Permit #2021100827

Permit Details

Status: COED

Parcel Id: 14-11-30-5538-00000-0110
Total Square Footage: 30024 sqft
Block: 00000
Subdivision: -
Job Phone: 407-916-7235
Location Address: 3 ADVENTHEALTH WAY
Type: BC - BUILDING COMMERCIAL
Issue Date: 05/20/2022
NOC: RECORDED
Applicant name: BRUCE ROBERT ADAMS
Owner: MEMORIAL HOSPITAL-FLAGLER INC

Address

60 MEMORIAL MEDICAL PKWY

PALM COAST, FL 32164

Lot: 0100
Contracted Stated Job Value: ¤6,500,000.00
Job Description: 30,000 SQ FT MEDICAL OFFICE BUILDING
Type: CN

Contractor

THE ROBINS & MORTON GROUP
Status Location Address Mailing Address State License Number Phone
ACTIVE

423 S KELLER RD

ORLANDO, FL 32810

#200

ORLANDO, FL 32810

CGC1523017 (Exp: 08/31/2026) 407-916-7235

Sub Contractors

MARION CASEY DEAN
Status Location Address State License Number Phone Fax
INACTIVE

1765 GREENSBORO STATION PL

TYSONS, VA 22102

EC0001830 (Exp: 08/31/2024) 703-802-6231 703-421-4670
JOHN PATRICK MANZELLA
Status Location Address State License Number Phone Fax
INACTIVE

4495 35TH STREET

ORLANDO, FL 32811

CCC050475 (Exp: 08/31/2026) (407)650-9541 (407)650-9542
MATTHEW JOHN WITTWER
Status Location Address State License Number Phone Fax
ACTIVE

231 JEAN STREET

DAYTONA BEACH, FL 32114

EC0002058 (Exp: 08/31/2026) (386)255-1418 (386)255-3429
JOHN MAXEN BARTKOVICH
Status Location Address State License Number Phone
ACTIVE

818 SHADOWMOSS DR

WINTERGARDEN, FL 32787

CAC1815793 (Exp: 08/31/2026) 407-886-3729
JOHN MAXEN BARTKOVICH
Status Location Address State License Number Phone
ACTIVE

818 SHADOWMOSS DR

WINTERGARDEN, FL 32787

CAC1815793 (Exp: 08/31/2026) 407-886-3729
MATTHEW JOHN WITTWER
Status Location Address State License Number Phone Fax
ACTIVE

231 JEAN STREET

DAYTONA BEACH, FL 32114

EC0002058 (Exp: 08/31/2026) (386)255-1418 (386)255-3429

Inspection History

Type Request Date Result Inspector
FIRE FINAL 05/26/2023 APPROVED RMARTIN
Note: 5/25/2023 - PREVIOUS INSPECTION NOTES 5/25/23 need 7 fire extinguishers in locations 5/24/2023 - PREVIOUS INSPECTION NOTES need approved life safety plans on site, electrician to walk and check exit/emergency lights, need certified fire extinguishers installed
FIRE FINAL 05/25/2023 Disapproved - NO FEE RMARTIN
Note: 5/25/23 need 7 fire extinguishers in locations 5/24/2023 - PREVIOUS INSPECTION NOTES need approved life safety plans on site, electrician to walk and check exit/emergency lights, need certified fire extinguishers installed
U - UTILITY COMMERCIAL FINAL 05/24/2023 FINAL APPROVED LFITZGERALD
ELECTRIC FINAL 05/24/2023 Approval - Private Provider PPROVIDER
Note: 5/23/2023 12:02:37 PM- PREVIOUS INSPECTION NOTES 05/19/2023 Carter electric level 2 highlighted on plans, near completion, should be completing 5-22 Monday Other contractor McDean, several items to complete, roof, electric for receptacles & lights, exhaust fans, lighting protection,2 electric rms ,miscellaneous labels, ckt directory's,missing breakers for mechanical equipment , breaker lockouts, xformer labels and other, elevator pit, exterior receptacles, lighting controls for outside lighting that's not installed, instant hots, may not be a complete list Victoria A Valley
ELECTRIC FINAL 05/24/2023 Approval - Private Provider PPROVIDER
Note: 05/19/2023 Highlighted on plans Victoria A Valley 05/24/2023 Electric final complete Frank D. Godawa
ELECTRIC FINAL 05/22/2023 Approval - Private Provider PPROVIDER
BUILDING FINAL 05/22/2023 Approval - Private Provider PPROVIDER
FIRE FINAL 05/19/2023 Disapproved - NO FEE RMARTIN
Note: need approved life safety plans on site, electrician to walk and check exit/emergency lights, need certified fire extinguishers installed
BUILDING FINAL 05/19/2023 CANCELLED BY APPLICANT WEB
EXTERIOR ARCHITECTURAL FEATURES 05/19/2023 APPROVED RPICATAGI
ELECTRIC FINAL 05/19/2023 PARTIALLY APPROVED PPROVIDER
Note: 05/19/2023 Carter electric level 2 highlighted on plans, near completion, should be completing 5-22 Monday Other contractor McDean, several items to complete, roof, electric for receptacles & lights, exhaust fans, lighting protection,2 electric rms ,miscellaneous labels, ckt directory's,missing breakers for mechanical equipment , breaker lockouts, xformer labels and other, elevator pit, exterior receptacles, lighting controls for outside lighting that's not installed, instant hots, may not be a complete list Victoria A Valley
PLUMBING FINAL 05/19/2023 Approval - Private Provider PPROVIDER
HVAC FINAL 05/19/2023 Approval - Private Provider PPROVIDER
FOUNDATION SURVEY - OFFICE USE ONLY 05/15/2023 APPROVED DLEAP
Note: Approved by Dennis in April
ELECTRIC FINAL 05/15/2023 Approval - Private Provider PPROVIDER
ELECTRIC FINAL 05/12/2023 Approval - Private Provider PPROVIDER
ELECTRIC FINAL 05/11/2023 Approval - Private Provider PPROVIDER
Note: 05/10/2023 Partial- 1st Floor- TI Buildout- Carter Electric - suites 1400 and 1200 Brittany A. Gerow
ELECTRIC FINAL 05/11/2023 Approval - Private Provider PPROVIDER
Note: 05/04/2023 TI build out- Carter Electric/ Core and Shell- MC Dean Brittany A. Gerow 05/11/2023 1st floor highlighted on plans Frank D. Godawa
ELECTRIC FINAL 05/10/2023 Approval - Private Provider PPROVIDER
Note: 05/04/2023 TI build out- Carter Electric/ Core and Shell- MC Dean Brittany A. Gerow 05/10/2023 Highlighted on plans Frank D. Godawa
ELECTRIC FINAL 05/10/2023 Approval - Private Provider PPROVIDER
Note: 05/09/2023 - Partial- 1st Floor- TI Buildout- Carter Electric - suites 1400 and 1200 Brittany A. Gerow 05/10/2023 Highlighted on plans Frank D. Godawa
ELECTRIC FINAL 05/09/2023 Approval - Private Provider PPROVIDER
Note: 5/9/2023 11:05:46 AM- PREVIOUS INSPECTION NOTES 05/04/2023 TI build out- Carter Electric/ Core and Shell- MC Dean Brittany A. Gerow 05/08/2023 Elevator pit, not complete Frank D. Godawa 05/04/2023 TI build out- Carter Electric/ Core and Shell- MC Dean Brittany A. Gerow 05/09/2023 1st floor highlighted on plans Frank D. Godawa
ELECTRIC FINAL 05/08/2023 PARTIALLY APPROVED PPROVIDER
Note: 05/04/2023 TI build out- Carter Electric/ Core and Shell- MC Dean Brittany A. Gerow 05/08/2023 Elevator pit, not complete Frank D. Godawa
ELECTRIC FINAL 05/04/2023 Approval - Private Provider PPROVIDER
Note: 05/04/2023 TI build out- Carter Electric/ Core and Shell- MC Dean Brittany A. Gerow 05/05/2023 Doing electric finals level one, highlighted on plans Frank D. Godawa
ELECTRIC 2ND ROUGH 05/04/2023 Approval - Private Provider PPROVIDER
Note: 05/04/2023 Transformer N2DPLA and Elevator Electrical Equipment Victoria A Valley
ELECTRIC - EARLY POWER 05/02/2023 Approval - Private Provider PPROVIDER
Note: Meter Cans T-N1DPLA, T-N2DPLA, N1DPLA, N2DPLA
ELECTRIC 2ND ROUGH 05/02/2023 Approval - Private Provider PPROVIDER
Note: 05/01/2023 2nd rough- 2nd floor NW corner - TI build out- Carter Electric Brittany A. Gerow I
ELECTRIC 2ND ROUGH 04/28/2023 Approval - Private Provider PPROVIDER
Note: 04/27/2023 for casework- 1st floor TI Build out- Carter Electric Victoria A Valley 04/28/2023 Mill work Frank D. Godawa
FIREWALL DRYWALL NAILING 04/28/2023 Approval - Private Provider PPROVIDER
Note: ELEVATOR 1ST FLOOR DRYWALL SCREW INSPECTION SECOND LAYER OF SMALL AREAS EACH SIDE AND TOP OF ELEVATOR SHAFT WALLS
ABOVE CEILING 04/27/2023 Approval - Private Provider PPROVIDER
INSULATION 04/27/2023 Approval - Private Provider PPROVIDER
Note: 04/26/2023 piping Insulation Brittany A. Gerow
ELECTRIC OTHER 04/27/2023 Approval - Private Provider PPROVIDER
Note: ELEC PANEL INSPECTIION 1ST FLOOR - CORE AND SHELL N1HA N1BPLA N1LA T-N1DPLA 2ND FLOOR N2DPLA T-N2DPLA
ELECTRIC OTHER 04/27/2023 Approval - Private Provider PPROVIDER
GRAVITY SEWER 04/27/2023 Approval - Private Provider PPROVIDER
FRAMING 03/17/2023 Approval - Private Provider PPROVIDER
FIREWALL DRYWALL NAILING 03/09/2023 Approval - Private Provider PPROVIDER
FIREWALL FRAMING 03/07/2023 Approval - Private Provider PPROVIDER
HVAC OTHER 03/07/2023 Approval - Private Provider PPROVIDER
ELECTRIC OTHER 02/27/2023 Approval - Private Provider PPROVIDER
Note: 12/12/2022 2:22:58 PM- PREVIOUS INSPECTION NOTES
FIREWALL DRYWALL NAILING 02/27/2023 Approval - Private Provider PPROVIDER
FIREWALL DRYWALL NAILING 02/24/2023 Approval - Private Provider PPROVIDER
FRAMING 02/24/2023 Approval - Private Provider PPROVIDER
Note: 2502,2503,2501,2512,2511,2509,2403,2402,2005 lobby
FIREWALL PENETRATIONS 02/24/2023 Approval - Private Provider PPROVIDER
Note: INSPECTION ENTERED INCORRECTLY- THIS WAS FOR THE MOB BUILDING - NOT THE HOSPITAL BUILDING.
FRAMING 02/22/2023 Approval - Private Provider PPROVIDER
ELECTRIC 2ND ROUGH 02/22/2023 Approval - Private Provider PPROVIDER
Note: 02/21/2023 Stair 1 Dakota L. Hilton 02/22/2023 South side Frank D. Godawa
ELECTRIC 2ND ROUGH 02/21/2023 Approval - Private Provider PPROVIDER
PLUMBING PRESSURE TEST 02/17/2023 Approval - Private Provider PPROVIDER
Note: 2nd floor
FRAMING 02/15/2023 Approval - Private Provider PPROVIDER
FIREWALL DRYWALL NAILING 02/14/2023 Approval - Private Provider PPROVIDER
PLUMBING PRESSURE TEST 02/14/2023 Approval - Private Provider PPROVIDER
ELECTRIC 2ND ROUGH 02/14/2023 Approval - Private Provider PPROVIDER
Note: 02/13/2023 2nd Floor Dakota L. Hilton 02/14/2023 Highlighted on plans Frank D. Godawa
ELECTRIC 2ND ROUGH 02/09/2023 Approval - Private Provider PPROVIDER
Note: 02/08/2023 1st Floor Dakota L. Hilton 02/09/2023 Highlighted on plans Frank D. Godawa
LATH/BRICK/WATER BARRIER 02/09/2023 Approval - Private Provider PPROVIDER
Note: 02/09/2023 Roof Level - Per Bill Victoria A Valley
HVAC ROUGH 02/03/2023 Approval - Private Provider PPROVIDER
MONOLITHIC SLAB 02/02/2023 Approval - Private Provider PPROVIDER
STOREFRONT 02/01/2023 Approval - Private Provider PPROVIDER
FIREWALL PENETRATIONS 01/27/2023 Approval - Private Provider PPROVIDER
ELECTRIC 2ND ROUGH 01/27/2023 Approval - Private Provider PPROVIDER
FIREWALL DRYWALL NAILING 01/24/2023 Approval - Private Provider PPROVIDER
Note: 01/23/2023 Firewall Nailing Victoria A Valley 01/24/2023 Passed Shaft wall first layer on 2nd floor middle%0dFixed missing screws on site William A. Ruzycky
EXTERIOR WALL SHEATHING / SHEARWALL 01/24/2023 Approval - Private Provider PPROVIDER
Note: 01/24/2023 Dens glass exterior roof wall fasteners William A. Ruzycky
ELECTRIC 2ND ROUGH 01/23/2023 Approval - Private Provider PPROVIDER
Note: 01/20/2023 1st Floor, X-Ray Room Dakota L. Hilton 01/23/2023 Floor & wall electric rough Frank D. Godawa
HVAC ROUGH 01/23/2023 Approval - Private Provider PPROVIDER
Note: 12/20/2022 2:16:11 PM- PREVIOUS INSPECTION NOTES 12/19/2022 1st Eric D. Reinertsen 01/23/2023 2nd corridor Eric D. Reinertsen
ELECTRIC 2ND ROUGH 01/20/2023 Approval - Private Provider PPROVIDER
PLUMBING 2ND ROUGH 01/20/2023 Approval - Private Provider PPROVIDER
FRAMING 01/20/2023 Approval - Private Provider PPROVIDER
INSULATION 01/03/2023 Approval - Private Provider PPROVIDER
Note: Piping insulation - partial pass
ELECTRIC 1ST ROUGH 12/19/2022 PARTIALLY APPROVED PPROVIDER
Note: 12/19/2022 Carter elec, wall rough, level one, southeast corner Frank D. Godawa
HVAC ROUGH 12/19/2022 PARTIALLY APPROVED PPROVIDER
Note: 12/19/2022 1st Eric D. Reinertsen
ELECTRIC 2ND ROUGH 12/12/2022 Approval - Private Provider PPROVIDER
Note: 12/09/2022 TI Buildout - Carter Electric Victoria A Valley 12/12/2022 Level 1, north east corner, highlighted on plans Frank D. Godawa
FRAMING 12/12/2022 Approval - Private Provider PPROVIDER
Note: Framing all 1400 rooms on 1st floor only BOW William A. Ruzycky
FRAMING 12/07/2022 Approval - Private Provider PPROVIDER
Note: 12/07/2022 1st Floor Interior top out framing Except Rm 1304 and stairway 2 %0d2nd Floor interior top out Corridor 2013 and Interior top out East side%0dExterior framing Except exterior south and west corner walls Rm 1304 Northeast Rms 1203 1204 1205 1208 William A. Ruzycky I
FIREWALL DRYWALL NAILING 12/07/2022 Approval - Private Provider PPROVIDER
Note: 12/06/2022 Firewall Screw Dakota L. Hilton 12/07/2022 Drywall screw inspection 1st floor electric room 2nd Layer William A. Ruzycky
ELECTRIC 1ST ROUGH 12/07/2022 Approval - Private Provider PPROVIDER
Note: 12/07/2022 Highlighted on plans "Carter Electric " Frank D. Godawa
ELECTRIC OTHER 12/07/2022 PARTIALLY APPROVED PPROVIDER
Note: 12/07/2022 Wall rough McDean Electric, highlighted on plans Frank D. Godawa
FIREWALL DRYWALL NAILING 11/30/2022 Approval - Private Provider PPROVIDER
FRAMING 11/21/2022 Approval - Private Provider PPROVIDER
Note: forst out framing at roof
HVAC OTHER 11/21/2022 Approval - Private Provider PPROVIDER
Note: Roof curb attachments hvac
FIREWALL DRYWALL NAILING 11/14/2022 Approval - Private Provider PPROVIDER
FRAMING 11/08/2022 Approval - Private Provider PPROVIDER
COLUMN 10/20/2022 Approval - Private Provider PPROVIDER
COLUMN 10/05/2022 Approval - Private Provider PPROVIDER
Note: Notes: Date Note User Name 10/03/2022 Rebar Victoria A Valley 10/05/2022 Passed 3 square columns and 1 round at GL 2.1D and GL 4D GL 4F GL 4J GL 4 William A. Ruzycky
COLUMN 10/04/2022 Approval - Private Provider PPROVIDER
SECOND FLOOR SLAB 09/27/2022 Approval - Private Provider PPROVIDER
COLUMN 09/26/2022 Approval - Private Provider PPROVIDER
Note: 09/26/2022 2 COLUMNS, 2ND FLOOR 09/26/2022 2ND LEVEL, 2 COLUMNS, PREPOUR
SECOND FLOOR SLAB 09/22/2022 Approval - Private Provider PPROVIDER
SECOND FLOOR SLAB 09/20/2022 Approval - Private Provider PPROVIDER
Note: 09/20/2022 rebar
BUILDING OTHER 09/06/2022 Approval - Private Provider PPROVIDER
BUILDING OTHER 08/31/2022 Approval - Private Provider PPROVIDER
Note: rebar inspection - for slab on grade
PLUMBING 1ST ROUGH 08/30/2022 Approval - Private Provider PPROVIDER
BUILDING OTHER 08/30/2022 Approval - Private Provider PPROVIDER
ELECTRIC 1ST ROUGH 08/11/2022 Approval - Private Provider PPROVIDER
ELECTRIC 1ST ROUGH 08/08/2022 Approval - Private Provider PPROVIDER
TILT WALL 08/08/2022 Approval - Private Provider PPROVIDER
TILT WALL 08/08/2022 Approval - Private Provider PPROVIDER
TILT WALL 08/08/2022 Approval - Private Provider PPROVIDER
ELECTRIC OTHER 07/27/2022 Approval - Private Provider PPROVIDER
BUILDING OTHER 07/07/2022 Approval - Private Provider PPROVIDER
PLUMBING OTHER 06/29/2022 Approval - Private Provider PPROVIDER
Note: 06/29/2022 Underground Sanitary Plumbing Inspection passed. Dakota Hilton
PLUMBING OTHER 06/23/2022 Approval - Private Provider PPROVIDER
Note: 06/23/2022 Underground Condensate Piping Inspection passed. Dakota Hilton
BUILDING OTHER 06/23/2022 Approval - Private Provider PPROVIDER
PLUMBING OTHER 06/22/2022 Approval - Private Provider PPROVIDER
Note: 06/22/2022 Underground Storm Piping and Condensate Inspection passed. Dakota Hilton
BLD - SEWER TIE IN 06/21/2022 Approval - Private Provider PPROVIDER
FOOTER 06/21/2022 Approval - Private Provider PPROVIDER
Note: 06/21/2022 Footing Inspection passed. Footings for stairway in MOB building only. Dakota Hilton

Review History

Department Status Date In Date Out
FI1 COMPLETE 05/16/2023 05/16/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM All separate permits are applied for, so comment is not needed on plans anymore.
BADMIN INFORMATION 05/16/2023 05/16/2023
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM UPLOAD PLANS INDIVIDUALLY
PLENG COMPLETE 04/26/2023 05/01/2023
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM Foundation Survey
BLD COMPLETE 04/26/2023 05/02/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM foundation survey
BADMIN INFORMATION 03/21/2023 03/21/2023
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM CAN NOT UPDATED INSPECTION REPORT FOR ELEC 2ND ROUGH. ELECTRICAL CONTRACTOR IS INACTIVE.
BADMIN INFORMATION 03/17/2023 03/17/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM WE cannot process, the plumbing and electrical contractors are inactive.
BADMIN INFORMATION 03/14/2023 03/14/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM The electrical and plumbing subcontractors are inactive, we cannot processs any inspections.
FI1 HOLD 01/02/2023 01/17/2023
Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM Not accepted, these notes were not added to the cover sheet as indicated. Please place the following notes on the cover sheets SAPARATE PERMITS REQUIRED FOR: Need separate permits for Automatic fire suppression systems per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Fire Underground per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Fire alarms and detection systems and related equipment per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for BDA systems and related equipment (if needed) per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Standpipe systems per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Hood Suppression per FFPC, NFPA 1, Fire Code section 1.12.8 Also add the following note… The Fire Protection sheets received a limited curtesy review (these will be looked at in detail when the separate permits have been submitted. The plans for the fire protection features in this set may not be used for construction under this permit. Additional comments are possible at time of Fire Protection Submittals. 1. OK 2. OK 3. OK
FI1 HOLD 12/26/2022 12/27/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Universal Stamp needs to removed from all Fire plans and Life Safety plans as we do not allow them to do Fire review or Fire inspections
ARCHR COMPLETE 09/27/2022 10/03/2022
Note: Released By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM
DSD COMPLETE 09/27/2022 10/03/2022
Note: Released By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM
FI1 HOLD 09/27/2022 10/06/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Universal Stamp needs to removed from all Fire plans as we do not allow them to do Fire review.
UD1 COMPLETE 09/27/2022 09/27/2022
Note: Released By: CHRIS JOHNSON - (386)986-2384 - CJOHNSON@PALMCOASTGOV.COM
FI1 COMPLETE 05/19/2022 05/19/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
FI1 HOLD 05/10/2022 05/17/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM No new plans were uploaded only response letter
FI1 HOLD 04/18/2022 04/28/2022
Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM All comments below per the 2020 Florida Fire Prevention Code. A ROSPONSE LETTER WAS REQUESTED PRIOR AND WAS NOT SUBMITTED WITH THE RESOPONSE BELOW, PLEASE SUBMIT FOR REVIEW. ((( Please provide a written response to each comment below in a response letter and provide clouded response changes on plan sheets as well as plan sheet numbers for each response ))). Please place the following notes on the cover sheets SAPARATE PERMITS REQUIRED FOR: Need separate permits for Automatic fire suppression systems per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Fire Underground per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Fire alarms and detection systems and related equipment per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for BDA systems and related equipment (if needed) per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Standpipe systems per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Hood Suppression per FFPC, NFPA 1, Fire Code section 1.12.8 Also add the following note… The Fire Protection sheets received a limited curtesy review (these will be looked at in detail when the separate permits have been submitted. The plans for the fire protection features in this set may not be used for construction under this permit. Additional comments are possible at time of Fire Protection Submittals. 1. Need to correct the code years for NFPA numbers on sheet G101…. • 16 should be 2015 • 75 should be 2016 • 259 should be 2013 • 720 should be 2015 • 1963 should be 2014 2. All Fire Alarm, Fire Protection, Life Safety, and Fire Suppression need to be resubmitted without Universal Engineering approval stamp for review, also these will receive only a cursory review and cannot be used for purposes of construction. 3. Provide note on G101 Project Data sheet. All fire extinguishers comply with FFPC 7Th edition 1, Chapter 13 and NFPA 10
ARCHR COMPLETE 10/21/2021 11/11/2021
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
DSD COMPLETE 10/21/2021 10/27/2021
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
FI1 HOLD 10/21/2021 11/04/2021
Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM All comments below per the 2020 Florida Fire Prevention Code. Please provide a written response to each comment below in a response letter and provide clouded response changes on plan sheets. Please place the following notes on the cover sheets SAPARATE PERMITS REQUIRED FOR: Need separate permits for Automatic fire suppression systems per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Fire Underground per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Fire alarms and detection systems and related equipment per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for BDA systems and related equipment (if needed) per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Standpipe systems per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Hood Suppression per FFPC, NFPA 1, Fire Code section 1.12.8 Also add the following note… The Fire Protection sheets received a limited curtesy review (these will be looked at in detail when the separate permits have been submitted. The plans for the fire protection features in this set may not be used for construction under this permit. Additional comments are possible at time of Fire Protection Submittals. 1. Need to correct the code years for NFPA numbers on sheet G101…. • 16 should be 2015 • 75 should be 2016 • 259 should be 2013 • 720 should be 2015 • 1963 should be 2014 2. All Fire Alarm, Fire Protection, Life Safety, and Fire Suppression need to be resubmitted without Universal Engineering approval stamp for review, also these will receive only a cursory review and cannot be used for purposes of construction. 3. Provide note on G101 Project Data sheet. All fire extinguishers comply with FFPC 7Th edition 1, Chapter 13 and NFPA 10
UD1 COMPLETE 10/21/2021 10/21/2021
Note: Released By: CHRIS JOHNSON - - CJOHNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 06/08/2023
ADMINISTRATIVE - COMMERCIAL PP ¤3,000.00 06/08/2023
CONTRACTOR CHANGE ¤20.00 04/24/2023
CONTRACTOR CHANGE ¤20.00 04/24/2023
CONTRACTOR CHANGE ¤20.00 04/24/2023
ADMINISTRATIVE - COMMERCIAL ¤75.00 05/20/2022
INSPECTION - FIRE COMMERCIAL ¤1,625.00 05/20/2022
PLAN REVIEW - COMMERCIAL ¤1,625.00 05/20/2022
3% FIRE IMPACT FEE CREDIT (¤531.00) 05/20/2022
IMPACT FEE FIRE ¤17,700.00 05/20/2022
IMPACT FEE TRANSPORTATION ¤113,940.00 05/20/2022
SURCHARGE FS 533.721 ¤64.41 05/20/2022
SURCHARGE - FS 468.631 ¤96.62 05/20/2022
3% TRANS IMPACT FEE CREDIT (¤3,418.20) 05/20/2022
SITE PLAN 30 ¤30.00 05/20/2022
Fees Total Due: ¤0.00 Total Paid: ¤134,286.83