I want to search for...
Permit #2021100827
Permit Details
Status: COED
| Parcel Id: 14-11-30-5538-00000-0110 |
| Total Square Footage: 30024 sqft |
| Block: 00000 |
| Subdivision: - |
| Job Phone: 407-916-7235 |
| Location Address: 3 ADVENTHEALTH WAY |
| Type: BC - BUILDING COMMERCIAL |
| Issue Date: 05/20/2022 |
| NOC: RECORDED |
| Applicant name: BRUCE ROBERT ADAMS |
| Owner: MEMORIAL HOSPITAL-FLAGLER INC |
|
Address 60 MEMORIAL MEDICAL PKWY PALM COAST, FL 32164 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤6,500,000.00 |
| Job Description: 30,000 SQ FT MEDICAL OFFICE BUILDING |
| Type: CN |
Contractor
THE ROBINS & MORTON GROUP
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
423 S KELLER RD ORLANDO, FL 32810 |
#200 ORLANDO, FL 32810 |
CGC1523017 (Exp: 08/31/2026) | 407-916-7235 |
Sub Contractors
MARION CASEY DEAN
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
1765 GREENSBORO STATION PL TYSONS, VA 22102 |
EC0001830 (Exp: 08/31/2024) | 703-802-6231 | 703-421-4670 |
JOHN PATRICK MANZELLA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
4495 35TH STREET ORLANDO, FL 32811 |
CCC050475 (Exp: 08/31/2026) | (407)650-9541 | (407)650-9542 |
MATTHEW JOHN WITTWER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
231 JEAN STREET DAYTONA BEACH, FL 32114 |
EC0002058 (Exp: 08/31/2026) | (386)255-1418 | (386)255-3429 |
JOHN MAXEN BARTKOVICH
| Status | Location Address | State License Number | Phone |
| ACTIVE |
818 SHADOWMOSS DR WINTERGARDEN, FL 32787 |
CAC1815793 (Exp: 08/31/2026) | 407-886-3729 |
JOHN MAXEN BARTKOVICH
| Status | Location Address | State License Number | Phone |
| ACTIVE |
818 SHADOWMOSS DR WINTERGARDEN, FL 32787 |
CAC1815793 (Exp: 08/31/2026) | 407-886-3729 |
MATTHEW JOHN WITTWER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
231 JEAN STREET DAYTONA BEACH, FL 32114 |
EC0002058 (Exp: 08/31/2026) | (386)255-1418 | (386)255-3429 |
Inspection History
| Type | Request Date | Result | Inspector |
| FIRE FINAL | 05/26/2023 | APPROVED | RMARTIN |
| Note: 5/25/2023 - PREVIOUS INSPECTION NOTES 5/25/23 need 7 fire extinguishers in locations 5/24/2023 - PREVIOUS INSPECTION NOTES need approved life safety plans on site, electrician to walk and check exit/emergency lights, need certified fire extinguishers installed | |||
| FIRE FINAL | 05/25/2023 | Disapproved - NO FEE | RMARTIN |
| Note: 5/25/23 need 7 fire extinguishers in locations 5/24/2023 - PREVIOUS INSPECTION NOTES need approved life safety plans on site, electrician to walk and check exit/emergency lights, need certified fire extinguishers installed | |||
| U - UTILITY COMMERCIAL FINAL | 05/24/2023 | FINAL APPROVED | LFITZGERALD |
| ELECTRIC FINAL | 05/24/2023 | Approval - Private Provider | PPROVIDER |
| Note: 5/23/2023 12:02:37 PM- PREVIOUS INSPECTION NOTES 05/19/2023 Carter electric level 2 highlighted on plans, near completion, should be completing 5-22 Monday Other contractor McDean, several items to complete, roof, electric for receptacles & lights, exhaust fans, lighting protection,2 electric rms ,miscellaneous labels, ckt directory's,missing breakers for mechanical equipment , breaker lockouts, xformer labels and other, elevator pit, exterior receptacles, lighting controls for outside lighting that's not installed, instant hots, may not be a complete list Victoria A Valley | |||
| ELECTRIC FINAL | 05/24/2023 | Approval - Private Provider | PPROVIDER |
| Note: 05/19/2023 Highlighted on plans Victoria A Valley 05/24/2023 Electric final complete Frank D. Godawa | |||
| ELECTRIC FINAL | 05/22/2023 | Approval - Private Provider | PPROVIDER |
| BUILDING FINAL | 05/22/2023 | Approval - Private Provider | PPROVIDER |
| FIRE FINAL | 05/19/2023 | Disapproved - NO FEE | RMARTIN |
| Note: need approved life safety plans on site, electrician to walk and check exit/emergency lights, need certified fire extinguishers installed | |||
| BUILDING FINAL | 05/19/2023 | CANCELLED BY APPLICANT | WEB |
| EXTERIOR ARCHITECTURAL FEATURES | 05/19/2023 | APPROVED | RPICATAGI |
| ELECTRIC FINAL | 05/19/2023 | PARTIALLY APPROVED | PPROVIDER |
| Note: 05/19/2023 Carter electric level 2 highlighted on plans, near completion, should be completing 5-22 Monday Other contractor McDean, several items to complete, roof, electric for receptacles & lights, exhaust fans, lighting protection,2 electric rms ,miscellaneous labels, ckt directory's,missing breakers for mechanical equipment , breaker lockouts, xformer labels and other, elevator pit, exterior receptacles, lighting controls for outside lighting that's not installed, instant hots, may not be a complete list Victoria A Valley | |||
| PLUMBING FINAL | 05/19/2023 | Approval - Private Provider | PPROVIDER |
| HVAC FINAL | 05/19/2023 | Approval - Private Provider | PPROVIDER |
| FOUNDATION SURVEY - OFFICE USE ONLY | 05/15/2023 | APPROVED | DLEAP |
| Note: Approved by Dennis in April | |||
| ELECTRIC FINAL | 05/15/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 05/12/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 05/11/2023 | Approval - Private Provider | PPROVIDER |
| Note: 05/10/2023 Partial- 1st Floor- TI Buildout- Carter Electric - suites 1400 and 1200 Brittany A. Gerow | |||
| ELECTRIC FINAL | 05/11/2023 | Approval - Private Provider | PPROVIDER |
| Note: 05/04/2023 TI build out- Carter Electric/ Core and Shell- MC Dean Brittany A. Gerow 05/11/2023 1st floor highlighted on plans Frank D. Godawa | |||
| ELECTRIC FINAL | 05/10/2023 | Approval - Private Provider | PPROVIDER |
| Note: 05/04/2023 TI build out- Carter Electric/ Core and Shell- MC Dean Brittany A. Gerow 05/10/2023 Highlighted on plans Frank D. Godawa | |||
| ELECTRIC FINAL | 05/10/2023 | Approval - Private Provider | PPROVIDER |
| Note: 05/09/2023 - Partial- 1st Floor- TI Buildout- Carter Electric - suites 1400 and 1200 Brittany A. Gerow 05/10/2023 Highlighted on plans Frank D. Godawa | |||
| ELECTRIC FINAL | 05/09/2023 | Approval - Private Provider | PPROVIDER |
| Note: 5/9/2023 11:05:46 AM- PREVIOUS INSPECTION NOTES 05/04/2023 TI build out- Carter Electric/ Core and Shell- MC Dean Brittany A. Gerow 05/08/2023 Elevator pit, not complete Frank D. Godawa 05/04/2023 TI build out- Carter Electric/ Core and Shell- MC Dean Brittany A. Gerow 05/09/2023 1st floor highlighted on plans Frank D. Godawa | |||
| ELECTRIC FINAL | 05/08/2023 | PARTIALLY APPROVED | PPROVIDER |
| Note: 05/04/2023 TI build out- Carter Electric/ Core and Shell- MC Dean Brittany A. Gerow 05/08/2023 Elevator pit, not complete Frank D. Godawa | |||
| ELECTRIC FINAL | 05/04/2023 | Approval - Private Provider | PPROVIDER |
| Note: 05/04/2023 TI build out- Carter Electric/ Core and Shell- MC Dean Brittany A. Gerow 05/05/2023 Doing electric finals level one, highlighted on plans Frank D. Godawa | |||
| ELECTRIC 2ND ROUGH | 05/04/2023 | Approval - Private Provider | PPROVIDER |
| Note: 05/04/2023 Transformer N2DPLA and Elevator Electrical Equipment Victoria A Valley | |||
| ELECTRIC - EARLY POWER | 05/02/2023 | Approval - Private Provider | PPROVIDER |
| Note: Meter Cans T-N1DPLA, T-N2DPLA, N1DPLA, N2DPLA | |||
| ELECTRIC 2ND ROUGH | 05/02/2023 | Approval - Private Provider | PPROVIDER |
| Note: 05/01/2023 2nd rough- 2nd floor NW corner - TI build out- Carter Electric Brittany A. Gerow I | |||
| ELECTRIC 2ND ROUGH | 04/28/2023 | Approval - Private Provider | PPROVIDER |
| Note: 04/27/2023 for casework- 1st floor TI Build out- Carter Electric Victoria A Valley 04/28/2023 Mill work Frank D. Godawa | |||
| FIREWALL DRYWALL NAILING | 04/28/2023 | Approval - Private Provider | PPROVIDER |
| Note: ELEVATOR 1ST FLOOR DRYWALL SCREW INSPECTION SECOND LAYER OF SMALL AREAS EACH SIDE AND TOP OF ELEVATOR SHAFT WALLS | |||
| ABOVE CEILING | 04/27/2023 | Approval - Private Provider | PPROVIDER |
| INSULATION | 04/27/2023 | Approval - Private Provider | PPROVIDER |
| Note: 04/26/2023 piping Insulation Brittany A. Gerow | |||
| ELECTRIC OTHER | 04/27/2023 | Approval - Private Provider | PPROVIDER |
| Note: ELEC PANEL INSPECTIION 1ST FLOOR - CORE AND SHELL N1HA N1BPLA N1LA T-N1DPLA 2ND FLOOR N2DPLA T-N2DPLA | |||
| ELECTRIC OTHER | 04/27/2023 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER | 04/27/2023 | Approval - Private Provider | PPROVIDER |
| FRAMING | 03/17/2023 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 03/09/2023 | Approval - Private Provider | PPROVIDER |
| FIREWALL FRAMING | 03/07/2023 | Approval - Private Provider | PPROVIDER |
| HVAC OTHER | 03/07/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC OTHER | 02/27/2023 | Approval - Private Provider | PPROVIDER |
| Note: 12/12/2022 2:22:58 PM- PREVIOUS INSPECTION NOTES | |||
| FIREWALL DRYWALL NAILING | 02/27/2023 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 02/24/2023 | Approval - Private Provider | PPROVIDER |
| FRAMING | 02/24/2023 | Approval - Private Provider | PPROVIDER |
| Note: 2502,2503,2501,2512,2511,2509,2403,2402,2005 lobby | |||
| FIREWALL PENETRATIONS | 02/24/2023 | Approval - Private Provider | PPROVIDER |
| Note: INSPECTION ENTERED INCORRECTLY- THIS WAS FOR THE MOB BUILDING - NOT THE HOSPITAL BUILDING. | |||
| FRAMING | 02/22/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC 2ND ROUGH | 02/22/2023 | Approval - Private Provider | PPROVIDER |
| Note: 02/21/2023 Stair 1 Dakota L. Hilton 02/22/2023 South side Frank D. Godawa | |||
| ELECTRIC 2ND ROUGH | 02/21/2023 | Approval - Private Provider | PPROVIDER |
| PLUMBING PRESSURE TEST | 02/17/2023 | Approval - Private Provider | PPROVIDER |
| Note: 2nd floor | |||
| FRAMING | 02/15/2023 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 02/14/2023 | Approval - Private Provider | PPROVIDER |
| PLUMBING PRESSURE TEST | 02/14/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC 2ND ROUGH | 02/14/2023 | Approval - Private Provider | PPROVIDER |
| Note: 02/13/2023 2nd Floor Dakota L. Hilton 02/14/2023 Highlighted on plans Frank D. Godawa | |||
| ELECTRIC 2ND ROUGH | 02/09/2023 | Approval - Private Provider | PPROVIDER |
| Note: 02/08/2023 1st Floor Dakota L. Hilton 02/09/2023 Highlighted on plans Frank D. Godawa | |||
| LATH/BRICK/WATER BARRIER | 02/09/2023 | Approval - Private Provider | PPROVIDER |
| Note: 02/09/2023 Roof Level - Per Bill Victoria A Valley | |||
| HVAC ROUGH | 02/03/2023 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 02/02/2023 | Approval - Private Provider | PPROVIDER |
| STOREFRONT | 02/01/2023 | Approval - Private Provider | PPROVIDER |
| FIREWALL PENETRATIONS | 01/27/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC 2ND ROUGH | 01/27/2023 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 01/24/2023 | Approval - Private Provider | PPROVIDER |
| Note: 01/23/2023 Firewall Nailing Victoria A Valley 01/24/2023 Passed Shaft wall first layer on 2nd floor middle%0dFixed missing screws on site William A. Ruzycky | |||
| EXTERIOR WALL SHEATHING / SHEARWALL | 01/24/2023 | Approval - Private Provider | PPROVIDER |
| Note: 01/24/2023 Dens glass exterior roof wall fasteners William A. Ruzycky | |||
| ELECTRIC 2ND ROUGH | 01/23/2023 | Approval - Private Provider | PPROVIDER |
| Note: 01/20/2023 1st Floor, X-Ray Room Dakota L. Hilton 01/23/2023 Floor & wall electric rough Frank D. Godawa | |||
| HVAC ROUGH | 01/23/2023 | Approval - Private Provider | PPROVIDER |
| Note: 12/20/2022 2:16:11 PM- PREVIOUS INSPECTION NOTES 12/19/2022 1st Eric D. Reinertsen 01/23/2023 2nd corridor Eric D. Reinertsen | |||
| ELECTRIC 2ND ROUGH | 01/20/2023 | Approval - Private Provider | PPROVIDER |
| PLUMBING 2ND ROUGH | 01/20/2023 | Approval - Private Provider | PPROVIDER |
| FRAMING | 01/20/2023 | Approval - Private Provider | PPROVIDER |
| INSULATION | 01/03/2023 | Approval - Private Provider | PPROVIDER |
| Note: Piping insulation - partial pass | |||
| ELECTRIC 1ST ROUGH | 12/19/2022 | PARTIALLY APPROVED | PPROVIDER |
| Note: 12/19/2022 Carter elec, wall rough, level one, southeast corner Frank D. Godawa | |||
| HVAC ROUGH | 12/19/2022 | PARTIALLY APPROVED | PPROVIDER |
| Note: 12/19/2022 1st Eric D. Reinertsen | |||
| ELECTRIC 2ND ROUGH | 12/12/2022 | Approval - Private Provider | PPROVIDER |
| Note: 12/09/2022 TI Buildout - Carter Electric Victoria A Valley 12/12/2022 Level 1, north east corner, highlighted on plans Frank D. Godawa | |||
| FRAMING | 12/12/2022 | Approval - Private Provider | PPROVIDER |
| Note: Framing all 1400 rooms on 1st floor only BOW William A. Ruzycky | |||
| FRAMING | 12/07/2022 | Approval - Private Provider | PPROVIDER |
| Note: 12/07/2022 1st Floor Interior top out framing Except Rm 1304 and stairway 2 %0d2nd Floor interior top out Corridor 2013 and Interior top out East side%0dExterior framing Except exterior south and west corner walls Rm 1304 Northeast Rms 1203 1204 1205 1208 William A. Ruzycky I | |||
| FIREWALL DRYWALL NAILING | 12/07/2022 | Approval - Private Provider | PPROVIDER |
| Note: 12/06/2022 Firewall Screw Dakota L. Hilton 12/07/2022 Drywall screw inspection 1st floor electric room 2nd Layer William A. Ruzycky | |||
| ELECTRIC 1ST ROUGH | 12/07/2022 | Approval - Private Provider | PPROVIDER |
| Note: 12/07/2022 Highlighted on plans "Carter Electric " Frank D. Godawa | |||
| ELECTRIC OTHER | 12/07/2022 | PARTIALLY APPROVED | PPROVIDER |
| Note: 12/07/2022 Wall rough McDean Electric, highlighted on plans Frank D. Godawa | |||
| FIREWALL DRYWALL NAILING | 11/30/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 11/21/2022 | Approval - Private Provider | PPROVIDER |
| Note: forst out framing at roof | |||
| HVAC OTHER | 11/21/2022 | Approval - Private Provider | PPROVIDER |
| Note: Roof curb attachments hvac | |||
| FIREWALL DRYWALL NAILING | 11/14/2022 | Approval - Private Provider | PPROVIDER |
| FRAMING | 11/08/2022 | Approval - Private Provider | PPROVIDER |
| COLUMN | 10/20/2022 | Approval - Private Provider | PPROVIDER |
| COLUMN | 10/05/2022 | Approval - Private Provider | PPROVIDER |
| Note: Notes: Date Note User Name 10/03/2022 Rebar Victoria A Valley 10/05/2022 Passed 3 square columns and 1 round at GL 2.1D and GL 4D GL 4F GL 4J GL 4 William A. Ruzycky | |||
| COLUMN | 10/04/2022 | Approval - Private Provider | PPROVIDER |
| SECOND FLOOR SLAB | 09/27/2022 | Approval - Private Provider | PPROVIDER |
| COLUMN | 09/26/2022 | Approval - Private Provider | PPROVIDER |
| Note: 09/26/2022 2 COLUMNS, 2ND FLOOR 09/26/2022 2ND LEVEL, 2 COLUMNS, PREPOUR | |||
| SECOND FLOOR SLAB | 09/22/2022 | Approval - Private Provider | PPROVIDER |
| SECOND FLOOR SLAB | 09/20/2022 | Approval - Private Provider | PPROVIDER |
| Note: 09/20/2022 rebar | |||
| BUILDING OTHER | 09/06/2022 | Approval - Private Provider | PPROVIDER |
| BUILDING OTHER | 08/31/2022 | Approval - Private Provider | PPROVIDER |
| Note: rebar inspection - for slab on grade | |||
| PLUMBING 1ST ROUGH | 08/30/2022 | Approval - Private Provider | PPROVIDER |
| BUILDING OTHER | 08/30/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC 1ST ROUGH | 08/11/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC 1ST ROUGH | 08/08/2022 | Approval - Private Provider | PPROVIDER |
| TILT WALL | 08/08/2022 | Approval - Private Provider | PPROVIDER |
| TILT WALL | 08/08/2022 | Approval - Private Provider | PPROVIDER |
| TILT WALL | 08/08/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC OTHER | 07/27/2022 | Approval - Private Provider | PPROVIDER |
| BUILDING OTHER | 07/07/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING OTHER | 06/29/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/29/2022 Underground Sanitary Plumbing Inspection passed. Dakota Hilton | |||
| PLUMBING OTHER | 06/23/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/23/2022 Underground Condensate Piping Inspection passed. Dakota Hilton | |||
| BUILDING OTHER | 06/23/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING OTHER | 06/22/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/22/2022 Underground Storm Piping and Condensate Inspection passed. Dakota Hilton | |||
| BLD - SEWER TIE IN | 06/21/2022 | Approval - Private Provider | PPROVIDER |
| FOOTER | 06/21/2022 | Approval - Private Provider | PPROVIDER |
| Note: 06/21/2022 Footing Inspection passed. Footings for stairway in MOB building only. Dakota Hilton |
Review History
| Department | Status | Date In | Date Out |
| FI1 | COMPLETE | 05/16/2023 | 05/16/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM All separate permits are applied for, so comment is not needed on plans anymore. | |||
| BADMIN | INFORMATION | 05/16/2023 | 05/16/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM UPLOAD PLANS INDIVIDUALLY | |||
| PLENG | COMPLETE | 04/26/2023 | 05/01/2023 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM Foundation Survey | |||
| BLD | COMPLETE | 04/26/2023 | 05/02/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM foundation survey | |||
| BADMIN | INFORMATION | 03/21/2023 | 03/21/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM CAN NOT UPDATED INSPECTION REPORT FOR ELEC 2ND ROUGH. ELECTRICAL CONTRACTOR IS INACTIVE. | |||
| BADMIN | INFORMATION | 03/17/2023 | 03/17/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM WE cannot process, the plumbing and electrical contractors are inactive. | |||
| BADMIN | INFORMATION | 03/14/2023 | 03/14/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM The electrical and plumbing subcontractors are inactive, we cannot processs any inspections. | |||
| FI1 | HOLD | 01/02/2023 | 01/17/2023 |
| Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM Not accepted, these notes were not added to the cover sheet as indicated. Please place the following notes on the cover sheets SAPARATE PERMITS REQUIRED FOR: Need separate permits for Automatic fire suppression systems per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Fire Underground per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Fire alarms and detection systems and related equipment per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for BDA systems and related equipment (if needed) per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Standpipe systems per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Hood Suppression per FFPC, NFPA 1, Fire Code section 1.12.8 Also add the following note… The Fire Protection sheets received a limited curtesy review (these will be looked at in detail when the separate permits have been submitted. The plans for the fire protection features in this set may not be used for construction under this permit. Additional comments are possible at time of Fire Protection Submittals. 1. OK 2. OK 3. OK | |||
| FI1 | HOLD | 12/26/2022 | 12/27/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Universal Stamp needs to removed from all Fire plans and Life Safety plans as we do not allow them to do Fire review or Fire inspections | |||
| ARCHR | COMPLETE | 09/27/2022 | 10/03/2022 |
| Note: Released By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM | |||
| DSD | COMPLETE | 09/27/2022 | 10/03/2022 |
| Note: Released By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM | |||
| FI1 | HOLD | 09/27/2022 | 10/06/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Universal Stamp needs to removed from all Fire plans as we do not allow them to do Fire review. | |||
| UD1 | COMPLETE | 09/27/2022 | 09/27/2022 |
| Note: Released By: CHRIS JOHNSON - (386)986-2384 - CJOHNSON@PALMCOASTGOV.COM | |||
| FI1 | COMPLETE | 05/19/2022 | 05/19/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| FI1 | HOLD | 05/10/2022 | 05/17/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM No new plans were uploaded only response letter | |||
| FI1 | HOLD | 04/18/2022 | 04/28/2022 |
| Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM All comments below per the 2020 Florida Fire Prevention Code. A ROSPONSE LETTER WAS REQUESTED PRIOR AND WAS NOT SUBMITTED WITH THE RESOPONSE BELOW, PLEASE SUBMIT FOR REVIEW. ((( Please provide a written response to each comment below in a response letter and provide clouded response changes on plan sheets as well as plan sheet numbers for each response ))). Please place the following notes on the cover sheets SAPARATE PERMITS REQUIRED FOR: Need separate permits for Automatic fire suppression systems per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Fire Underground per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Fire alarms and detection systems and related equipment per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for BDA systems and related equipment (if needed) per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Standpipe systems per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Hood Suppression per FFPC, NFPA 1, Fire Code section 1.12.8 Also add the following note… The Fire Protection sheets received a limited curtesy review (these will be looked at in detail when the separate permits have been submitted. The plans for the fire protection features in this set may not be used for construction under this permit. Additional comments are possible at time of Fire Protection Submittals. 1. Need to correct the code years for NFPA numbers on sheet G101…. • 16 should be 2015 • 75 should be 2016 • 259 should be 2013 • 720 should be 2015 • 1963 should be 2014 2. All Fire Alarm, Fire Protection, Life Safety, and Fire Suppression need to be resubmitted without Universal Engineering approval stamp for review, also these will receive only a cursory review and cannot be used for purposes of construction. 3. Provide note on G101 Project Data sheet. All fire extinguishers comply with FFPC 7Th edition 1, Chapter 13 and NFPA 10 | |||
| ARCHR | COMPLETE | 10/21/2021 | 11/11/2021 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| DSD | COMPLETE | 10/21/2021 | 10/27/2021 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| FI1 | HOLD | 10/21/2021 | 11/04/2021 |
| Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM All comments below per the 2020 Florida Fire Prevention Code. Please provide a written response to each comment below in a response letter and provide clouded response changes on plan sheets. Please place the following notes on the cover sheets SAPARATE PERMITS REQUIRED FOR: Need separate permits for Automatic fire suppression systems per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Fire Underground per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Fire alarms and detection systems and related equipment per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for BDA systems and related equipment (if needed) per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Standpipe systems per FFPC, NFPA 1, Fire Code section 1.12.8 Need separate permits for Hood Suppression per FFPC, NFPA 1, Fire Code section 1.12.8 Also add the following note… The Fire Protection sheets received a limited curtesy review (these will be looked at in detail when the separate permits have been submitted. The plans for the fire protection features in this set may not be used for construction under this permit. Additional comments are possible at time of Fire Protection Submittals. 1. Need to correct the code years for NFPA numbers on sheet G101…. • 16 should be 2015 • 75 should be 2016 • 259 should be 2013 • 720 should be 2015 • 1963 should be 2014 2. All Fire Alarm, Fire Protection, Life Safety, and Fire Suppression need to be resubmitted without Universal Engineering approval stamp for review, also these will receive only a cursory review and cannot be used for purposes of construction. 3. Provide note on G101 Project Data sheet. All fire extinguishers comply with FFPC 7Th edition 1, Chapter 13 and NFPA 10 | |||
| UD1 | COMPLETE | 10/21/2021 | 10/21/2021 |
| Note: Released By: CHRIS JOHNSON - - CJOHNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 06/08/2023 |
| ADMINISTRATIVE - COMMERCIAL PP | ¤3,000.00 | 06/08/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 04/24/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 04/24/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 04/24/2023 |
| ADMINISTRATIVE - COMMERCIAL | ¤75.00 | 05/20/2022 |
| INSPECTION - FIRE COMMERCIAL | ¤1,625.00 | 05/20/2022 |
| PLAN REVIEW - COMMERCIAL | ¤1,625.00 | 05/20/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤531.00) | 05/20/2022 |
| IMPACT FEE FIRE | ¤17,700.00 | 05/20/2022 |
| IMPACT FEE TRANSPORTATION | ¤113,940.00 | 05/20/2022 |
| SURCHARGE FS 533.721 | ¤64.41 | 05/20/2022 |
| SURCHARGE - FS 468.631 | ¤96.62 | 05/20/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤3,418.20) | 05/20/2022 |
| SITE PLAN 30 | ¤30.00 | 05/20/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤134,286.83 |