Permit #2021100949

Permit Details

Status: COED

Parcel Id: 07-11-31-7037-00270-0030
CONDITIONED SPACE: 2130 sqft
GARAGE: 592 sqft
OPENED PORCH (WITH ROOF) : 199 sqft
OPENED PORCH (WITH ROOF) : 40 sqft
Total Square Footage: 2961 sqft
Block: 00270
Subdivision: 2176 - SECTION 37-LAKEVIEW
Job Phone: 321-271-9033
Location Address: 36 LYNDENHURST LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/21/2022
NOC: RECORDED
Applicant name: KEITH E TANNER
Owner: VINTAGE ESTATE HOMES, LLC

Address

4885 NORTH WICKHAM RD

MELBOURNE, FL 32940

Lot: 0030
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

MERCEDES PREMIER HOMES, LLC
Status Location Address Mailing Address State License Number Phone
INACTIVE

4885 N WICKHAM RD

MELBOURNE, FL 32940

STE 101

MELBOURNE, FL 32940

CGC1516602 (Exp: 08/31/2024) 321-610-3924

Sub Contractors

ZACHARY PETER BOERA
Status Location Address State License Number Phone
CANCEL

7225 SANDSCOVE COURT, SUITE 1

WINTER PARK, FL 32792

CAC1817652 (Exp: 08/31/2022) 407-629-6920
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
JASON LEE JAMES
Status Location Address State License Number Phone
ACTIVE

217 N WESTMONTE DR SUITE 1007

ALTAMONTE SPRINGS, FL 32714

CAC1820196 (Exp: 08/31/2026) 407-404-4000

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 11/30/2022 FINAL APPROVED MKRASKI
ROW - STORMWATER FINAL 11/30/2022 FINAL APPROVED EMADISON
Note: ** 11/30/22 CORRECTIONS HAVE BEEN MADE 11/29/2022 - PREVIOUS INSPECTION NOTES ** 11/29/22 NO CORRECTIONS MADE AS INDICATED IN THE FIELD SURVEY ON PRVIOUS INSPECTION ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS SILT FENCE STAKES ** CLEAN CULVERT ENDS ** SEE NOTES IN FIELD SURVEY
U -UTILITY RESIDENTIAL FINAL 11/29/2022 FINAL APPROVED DHANEY
ROW - STORMWATER FINAL 11/29/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 11/29/22 NO CORRECTIONS MADE AS INDICATED IN THE FIELD SURVEY ON PRVIOUS INSPECTION ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS SILT FENCE STAKES ** CLEAN CULVERT ENDS ** SEE NOTES IN FIELD SURVEY
ROW - FINAL APRON (AFTER POUR) 11/28/2022 APPROVED EMADISON
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/28/2022 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 11/28/2022 APPROVED EMADISON
Note: ** 11/28/22 REMOVE ALL COSTRUCTION DEBRIS STAKES FROM AROUND EDGE OF PROPERTY AND REMOVE ALL TRASH. ** CLEAN CULVERT ENDS
ROW- PRE-APRON (PRE-POUR) 11/07/2022 APPROVED EMADISON
Note: ** 11/07/22 ALL CORRECTIONS MADE READY TO POUR ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL 11/4/2022 - PREVIOUS INSPECTION NOTES ** 11/04/22 TO MUCH STONE IN APRON POUR AREA NEED TO HAVE A MINIMUM OF 5 INCHES OF CONCRETE IN APRON ** MITERED END FOOTERS NEED TO BE DUG OUT 10/31/2022 - PREVIOUS INSPECTION NOTES COLVERT PIPEE CANNOT SLOPED MORE THAN .10 MITER END THEY ARE NOT EQUALS . MITER END ON THE RIGHT SIDE NEED TO MOVE FORM BOARD MINIMUM 6 ICH BACK AND ON THE LEFT NEED TO BRING IT CLOSE TO THE MITER END
ROW- PRE-APRON (PRE-POUR) 11/04/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 11/04/22 TO MUCH STONE IN APRON POUR AREA NEED TO HAVE A MINIMUM OF 5 INCHES OF CONCRETE IN APRON ** MITERED END FOOTERS NEED TO BE DUG OUT 10/31/2022 - PREVIOUS INSPECTION NOTES COLVERT PIPEE CANNOT SLOPED MORE THAN .10 MITER END THEY ARE NOT EQUALS . MITER END ON THE RIGHT SIDE NEED TO MOVE FORM BOARD MINIMUM 6 ICH BACK AND ON THE LEFT NEED TO BRING IT CLOSE TO THE MITER END
ROW- PRE-APRON (PRE-POUR) 10/31/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: COLVERT PIPEE CANNOT SLOPED MORE THAN .10 MITER END THEY ARE NOT EQUALS . MITER END ON THE RIGHT SIDE NEED TO MOVE FORM BOARD MINIMUM 6 ICH BACK AND ON THE LEFT NEED TO BRING IT CLOSE TO THE MITER END
U-CROSS CONNECTION 10/31/2022 APPROVED DHANEY
ROW- PRE-APRON (PRE-POUR) 10/28/2022 CANCELLED BY APPLICANT WEB
ELECTRIC - EARLY POWER 10/28/2022 APPROVED RMARTIN
U - SEWER TIE IN 10/13/2022 APPROVED MGIBSON
ROW - DRAINAGE 09/16/2022 APPROVED EMADISON
Note: 9/15/2022 - PREVIOUS INSPECTION NOTES ** 09/16/22 CORRECTIONS MADE EVERYTHING LOOKS GOOD AT THE TIME OF THIS INSPECTION ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON ADAILY BASIS THIS IS A REINSPECTION ** 09/15/22 ** 0N 09/10/22 BUILDER SHOWED UP ON SITE I EXPLAINED WHAT NEEDED TO BE DONE TO CORRECT THE DRAINAGE ISSUES HE ASKED FOR AN EXTENSION THAT IT WOULD BE DONE BY TODAY AT THE TIME OF THIS INSPECTION NO CORRECTIVE ACTION HAS BEEN TAKEN THE EXTENSION WAS GRANTED AFTER SEVERAL PREVIOUSLY FAILED INSPECTION. ** TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** FOLLOW UP INSPECTION ON 09/16/22 THIS IS A REINSPECTION 09/10/22 ** NO CORRECTIVE ACTION TAKEN ** TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE NEXT INSPECTION ON 09/13/22 WILL START A STOP WORK ORDER AT PROJECT IF NO CORRECTION MADE THIS IS A REINSPECTION 09/09/22 ** NO CORRECTIVE ACTION TAKEN ** TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE NEXT INSPECTION ON 09/12/22 WILL START A STOP WORK ORDER AT PROJECT IF NO CORRECTION MADE THIS IS A REINSPECTION ** NO CORRECTIVE ACTION TAKEN ** 09/08/22 TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE NEXT INSPECTION ON 09/09/22 THIS IS A REINSPECTION ** NO CORRECTIVE ACTION TAKEN ** 09/07/22 TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE NEXT INSPECTION ON 09/08/22 THIS IS A REINSPECTION ** 09/06/22 NO CHANGES SINCE PREVIOUS I8NSPECTION ** FOLLOW UP INSPECTION 0N 09/07/22 ** 08/31/22 TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE ** 09/06/22
ROW - DRAINAGE 09/15/2022 Disapproved -FEE REQUIRED EMADISON
Note: THIS IS A REINSPECTION ** 09/15/22 ** 0N 09/10/22 BUILDER SHOWED UP ON SITE I EXPLAINED WHAT NEEDED TO BE DONE TO CORRECT THE DRAINAGE ISSUES HE ASKED FOR AN EXTENSION THAT IT WOULD BE DONE BY TODAY AT THE TIME OF THIS INSPECTION NO CORRECTIVE ACTION HAS BEEN TAKEN THE EXTENSION WAS GRANTED AFTER SEVERAL PREVIOUSLY FAILED INSPECTION. ** TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** FOLLOW UP INSPECTION ON 09/16/22 THIS IS A REINSPECTION 09/10/22 ** NO CORRECTIVE ACTION TAKEN ** TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE NEXT INSPECTION ON 09/13/22 WILL START A STOP WORK ORDER AT PROJECT IF NO CORRECTION MADE THIS IS A REINSPECTION 09/09/22 ** NO CORRECTIVE ACTION TAKEN ** TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE NEXT INSPECTION ON 09/12/22 WILL START A STOP WORK ORDER AT PROJECT IF NO CORRECTION MADE THIS IS A REINSPECTION ** NO CORRECTIVE ACTION TAKEN ** 09/08/22 TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE NEXT INSPECTION ON 09/09/22 THIS IS A REINSPECTION ** NO CORRECTIVE ACTION TAKEN ** 09/07/22 TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE NEXT INSPECTION ON 09/08/22 THIS IS A REINSPECTION ** 09/06/22 NO CHANGES SINCE PREVIOUS I8NSPECTION ** FOLLOW UP INSPECTION 0N 09/07/22 ** 08/31/22 TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE ** 09/06/22
ROW - DRAINAGE 09/12/2022 Disapproved -FEE REQUIRED EMADISON
Note: THIS IS A REINSPECTION ** 09/12/22 NO CORRECTIVE ACTION TAKEN CM SHOWED UP ON SITE AFTER I RESULTED INSPECTION ASKED FOR AN EXTENSION TO COMPLETE WORK FOR 09/15/22 ** TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE NEXT INSPECTION ON 09/15/22 WILL START A STOP WORK ORDER AT PROJECT IF NO CORRECTION MADE THIS IS A REINSPECTION 09/09/22 ** NO CORRECTIVE ACTION TAKEN ** TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE NEXT INSPECTION ON 09/12/22 WILL START A STOP WORK ORDER AT PROJECT IF NO CORRECTION MADE THIS IS A REINSPECTION ** NO CORRECTIVE ACTION TAKEN ** 09/08/22 TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE NEXT INSPECTION ON 09/09/22 THIS IS A REINSPECTION ** NO CORRECTIVE ACTION TAKEN ** 09/07/22 TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE NEXT INSPECTION ON 09/08/22 THIS IS A REINSPECTION ** 09/06/22 NO CHANGES SINCE PREVIOUS I8NSPECTION ** FOLLOW UP INSPECTION 0N 09/07/22 ** 08/31/22 TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE ** 09/06/22
ROW - DRAINAGE 09/09/2022 Disapproved -FEE REQUIRED EMADISON
Note: THIS IS A REINSPECTION 09/09/22 ** NO CORRECTIVE ACTION TAKEN ** TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE NEXT INSPECTION ON 09/12/22 WILL START A STOP WORK ORDER AT PROJECT IF NO CORRECTION MADE THIS IS A REINSPECTION ** NO CORRECTIVE ACTION TAKEN ** 09/08/22 TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE NEXT INSPECTION ON 09/09/22 THIS IS A REINSPECTION ** NO CORRECTIVE ACTION TAKEN ** 09/07/22 TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE NEXT INSPECTION ON 09/08/22 THIS IS A REINSPECTION ** 09/06/22 NO CHANGES SINCE PREVIOUS I8NSPECTION ** FOLLOW UP INSPECTION 0N 09/07/22 ** 08/31/22 TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE ** 09/06/22
PEP TANK INSTALLATION REQUEST 09/09/2022 APPROVED CSTONE
ROW - DRAINAGE 09/08/2022 Disapproved -FEE REQUIRED EMADISON
Note: THIS IS A REINSPECTION ** NO CORRECTIVE ACTION TAKEN ** 09/08/22 TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE NEXT INSPECTION ON 09/09/22 THIS IS A REINSPECTION ** NO CORRECTIVE ACTION TAKEN ** 09/07/22 TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE NEXT INSPECTION ON 09/08/22 THIS IS A REINSPECTION ** 09/06/22 NO CHANGES SINCE PREVIOUS I8NSPECTION ** FOLLOW UP INSPECTION 0N 09/07/22 ** 08/31/22 TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE ** 09/06/22
ROW - DRAINAGE 09/07/2022 Disapproved -FEE REQUIRED EMADISON
Note: THIS IS A REINSPECTION ** NO CORRECTIVE ACTION TAKEN ** 09/07/22 TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE NEXT INSPECTION ON 09/08/22 THIS IS A REINSPECTION ** 09/06/22 NO CHANGES SINCE PREVIOUS I8NSPECTION ** FOLLOW UP INSPECTION 0N 09/07/22 ** 08/31/22 TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE ** 09/06/22
ROW - DRAINAGE 09/06/2022 Disapproved -FEE REQUIRED EMADISON
Note: THIS IS A REINSPECTION ** 09/06/22 NO CHANGES SINCE PREVIOUS I8NSPECTION ** FOLLOW UP INSPECTION 0N 09/07/22 ** 08/31/22 TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE ** 09/06/22
ROW - DRAINAGE 08/31/2022 Disapproved - NO FEE EMADISON
Note: ** 08/31/22 TEMPORARY CULVERT PIPE IS CRUSHED ON THE OUTLET END (RIGHT SIDE) AND BLOCKED CAUSING WATER TO BACK UP AND NEGATIVELY IMPACTING THE ADJACENT PROPERTY AT 38 LYNDENHURST. ** ALSO NEED TO REMOVE PORTA-JOHN FROM SWALE AND PUT ONTO SITE AS IT IS ALSO BLOCKING THE SWALE ** 09/06/22
INSULATION 08/30/2022 APPROVED FWILLIS
ROOF VALLEY & METAL 08/12/2022 APPROVED - AS NOTED RMARTIN
Note: met contractor on site opened up roof
ALL ROUGH 08/12/2022 APPROVED RMARTIN
Note: Inspector Notes from Inspection 2467 met contractor on site opened up roof
LATH/BRICK/ WATER BARRIER 06/28/2022 APPROVED RMARTIN
WALL SHEATHING 06/10/2022 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/10/2022 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 05/05/2022 APPROVED TDOAK
TIE BEAM / LINTEL 05/03/2022 APPROVED FWILLIS
Note: THIS IS A REINSPECTION Dowls (3) need to be drilled and epoxied in front column to the right of front entry
TIE BEAM / LINTEL 05/02/2022 Disapproved - NO FEE MKRASKI
Note: Dowls (3) need to be drilled and epoxied in front column to the right of front entry
MONOLITHIC SLAB 04/20/2022 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 04/18/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 04/18/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 03/29/2022 APPROVED CSTONE
Note: THIS IS A REINSPECTION ADDED ON 2/7/2022 9:01:34 AM lot not cleared
WATER METER INSTALLATION REQUEST 02/02/2022 Disapproved - NO FEE CSTONE
Note: lot not cleared

Review History

Department Status Date In Date Out
MECH COMPLETE 11/17/2022 11/18/2022
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 11/16/2022 11/16/2022
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Indoor design temp on heatload must be a minimum of 75 degrees per R302.1 FBC Energy Conservation 2020 7Th edition 2. Design location on heatload needs to match the Energy Calc(St. augustine)
ENGIN1 COMPLETE 05/05/2022 05/05/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/05/2022 05/05/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/05/2022 05/05/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 HOLD 04/25/2022 04/26/2022
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is not acceptable as foundation survey Please submit foundation survey showing location, dimensions and elevatiaon of finished concrete foundation/slabs.
ZON HOLD 04/25/2022 04/25/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Survey submitted shows it is a form board survey not a foundation survey
MECH COMPLETE 12/28/2021 12/29/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ELEC COMPLETE 12/28/2021 12/28/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 10/22/2021 12/28/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 10/21/2021 10/25/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 10/21/2021 10/25/2021
Note: Released By: HALEIGH HAND - -
ELEC HOLD 10/21/2021 10/22/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need switch for outside lighting in nook area. NEC 2017 210.70
ENGIN1 COMPLETE 10/21/2021 10/22/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 10/21/2021 10/26/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 10/21/2021 10/22/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Indoor design temp on heatload must be a minimum of 75 degrees per R302.1 FBC Energy Conservation 2020 7Th edition 2. Energy Calcs and EPL card need to be signed by the builder
SW1 COMPLETE 10/21/2021 10/26/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON COMPLETE 10/21/2021 10/26/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 11/29/2022
PLAN REVIEW - REVISION ¤32.50 11/29/2022
SW ENG REINSPECTION 30 ¤30.00 11/17/2022
SW ENG REINSPECTION 30 ¤30.00 11/17/2022
CONTRACTOR CHANGE ¤20.00 11/17/2022
CONTRACTOR CHANGE ¤40.00 11/17/2022
SW ENG - INSPECTION 20 ¤20.00 11/17/2022
SW ENG - INSPECTION 20 ¤20.00 11/17/2022
SW ENG - INSPECTION 20 ¤20.00 11/17/2022
SW ENG - INSPECTION 20 ¤20.00 11/17/2022
SW ENG - INSPECTION 20 ¤20.00 11/17/2022
SW ENG - INSPECTION 20 ¤20.00 11/17/2022
SW ENG - INSPECTION 20 ¤20.00 11/17/2022
SW ENG - INSPECTION 20 ¤20.00 11/17/2022
SW ENG INSPECTION 80 ¤80.00 01/21/2022
SW ENG PRE APRON ¤30.00 01/21/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 01/21/2022
IMPACT FEE FIRE ¤388.65 01/21/2022
IMPACT FEE PARKS ¤1,455.13 01/21/2022
IMPACT FEE SCHOOL ¤3,600.00 01/21/2022
IMPACT FEE TRANSPORTATION ¤1,718.00 01/21/2022
WATER -IRRIGATION INSPECTION ¤25.00 01/21/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 01/21/2022
SURCHARGE FS 533.721 ¤10.39 01/21/2022
SURCHARGE - FS 468.631 ¤15.59 01/21/2022
SW ENG - FOUNDATION SURVEY ¤20.00 01/21/2022
SW ENG - REVIEW 20 ¤20.00 01/21/2022
SW ENG RES REVIEW 200 ¤200.00 01/21/2022
3% TRANS IMPACT FEE CREDIT (¤51.54) 01/21/2022
SEWER CREDIT (¤268.62) 01/21/2022
SEWER INSPECTION ¤25.00 01/21/2022
SEWER CAPITAL FACILITY ¤4,939.76 01/21/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 01/21/2022
SITE PLAN 30 ¤30.00 01/21/2022
CONNECTION FEES ¤1,077.88 01/21/2022
METER - DEPOSIT ¤60.00 01/21/2022
WATER- TURN ON ¤25.00 01/21/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/21/2022
INSPECTION - RESIDENTIAL ¤742.50 01/21/2022
PLAN REVIEW - RESIDENTIAL ¤210.60 01/21/2022
Fees Total Due: ¤0.00 Total Paid: ¤18,287.03