Permit #2021100800
Permit Details
Status: COED
| Parcel Id: 29-10-31-5540-00000-1350 |
| CONDITIONED SPACE: 2665 sqft |
| GARAGE: 893 sqft |
| OPENED PORCH (WITH ROOF) : 367 sqft |
| OPENED PORCH (WITH ROOF) : 138 sqft |
| Total Square Footage: 4063 sqft |
| Block: 00000 |
| Subdivision: 1005 - SANCTUARY SUBDIVISION |
| Job Phone: 386-931-6577 |
| Location Address: 71 OLD OAK DR S |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/13/2022 |
| NOC: RECORDED |
| Applicant name: LUIS JORGE MEDEIROS |
| Owner: SIGALOV SERGEI & SALIMA ARSHINOVA H&W |
|
Address 209 RIVERSHIRE LANE #301 LINCOLNSHIRE, IL 60069 |
| Lot: 1350 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
A PLUS HOME IMPROVEMENTS LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
306 S RAILROAD ST BUNNELL, FL 32110 |
CRC1327024 (Exp: 08/31/2026) | 386-263-2167 |
Sub Contractors
JOSE E ORTIZ JR
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
4601 E MOODY BLVD BUNNELL, FL 32110 |
SUITE B7 BUNNELL, FL 32110 |
RC29027619 (Exp: 08/31/2023) | 386-503-6922 |
MIGUEL ANGEL GALLARDO
| Status | Location Address | State License Number | Phone |
| INACTIVE |
315 PACER CT SANFORD, FL 32773 |
CAC1813826 (Exp: 08/31/2026) | 407-202-0953 |
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/16/2024 | FINAL APPROVED | JWALKER |
| Note: New inspection due to canceled inspection 5/10/2024 - PREVIOUS INSPECTION NOTES 5/10/24: 1). Missing Locking port caps at ODU. (M1411.8) 2). Exterior Lineset sleeve needs to be sealed at the bottom. M1203.2.1 3). Exterior wall at low voltage lines needs to be sealed. 4). All holes in garage ceiling and walls need to be sealed. FBC R302.6 (Including holes for lineset above AHU). 5). MC cable for AHU is missing a cover & the approved fitting at the top. NEC 330.40 6). Breaker for Disconnect at AC (ODU) is not identified properly & the two breakers in the disconnect box need to be labeled as required. NEC 408.4 (A) 7). Range & dishwasher were not installed so the could not be checked. Also, there was no cooking appliance supplied. Inspector Notes from Inspection 2250 02-15-2024 Please have approved drawings on site for all inspections. | |||
| BLD - BUILDING FINAL | 05/15/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 5/10/2024 - PREVIOUS INSPECTION NOTES 5/10/24: 1). Missing Locking port caps at ODU. (M1411.8) 2). Exterior Lineset sleeve needs to be sealed at the bottom. M1203.2.1 3). Exterior wall at low voltage lines needs to be sealed. 4). All holes in garage ceiling and walls need to be sealed. FBC R302.6 (Including holes for lineset above AHU). 5). MC cable for AHU is missing a cover & the approved fitting at the top. NEC 330.40 6). Breaker for Disconnect at AC (ODU) is not identified properly & the two breakers in the disconnect box need to be labeled as required. NEC 408.4 (A) 7). Range & dishwasher were not installed so the could not be checked. Also, there was no cooking appliance supplied. Inspector Notes from Inspection 2250 02-15-2024 Please have approved drawings on site for all inspections. | |||
| BLD - BUILDING FINAL | 05/10/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 5/10/24: 1). Missing Locking port caps at ODU. (M1411.8) 2). Exterior Lineset sleeve needs to be sealed at the bottom. M1203.2.1 3). Exterior wall at low voltage lines needs to be sealed. 4). All holes in garage ceiling and walls need to be sealed. FBC R302.6 (Including holes for lineset above AHU). 5). MC cable for AHU is missing a cover & the approved fitting at the top. NEC 330.40 6). Breaker for Disconnect at AC (ODU) is not identified properly & the two breakers in the disconnect box need to be labeled as required. NEC 408.4 (A) 7). Range & dishwasher were not installed so the could not be checked. Also, there was no cooking appliance supplied. Inspector Notes from Inspection 2250 02-15-2024 Please have approved drawings on site for all inspections. | |||
| ROW - STORMWATER FINAL | 05/10/2024 | APPROVED | GBERTOLA |
| Note: 5/10/24= AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/3/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY EMADISON 5/3/2024 10:29:41 AM *** ** 05/03/24 BUILDER NEEDS TO FINISH LANDSCAPING AND COVER ALL BARE AREAS OF EARTH TO ASSIST IN PREVENTING ANY EROSION OF MATERIAL | |||
| U -UTILITY RESIDENTIAL FINAL | 05/03/2024 | FINAL APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 05/03/2024 | Disapproved - NO FEE | EMADISON |
| Note: *** NOTES ADDED BY EMADISON 5/3/2024 10:29:41 AM *** ** 05/03/24 BUILDER NEEDS TO FINISH LANDSCAPING AND COVER ALL BARE AREAS OF EARTH TO ASSIST IN PREVENTING ANY EROSION OF MATERIAL | |||
| ROW - FINAL APRON (AFTER POUR) | 05/03/2024 | APPROVED | EMADISON |
| Note: *** NOTES ADDED BY EMADISON 5/3/2024 10:23:17 AM *** ** 05/03/24 ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/02/2024 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/02/2024 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. | |||
| U-CROSS CONNECTION | 05/02/2024 | FINAL APPROVED | LFITZGERALD |
| ELECTRIC - EARLY POWER | 03/19/2024 | APPROVED | RMARTIN |
| ROW- PRE-APRON (PRE-POUR) | 03/14/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 3/14/24 YOU ARE APPROVED TO LAY PAVERS AT THIS TIME. PER MY DISCUSSION WITH AMADEU IN THE FUTURE DO NOT DO ANY WORK WITHOUT THE INSPECTION APPROVED OR YOU WILL BE REQUIRED TO PULL THE PAVERS. PASSING AS NOTED DUE TO THE FACT I INSPECTED IT YESTERDAY AND EXCEPT FOR THE REAR FOOTER EVERYTHING WAS COMPLETED AND SPREAD AND COMPACTION WAS TO COPC STANDARDS. 3/13/2024 - PREVIOUS INSPECTION NOTES 1/11/2024 - PREVIOUS INSPECTION NOTES Approved for the Apron and Paver restraints only. Second pre pour will be needed after the base is down and compacted but BEFORE the pavers are placed. 1/10/2024 - PREVIOUS INSPECTION NOTES PAVER RESTRAINTS NEED TO BE A MINIMUM OF 4" WIDE AND 8" DEEP. NEED TO DIG OUT SO IT MEETS CITY'S STANDARDS --------------------------------------------------------------------------------------- 1/9/2024 - PREVIOUS INSPECTION NOTES COULD NOT DO INSPECTION THERE IS NO ADDRESS FOR THIS HOUSE DISPLAYED OR THE PERMIT BOX DOESN'T HAVE ANY PAPER WORK TO VERIFY IF THIS WAS THE RIGHT HOUSE ADDRESS MUST BE VISIBLE AT ALL TIMES OF THE CONSTRUCTION AND PERMIT BOX MUST HAVE ALL PAPER WORK IN THE PERMIT BOX AT ALL TIMES ------------------------------------------------------------------------------------ 1/5/2024 - PREVIOUS INSPECTION NOTES | |||
| ROW- PRE-APRON (PRE-POUR) | 03/13/2024 | CANCELLED BY APPLICANT | FSLADISH |
| Note: 1/11/2024 - PREVIOUS INSPECTION NOTES Approved for the Apron and Paver restraints only. Second pre pour will be needed after the base is down and compacted but BEFORE the pavers are placed. 1/10/2024 - PREVIOUS INSPECTION NOTES PAVER RESTRAINTS NEED TO BE A MINIMUM OF 4" WIDE AND 8" DEEP. NEED TO DIG OUT SO IT MEETS CITY'S STANDARDS --------------------------------------------------------------------------------------- 1/9/2024 - PREVIOUS INSPECTION NOTES COULD NOT DO INSPECTION THERE IS NO ADDRESS FOR THIS HOUSE DISPLAYED OR THE PERMIT BOX DOESN'T HAVE ANY PAPER WORK TO VERIFY IF THIS WAS THE RIGHT HOUSE ADDRESS MUST BE VISIBLE AT ALL TIMES OF THE CONSTRUCTION AND PERMIT BOX MUST HAVE ALL PAPER WORK IN THE PERMIT BOX AT ALL TIMES ------------------------------------------------------------------------------------ 1/5/2024 - PREVIOUS INSPECTION NOTES | |||
| MONOLITHIC SLAB | 02/15/2024 | APPROVED - AS NOTED | AGAETANO |
| Note: 02-15-2024 Please have approved drawings on site for all inspections. | |||
| GRAVITY SEWER TEST | 01/26/2024 | APPROVED | AGAETANO |
| U - SEWER TIE IN | 01/26/2024 | APPROVED | AGAETANO |
| ROW- PRE-APRON (PRE-POUR) | 01/11/2024 | PARTIALLY APPROVED | RGROSS |
| Note: Approved for the Apron and Paver restraints only. Second pre pour will be needed after the base is down and compacted but BEFORE the pavers are placed. 1/10/2024 - PREVIOUS INSPECTION NOTES PAVER RESTRAINTS NEED TO BE A MINIMUM OF 4" WIDE AND 8" DEEP. NEED TO DIG OUT SO IT MEETS CITY'S STANDARDS --------------------------------------------------------------------------------------- 1/9/2024 - PREVIOUS INSPECTION NOTES COULD NOT DO INSPECTION THERE IS NO ADDRESS FOR THIS HOUSE DISPLAYED OR THE PERMIT BOX DOESN'T HAVE ANY PAPER WORK TO VERIFY IF THIS WAS THE RIGHT HOUSE ADDRESS MUST BE VISIBLE AT ALL TIMES OF THE CONSTRUCTION AND PERMIT BOX MUST HAVE ALL PAPER WORK IN THE PERMIT BOX AT ALL TIMES ------------------------------------------------------------------------------------ 1/5/2024 - PREVIOUS INSPECTION NOTES | |||
| ROW- PRE-APRON (PRE-POUR) | 01/10/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: PAVER RESTRAINTS NEED TO BE A MINIMUM OF 4" WIDE AND 8" DEEP. NEED TO DIG OUT SO IT MEETS CITY'S STANDARDS --------------------------------------------------------------------------------------- 1/9/2024 - PREVIOUS INSPECTION NOTES COULD NOT DO INSPECTION THERE IS NO ADDRESS FOR THIS HOUSE DISPLAYED OR THE PERMIT BOX DOESN'T HAVE ANY PAPER WORK TO VERIFY IF THIS WAS THE RIGHT HOUSE ADDRESS MUST BE VISIBLE AT ALL TIMES OF THE CONSTRUCTION AND PERMIT BOX MUST HAVE ALL PAPER WORK IN THE PERMIT BOX AT ALL TIMES ------------------------------------------------------------------------------------ 1/5/2024 - PREVIOUS INSPECTION NOTES | |||
| ROW- PRE-APRON (PRE-POUR) | 01/09/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: COULD NOT DO INSPECTION THERE IS NO ADDRESS FOR THIS HOUSE DISPLAYED OR THE PERMIT BOX DOESN'T HAVE ANY PAPER WORK TO VERIFY IF THIS WAS THE RIGHT HOUSE ADDRESS MUST BE VISIBLE AT ALL TIMES OF THE CONSTRUCTION AND PERMIT BOX MUST HAVE ALL PAPER WORK IN THE PERMIT BOX AT ALL TIMES ------------------------------------------------------------------------------------ 1/5/2024 - PREVIOUS INSPECTION NOTES | |||
| ROW- PRE-APRON (PRE-POUR) | 01/05/2024 | CANCELLED BY APPLICANT | GBERTOLA |
| INSULATION | 11/30/2023 | APPROVED | AGAETANO |
| LATH/BRICK/ WATER BARRIER | 11/16/2023 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2420 10/27/2023 8:05:11 AM- PREVIOUS INSPECTION NOTES 10/13/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 7/12/2023 - PREVIOUS INSPECTION NOTES 6/20/2023 - PREVIOUS INSPECTION NOTES 06/20/2023 1. Missing strapping in back area valley feaming 2. Sheathing blocking view of straps in entry way 3. Unable to read valley frame detail on plans PLEASE CALL FOR A SITE VISIT 386-986-7930-thomas 6/1/2023 - PREVIOUS INSPECTION NOTES 5/17/2023 - PREVIOUS INSPECTION NOTES 05-17-2023 1. Drawings are faded, ripped, and unable to read on certain sheets. 2. Truss layout not on site. 3. Connector schedule not on site. Inspection stopped. 07-12-2023 1. Truss layout too small to read. 2. Drawings are blurry and cannot read details and print. 3. SD2 - Typical frame to Block Wall not installed as per plans. 4. B03 only one strap installed. 5. A20 only one strap installed. Inspection stopped. 10-11-2023 1. A01 girder not nailed per specs. 2. A03 only one strap. 3. Truss EJ7 #6 no strap. 4. Safe room, walk in closet, door 114. Please provide engineering for concrete ceiling. 5. G02 trusses at entry needs bucket connectors. 6. G03 at entry needs bucket connectors. 7. EJ5A at entry needs bucket connector. Check at all rough. 1. Approved electrical and mechanical plans not on site. 2. Dryer vent needs shield plate at top plate both sides. 3. Safe room, walk in closet, door 114. Please provide engineering for concrete ceiling by insulation. 4. Dryer vent not per code. M1502.4 Dryer exhaust ducts. Dryer exhaust ducts shall conform to the requirements of Sections M1502.4.1 through M1502.4.7. Cannot slope downwards. Inspection stopped. 11-9-2023 1. Dryer vent needs shield plates at top plate, both sides. 2. Please have approved, readable electrical plans on site for inspections. Check at next inspection. | |||
| ALL ROUGH | 11/09/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 10/27/2023 8:05:11 AM- PREVIOUS INSPECTION NOTES 10/13/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 7/12/2023 - PREVIOUS INSPECTION NOTES 6/20/2023 - PREVIOUS INSPECTION NOTES 06/20/2023 1. Missing strapping in back area valley feaming 2. Sheathing blocking view of straps in entry way 3. Unable to read valley frame detail on plans PLEASE CALL FOR A SITE VISIT 386-986-7930-thomas 6/1/2023 - PREVIOUS INSPECTION NOTES 5/17/2023 - PREVIOUS INSPECTION NOTES 05-17-2023 1. Drawings are faded, ripped, and unable to read on certain sheets. 2. Truss layout not on site. 3. Connector schedule not on site. Inspection stopped. 07-12-2023 1. Truss layout too small to read. 2. Drawings are blurry and cannot read details and print. 3. SD2 - Typical frame to Block Wall not installed as per plans. 4. B03 only one strap installed. 5. A20 only one strap installed. Inspection stopped. 10-11-2023 1. A01 girder not nailed per specs. 2. A03 only one strap. 3. Truss EJ7 #6 no strap. 4. Safe room, walk in closet, door 114. Please provide engineering for concrete ceiling. 5. G02 trusses at entry needs bucket connectors. 6. G03 at entry needs bucket connectors. 7. EJ5A at entry needs bucket connector. Check at all rough. 1. Approved electrical and mechanical plans not on site. 2. Dryer vent needs shield plate at top plate both sides. 3. Safe room, walk in closet, door 114. Please provide engineering for concrete ceiling by insulation. 4. Dryer vent not per code. M1502.4 Dryer exhaust ducts. Dryer exhaust ducts shall conform to the requirements of Sections M1502.4.1 through M1502.4.7. Cannot slope downwards. Inspection stopped. 11-9-2023 1. Dryer vent needs shield plates at top plate, both sides. 2. Please have approved, readable electrical plans on site for inspections. Check at next inspection. | |||
| ALL ROUGH | 10/27/2023 | CANCELLED BY APPLICANT | MRAMOS |
| Note: 10/13/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 7/12/2023 - PREVIOUS INSPECTION NOTES 6/20/2023 - PREVIOUS INSPECTION NOTES 06/20/2023 1. Missing strapping in back area valley feaming 2. Sheathing blocking view of straps in entry way 3. Unable to read valley frame detail on plans PLEASE CALL FOR A SITE VISIT 386-986-7930-thomas 6/1/2023 - PREVIOUS INSPECTION NOTES 5/17/2023 - PREVIOUS INSPECTION NOTES 05-17-2023 1. Drawings are faded, ripped, and unable to read on certain sheets. 2. Truss layout not on site. 3. Connector schedule not on site. Inspection stopped. 07-12-2023 1. Truss layout too small to read. 2. Drawings are blurry and cannot read details and print. 3. SD2 - Typical frame to Block Wall not installed as per plans. 4. B03 only one strap installed. 5. A20 only one strap installed. Inspection stopped. 10-11-2023 1. A01 girder not nailed per specs. 2. A03 only one strap. 3. Truss EJ7 #6 no strap. 4. Safe room, walk in closet, door 114. Please provide engineering for concrete ceiling. 5. G02 trusses at entry needs bucket connectors. 6. G03 at entry needs bucket connectors. 7. EJ5A at entry needs bucket connector. Check at all rough. 1. Approved electrical and mechanical plans not on site. 2. Dryer vent needs shield plate at top plate both sides. 3. Safe room, walk in closet, door 114. Please provide engineering for concrete ceiling by insulation. 4. Dryer vent not per code. M1502.4 Dryer exhaust ducts. Dryer exhaust ducts shall conform to the requirements of Sections M1502.4.1 through M1502.4.7. Cannot slope downwards. Inspection stopped. | |||
| ALL ROUGH | 10/13/2023 | Disapproved - NO FEE | AGAETANO |
| Note: Inspector Notes from Inspection 2460 7/12/2023 - PREVIOUS INSPECTION NOTES 6/20/2023 - PREVIOUS INSPECTION NOTES 06/20/2023 1. Missing strapping in back area valley feaming 2. Sheathing blocking view of straps in entry way 3. Unable to read valley frame detail on plans PLEASE CALL FOR A SITE VISIT 386-986-7930-thomas 6/1/2023 - PREVIOUS INSPECTION NOTES 5/17/2023 - PREVIOUS INSPECTION NOTES 05-17-2023 1. Drawings are faded, ripped, and unable to read on certain sheets. 2. Truss layout not on site. 3. Connector schedule not on site. Inspection stopped. 07-12-2023 1. Truss layout too small to read. 2. Drawings are blurry and cannot read details and print. 3. SD2 - Typical frame to Block Wall not installed as per plans. 4. B03 only one strap installed. 5. A20 only one strap installed. Inspection stopped. 10-11-2023 1. A01 girder not nailed per specs. 2. A03 only one strap. 3. Truss EJ7 #6 no strap. 4. Safe room, walk in closet, door 114. Please provide engineering for concrete ceiling. 5. G02 trusses at entry needs bucket connectors. 6. G03 at entry needs bucket connectors. 7. EJ5A at entry needs bucket connector. Check at all rough. 1. Approved electrical and mechanical plans not on site. 2. Dryer vent needs shield plate at top plate both sides. 3. Safe room, walk in closet, door 114. Please provide engineering for concrete ceiling by insulation. 4. Dryer vent not per code. M1502.4 Dryer exhaust ducts. Dryer exhaust ducts shall conform to the requirements of Sections M1502.4.1 through M1502.4.7. Exceeds length. Cannot slope downwards. Please have a large, approved, readable, set of drawings on site for all inspections. Inspection stopped. | |||
| ELECTRIC-TUG | 10/12/2023 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/11/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 7/12/2023 - PREVIOUS INSPECTION NOTES 6/20/2023 - PREVIOUS INSPECTION NOTES 06/20/2023 1. Missing strapping in back area valley feaming 2. Sheathing blocking view of straps in entry way 3. Unable to read valley frame detail on plans PLEASE CALL FOR A SITE VISIT 386-986-7930-thomas 6/1/2023 - PREVIOUS INSPECTION NOTES 5/17/2023 - PREVIOUS INSPECTION NOTES 05-17-2023 1. Drawings are faded, ripped, and unable to read on certain sheets. 2. Truss layout not on site. 3. Connector schedule not on site. Inspection stopped. 07-12-2023 1. Truss layout too small to read. 2. Drawings are blurry and cannot read details and print. 3. SD2 - Typical frame to Block Wall not installed as per plans. 4. B03 only one strap installed. 5. A20 only one strap installed. Inspection stopped. 10-11-2023 1. A01 girder not nailed per specs. 2. A03 only one strap. 3. Truss EJ7 #6 no strap. 4. Safe room, walk in closet, door 114. Please provide engineering for concrete ceiling. 5. G02 trusses at entry needs bucket connectors. 6. G03 at entry needs bucket connectors. 7. EJ5A at entry needs bucket connector. Check at all rough. | |||
| ROOF VALLEY & METAL | 09/27/2023 | APPROVED | AGAETANO |
| Note: 9/14/2023 - PREVIOUS INSPECTION NOTES 09-14-2023 1. Approximately half of roof is complete (tiles installed). 2. Areas of roof that does not have tiles installed is correct, provided the underlayment installed matches Roofing Worksheet. 3. Unable to identify underlayment installed. Please provide documentation that underlayment is installed as per roofing worksheet. 4. Roofing manufacturers specs not on site. Please have roofing manufacturer's specs on site. 5. Please provide engineering that batons are or are not needed. | |||
| ROOF VALLEY & METAL | 09/14/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 09-14-2023 1. Approximately half of roof is complete (tiles installed). 2. Areas of roof that does not have tiles installed is correct, provided the underlayment installed matches Roofing Worksheet. 3. Unable to identify underlayment installed. Please provide documentation that underlayment is installed as per roofing worksheet. 4. Roofing manufacturers specs not on site. Please have roofing manufacturer's specs on site. 5. Please provide engineering that batons are or are not needed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/12/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 6/20/2023 - PREVIOUS INSPECTION NOTES 06/20/2023 1. Missing strapping in back area valley feaming 2. Sheathing blocking view of straps in entry way 3. Unable to read valley frame detail on plans PLEASE CALL FOR A SITE VISIT 386-986-7930-thomas 6/1/2023 - PREVIOUS INSPECTION NOTES 5/17/2023 - PREVIOUS INSPECTION NOTES 05-17-2023 1. Drawings are faded, ripped, and unable to read on certain sheets. 2. Truss layout not on site. 3. Connector schedule not on site. Inspection stopped. 07-12-2023 1. Truss layout too small to read. 2. Drawings are blurry and cannot read details and print. 3. SD2 - Typical frame to Block Wall not installed as per plans. 4. B03 only one strap installd. 5. A20 only one strap installed. Inspection stopped. | |||
| ROOF SHEATHING | 06/21/2023 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/20/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: 06/20/2023 1. Missing strapping in back area valley feaming 2. Sheathing blocking view of straps in entry way 3. Unable to read valley frame detail on plans PLEASE CALL FOR A SITE VISIT 386-986-7930-thomas 6/1/2023 - PREVIOUS INSPECTION NOTES 5/17/2023 - PREVIOUS INSPECTION NOTES 05-17-2023 1. Drawings are faded, ripped, and unable to read on certain sheets. 2. Truss layout not on site. 3. Connector schedule not on site. Inspection stopped. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/01/2023 | CANCELLED BY APPLICANT | AGAETANO |
| Note: 5/17/2023 - PREVIOUS INSPECTION NOTES 05-17-2023 1. Drawings are faded, ripped, and unable to read on certain sheets. 2. Truss layout not on site. 3. Connector schedule not on site. Inspection stopped. | |||
| WALL SHEATHING | 05/17/2023 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/17/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 05-17-2023 1. Drawings are faded, ripped, and unable to read on certain sheets. Please provide a set of approved readble drawings for inspections. 2. Truss layout not on site. 3. Connector schedule not on site. Inspection stopped. | |||
| FOUND SURVEY APPROVED (OFFICE) | 12/06/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 11/23/2022 | APPROVED | AGAETANO |
| Note: 11-23-2022 Plans are wet, dirty, moldy, and disorganized. Please provide a new clean set of approved drawings for inspections. | |||
| MONOLITHIC SLAB | 09/26/2022 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION 09-07-2022 Contractor not ready. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 09/13/2022 | APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION SPOKE WITH CONTRACTOR AND WAS TOLD HE DID NOT SCHEDULE THIS INSPECTION, WAS DONE VIA WEB. MASTER BATHROOM HAS NO VENT BETWEEN W/C AND BIDET AND FREE STANDING TUB. MAKE NECESSARY CORRECTIONS AND RESCHEDULE | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 09/08/2022 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: THIS IS A REINSPECTION SPOKE WITH CONTRACTOR AND WAS TOLD HE DID NOT SCHEDULE THIS INSPECTION, WAS DONE VIA WEB. MASTER BATHROOM HAS NO VENT BETWEEN W/C AND BIDET AND FREE STANDING TUB. MAKE NECESSARY CORRECTIONS AND RESCHEDULE | |||
| MONOLITHIC SLAB | 09/07/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 09-07-2022 Contractor not ready. | |||
| STEM WALL FOUNDATION | 07/19/2022 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION 1. Drawings are a matted mess and not readable. FP-1 foundation details are blurry and not readable. Please provide an approved set of readable drawings for inspection. 2. FP-1 foundation plan at F1 is not built as per plan. Noted on the right side of drawings. | |||
| STEM WALL FOUNDATION | 07/15/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 1. Drawings are a matted mess and not readable. FP-1 foundation details are blurry and not readable. Please provide an approved set of readable drawings for inspection. 2. FP-1 foundation plan at F1 is not built as per plan. Noted on the right side of drawings. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/06/2022 | CANCELLED BY APPLICANT | MGIBSON |
| Note: SPOKE WITH CONTRACTOR AND WAS TOLD HE DID NOT SCHEDULE THIS INSPECTION, WAS DONE VIA WEB | |||
| FOOTER | 04/28/2022 | APPROVED | AGAETANO |
| WATER METER INSTALLATION REQUEST | 04/18/2022 | APPROVED | CSTONE |
| WILDLIFE CHECK - ENVIRONMENTAL | 03/17/2022 | APPROVED | JMYERS |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 05/09/2024 | 05/14/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 01/24/2024 | 01/24/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Change of subcontractors are to be managed through the online portal. See page 56 of the 'how to' guide to change subcontractors and make inactive those that are no longer performing work on your project. | |||
| MECH | COMPLETE | 11/21/2023 | 11/27/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/08/2023 | 11/08/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 11/07/2023 | 11/07/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM RENAME TO ENERGY CALCS.PDF | |||
| MECH | HOLD | 11/07/2023 | 11/07/2023 |
| Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/06/2023 | 11/06/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Design location on Heatload needs to be Daytona Beach ( Third Request) | |||
| ELEC | COMPLETE | 11/06/2023 | 11/06/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/31/2023 | 10/31/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Design location on Heatload needs to be Daytona Beach 2. Provide Duct layout signed by AC contractor 3. Update mechanical subcontractor 4. Revise Plan sheet 4. It shows Honest heating and air on duct layout. | |||
| BLD | COMPLETE | 10/23/2023 | 10/26/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 10/18/2023 | 10/23/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/18/2023 | 10/19/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Design location on heatload needs to be Daytona Beach 2. Duct layout needs to be signed by the AC contractor. 3. Update mechanical subcontractor (Second Request) | |||
| MECH | HOLD | 06/12/2023 | 06/13/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Design location on heatload needs to be Daytona Beach 2. Duct layout needs to be signed by the AC contractor. 3. Update mechanical subcontractor | |||
| ENGIN1 | COMPLETE | 12/05/2022 | 12/06/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/05/2022 | 12/05/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 03/16/2022 | 03/17/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Approved After Action Report has been accepted. | |||
| PLENV | HOLD | 02/16/2022 | 02/16/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Staff conducted a site visit on 2/16/22 and found multiple Gopher Tortoise on the property. Please provide Approved After Action Report after relocation activities have been completed. | |||
| ZON | COMPLETE | 11/12/2021 | 11/12/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/09/2021 | 11/10/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 11/09/2021 | 11/12/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan and survey must show the walkway widths. If that is planters in front please show a setback from them to the front property line Please have notary write the owners names in the blank of the signatures that she is notarizing on right of way agreement | |||
| ELEC | COMPLETE | 10/29/2021 | 11/01/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/29/2021 | 11/01/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Repeat comment: Roof: please provide a clear measurement of the roof pitch. Measurement on plans not readable | |||
| BLD | HOLD | 10/29/2021 | 11/01/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Residential REVIEW COMMENTS: 1. Provide a completed City of Palm Coast Roofing Worksheet 2. Roofing wind zones on sheet GN are from a previous Code. A revision is required to reflect the current Code requirements. See Figure R301.2(7) 2020 Florida Building Code Residential 7th Edition. | |||
| ENGIN1 | COMPLETE | 10/29/2021 | 11/01/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/29/2021 | 11/08/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/21/2021 | 10/21/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Site plan and survey: Please provide walk way widths. also provide the total sq of lot. Does drive way with the pavers go all the way to apron. If so please provide a provide a Right of way utilization agreement for the paved drive way. The agreement must be signed by all owners on property deed, and notarized. landscaping plans: all required shrubs shall be planted 2.5 feet and 8 feet of the homes foundation please provide the distance. please make notes on the landscape plan St. Augustine grass requires irrigation. Roof: please provide a clead measurement of the roof pitch. | |||
| BLD | HOLD | 10/20/2021 | 10/22/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Residential REVIEW COMMENTS: 1. Provide a completed City of Palm Coast Roofing Worksheet 2. Roofing wind zones on sheet GN are from a previous Code. A revision is required to reflect the current Code requirements. See Figure R301.2(7) 2020 Florida Building Code Residential 7th Edition. | |||
| CUSVC | COMPLETE | 10/20/2021 | 10/21/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 10/20/2021 | 10/21/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Electric load calcs do match the square footage of the house | |||
| ENGIN1 | COMPLETE | 10/20/2021 | 10/20/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 10/20/2021 | 10/22/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/20/2021 | 10/21/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/20/2021 | 10/26/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 05/21/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/21/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/21/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/21/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/21/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/21/2024 |
| CONTRACTOR CHANGE | ¤40.00 | 05/21/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 05/21/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 05/21/2024 |
| IMPACT FEE FIRE | ¤367.00 | 05/21/2024 |
| IMPACT FEE PARKS | ¤1,199.12 | 05/21/2024 |
| IMPACT FEE TRANSPORTATION | ¤3,139.00 | 05/21/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 05/21/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 05/21/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/13/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/13/2022 |
| SEWER INSPECTION | ¤25.00 | 01/13/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 01/13/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 01/13/2022 |
| SITE PLAN 30 | ¤30.00 | 01/13/2022 |
| SURCHARGE FS 533.721 | ¤13.29 | 01/13/2022 |
| SURCHARGE - FS 468.631 | ¤19.93 | 01/13/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/13/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/13/2022 |
| SW ENG PRE APRON | ¤30.00 | 01/13/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/13/2022 |
| CONNECTION FEES | ¤25.00 | 01/13/2022 |
| METER - DEPOSIT | ¤60.00 | 01/13/2022 |
| WATER-METER | ¤467.09 | 01/13/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/13/2022 |
| INSPECTION - RESIDENTIAL | ¤962.50 | 01/13/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤273.00 | 01/13/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤19,484.69 |