I want to search for...

Permit #2021100964

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00090-0020
CONDITIONED SPACE: 2274 sqft
GARAGE: 780 sqft
OPENED PORCH (WITH ROOF) : 351 sqft
OPENED PORCH (WITH ROOF) : 85 sqft
Total Square Footage: 3490 sqft
Block: 00090
Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA
Job Phone: 863-420-2100
Location Address: 74 NEW LEATHERWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/29/2021
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0020
Contracted Stated Job Value: ¤300,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
DAVID MILLER
Status Location Address State License Number Phone
CANCEL

2659 MERCY DRIVE

ORLANDO, FL 32808

06157 (Exp: 08/31/2024) 407-466-6514
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
NICHOLAS KEITH REX
Status Location Address State License Number Phone
ACTIVE

1408 HAMLIN UNIT B

SAINT CLOUD, FL 34771

EC13006779 (Exp: 08/31/2026) 407-873-2231

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/22/2022 FINAL APPROVED RMARTIN
Note: 12/21/2022 - PREVIOUS INSPECTION NOTES Still working on tile in shower and baths
BLD - BUILDING FINAL 12/21/2022 Disapproved - NO FEE LMILLER
Note: Still working on tile in shower and baths
WATER METER INSTALLATION REQUEST 12/20/2022 APPROVED CSTONE
U-CROSS CONNECTION 12/20/2022 APPROVED - AS NOTED LFITZGERALD
Note: has reclaim irrigation-no cross connection
U -UTILITY RESIDENTIAL FINAL 12/20/2022 FINAL APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 12/19/2022 APPROVED PFLANAGAN
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/19/2022 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 12/19/2022 APPROVED PFLANAGAN
ROW - STORMWATER FINAL 12/19/2022 APPROVED PFLANAGAN
ROW- PRE-APRON (PRE-POUR) 12/08/2022 APPROVED PFLANAGAN
Note: READY FOR PAVERS ----------------------------------------------------------------------- 12/5/2022 - PREVIOUS INSPECTION NOTES NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB BASE OR PAVER BASE SAND, AND COMPACTION IS DONE Base can no longer simply be on site in a pile. Base must be spread and compacted for the second part of a pre-pour for pavers to be approved.
ELECTRIC - EARLY POWER 12/07/2022 APPROVED LMILLER
Note: Inspector Notes from Inspection 2200 EMAILED FPL RELEASED POWER 2:25
ROW- PRE-APRON (PRE-POUR) 12/05/2022 PARTIALLY APPROVED GBERTOLA
Note: NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB BASE OR PAVER BASE SAND, AND COMPACTION IS DONE Base can no longer simply be on site in a pile. Base must be spread and compacted for the second part of a pre-pour for pavers to be approved.
ROW- PAVER RESTRAINTS 12/05/2022 APPROVED GBERTOLA
Note: ready to pour
GRAVITY SEWER TEST 11/04/2022 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 11/04/2022 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 11/02/2022 APPROVED KSANDOE
INSULATION 10/05/2022 APPROVED RMARTIN
Note: Inspector Notes from Inspection 2420 need to check fireblocking at insiulation
ALL ROUGH 09/27/2022 APPROVED - AS NOTED LMILLER
Note: need to check fireblocking at insiulation
WALL SHEATHING 08/25/2022 APPROVED KSANDOE
Note: THIS IS A REINSPECTION Inspector Notes from Inspection 2460 THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION 1. Front entry not framed per plans. (missing 6x6 post, connections, etc) 2. shinners in many areas (check all) 3. missing HTT5 at posts near entryway 4. HUS612 missing nails on right side (Porch) Inspection stopped, not reqady. Nothing further looked at. 7-7-22 Via a phone call from Greg, this follow-up inspection is only for sheathing. there are still shinners in many areas and now there are loose sheets (check all) (all other notes above were not looked at and will require re-inspection) 7.8.22 ROOF SHEATHING ONLY 7/14/22 check bolts at entry on insulation 7-19-22 notes above to be resolved at insulation per notes on roof sheathing braces ties down cell inspection Result is check panel ends at entry for maximum spacing exceeded
WALL SHEATHING 07/19/2022 Disapproved - NO FEE LMILLER
Note: Inspector Notes from Inspection 2460 THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION 1. Front entry not framed per plans. (missing 6x6 post, connections, etc) 2. shinners in many areas (check all) 3. missing HTT5 at posts near entryway 4. HUS612 missing nails on right side (Porch) Inspection stopped, not reqady. Nothing further looked at. 7-7-22 Via a phone call from Greg, this follow-up inspection is only for sheathing. there are still shinners in many areas and now there are loose sheets (check all) (all other notes above were not looked at and will require re-inspection) 7.8.22 ROOF SHEATHING ONLY 7/14/22 check bolts at entry on insulation 7-19-22 notes above to be resolved at insulation per notes on roof sheathing braces ties down cell inspection Result is check panel ends at entry for maximum spacing exceeded
ROOF VALLEY & METAL 07/19/2022 APPROVED LMILLER
Note: Inspector Notes from Inspection 2460 THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION 1. Front entry not framed per plans. (missing 6x6 post, connections, etc) 2. shinners in many areas (check all) 3. missing HTT5 at posts near entryway 4. HUS612 missing nails on right side (Porch) Inspection stopped, not reqady. Nothing further looked at. 7-7-22 Via a phone call from Greg, this follow-up inspection is only for sheathing. there are still shinners in many areas and now there are loose sheets (check all) (all other notes above were not looked at and will require re-inspection) 7.8.22 ROOF SHEATHING ONLY 7/14/22 check bolts at entry on insulation 7-19-22 notes above to be resolved by insulation inspection Result of this inspection is Approved
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/14/2022 APPROVED - AS NOTED RMARTIN
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION 1. Front entry not framed per plans. (missing 6x6 post, connections, etc) 2. shinners in many areas (check all) 3. missing HTT5 at posts near entryway 4. HUS612 missing nails on right side (Porch) Inspection stopped, not reqady. Nothing further looked at. 7-7-22 Via a phone call from Greg, this follow-up inspection is only for sheathing. there are still shinners in many areas and now there are loose sheets (check all) (all other notes above were not looked at and will require re-inspection) 7.8.22 ROOF SHEATHING ONLY 7/14/22 check bolts at entry on insulation
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/08/2022 PARTIALLY APPROVED DCUSHING
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. Front entry not framed per plans. (missing 6x6 post, connections, etc) 2. shinners in many areas (check all) 3. missing HTT5 at posts near entryway 4. HUS612 missing nails on right side (Porch) Inspection stopped, not reqady. Nothing further looked at. 7-7-22 Via a phone call from Greg, this follow-up inspection is only for sheathing. there are still shinners in many areas and now there are loose sheets (check all) (all other notes above were not looked at and will require re-inspection) 7.8.22 ROOF SHEATHING ONLY
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/07/2022 Disapproved - NO FEE LMILLER
Note: THIS IS A REINSPECTION 1. Front entry not framed per plans. (missing 6x6 post, connections, etc) 2. shinners in many areas (check all) 3. missing HTT5 at posts near entryway 4. HUS612 missing nails on right side (Porch) Inspection stopped, not reqady. Nothing further looked at. 7-7-22 Via a phone call from Greg, this follow-up inspection is only for sheathing. there are still shinners in many areas and now there are loose sheets (check all) (all other notes above were not looked at and will require re-inspection) (no one on site worknig to correct)
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/06/2022 Disapproved -FEE REQUIRED LMILLER
Note: 1. Front entry not framed per plans. (missing 6x6 post, connections, etc) 2. shinners in many areas (check all) 3. missing HTT5 at posts near entryway 4. HUS612 missing nails on right side (Porch) Inspection stopped, not reqady. Nothing further looked at.
ELECTRIC-TUG 02/03/2022 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 2:25
ELECTRIC-TUG 02/01/2022 Disapproved - NO FEE RMARTIN
Note: NEED SCH 80 CONDUIT FOR UNDERGROUND PIPE
FOUND SURVEY APPROVED (OFFICE) 01/28/2022 APPROVED TBAKER
TIE BEAM / LINTEL 01/06/2022 APPROVED LMILLER
MONOLITHIC SLAB 12/20/2021 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION interior footings do not meet minimum width per plans there is a piece of reinforcing bar protruding through the plastic and a missing vertical bar (marked on plans
MONOLITHIC SLAB 12/17/2021 Disapproved -FEE REQUIRED LMILLER
Note: interior footings do not meet minimum width per plans there is a piece of reinforcing bar protruding through the plastic and a missing vertical bar (marked on plans
PLUMBING 1ST ROUGH UNDERGROUND 12/09/2021 APPROVED MGIBSON
FOOTER 11/12/2021 APPROVED TSTAUFFACHER

Review History

Department Status Date In Date Out
ELEC COMPLETE 09/01/2022 09/02/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN INFORMATION 07/11/2022 07/11/2022
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO SUPP DOC.PDF
BLD COMPLETE 07/05/2022 07/05/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/27/2022 01/28/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/27/2022 01/27/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
URB COMPLETE 10/26/2021 10/27/2021
Note: Released By: JOHN BEAUDET - (386)986-2456 -
BLD COMPLETE 10/22/2021 10/22/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 10/22/2021 10/25/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 10/22/2021 10/26/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/22/2021 10/22/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 10/22/2021 10/25/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 10/22/2021 10/25/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 10/22/2021 10/28/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
ZON COMPLETE 10/22/2021 10/27/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 09/14/2022
CONTRACTOR CHANGE ¤40.00 09/14/2022
REINSPECTION RESIDENTIAL ¤40.00 09/14/2022
REINSPECTION RESIDENTIAL ¤40.00 04/18/2022
CONNECTION FEES ¤25.00 10/29/2021
METER - DEPOSIT ¤60.00 10/29/2021
WATER-METER ¤441.07 10/29/2021
WATER-METER ¤366.42 10/29/2021
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/29/2021
INSPECTION - RESIDENTIAL ¤830.50 10/29/2021
PLAN REVIEW - RESIDENTIAL ¤235.56 10/29/2021
3% FIRE IMPACT FEE CREDIT (¤11.66) 10/29/2021
IMPACT FEE FIRE ¤388.65 10/29/2021
IMPACT FEE PARKS ¤1,455.13 10/29/2021
IMPACT FEE SCHOOL ¤3,600.00 10/29/2021
IMPACT FEE TRANSPORTATION ¤3,139.00 10/29/2021
3% PARKS IMPACT FEE CREDIT (¤43.65) 10/29/2021
SURCHARGE FS 533.721 ¤11.55 10/29/2021
SURCHARGE - FS 468.631 ¤17.33 10/29/2021
SW ENG - FOUNDATION SURVEY ¤20.00 10/29/2021
SW ENG INSPECTION 80 ¤80.00 10/29/2021
SW ENG PRE APRON ¤30.00 10/29/2021
SW ENG - REVIEW 20 ¤20.00 10/29/2021
SW ENG RES REVIEW 200 ¤200.00 10/29/2021
3% TRANS IMPACT FEE CREDIT (¤94.17) 10/29/2021
SEWER INSPECTION ¤25.00 10/29/2021
SITE PLAN 30 ¤30.00 10/29/2021
Fees Total Due: ¤0.00 Total Paid: ¤10,995.73