I want to search for...

Permit #2021100861

Permit Details

Status: COED

Parcel Id: 07-11-31-7033-00410-0040
CONDITIONED SPACE: 1643 sqft
GARAGE: 578 sqft
OPENED PORCH (WITH ROOF) : 377 sqft
OPENED PORCH (WITH ROOF) : 64 sqft
Total Square Footage: 2662 sqft
Block: 00410
Subdivision: 2184 - SECTION 33-ROYAL PALMS
Job Phone: 386-931-6577
Location Address: 20 RENFRO LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/15/2021
NOC: RECORDED
Applicant name: LUIS JORGE MEDEIROS
Owner: TANIA REGINA DA COSTA

Address

20 RENFRO LANE

PALM COAST, FL 32164

Lot: 0040
Contracted Stated Job Value: ¤150,000.00
Job Description: SINGLE FAMILE RESIDENCE
Type: CN

Contractor

A PLUS HOME IMPROVEMENTS LLC
Status Location Address State License Number Phone
ACTIVE

306 S RAILROAD ST

BUNNELL, FL 32110

CRC1327024 (Exp: 08/31/2026) 386-263-2167

Sub Contractors

FERNANDO M FARIA
Status Location Address State License Number Phone
ACTIVE

23 FREELAND LANE

PALM COAST, FL 32137

RF11067823 (Exp: 08/31/2027) 386-569-4336
JOSE E ORTIZ JR
Status Location Address Mailing Address State License Number Phone
CANCEL

4601 E MOODY BLVD

BUNNELL, FL 32110

SUITE B7

BUNNELL, FL 32110

RC29027619 (Exp: 08/31/2023) 386-503-6922
WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
MIGUEL ANGEL GALLARDO
Status Location Address State License Number Phone
INACTIVE

315 PACER CT

SANFORD, FL 32773

CAC1813826 (Exp: 08/31/2026) 407-202-0953

Inspection History

Type Request Date Result Inspector
U-CROSS CONNECTION 03/22/2023 APPROVED - AS NOTED LFITZGERALD
Note: well irrigation-no cross connection
U -UTILITY RESIDENTIAL FINAL 03/22/2023 FINAL APPROVED LFITZGERALD
BLD - BUILDING FINAL 03/21/2023 FINAL APPROVED RMARTIN
ROW - FINAL APRON (AFTER POUR) 03/20/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/20/2023 APPROVED GBERTOLA
ROW FIELD SURVEY /GRADING CERTIFICATION 03/20/2023 APPROVED GBERTOLA
ROW - STORMWATER FINAL 03/20/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW- PRE-APRON (PRE-POUR) 02/15/2023 APPROVED PFLANAGAN
Note: READY FOR PAVERS ---------------------------------------------------------- 2/9/2023 - PREVIOUS INSPECTION NOTES AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
ROW- PAVER RESTRAINTS 02/09/2023 APPROVED GBERTOLA
ROW- PRE-APRON (PRE-POUR) 02/09/2023 PARTIALLY APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
U - SEWER TIE IN 02/08/2023 APPROVED MGIBSON
GRAVITY SEWER TEST 02/08/2023 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 C/O AT EXIT OF BUILDING NEEDS TO BE 18'' AWAY FROM FOUNDATION FOR RODDING PURPOSE
ELECTRIC - EARLY POWER 02/01/2023 APPROVED JMUNSON
PEP TANK INSTALLATION REQUEST 01/04/2023 APPROVED CSTONE
INSULATION 12/05/2022 APPROVED JWALKER
Note: Inspector Notes from Inspection 2420 Fill concrete cut out at master bath tub drains. Front door head jamb not fastened.
LATH/BRICK/ WATER BARRIER 12/05/2022 APPROVED JWALKER
Note: Inspector Notes from Inspection 2420 Fill concrete cut out at master bath tub drains. Front door head jamb not fastened.
ALL ROUGH 11/30/2022 APPROVED - AS NOTED JWALKER
Note: Fill concrete cut out at master bath tub drains. Front door head jamb not fastened.
WALL SHEATHING 11/29/2022 APPROVED JWALKER
Note: Inspector Notes from Inspection 2460 10/27/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Missing block and dowels at front entry marked on plans 6/22/22 contractor will need to get a letter from engineer on front entry lintel change and submit to get approved. 10/27/22 Please have a full set of approved drawings onstite as well as truss engineer packet. Remove form boards from down cells. Letter requested above needs to be submitting to the building department. 10/28/22 NEED TO HAVE TWO STRAPS ON DOUBLE TRUSS MASTER SIDE BY ALL ROUGH
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/28/2022 APPROVED - AS NOTED RMARTIN
Note: 10/27/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Missing block and dowels at front entry marked on plans 6/22/22 contractor will need to get a letter from engineer on front entry lintel change and submit to get approved. 10/27/22 Please have a full set of approved drawings onstite as well as truss engineer packet. Remove form boards from down cells. Letter requested above needs to be submitting to the building department. 10/28/22 NEED TO HAVE TWO STRAPS ON DOUBLE TRUSS MASTER SIDE BY ALL ROUGH
ROOF VALLEY & METAL 10/28/2022 APPROVED RMARTIN
Note: 10/27/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Missing block and dowels at front entry marked on plans 6/22/22 contractor will need to get a letter from engineer on front entry lintel change and submit to get approved 10/27/22 Please have a full set of approved drawings onsite for all inspection. See roof brace, tie, sheating ispection
ROOF VALLEY & METAL 10/27/2022 Disapproved - NO FEE JWALKER
Note: THIS IS A REINSPECTION Missing block and dowels at front entry marked on plans 6/22/22 contractor will need to get a letter from engineer on front entry lintel change and submit to get approved 10/27/22 Please have a full set of approved drawings onsite for all inspection. See roof brace, tie, sheating ispection
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/27/2022 Disapproved - NO FEE JWALKER
Note: THIS IS A REINSPECTION Missing block and dowels at front entry marked on plans 6/22/22 contractor will need to get a letter from engineer on front entry lintel change and submit to get approved. 10/27/22 Please have a full set of approved drawings onstite as well as truss engineer packet. Remove form boards from down cells. Letter requested above needs to be submitting to the building department.
TIE BEAM / LINTEL 06/22/2022 APPROVED - AS NOTED RMARTIN
Note: THIS IS A REINSPECTION Missing block and dowels at front entry marked on plans 6/22/22 contractor will need to get a letter from engineer on front entry lintel change and submit to get approved
ROW - DRAINAGE 05/31/2022 APPROVED GBERTOLA
Note: 05/31/22= THIS IS A REINSPECTION 05/20/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE INSPECTOR BE BACK 5/23/22 05/19/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE INSTALL A SILT FENCE ON THE RIGHT SIDE AND ON THE BACK SIDE Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. INSPECTOR BE BACK ON 5/19/22 5/23/22 - Drainage still blocked. Next Inspection 5/30/22.
ROW - DRAINAGE 05/30/2022 CANCELLED BY APPLICANT GBERTOLA
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 05/20/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE INSPECTOR BE BACK 5/23/22 05/19/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE INSTALL A SILT FENCE ON THE RIGHT SIDE AND ON THE BACK SIDE Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. INSPECTOR BE BACK ON 5/19/22 5/23/22 - Drainage still blocked. Next Inspection 5/30/22.
TIE BEAM / LINTEL 05/27/2022 Disapproved - NO FEE MKRASKI
Note: Missing block and dowels at front entry marked on plans
ROW - DRAINAGE 05/23/2022 Disapproved -FEE REQUIRED RGROSS
Note: THIS IS A REINSPECTION 05/20/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE INSPECTOR BE BACK 5/23/22 05/19/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE INSTALL A SILT FENCE ON THE RIGHT SIDE AND ON THE BACK SIDE Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. INSPECTOR BE BACK ON 5/19/22 5/23/22 - Drainage still blocked. Next Inspection 5/30/22.
ROW - DRAINAGE 05/20/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 05/20/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE INSPECTOR BE BACK 5/23/22 05/19/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE INSTALL A SILT FENCE ON THE RIGHT SIDE AND ON THE BACK SIDE Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. INSPECTOR BE BACK ON 5/19/22
ROW - DRAINAGE 05/19/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 05/19/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE INSTALL A SILT FENCE ON THE RIGHT SIDE AND ON THE BACK SIDE INSPECTOR BE BACK 5/20/22 Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. INSPECTOR BE BACK ON 5/19/22
ROW - DRAINAGE 05/13/2022 Disapproved - NO FEE GBERTOLA
Note: INSTALL A SILT FENCE ON THE RIGHT SIDE AND ON THE BACK SIDE Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. INSPECTOR BE BACK ON 5/19/22
FOOTER 05/11/2022 APPROVED JWALKER
Note: THIS IS A REINSPECTION Footers have soil eroded into them and the rebar are covered.
FOOTER 05/10/2022 Disapproved - NO FEE JWALKER
Note: Footers have soil eroded into them and the rebar are covered.
WATER METER INSTALLATION REQUEST 04/26/2022 APPROVED CSTONE
Note: THIS IS A REINSPECTION ADDED ON 1/31/2022 10:45:42 AM lot not cleared
FOUND SURVEY APPROVED (OFFICE) 03/04/2022 APPROVED TBAKER
MONOLITHIC SLAB 02/10/2022 APPROVED - AS NOTED JWALKER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Slab is not finished. Compaction test not on site. 5 workers on site. Returned at 3:21pm Im sorry but the slab cannot be passed. the 2F footing detail at the front entry has not been dug out. The rebar at the rear of the garage is not installed correctly, separate the rebar and ensure that 3" clearance is maitained. The right side of the garage footing is measuring 17"s the details call for a 20" footing. 2/10/22 Slab may be poured. The front entry will have to be where the missing footing has not been dug cannot be poured at this time.
MONOLITHIC SLAB 02/09/2022 Disapproved - NO FEE JWALKER
Note: Slab is not finished. Compaction test not on site. 5 workers on site.
MONOLITHIC SLAB 02/09/2022 Disapproved -FEE REQUIRED JWALKER
Note: THIS IS A REINSPECTION Slab is not finished. Compaction test not on site. 5 workers on site. Returned at 3:21pm Im sorry but the slab cannot be passed. the 2F footing detail at the front entry has not been dug out. The rebar at the rear of the garage is not installed correctly, separate the rebar and ensure that 3" clearance is maitained. The right side of the garage footing is measuring 17"s the details call for a 20" footing.
PLUMBING 1ST ROUGH UNDERGROUND 01/26/2022 APPROVED - AS NOTED MGIBSON
Note: C/O AT EXIT OF BUILDING NEEDS TO BE 18'' AWAY FROM FOUNDATION FOR RODDING PURPOSE
WATER METER INSTALLATION REQUEST 01/26/2022 Disapproved - NO FEE CSTONE
Note: lot not cleared

Review History

Department Status Date In Date Out
BADMIN INFORMATION 03/16/2023 03/16/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please upload under 'final survey' document type.
ZON COMPLETE 02/10/2023 02/10/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/06/2023 02/09/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 02/06/2023 02/10/2023
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON HOLD 02/06/2023 02/06/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide a right of way agreement for pavers signed by all owners and notarized.
BADMIN INFORMATION 10/13/2022 10/13/2022
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM PLAN MISSING DIGITAL SIGNATURE
BLD COMPLETE 10/13/2022 10/14/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/04/2022 03/04/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/04/2022 03/04/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
MECH COMPLETE 11/02/2021 11/02/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 11/02/2021 11/02/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
BADMIN COMPLETE 11/01/2021 11/01/2021
Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM We do not allow for split submittal types for permit applications when they are in for review. If a permit was created manually, the submittals until issuance must be submitted manually. If it was submitted electronically, we do not accept manual submittals. Please submit your corrections manually in accordance with the original submission type.
MECH HOLD 10/28/2021 10/28/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy calcs does not match the site plan. Revise to match. (Second Request) Front door faces south
ELEC COMPLETE 10/28/2021 10/28/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON HOLD 10/28/2021 10/28/2021
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM repeat comment Plantings and shrubbery Residential homes shall provide a foundation plantings consisting of 16 shrubs on interior lots. Eight shrubs shall be planted in front of home and four shrubs planted on each side of the home. The corners of the home shall be wrapped with shrubbery or have an understory tree planted there. *All of these required shrubs shall be planted between two and one half and eight feet of the homes foundation.*
BLD COMPLETE 10/28/2021 10/29/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
SWALE COMPLETE 10/22/2021 12/27/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 10/21/2021 10/25/2021
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Building REVIEW COMMENTS: 1. Roof nailing Zones on sheet 6 does not appear to be updated. A revision is required to reflect the current Code. See figure 301.2(7) 2020 Florida Building Code Residential. 2. Provide a completed City of Palm Coast Roofing Worksheet
CUSVC COMPLETE 10/21/2021 10/25/2021
Note: Released By: HALEIGH HAND - -
ELEC HOLD 10/21/2021 10/22/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need outlet by bathroom sink. NEC 2017 210.52 Need swicth for outside lighting on back porch by exterior door in master bedroom. NEC 2017 210.70
ENGIN1 COMPLETE 10/21/2021 10/22/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 10/21/2021 10/26/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 10/21/2021 10/22/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy calcs does not match the site plan. Revise to match
SW1 COMPLETE 10/21/2021 10/26/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON HOLD 10/21/2021 10/22/2021
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Plantings and shrubbery Residential homes shall provide a foundation plantings consisting of 16 shrubs on interior lots. Eight shrubs shall be planted in front of home and four shrubs planted on each side of the home. The corners of the home shall be wrapped with shrubbery or have an understory tree planted there. *All of these required shrubs shall be planted between two and one half and eight feet of the homes foundation.*

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 04/06/2023
CONTRACTOR CHANGE ¤20.00 04/06/2023
CONTRACTOR CHANGE ¤20.00 04/06/2023
IMPACT FEE FIRE ¤388.65 04/06/2023
IMPACT FEE PARKS ¤1,455.13 04/06/2023
SW ENG - INSPECTION 20 ¤20.00 04/06/2023
SW ENG - INSPECTION 20 ¤20.00 04/06/2023
SW ENG - INSPECTION 20 ¤20.00 04/06/2023
SW ENG - INSPECTION 20 ¤20.00 04/06/2023
SW ENG - INSPECTION 20 ¤20.00 04/06/2023
SW ENG - INSPECTION 20 ¤20.00 04/06/2023
RECORDING FEE REIMBURSE DOC ¤44.00 04/06/2023
IMPACT FEE TRANSPORTATION ¤1,718.00 04/06/2023
PLAN REVIEW - REVISION ¤32.50 04/06/2023
REINSPECTION RESIDENTIAL ¤40.00 04/06/2023
CONNECTION FEES ¤1,017.83 11/15/2021
WATER -IRRIGATION INSPECTION ¤25.00 11/15/2021
SURCHARGE FS 533.721 ¤8.76 11/15/2021
SURCHARGE - FS 468.631 ¤13.14 11/15/2021
SW ENG - FOUNDATION SURVEY ¤20.00 11/15/2021
SW ENG INSPECTION 80 ¤80.00 11/15/2021
SW ENG PRE APRON ¤30.00 11/15/2021
SW ENG - REVIEW 20 ¤20.00 11/15/2021
SW ENG RES REVIEW 200 ¤200.00 11/15/2021
SEWER CREDIT (¤1,466.00) 11/15/2021
SEWER INSPECTION ¤25.00 11/15/2021
SEWER CAPITAL FACILITY ¤4,664.55 11/15/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 11/15/2021
SITE PLAN 30 ¤30.00 11/15/2021
IMPACT FEE SCHOOL ¤3,600.00 11/15/2021
METER - DEPOSIT ¤60.00 11/15/2021
WATER- TURN ON ¤25.00 11/15/2021
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/15/2021
INSPECTION - RESIDENTIAL ¤618.75 11/15/2021
PLAN REVIEW - RESIDENTIAL ¤175.50 11/15/2021
Fees Total Due: ¤0.00 Total Paid: ¤16,460.26