 the construction elevation certificate had the BFE at 8.0' now it says 7.5 please clarify and include measurement mark. Section D surveyor must date on top of the seal as well as sign.
PLFM COMPLETE 03/24/2022 03/24/2022
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The foundation elevation certificate has been approved. However, if there is no measurement mark after the Base Flood Elevation in B9 at the final elevation certificate, it will not be approved.
ENGIN1 COMPLETE 03/18/2022 03/21/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
PLFM HOLD 03/18/2022 03/18/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM These comments are in regard to the elevation certificate: A1 needs to have a building owner listed. A8 a,b,c and A9 b,c need to be N/A not 0. B9 the construction elevation certificate had the BFE at 8.0' now it says 7.5 please clarify and include measurement mark. Section D surveyor must date on top of the seal as well as sign.
ZON COMPLETE 03/18/2022 03/18/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ELEC COMPLETE 10/14/2021 10/18/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLFM COMPLETE 10/14/2021 10/15/2021
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate has been accepted. Please provide Foundation and Final prior to receiving CO.
SW1 COMPLETE 10/14/2021 10/21/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
BLD COMPLETE 10/11/2021 10/11/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 10/11/2021 10/14/2021
Note: Released By: HALEIGH HAND - -
ELEC HOLD 10/11/2021 10/11/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need switch by exterior Master bedroom door for outside lighting. NEC 2017 210.70
ENGIN1 COMPLETE 10/11/2021 10/11/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 10/11/2021 10/12/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 10/11/2021 10/12/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 10/11/2021 10/14/2021
Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM lot drainage features must be shown on site plan include flow arrows Finished Floor Elevations (FFE): Site Plan must include the FFE of the subject property as well as the FFE of any adjacent developed properties. (A) please revise the site plan to show ffe of adjacent lots or vaccant if no ffe
ZON COMPLETE 10/11/2021 10/11/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
PLFM HOLD 10/11/2021 10/11/2021
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM On Elevation Certificate: A8b should be N/A not NA/. A9b and A9c should be N/A not 0. B9 please put 8.0'. C1 needs to have a box checked for construction. C2h should be N/A not NA. Section D, surveyor needs to sign and date on top of the seal.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 02/17/2023
CONTRACTOR CHANGE ¤20.00 02/17/2023
PLAN REVIEW - REVISION ¤32.50 02/17/2023
PLAN REVIEW - REVISION ¤32.50 02/17/2023
REINSPECTION RESIDENTIAL ¤40.00 02/17/2023
CONNECTION FEES ¤25.00 11/10/2021
METER - DEPOSIT ¤60.00 11/10/2021
WATER-METER ¤441.07 11/10/2021
WATER-METER ¤366.42 11/10/2021
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/10/2021
INSPECTION - RESIDENTIAL ¤1,204.50 11/10/2021
PLAN REVIEW - RESIDENTIAL ¤341.64 11/10/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 11/10/2021
IMPACT FEE FIRE ¤367.00 11/10/2021
IMPACT FEE PARKS ¤1,199.12 11/10/2021
IMPACT FEE SCHOOL ¤3,600.00 11/10/2021
IMPACT FEE TRANSPORTATION ¤3,139.00 11/10/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 11/10/2021
SURCHARGE FS 533.721 ¤16.47 11/10/2021
SURCHARGE - FS 468.631 ¤24.71 11/10/2021
SW ENG - FOUNDATION SURVEY ¤20.00 11/10/2021
SW ENG INSPECTION 80 ¤80.00 11/10/2021
SW ENG PRE APRON ¤30.00 11/10/2021
SW ENG - REVIEW 20 ¤20.00 11/10/2021
SW ENG RES REVIEW 200 ¤200.00 11/10/2021
3% TRANS IMPACT FEE CREDIT (¤94.17) 11/10/2021
SEWER INSPECTION ¤25.00 11/10/2021
SITE PLAN 30 ¤30.00 11/10/2021
Fees Total Due: ¤0.00 Total Paid: ¤11,223.78