Permit #2021110032

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7014-00060-0480
CONDITIONED SPACE: 510 sqft
Total Square Footage: 510 sqft
Block: 00060
Subdivision: 2202 - SECTION 14-COUNTRY CLUB COVE
Job Phone: (386)445-9424
Location Address: 23 CEDARFIELD CT
Type: BA - BUILDING ADDITION
Issue Date: 02/07/2022
NOC: RECORDED
Applicant name: JOSE LOPEZ
Owner: BLAKE JONATHAN D & SUSAN HUNTER BLAKE H&W

Address

23 CEDARFIELD COURT

PALM COAST, FL 32137

Lot: 0480
Contracted Stated Job Value: ¤120,000.00
Job Description: BUILDING ADDITION
Type: CN

Contractor

JOSE LOPEZ CONSTRUCTION, INC.
Status Location Address State License Number Phone
ACTIVE

14 UTILITY DRIVE #12

BUNNELL, FL 32110

CRC1327719 (Exp: 08/31/2026) (386)445-9424

Sub Contractors

ROBERT CARLTON LITTLE
Status Location Address State License Number Phone
ACTIVE

3050 EAST MOODY BLVD

BUNNELL, FL 32110

EC13003740 (Exp: 08/31/2026) 386-931-1708
THOMAS ALAN MOSE
Status Location Address State License Number Phone Fax
INACTIVE

PO BOX 1894

HOLLY HILL, FL 32117

CAC048082 (Exp: 08/31/2026) 386-255-4545 (386)252-4979
MARK B SOWERS
Status Location Address State License Number Phone
ACTIVE

609 FOURTH ST

BUNNELL, FL 32110

35616 (Exp: 08/31/2026) 386-225-1753

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/08/2023 FINAL APPROVED BTAYLOR
Note: 11/29/2023 - PREVIOUS INSPECTION NOTES 5/30/2023 - PREVIOUS INSPECTION NOTES 5-16-2022 Please provide engineering clarity that 2 x 12 rafters as installed can rest on the existing 2 x 4 wall. Provide bearing wall details for the 2 x 12 rafters. Bearing wall will need to be exposed. continue at contractors risk... (revision needed by final for location, orientation, and attachement of deck. (not matching plans) 05030-2023 1. Revison not submitted to the building department as noted on 5-31-2022 for deck location, orientation, and attachment (not matching plans). Deck not installed as per plans. 2. New gas fireplace shut off not readily accessible. Homeowner not aware of location. 3. Gas permit has not been pulled for gas fireplace. There is no gas contractor listed for the fireplace. 4. Gas line not bonded. Inspection stopped.
BLD - BUILDING FINAL 11/29/2023 CANCELLED BY APPLICANT AGAETANO
Note: 5/30/2023 - PREVIOUS INSPECTION NOTES 5-16-2022 Please provide engineering clarity that 2 x 12 rafters as installed can rest on the existing 2 x 4 wall. Provide bearing wall details for the 2 x 12 rafters. Bearing wall will need to be exposed. continue at contractors risk... (revision needed by final for location, orientation, and attachement of deck. (not matching plans) 05030-2023 1. Revison not submitted to the building department as noted on 5-31-2022 for deck location, orientation, and attachment (not matching plans). Deck not installed as per plans. 2. New gas fireplace shut off not readily accessible. Homeowner not aware of location. 3. Gas permit has not been pulled for gas fireplace. There is no gas contractor listed for the fireplace. 4. Gas line not bonded. Inspection stopped.
BLD - BUILDING FINAL 05/30/2023 Disapproved - NO FEE AGAETANO
Note: 5-16-2022 Please provide engineering clarity that 2 x 12 rafters as installed can rest on the existing 2 x 4 wall. Provide bearing wall details for the 2 x 12 rafters. Bearing wall will need to be exposed. continue at contractors risk... (revision needed by final for location, orientation, and attachement of deck. (not matching plans) 05030-2023 1. Revison not submitted to the building department as noted on 5-31-2022 for deck location, orientation, and attachment (not matching plans). Deck not installed as per plans. 2. New gas fireplace shut off not readily accessible. Homeowner not aware of location. 3. Gas permit has not been pulled for gas fireplace. There is no gas contractor listed for the fireplace. 4. Gas line not bonded. Inspection stopped.
ELEVATION CERTIFICATE-FINAL APPROVAL 05/25/2023 APPROVED JMYERS
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/23/2023 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 05/23/2023 APPROVED EMADISON
ROW - FINAL INSPECTION 12/05/2022 FINAL APPROVED EMADISON
U -UTILITY RESIDENTIAL FINAL 12/05/2022 FINAL APPROVED DHANEY
FOOTER 05/31/2022 APPROVED - AS NOTED LMILLER
Note: continue at contractors risk... (revision needed by final for location, orientation, and attachement of deck. (not matching plans)
INSULATION 05/23/2022 APPROVED - AS NOTED AGAETANO
Note: Please expose bearing wall under 2 x 12 rafters that will have the engineering details.
ALL ROUGH 05/19/2022 APPROVED AGAETANO
FRAMING 05/18/2022 APPROVED AGAETANO
WALL SHEATHING 05/18/2022 APPROVED AGAETANO
ROOF VALLEY & METAL 05/18/2022 APPROVED AGAETANO
Note: Contractor shingled the entire roof. Inspector met with contractor on site at 2:20pm and conducted a destruct of three areas in the valleys.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/16/2022 APPROVED - AS NOTED AGAETANO
Note: THIS IS A REINSPECTION 1. Vent pipe was drilled through existing beam incorrectly. Drilling and notching 2. Collar ties not installed as per plans. 3. Please provide engineering clarity on 2 x 12 hip / valley rafters. 4. Strap at hip / valley rafter installed incorrectly. Please see Simpson manual. 05-16-2022 Please provide engineering clarity that 2 x 12 rafters as installed can rest on the existing 2 x 4 wall.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/11/2022 Disapproved - NO FEE AGAETANO
Note: 1. Vent pipe was drilled through existing beam incorrectly. R802 Drilling and notching. Provide engineering details for drilled vent pipe and submit to the building department. 2. Collar ties not installed as per plans. 3. Please provide engineering clarity on 2 x 12 hip / valley rafters. 4. Strap at hip / valley rafter installed incorrectly. Please see Simpson manual.
ELEV CERT-FOUNDATION APPROVAL 04/29/2022 APPROVED JMYERS
MONOLITHIC SLAB 03/16/2022 APPROVED AGAETANO

Review History

Department Status Date In Date Out
PLFM COMPLETE 05/25/2023 05/25/2023
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved.
PLFM HOLD 05/19/2023 05/22/2023
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM A7 has changed from Diagram 5 to 1B please explain why. B9 needs to be written as 7.0'. There is now an elevation listed in C2e for machinery or equipment, please provide a description in the Section D Comments.
BLD COMPLETE 05/09/2023 05/09/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLFM COMPLETE 04/28/2022 04/29/2022
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The construction and foundation elevation certificates have been approved. However, at final B9 needs to be written as 7.0', and the Final Survey needs to have both flood zones in the Notes.
ENGIN1 COMPLETE 04/28/2022 04/29/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/28/2022 04/28/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD CANCEL 04/28/2022 04/29/2022
Note: 04/29/2022 – Building Plan Review not required. Elevation Cert and Survey submitted: HA
PLFM HOLD 03/16/2022 03/16/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM This addition is part of the livable structure of the house and therefore requires elevation certificates at construction, foundation, and final.
BLD HOLD 03/09/2022 03/14/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Revise plans to reflect the work being performed.
ZON HOLD 03/09/2022 03/10/2022
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Hello tried calling you and call not going through. When we spoke last you were looking to add toe the proposed Florida room and extend it to the 7.5 setback. What is submitted today is not that. I can not approve the new roof over existing open patio. This will require a new permit. This was not articulated in the original permit and can not be added to this one. If you would please submit a permit for this project.
MECH COMPLETE 01/11/2022 01/11/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 01/11/2022 01/12/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 01/11/2022 01/11/2022
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
SW1 COMPLETE 01/11/2022 01/19/2022
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
BLD COMPLETE 11/01/2021 11/02/2021
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
ELEC HOLD 11/01/2021 11/02/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need outlet on new deck. NEC 2017 210.52 (E) (3)
MECH HOLD 11/01/2021 11/02/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calcs and duct layout
PLUM CANCEL 11/01/2021 11/02/2021
SW1 HOLD 11/01/2021 11/08/2021
Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM Several things needed on the site plan for a Storm Water approval. FFE, Drainage arrows showing the pattern of intended final storm water flow and more. See attachments Stormwater Checklist dated 11/8/21 for all requirements.
ZON HOLD 11/01/2021 11/03/2021
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Please include new deck in your site plan as shown in the plans. they must match

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 12/01/2023
EXTENSION ¤40.00 05/15/2023
INSPECTION - RESIDENTIAL ¤330.00 02/07/2022
PLAN REVIEW - RESIDENTIAL ¤93.60 02/07/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/07/2022
SURCHARGE FS 533.721 ¤4.96 02/07/2022
SURCHARGE - FS 468.631 ¤7.44 02/07/2022
SW ENG - INSPECTION 20 ¤20.00 02/07/2022
SW ENG - REVIEW 20 ¤20.00 02/07/2022
SITE PLAN 30 ¤30.00 02/07/2022
Fees Total Due: ¤0.00 Total Paid: ¤596.00