I want to search for...
Permit #2021101220
Permit Details
Status: COED
| Parcel Id: 07-11-31-7019-00060-0060 |
| CONDITIONED SPACE: 1620 sqft |
| GARAGE: 396 sqft |
| OPENED PORCH (WITH ROOF) : 176 sqft |
| OPENED PORCH (WITH ROOF) : 63 sqft |
| Total Square Footage: 2255 sqft |
| Block: 00060 |
| Subdivision: 2214 - SECTION 19-WYNNFIELD |
| Job Phone: (386) 672-8285 |
| Location Address: 8 WAVECREST PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/03/2021 |
| NOC: RECORDED |
| Applicant name: JOSEPH TODD VANACORE |
| Owner: JUDY TIDRICK |
|
Address 40 WHITE HALL DRIVE PALM COAST, FL 32164 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤199,999.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
VANACORE CONSTRUCTION INC.
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1451 N US HIGHWAY 1 Ormond Beach, FL 32174 |
SUITE 13 Ormond Beach, FL 32174 |
CBC058991 (Exp: 08/31/2024) | (386) 672-8285 |
Sub Contractors
ALFRED N FYOCK JR
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
387 SAULS ORMOND BEACH, FL 32174 |
ST ORMOND BEACH, FL 32174 |
CCC1329075 (Exp: 08/31/2026) | 386-566-6112 | 386-673-4299 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
VERNON JACK SMITH III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
224 KIRKLAND ROAD NEW SMYRNA BEACH, FL 32169 |
EC13004432 (Exp: 08/31/2026) | 386-409-3616 | 386-409-3616 |
Inspection History
| Type | Request Date | Result | Inspector |
| PLUMBING FINAL | 11/23/2022 | Approval - Private Provider | PPROVIDER |
| HVAC FINAL | 11/23/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 11/23/2022 | Approval - Private Provider | PPROVIDER |
| BLD - BUILDING FINAL | 11/23/2022 | Approval - Private Provider | PPROVIDER |
| U -UTILITY RESIDENTIAL FINAL | 11/23/2022 | FINAL APPROVED | JHARDING |
| ROW - FINAL APRON (AFTER POUR) | 11/21/2022 | APPROVED | PFLANAGAN |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/21/2022 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/21/2022 | APPROVED | PFLANAGAN |
| ROW - STORMWATER FINAL | 11/21/2022 | FINAL APPROVED | PFLANAGAN |
| Note: LOOKS GOOD AT TIME OF INSPECTION | |||
| U-CROSS CONNECTION | 11/21/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: well irrigation-no cross connection | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/15/2022 | APPROVED | RGROSS |
| Note: Inspector Notes from Inspection 9270 09/23/22=DO NOT COVER MAN HOLES WITH THE CONCRETE AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ............................................................................................................................................................................................................................ 9/22/2022 - PREVIOUS INSPECTION NOTES they are working on it | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/15/2022 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 09/23/2022 | APPROVED - AS NOTED | GBERTOLA |
| Note: 09/23/22=DO NOT COVER MAN HOLES WITH THE CONCRETE AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ............................................................................................................................................................................................................................ 9/22/2022 - PREVIOUS INSPECTION NOTES they are working on it | |||
| ROW- PRE-APRON (PRE-POUR) | 09/22/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: they are working on it , no ready for inspection | |||
| U - SEWER TIE IN | 09/16/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS AVIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 09/14/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC - EARLY POWER | 08/12/2022 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 05/25/2022 | Approval - Private Provider | PPROVIDER |
| INSULATION | 05/12/2022 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 05/09/2022 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 03/29/2022 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 03/23/2022 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/23/2022 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 02/09/2022 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 02/03/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 01/26/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/20/2022 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 12/22/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 02/03/2022 | 02/03/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/03/2022 | 02/03/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 10/28/2021 | 01/10/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 10/27/2021 | 11/02/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ENGIN1 | COMPLETE | 10/27/2021 | 10/28/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 10/27/2021 | 10/28/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/27/2021 | 11/03/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/27/2021 | 10/29/2021 |
| Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| METER - DEPOSIT | ¤60.00 | 11/03/2021 |
| WATER- TURN ON | ¤25.00 | 11/03/2021 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 11/03/2021 |
| CONNECTION FEES | ¤1,017.83 | 11/03/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 11/03/2021 |
| IMPACT FEE FIRE | ¤388.65 | 11/03/2021 |
| IMPACT FEE PARKS | ¤1,455.13 | 11/03/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/03/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 11/03/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/03/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 11/03/2021 |
| SURCHARGE FS 533.721 | ¤2.62 | 11/03/2021 |
| SURCHARGE - FS 468.631 | ¤3.92 | 11/03/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/03/2021 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/03/2021 |
| SW ENG PRE APRON | ¤30.00 | 11/03/2021 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/03/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/03/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 11/03/2021 |
| SEWER CREDIT | (¤1,147.00) | 11/03/2021 |
| SEWER INSPECTION | ¤25.00 | 11/03/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 11/03/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 11/03/2021 |
| SITE PLAN 30 | ¤30.00 | 11/03/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,761.30 |