Permit #2021100861
Permit Details
Status: COED
| Parcel Id: 07-11-31-7033-00410-0040 |
| CONDITIONED SPACE: 1643 sqft |
| GARAGE: 578 sqft |
| OPENED PORCH (WITH ROOF) : 377 sqft |
| OPENED PORCH (WITH ROOF) : 64 sqft |
| Total Square Footage: 2662 sqft |
| Block: 00410 |
| Subdivision: 2184 - SECTION 33-ROYAL PALMS |
| Job Phone: 386-931-6577 |
| Location Address: 20 RENFRO LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/15/2021 |
| NOC: RECORDED |
| Applicant name: LUIS JORGE MEDEIROS |
| Owner: TANIA REGINA DA COSTA |
|
Address 20 RENFRO LANE PALM COAST, FL 32164 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤150,000.00 |
| Job Description: SINGLE FAMILE RESIDENCE |
| Type: CN |
Contractor
A PLUS HOME IMPROVEMENTS LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
306 S RAILROAD ST BUNNELL, FL 32110 |
CRC1327024 (Exp: 08/31/2026) | 386-263-2167 |
Sub Contractors
FERNANDO M FARIA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
23 FREELAND LANE PALM COAST, FL 32137 |
RF11067823 (Exp: 08/31/2027) | 386-569-4336 |
JOSE E ORTIZ JR
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
4601 E MOODY BLVD BUNNELL, FL 32110 |
SUITE B7 BUNNELL, FL 32110 |
RC29027619 (Exp: 08/31/2023) | 386-503-6922 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
MIGUEL ANGEL GALLARDO
| Status | Location Address | State License Number | Phone |
| INACTIVE |
315 PACER CT SANFORD, FL 32773 |
CAC1813826 (Exp: 08/31/2026) | 407-202-0953 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 03/22/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: well irrigation-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 03/22/2023 | FINAL APPROVED | LFITZGERALD |
| BLD - BUILDING FINAL | 03/21/2023 | FINAL APPROVED | RMARTIN |
| ROW - FINAL APRON (AFTER POUR) | 03/20/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/20/2023 | APPROVED | GBERTOLA |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/20/2023 | APPROVED | GBERTOLA |
| ROW - STORMWATER FINAL | 03/20/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW- PRE-APRON (PRE-POUR) | 02/15/2023 | APPROVED | PFLANAGAN |
| Note: READY FOR PAVERS ---------------------------------------------------------- 2/9/2023 - PREVIOUS INSPECTION NOTES AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ROW- PAVER RESTRAINTS | 02/09/2023 | APPROVED | GBERTOLA |
| ROW- PRE-APRON (PRE-POUR) | 02/09/2023 | PARTIALLY APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| U - SEWER TIE IN | 02/08/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 02/08/2023 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 C/O AT EXIT OF BUILDING NEEDS TO BE 18'' AWAY FROM FOUNDATION FOR RODDING PURPOSE | |||
| ELECTRIC - EARLY POWER | 02/01/2023 | APPROVED | JMUNSON |
| PEP TANK INSTALLATION REQUEST | 01/04/2023 | APPROVED | CSTONE |
| INSULATION | 12/05/2022 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2420 Fill concrete cut out at master bath tub drains. Front door head jamb not fastened. | |||
| LATH/BRICK/ WATER BARRIER | 12/05/2022 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2420 Fill concrete cut out at master bath tub drains. Front door head jamb not fastened. | |||
| ALL ROUGH | 11/30/2022 | APPROVED - AS NOTED | JWALKER |
| Note: Fill concrete cut out at master bath tub drains. Front door head jamb not fastened. | |||
| WALL SHEATHING | 11/29/2022 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2460 10/27/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Missing block and dowels at front entry marked on plans 6/22/22 contractor will need to get a letter from engineer on front entry lintel change and submit to get approved. 10/27/22 Please have a full set of approved drawings onstite as well as truss engineer packet. Remove form boards from down cells. Letter requested above needs to be submitting to the building department. 10/28/22 NEED TO HAVE TWO STRAPS ON DOUBLE TRUSS MASTER SIDE BY ALL ROUGH | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/28/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: 10/27/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Missing block and dowels at front entry marked on plans 6/22/22 contractor will need to get a letter from engineer on front entry lintel change and submit to get approved. 10/27/22 Please have a full set of approved drawings onstite as well as truss engineer packet. Remove form boards from down cells. Letter requested above needs to be submitting to the building department. 10/28/22 NEED TO HAVE TWO STRAPS ON DOUBLE TRUSS MASTER SIDE BY ALL ROUGH | |||
| ROOF VALLEY & METAL | 10/28/2022 | APPROVED | RMARTIN |
| Note: 10/27/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Missing block and dowels at front entry marked on plans 6/22/22 contractor will need to get a letter from engineer on front entry lintel change and submit to get approved 10/27/22 Please have a full set of approved drawings onsite for all inspection. See roof brace, tie, sheating ispection | |||
| ROOF VALLEY & METAL | 10/27/2022 | Disapproved - NO FEE | JWALKER |
| Note: THIS IS A REINSPECTION Missing block and dowels at front entry marked on plans 6/22/22 contractor will need to get a letter from engineer on front entry lintel change and submit to get approved 10/27/22 Please have a full set of approved drawings onsite for all inspection. See roof brace, tie, sheating ispection | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/27/2022 | Disapproved - NO FEE | JWALKER |
| Note: THIS IS A REINSPECTION Missing block and dowels at front entry marked on plans 6/22/22 contractor will need to get a letter from engineer on front entry lintel change and submit to get approved. 10/27/22 Please have a full set of approved drawings onstite as well as truss engineer packet. Remove form boards from down cells. Letter requested above needs to be submitting to the building department. | |||
| TIE BEAM / LINTEL | 06/22/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION Missing block and dowels at front entry marked on plans 6/22/22 contractor will need to get a letter from engineer on front entry lintel change and submit to get approved | |||
| ROW - DRAINAGE | 05/31/2022 | APPROVED | GBERTOLA |
| Note: 05/31/22= THIS IS A REINSPECTION 05/20/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE INSPECTOR BE BACK 5/23/22 05/19/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE INSTALL A SILT FENCE ON THE RIGHT SIDE AND ON THE BACK SIDE Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. INSPECTOR BE BACK ON 5/19/22 5/23/22 - Drainage still blocked. Next Inspection 5/30/22. | |||
| ROW - DRAINAGE | 05/30/2022 | CANCELLED BY APPLICANT | GBERTOLA |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 05/20/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE INSPECTOR BE BACK 5/23/22 05/19/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE INSTALL A SILT FENCE ON THE RIGHT SIDE AND ON THE BACK SIDE Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. INSPECTOR BE BACK ON 5/19/22 5/23/22 - Drainage still blocked. Next Inspection 5/30/22. | |||
| TIE BEAM / LINTEL | 05/27/2022 | Disapproved - NO FEE | MKRASKI |
| Note: Missing block and dowels at front entry marked on plans | |||
| ROW - DRAINAGE | 05/23/2022 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION 05/20/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE INSPECTOR BE BACK 5/23/22 05/19/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE INSTALL A SILT FENCE ON THE RIGHT SIDE AND ON THE BACK SIDE Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. INSPECTOR BE BACK ON 5/19/22 5/23/22 - Drainage still blocked. Next Inspection 5/30/22. | |||
| ROW - DRAINAGE | 05/20/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 05/20/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE INSPECTOR BE BACK 5/23/22 05/19/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE INSTALL A SILT FENCE ON THE RIGHT SIDE AND ON THE BACK SIDE Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. INSPECTOR BE BACK ON 5/19/22 | |||
| ROW - DRAINAGE | 05/19/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 05/19/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE INSTALL A SILT FENCE ON THE RIGHT SIDE AND ON THE BACK SIDE INSPECTOR BE BACK 5/20/22 Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. INSPECTOR BE BACK ON 5/19/22 | |||
| ROW - DRAINAGE | 05/13/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: INSTALL A SILT FENCE ON THE RIGHT SIDE AND ON THE BACK SIDE Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. INSPECTOR BE BACK ON 5/19/22 | |||
| FOOTER | 05/11/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION Footers have soil eroded into them and the rebar are covered. | |||
| FOOTER | 05/10/2022 | Disapproved - NO FEE | JWALKER |
| Note: Footers have soil eroded into them and the rebar are covered. | |||
| WATER METER INSTALLATION REQUEST | 04/26/2022 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 1/31/2022 10:45:42 AM lot not cleared | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/04/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 02/10/2022 | APPROVED - AS NOTED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Slab is not finished. Compaction test not on site. 5 workers on site. Returned at 3:21pm Im sorry but the slab cannot be passed. the 2F footing detail at the front entry has not been dug out. The rebar at the rear of the garage is not installed correctly, separate the rebar and ensure that 3" clearance is maitained. The right side of the garage footing is measuring 17"s the details call for a 20" footing. 2/10/22 Slab may be poured. The front entry will have to be where the missing footing has not been dug cannot be poured at this time. | |||
| MONOLITHIC SLAB | 02/09/2022 | Disapproved - NO FEE | JWALKER |
| Note: Slab is not finished. Compaction test not on site. 5 workers on site. | |||
| MONOLITHIC SLAB | 02/09/2022 | Disapproved -FEE REQUIRED | JWALKER |
| Note: THIS IS A REINSPECTION Slab is not finished. Compaction test not on site. 5 workers on site. Returned at 3:21pm Im sorry but the slab cannot be passed. the 2F footing detail at the front entry has not been dug out. The rebar at the rear of the garage is not installed correctly, separate the rebar and ensure that 3" clearance is maitained. The right side of the garage footing is measuring 17"s the details call for a 20" footing. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/26/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: C/O AT EXIT OF BUILDING NEEDS TO BE 18'' AWAY FROM FOUNDATION FOR RODDING PURPOSE | |||
| WATER METER INSTALLATION REQUEST | 01/26/2022 | Disapproved - NO FEE | CSTONE |
| Note: lot not cleared |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 03/16/2023 | 03/16/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please upload under 'final survey' document type. | |||
| ZON | COMPLETE | 02/10/2023 | 02/10/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/06/2023 | 02/09/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/06/2023 | 02/10/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/06/2023 | 02/06/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide a right of way agreement for pavers signed by all owners and notarized. | |||
| BADMIN | INFORMATION | 10/13/2022 | 10/13/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM PLAN MISSING DIGITAL SIGNATURE | |||
| BLD | COMPLETE | 10/13/2022 | 10/14/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/04/2022 | 03/04/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/04/2022 | 03/04/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/02/2021 | 11/02/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/02/2021 | 11/02/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 11/01/2021 | 11/01/2021 |
| Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM We do not allow for split submittal types for permit applications when they are in for review. If a permit was created manually, the submittals until issuance must be submitted manually. If it was submitted electronically, we do not accept manual submittals. Please submit your corrections manually in accordance with the original submission type. | |||
| MECH | HOLD | 10/28/2021 | 10/28/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy calcs does not match the site plan. Revise to match. (Second Request) Front door faces south | |||
| ELEC | COMPLETE | 10/28/2021 | 10/28/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/28/2021 | 10/28/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM repeat comment Plantings and shrubbery Residential homes shall provide a foundation plantings consisting of 16 shrubs on interior lots. Eight shrubs shall be planted in front of home and four shrubs planted on each side of the home. The corners of the home shall be wrapped with shrubbery or have an understory tree planted there. *All of these required shrubs shall be planted between two and one half and eight feet of the homes foundation.* | |||
| BLD | COMPLETE | 10/28/2021 | 10/29/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 10/22/2021 | 12/27/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 10/21/2021 | 10/25/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Building REVIEW COMMENTS: 1. Roof nailing Zones on sheet 6 does not appear to be updated. A revision is required to reflect the current Code. See figure 301.2(7) 2020 Florida Building Code Residential. 2. Provide a completed City of Palm Coast Roofing Worksheet | |||
| CUSVC | COMPLETE | 10/21/2021 | 10/25/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 10/21/2021 | 10/22/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need outlet by bathroom sink. NEC 2017 210.52 Need swicth for outside lighting on back porch by exterior door in master bedroom. NEC 2017 210.70 | |||
| ENGIN1 | COMPLETE | 10/21/2021 | 10/22/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 10/21/2021 | 10/26/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/21/2021 | 10/22/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy calcs does not match the site plan. Revise to match | |||
| SW1 | COMPLETE | 10/21/2021 | 10/26/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/21/2021 | 10/22/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Plantings and shrubbery Residential homes shall provide a foundation plantings consisting of 16 shrubs on interior lots. Eight shrubs shall be planted in front of home and four shrubs planted on each side of the home. The corners of the home shall be wrapped with shrubbery or have an understory tree planted there. *All of these required shrubs shall be planted between two and one half and eight feet of the homes foundation.* |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 04/06/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 04/06/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 04/06/2023 |
| IMPACT FEE FIRE | ¤388.65 | 04/06/2023 |
| IMPACT FEE PARKS | ¤1,455.13 | 04/06/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/06/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/06/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/06/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/06/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/06/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/06/2023 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 04/06/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 04/06/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/06/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/06/2023 |
| CONNECTION FEES | ¤1,017.83 | 11/15/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/15/2021 |
| SURCHARGE FS 533.721 | ¤8.76 | 11/15/2021 |
| SURCHARGE - FS 468.631 | ¤13.14 | 11/15/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/15/2021 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/15/2021 |
| SW ENG PRE APRON | ¤30.00 | 11/15/2021 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/15/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/15/2021 |
| SEWER CREDIT | (¤1,466.00) | 11/15/2021 |
| SEWER INSPECTION | ¤25.00 | 11/15/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 11/15/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 11/15/2021 |
| SITE PLAN 30 | ¤30.00 | 11/15/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/15/2021 |
| METER - DEPOSIT | ¤60.00 | 11/15/2021 |
| WATER- TURN ON | ¤25.00 | 11/15/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/15/2021 |
| INSPECTION - RESIDENTIAL | ¤618.75 | 11/15/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤175.50 | 11/15/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,460.26 |