Permit #2021101303
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7035-00030-0130 |
| Block: 00030 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 386-931-4799 |
| Location Address: 1 BURNING WICK PL |
| Type: DR - DRIVEWAY |
| Issue Date: 11/22/2021 |
| NOC: RECORDED |
| Applicant name: JOHN DONALD GORDON |
| Owner: MCMULLEN TIMOTHY & MARICA MCMULLEN H&W |
|
Address 39 S MAIN STREET CASTILE, NY 14427 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤6,000.00 |
| Job Description: CIRCULAR DRIVEWAY |
| Type: CN |
Contractor
PRECISION CUSTOM BUILDERS OF NORTH FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
7755 S. US HWY 1 BUNNELL, FL 32110 |
CGC1528576 (Exp: 08/31/2026) | 386-931-4799 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 06/28/2022 | FINAL APPROVED | JHARDING |
| ROW - FINAL APRON (AFTER POUR) | 06/13/2022 | APPROVED | EMADISON |
| ROW - FINAL INSPECTION | 06/13/2022 | APPROVED - AS NOTED | EMADISON |
| Note: * EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION | |||
| ROW- PROJECT STATUS | 03/28/2022 | APPROVED - AS NOTED | KRUTH |
| Note: the driveway addition was in question as if it was in the row and it is not in the row | |||
| ROW- PRE-APRON (PRE-POUR) | 12/28/2021 | APPROVED - AS NOTED | KRUTH |
| Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 06/23/2022 | 06/24/2022 |
| Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/24/2022 | 02/25/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 02/24/2022 | 02/24/2022 |
| Note: Released By: DON HANEY - - DHANEY@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/24/2022 | 02/24/2022 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Bottom of new circular driveway encroaching in 5' utility easement. Not constructed as approved on site plan. | |||
| ZON | COMPLETE | 11/10/2021 | 11/10/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/10/2021 | 11/10/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 11/10/2021 | 11/17/2021 |
| Note: Released By: LARRY FITZGERALD - - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | HOLD | 11/03/2021 | 11/03/2021 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM REPEAT COMMENTS: 2. Site plan must show width of proposed circular driveway addition (note that it cannot exceed 18' wide at it's widest point. (THE DRIVEWAY APPEARS TO BE DRAWN WIDER WHERE IT INTERSECTS WITH THE EXISTING DRIVEWAY - PLEASE PROVIDE THAT WIDTH). 3. Site plan must show distance from FRONT PROPERTY LINE (NOT ROAD) to bottom edge of proposed circular driveway to demonstrate that it is a minimum of 5' from the front property line. PLEASE PROVIDE THIS SETBACK ON SITE PLAN. | |||
| ENGIN1 | COMPLETE | 10/28/2021 | 11/01/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 10/28/2021 | 11/03/2021 |
| Note: Released By: LARRY FITZGERALD - - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/28/2021 | 11/01/2021 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM 1. Site plan must note material to be used for circular driveway addition. If you are using pavers, a completed Right of Way Utilization Agreement for paver driveway is required. This Agreement must be signed by all persons on deed to property, witnessed and notarized and an electronic copy must be provided for review by Zoning staff. 2. Site plan must show width of proposed circular driveway addition (note that it cannot exceed 18' wide at it's widest point. 3. Site plan must show distance from FRONT PROPERTY LINE (NOT ROAD) to bottom edge of proposed circular driveway to demonstrate that it is a minimum of 5' from the front property line. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/22/2021 |
| SW ENG INSPECTION 40 | ¤40.00 | 11/22/2021 |
| SW ENG PRE APRON | ¤30.00 | 11/22/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/22/2021 |
| SITE PLAN 15 | ¤15.00 | 11/22/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤315.00 |