Permit #2021100443
Permit Details
Status: COED
| Parcel Id: 07-11-31-7019-00090-0100 |
| CONDITIONED SPACE: 2150 sqft |
| GARAGE: 579 sqft |
| OPENED PORCH (WITH ROOF) : 254 sqft |
| OPENED PORCH (WITH ROOF) : 64 sqft |
| Total Square Footage: 3047 sqft |
| Block: 00090 |
| Subdivision: 2214 - SECTION 19-WYNNFIELD |
| Job Phone: (386) 672-8285 |
| Location Address: 9 WAVES PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/21/2021 |
| NOC: RECORDED |
| Applicant name: JOSEPH TODD VANACORE |
| Owner: BARRETT STEPHANIE & JUDITH WALKER |
|
Address 5 BAYBERRY AVENUE EGG HARBOR TOWNSHIP, NJ 08234 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤236,999.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
VANACORE CONSTRUCTION INC.
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1451 N US HIGHWAY 1 Ormond Beach, FL 32174 |
SUITE 13 Ormond Beach, FL 32174 |
CBC058991 (Exp: 08/31/2024) | (386) 672-8285 |
Sub Contractors
ALFRED N FYOCK JR
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
387 SAULS ORMOND BEACH, FL 32174 |
ST ORMOND BEACH, FL 32174 |
CCC1329075 (Exp: 08/31/2026) | 386-566-6112 | 386-673-4299 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
VERNON JACK SMITH III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
224 KIRKLAND ROAD NEW SMYRNA BEACH, FL 32169 |
EC13004432 (Exp: 08/31/2026) | 386-409-3616 | 386-409-3616 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 11/18/2022 | APPROVED | GBERTOLA |
| Note: 11/18/22=correction were made ----------------------------------------------------------------------------------------------------------- 11/17/2022 - PREVIOUS INSPECTION NOTES ** 11/17/22 RIGHT SIDE STRAW NEEDS TO BE REMOVED ALL BARE EARTH AREAS ON RIGHT SIDE NEED TO BE SODDED AS INDICATED IN THE NOTES PREVIOUSLY NOTED FOR THE FINAL ROW INSPECTION ** DISCHARGING WATER FROM SWIMMING POOL IS AN ILLICIT DISCHARGE SEDIMENT IS BEING DEPOSITED INTO THE CITIES DITCH HAVING A NEGATIVE IMPACT SEDIMENT NEEDS TO BE REMOVED FROM DITCH IMMEDIATE ACTION IS RERQUIRED TO CORRECT THIS PROBLEM ** HOT PATCH ROAD REPAIR NEEDS TO BE COMPLETED / REMOVE REBAR ON RIGHT SIDE IN EASEMENT on the RIGHT side need to remove THE STRAW AND ADD SOD . Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion | |||
| U -UTILITY RESIDENTIAL FINAL | 11/17/2022 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 11/17/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 11/17/22 RIGHT SIDE STRAW NEEDS TO BE REMOVED ALL BARE EARTH AREAS ON RIGHT SIDE NEED TO BE SODDED AS INDICATED IN THE NOTES PREVIOUSLY NOTED FOR THE FINAL ROW INSPECTION ** DISCHARGING WATER FROM SWIMMING POOL IS AN ILLICIT DISCHARGE SEDIMENT IS BEING DEPOSITED INTO THE CITIES DITCH HAVING A NEGATIVE IMPACT SEDIMENT NEEDS TO BE REMOVED FROM DITCH IMMEDIATE ACTION IS RERQUIRED TO CORRECT THIS PROBLEM ** HOT PATCH ROAD REPAIR NEEDS TO BE COMPLETED / REMOVE REBAR ON RIGHT SIDE IN EASEMENT on the RIGHT side need to remove THE STRAW AND ADD SOD . Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion | |||
| ROW - FINAL APRON (AFTER POUR) | 11/17/2022 | APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/16/2022 | APPROVED | GBERTOLA |
| Note: Inspector Notes from Inspection 9270 AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/16/2022 | APPROVED | GBERTOLA |
| PLUMBING FINAL | 11/14/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 11/14/2022 | Approval - Private Provider | PPROVIDER |
| BLD - BUILDING FINAL | 11/14/2022 | Approval - Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 11/14/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: well irrigation-no cross connection | |||
| ROW- PRE-APRON (PRE-POUR) | 10/21/2022 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| GRAVITY SEWER TEST | 09/12/2022 | Approval - Private Provider | PPROVIDER |
| U - SEWER TIE IN | 09/12/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ELECTRIC - EARLY POWER | 08/09/2022 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 06/06/2022 | Approval - Private Provider | PPROVIDER |
| INSULATION | 06/01/2022 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 05/26/2022 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 03/29/2022 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 03/09/2022 | Approval - Private Provider | PPROVIDER |
| Note: 03/09/2022 Roof and Wall Sheathing Inspection passed. Dakota Hilton I | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/09/2022 | Approval - Private Provider | PPROVIDER |
| Note: 03/09/2022 Roof and Wall Sheathing Inspection passed. Dakota Hilton I | |||
| TIE BEAM / LINTEL | 02/07/2022 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 02/01/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 01/20/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/19/2022 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 12/13/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 11/21/2022 | 11/21/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO TERMITE.PDF | |||
| ENGIN1 | COMPLETE | 02/01/2022 | 02/01/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/01/2022 | 02/01/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/13/2021 | 10/20/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 10/12/2021 | 12/15/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 10/11/2021 | 10/13/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ENGIN1 | COMPLETE | 10/11/2021 | 10/12/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 10/11/2021 | 10/13/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/11/2021 | 10/13/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/11/2021 | 10/13/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/18/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/21/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/21/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 10/21/2021 |
| SEWER CREDIT | (¤1,342.00) | 10/21/2021 |
| SEWER INSPECTION | ¤25.00 | 10/21/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 10/21/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 10/21/2021 |
| SITE PLAN 30 | ¤30.00 | 10/21/2021 |
| METER - DEPOSIT | ¤60.00 | 10/21/2021 |
| WATER- TURN ON | ¤25.00 | 10/21/2021 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 10/21/2021 |
| INSPECTION - RESIDENTIAL | ¤756.25 | 10/21/2021 |
| CONNECTION FEES | ¤1,017.83 | 10/21/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 10/21/2021 |
| IMPACT FEE FIRE | ¤367.00 | 10/21/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 10/21/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/21/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 10/21/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/21/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 10/21/2021 |
| SURCHARGE FS 533.721 | ¤10.37 | 10/21/2021 |
| SURCHARGE - FS 468.631 | ¤15.56 | 10/21/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/21/2021 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/21/2021 |
| SW ENG PRE APRON | ¤30.00 | 10/21/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,092.61 |