I want to search for...
Permit #2021100388
Permit Details
Status: COED
| Parcel Id: 48-11-31-1710-00000-0920 |
| GARAGE: 628 sqft |
| CONDITIONED SPACE: 2709 sqft |
| OPENED PORCH (WITH ROOF) : 600 sqft |
| OPENED PORCH (WITH ROOF) : 56 sqft |
| CONDITIONED SPACE: 40 sqft |
| Total Square Footage: 4033 sqft |
| Block: 00000 |
| Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II |
| Job Phone: 386-445-2012 |
| Location Address: 12 BLUE OAK LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/10/2021 |
| NOC: RECORDED |
| Applicant name: JOHN NICHOLAS CORDASCI |
| Owner: RONALD B & SHARON L RAGSDALE |
|
Address 7432 DUNSAYCT WAKE FOREST , NC 27587 |
| Lot: 0920 |
| Contracted Stated Job Value: ¤437,772.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SKYWAY BUILDERS INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 354786 PALM COAST, FL 32135 |
CBC1263769 (Exp: 08/31/2024) | 386-445-2012 |
Sub Contractors
MARK JOHN LUTCZA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
26 ROYAL LEAF LANE PALM COAST, FL 32164 |
EC13005145 (Exp: 08/31/2026) | 386-586-0770 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
MARK B SOWERS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
609 FOURTH ST BUNNELL, FL 32110 |
35616 (Exp: 08/31/2026) | 386-225-1753 |
BOB BELL
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3200 PARKER DRIVE ST AUGUSTINE, FL 32084 |
LG35711 (Exp: 08/31/2027) | 904-417-6470 | 877-566-4016 |
Inspection History
| Type | Request Date | Result | Inspector |
| GAS FINAL | 02/21/2023 | APPROVED | MGIBSON |
| Note: 2/17/2023 - PREVIOUS INSPECTION NOTES GAS LINE NOT BONDED | |||
| GAS ROUGH | 02/17/2023 | APPROVED | MGIBSON |
| GAS FINAL | 02/17/2023 | Disapproved - NO FEE | MGIBSON |
| Note: GAS LINE NOT BONDED | |||
| FINAL SURVEY (OFFICE USE ONLY) | 02/17/2023 | APPROVED | PFLANAGAN |
| BLD - BUILDING FINAL | 02/17/2023 | FINAL APPROVED | TSTAUFFACHER |
| U-CROSS CONNECTION | 02/16/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has reclaim irrigation-no cross connection | |||
| ELEVATION CERTIFICATE-FINAL APPROVAL | 02/16/2023 | APPROVED | JMYERS |
| U -UTILITY RESIDENTIAL FINAL | 02/16/2023 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 02/15/2023 | FINAL APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/15/2023 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/15/2023 | APPROVED | EMADISON |
| ROW - STORMWATER FINAL | 02/15/2023 | FINAL APPROVED | EMADISON |
| ROW- PRE-APRON (PRE-POUR) | 01/19/2023 | APPROVED | PFLANAGAN |
| ROW- PRE-APRON (PRE-POUR) | 12/22/2022 | APPROVED | GBERTOLA |
| Note: ready to pour | |||
| ELECTRIC - EARLY POWER | 11/02/2022 | APPROVED | RMARTIN |
| INSULATION | 09/12/2022 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION need fire blocking at soffits over electric panel, dryer vent, fireplace, range vent, and both sides of entry to main suite. 9-12-22 notes above resolved | |||
| INSULATION | 09/09/2022 | Disapproved - NO FEE | LMILLER |
| Note: need fire blocking at soffits over electric panel, dryer vent, fireplace, range vent, and both sides of entry to main suite. | |||
| GAS ROUGH | 09/08/2022 | APPROVED | MGIBSON |
| LATH/BRICK/ WATER BARRIER | 09/01/2022 | APPROVED | LMILLER |
| GRAVITY SEWER TEST | 08/29/2022 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 08/29/2022 | APPROVED | MGIBSON |
| ALL ROUGH | 08/26/2022 | APPROVED | DCUSHING |
| WALL SHEATHING | 07/05/2022 | APPROVED | DCUSHING |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/21/2022 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 4-13-22... Incomplete inspection, not ready for inspection, too many items wrong.... partial list follows... 1. need complete details for stairs (connections and support), (aslo header has no jacks under it) 2. need details for stud packs under girders R301,2.1 3. overframing connections missing R301,2.1 4. missing nails in overframing R301,2.1 6-21-22 notes above resolved | |||
| ELECTRIC-TUG | 05/06/2022 | APPROVED - AS NOTED | LMILLER |
| Note: notified FPL at 9:58am | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/13/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: THIS IS A REINSPECTION 4-13-22... Incomplete inspection, not ready for inspection, too many items wrong.... partial list follows... 1. need complete details for stairs (connections and support), (aslo header has no jacks under it) 2. need details for stud packs under girders R301,2.1 3. overframing connections missing R301,2.1 4. missing nails in overframing R301,2.1 | |||
| ROOF VALLEY & METAL | 04/13/2022 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION 34-13-22... approved | |||
| ROOF VALLEY & METAL | 04/12/2022 | CANCELLED BY APPLICANT | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/12/2022 | CANCELLED BY APPLICANT | AGAETANO |
| ELEV CERT-FOUNDATION APPROVAL | 03/24/2022 | APPROVED | JMYERS |
| FOUND SURVEY APPROVED (OFFICE) | 03/21/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 03/09/2022 | APPROVED | LMILLER |
| MONOLITHIC SLAB | 02/14/2022 | APPROVED | LMILLER |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/07/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 01/31/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 02/16/2023 | 02/16/2023 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved. | |||
| PLFM | HOLD | 02/14/2023 | 02/15/2023 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM B9 needs to be 8.00'. In Section D the date in the seal box is 3/23/22 but the date on the signature row is 2/14/23, these need to be the same date. The Final Survey is missing the elevation of the garage, please revise. | |||
| BLD | COMPLETE | 02/03/2023 | 02/09/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| PLUM | HOLD | 09/07/2022 | 09/07/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Gas Riser is t be signed by the gas contractor and provide license number. | |||
| PLUM | COMPLETE | 09/07/2022 | 09/08/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/19/2022 | 04/20/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 03/24/2022 | 03/24/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The construction elevation certificate was submitted again. The Foundation elevation certificate is required with the following corrections: A1 needs to have a building owner listed. A8 a,b,c and A9 b,c need to be N/A not 0. B9 the construction elevation certificate had the BFE at 8.0' now it says 7.5 please clarify and include measurement mark. Section D surveyor must date on top of the seal as well as sign. | |||
| PLFM | COMPLETE | 03/24/2022 | 03/24/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The foundation elevation certificate has been approved. However, if there is no measurement mark after the Base Flood Elevation in B9 at the final elevation certificate, it will not be approved. | |||
| ENGIN1 | COMPLETE | 03/18/2022 | 03/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 03/18/2022 | 03/18/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM These comments are in regard to the elevation certificate: A1 needs to have a building owner listed. A8 a,b,c and A9 b,c need to be N/A not 0. B9 the construction elevation certificate had the BFE at 8.0' now it says 7.5 please clarify and include measurement mark. Section D surveyor must date on top of the seal as well as sign. | |||
| ZON | COMPLETE | 03/18/2022 | 03/18/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 10/14/2021 | 10/18/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 10/14/2021 | 10/15/2021 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate has been accepted. Please provide Foundation and Final prior to receiving CO. | |||
| SW1 | COMPLETE | 10/14/2021 | 10/21/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/11/2021 | 10/11/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 10/11/2021 | 10/14/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 10/11/2021 | 10/11/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need switch by exterior Master bedroom door for outside lighting. NEC 2017 210.70 | |||
| ENGIN1 | COMPLETE | 10/11/2021 | 10/11/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 10/11/2021 | 10/12/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/11/2021 | 10/12/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 10/11/2021 | 10/14/2021 |
| Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM lot drainage features must be shown on site plan include flow arrows Finished Floor Elevations (FFE): Site Plan must include the FFE of the subject property as well as the FFE of any adjacent developed properties. (A) please revise the site plan to show ffe of adjacent lots or vaccant if no ffe | |||
| ZON | COMPLETE | 10/11/2021 | 10/11/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 10/11/2021 | 10/11/2021 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM On Elevation Certificate: A8b should be N/A not NA/. A9b and A9c should be N/A not 0. B9 please put 8.0'. C1 needs to have a box checked for construction. C2h should be N/A not NA. Section D, surveyor needs to sign and date on top of the seal. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 02/17/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 02/17/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/17/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/17/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/17/2023 |
| CONNECTION FEES | ¤25.00 | 11/10/2021 |
| METER - DEPOSIT | ¤60.00 | 11/10/2021 |
| WATER-METER | ¤441.07 | 11/10/2021 |
| WATER-METER | ¤366.42 | 11/10/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/10/2021 |
| INSPECTION - RESIDENTIAL | ¤1,204.50 | 11/10/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤341.64 | 11/10/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 11/10/2021 |
| IMPACT FEE FIRE | ¤367.00 | 11/10/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 11/10/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/10/2021 |
| IMPACT FEE TRANSPORTATION | ¤3,139.00 | 11/10/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 11/10/2021 |
| SURCHARGE FS 533.721 | ¤16.47 | 11/10/2021 |
| SURCHARGE - FS 468.631 | ¤24.71 | 11/10/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/10/2021 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/10/2021 |
| SW ENG PRE APRON | ¤30.00 | 11/10/2021 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/10/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/10/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤94.17) | 11/10/2021 |
| SEWER INSPECTION | ¤25.00 | 11/10/2021 |
| SITE PLAN 30 | ¤30.00 | 11/10/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤11,223.78 |