Permit #2021110081
Permit Details
Status: COED
| Parcel Id: 07-11-31-7025-00210-0180 |
| Block: 00210 |
| Subdivision: 2189 - SECTION 25-PINE GROVE |
| Job Phone: 386-222-2656 |
| Location Address: 131 PARKVIEW DR |
| Type: RF - REROOF |
| Issue Date: 11/04/2021 |
| NOC: RECORDED |
| Applicant name: JAMES WILLIAM RICCI |
| Owner: LANCASTER SUSAN G |
|
Address 131 PARKVIEW DR PALM COAST, FL 32164 |
| Lot: 0180 |
| Contracted Stated Job Value: ¤17,321.87 |
| Job Description: Tear Off & Re-Roof FL16305 R10 |
| Type: CN |
Contractor
JRC HOME SERVICES LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
2515 SILVER STAR ROAD ORLANDO, FL 32804 |
CCC1326619 (Exp: 08/31/2026) | 386-222-2656 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROOF FINAL | 02/17/2022 | FINAL APPROVED | KSANDOE |
| ROOF AFFIDAVIT | 02/16/2022 | APPROVED | STHOMAS |
| ROOF IN PROGRESS- MIDROOF | 02/15/2022 | FINAL APPROVED | KSANDOE |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Crew still doing tear off. No shingles installed 1/31/22 - Stopped by first thing in the morning, roof was not ready for inspection. No shingles installed, drip edge incomplete. Spoke to a worker briefly and stated roof was not ready and some shingles needed to be installed in order to pass MIDROOF inspection. Stopped by again at 1230. Roof is completed. 1/3/22 - Midroof destructive inspection required… roof was completed and shingles were applied prior to midroof inspection being passed. Contractor will need to be onsite for next midroof inspection with approved documents, roofing worksheet, and astm and installation documents for a destructive inspection with materials and personnel on site to remove shingles and replace as directed by inspector. | |||
| ROOF IN PROGRESS- MIDROOF | 02/14/2022 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Crew still doing tear off. No shingles installed 1/31/22 - Stopped by first thing in the morning, roof was not ready for inspection. No shingles installed, drip edge incomplete. Spoke to a worker briefly and stated roof was not ready and some shingles needed to be installed in order to pass MIDROOF inspection. Stopped by again at 1230. Roof is completed. 1/3/22 - Midroof destructive inspection required… roof was completed and shingles were applied prior to midroof inspection being passed. Contractor will need to be onsite for next midroof inspection with approved documents, roofing worksheet, and astm and installation documents for a destructive inspection with materials and personnel on site to remove shingles and replace as directed by inspector. | |||
| ROOF IN PROGRESS- MIDROOF | 02/03/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Crew still doing tear off. No shingles installed 1/31/22 - Stopped by first thing in the morning, roof was not ready for inspection. No shingles installed, drip edge incomplete. Spoke to a worker briefly and stated roof was not ready and some shingles needed to be installed in order to pass MIDROOF inspection. Stopped by again at 1230. Roof is completed. 1/3/22 - Midroof destructive inspection required… roof was completed and shingles were applied prior to midroof inspection being passed. Contractor will need to be onsite for next midroof inspection with approved documents, roofing worksheet, and astm and installation documents for a destructive inspection with materials and personnel on site to remove shingles and replace as directed by inspector. | |||
| ROOF IN PROGRESS- MIDROOF | 01/31/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: THIS IS A REINSPECTION Crew still doing tear off. No shingles installed 1/31/22 - Stopped by first thing in the morning, roof was not ready for inspection. No shingles installed, drip edge incomplete. Spoke to a worker briefly and stated roof was not ready and some shingles needed to be installed in order to pass MIDROOF inspection. Stopped by again at 1230. Roof is completed. | |||
| ROOF IN PROGRESS- MIDROOF | 01/28/2022 | Disapproved - NO FEE | KSANDOE |
| Note: Crew still doing tear off. No shingles installed |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/11/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/31/2022 |
| SURCHARGE FS 533.721 | ¤2.00 | 11/04/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 11/04/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/04/2021 |
| INSPECTION - RESIDENTIAL | ¤60.00 | 11/04/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤174.00 |