Permit #2021110032
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7014-00060-0480 |
| CONDITIONED SPACE: 510 sqft |
| Total Square Footage: 510 sqft |
| Block: 00060 |
| Subdivision: 2202 - SECTION 14-COUNTRY CLUB COVE |
| Job Phone: (386)445-9424 |
| Location Address: 23 CEDARFIELD CT |
| Type: BA - BUILDING ADDITION |
| Issue Date: 02/07/2022 |
| NOC: RECORDED |
| Applicant name: JOSE LOPEZ |
| Owner: BLAKE JONATHAN D & SUSAN HUNTER BLAKE H&W |
|
Address 23 CEDARFIELD COURT PALM COAST, FL 32137 |
| Lot: 0480 |
| Contracted Stated Job Value: ¤120,000.00 |
| Job Description: BUILDING ADDITION |
| Type: CN |
Contractor
JOSE LOPEZ CONSTRUCTION, INC.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
14 UTILITY DRIVE #12 BUNNELL, FL 32110 |
CRC1327719 (Exp: 08/31/2026) | (386)445-9424 |
Sub Contractors
ROBERT CARLTON LITTLE
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3050 EAST MOODY BLVD BUNNELL, FL 32110 |
EC13003740 (Exp: 08/31/2026) | 386-931-1708 |
THOMAS ALAN MOSE
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 1894 HOLLY HILL, FL 32117 |
CAC048082 (Exp: 08/31/2026) | 386-255-4545 | (386)252-4979 |
MARK B SOWERS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
609 FOURTH ST BUNNELL, FL 32110 |
35616 (Exp: 08/31/2026) | 386-225-1753 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/08/2023 | FINAL APPROVED | BTAYLOR |
| Note: 11/29/2023 - PREVIOUS INSPECTION NOTES 5/30/2023 - PREVIOUS INSPECTION NOTES 5-16-2022 Please provide engineering clarity that 2 x 12 rafters as installed can rest on the existing 2 x 4 wall. Provide bearing wall details for the 2 x 12 rafters. Bearing wall will need to be exposed. continue at contractors risk... (revision needed by final for location, orientation, and attachement of deck. (not matching plans) 05030-2023 1. Revison not submitted to the building department as noted on 5-31-2022 for deck location, orientation, and attachment (not matching plans). Deck not installed as per plans. 2. New gas fireplace shut off not readily accessible. Homeowner not aware of location. 3. Gas permit has not been pulled for gas fireplace. There is no gas contractor listed for the fireplace. 4. Gas line not bonded. Inspection stopped. | |||
| BLD - BUILDING FINAL | 11/29/2023 | CANCELLED BY APPLICANT | AGAETANO |
| Note: 5/30/2023 - PREVIOUS INSPECTION NOTES 5-16-2022 Please provide engineering clarity that 2 x 12 rafters as installed can rest on the existing 2 x 4 wall. Provide bearing wall details for the 2 x 12 rafters. Bearing wall will need to be exposed. continue at contractors risk... (revision needed by final for location, orientation, and attachement of deck. (not matching plans) 05030-2023 1. Revison not submitted to the building department as noted on 5-31-2022 for deck location, orientation, and attachment (not matching plans). Deck not installed as per plans. 2. New gas fireplace shut off not readily accessible. Homeowner not aware of location. 3. Gas permit has not been pulled for gas fireplace. There is no gas contractor listed for the fireplace. 4. Gas line not bonded. Inspection stopped. | |||
| BLD - BUILDING FINAL | 05/30/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 5-16-2022 Please provide engineering clarity that 2 x 12 rafters as installed can rest on the existing 2 x 4 wall. Provide bearing wall details for the 2 x 12 rafters. Bearing wall will need to be exposed. continue at contractors risk... (revision needed by final for location, orientation, and attachement of deck. (not matching plans) 05030-2023 1. Revison not submitted to the building department as noted on 5-31-2022 for deck location, orientation, and attachment (not matching plans). Deck not installed as per plans. 2. New gas fireplace shut off not readily accessible. Homeowner not aware of location. 3. Gas permit has not been pulled for gas fireplace. There is no gas contractor listed for the fireplace. 4. Gas line not bonded. Inspection stopped. | |||
| ELEVATION CERTIFICATE-FINAL APPROVAL | 05/25/2023 | APPROVED | JMYERS |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/23/2023 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/23/2023 | APPROVED | EMADISON |
| ROW - FINAL INSPECTION | 12/05/2022 | FINAL APPROVED | EMADISON |
| U -UTILITY RESIDENTIAL FINAL | 12/05/2022 | FINAL APPROVED | DHANEY |
| FOOTER | 05/31/2022 | APPROVED - AS NOTED | LMILLER |
| Note: continue at contractors risk... (revision needed by final for location, orientation, and attachement of deck. (not matching plans) | |||
| INSULATION | 05/23/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: Please expose bearing wall under 2 x 12 rafters that will have the engineering details. | |||
| ALL ROUGH | 05/19/2022 | APPROVED | AGAETANO |
| FRAMING | 05/18/2022 | APPROVED | AGAETANO |
| WALL SHEATHING | 05/18/2022 | APPROVED | AGAETANO |
| ROOF VALLEY & METAL | 05/18/2022 | APPROVED | AGAETANO |
| Note: Contractor shingled the entire roof. Inspector met with contractor on site at 2:20pm and conducted a destruct of three areas in the valleys. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/16/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: THIS IS A REINSPECTION 1. Vent pipe was drilled through existing beam incorrectly. Drilling and notching 2. Collar ties not installed as per plans. 3. Please provide engineering clarity on 2 x 12 hip / valley rafters. 4. Strap at hip / valley rafter installed incorrectly. Please see Simpson manual. 05-16-2022 Please provide engineering clarity that 2 x 12 rafters as installed can rest on the existing 2 x 4 wall. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/11/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 1. Vent pipe was drilled through existing beam incorrectly. R802 Drilling and notching. Provide engineering details for drilled vent pipe and submit to the building department. 2. Collar ties not installed as per plans. 3. Please provide engineering clarity on 2 x 12 hip / valley rafters. 4. Strap at hip / valley rafter installed incorrectly. Please see Simpson manual. | |||
| ELEV CERT-FOUNDATION APPROVAL | 04/29/2022 | APPROVED | JMYERS |
| MONOLITHIC SLAB | 03/16/2022 | APPROVED | AGAETANO |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 05/25/2023 | 05/25/2023 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved. | |||
| PLFM | HOLD | 05/19/2023 | 05/22/2023 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM A7 has changed from Diagram 5 to 1B please explain why. B9 needs to be written as 7.0'. There is now an elevation listed in C2e for machinery or equipment, please provide a description in the Section D Comments. | |||
| BLD | COMPLETE | 05/09/2023 | 05/09/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 04/28/2022 | 04/29/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The construction and foundation elevation certificates have been approved. However, at final B9 needs to be written as 7.0', and the Final Survey needs to have both flood zones in the Notes. | |||
| ENGIN1 | COMPLETE | 04/28/2022 | 04/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/28/2022 | 04/28/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | CANCEL | 04/28/2022 | 04/29/2022 |
| Note: 04/29/2022 – Building Plan Review not required. Elevation Cert and Survey submitted: HA | |||
| PLFM | HOLD | 03/16/2022 | 03/16/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM This addition is part of the livable structure of the house and therefore requires elevation certificates at construction, foundation, and final. | |||
| BLD | HOLD | 03/09/2022 | 03/14/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Revise plans to reflect the work being performed. | |||
| ZON | HOLD | 03/09/2022 | 03/10/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Hello tried calling you and call not going through. When we spoke last you were looking to add toe the proposed Florida room and extend it to the 7.5 setback. What is submitted today is not that. I can not approve the new roof over existing open patio. This will require a new permit. This was not articulated in the original permit and can not be added to this one. If you would please submit a permit for this project. | |||
| MECH | COMPLETE | 01/11/2022 | 01/11/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 01/11/2022 | 01/12/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/11/2022 | 01/11/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/11/2022 | 01/19/2022 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/01/2021 | 11/02/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 11/01/2021 | 11/02/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need outlet on new deck. NEC 2017 210.52 (E) (3) | |||
| MECH | HOLD | 11/01/2021 | 11/02/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calcs and duct layout | |||
| PLUM | CANCEL | 11/01/2021 | 11/02/2021 |
| SW1 | HOLD | 11/01/2021 | 11/08/2021 |
| Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM Several things needed on the site plan for a Storm Water approval. FFE, Drainage arrows showing the pattern of intended final storm water flow and more. See attachments Stormwater Checklist dated 11/8/21 for all requirements. | |||
| ZON | HOLD | 11/01/2021 | 11/03/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Please include new deck in your site plan as shown in the plans. they must match |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 12/01/2023 |
| EXTENSION | ¤40.00 | 05/15/2023 |
| INSPECTION - RESIDENTIAL | ¤330.00 | 02/07/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤93.60 | 02/07/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/07/2022 |
| SURCHARGE FS 533.721 | ¤4.96 | 02/07/2022 |
| SURCHARGE - FS 468.631 | ¤7.44 | 02/07/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/07/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/07/2022 |
| SITE PLAN 30 | ¤30.00 | 02/07/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤596.00 |