I want to search for...

Permit #2021110100

Permit Details

Status: COED

Parcel Id: 07-11-31-7010-00050-0140
CONDITIONED SPACE: 2551 sqft
GARAGE: 634 sqft
OPENED PORCH (WITH ROOF) : 345 sqft
OPENED PORCH (WITH ROOF) : 33 sqft
Total Square Footage: 3563 sqft
Block: 00050
Subdivision: 2137 - SECTION 10-FLORIDA PARK
Job Phone: 321-271-9033
Location Address: 30 FERNMILL LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/21/2022
NOC: RECORDED
Applicant name: KEITH E TANNER
Owner: LS-VEH 2 LLC

Address

4885 N WICKHAM ROAD

MELBOURNE, FL 32940

Lot: 0140
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

MERCEDES PREMIER HOMES, LLC
Status Location Address Mailing Address State License Number Phone
INACTIVE

4885 N WICKHAM RD

MELBOURNE, FL 32940

STE 101

MELBOURNE, FL 32940

CGC1516602 (Exp: 08/31/2024) 321-610-3924

Sub Contractors

JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JASON LEE JAMES
Status Location Address State License Number Phone
ACTIVE

217 N WESTMONTE DR SUITE 1007

ALTAMONTE SPRINGS, FL 32714

CAC1820196 (Exp: 08/31/2026) 407-404-4000

Inspection History

Type Request Date Result Inspector
U-CROSS CONNECTION 10/31/2022 APPROVED DHANEY
BLD - BUILDING FINAL 10/28/2022 FINAL APPROVED AGAETANO
Note: 10/27/2022 - PREVIOUS INSPECTION NOTES 10-26-2022 AHU Energy Calcs do not match.
BLD - BUILDING FINAL 10/27/2022 Disapproved - NO FEE AGAETANO
Note: 10-26-2022 AHU Energy Calcs do not match.
U -UTILITY RESIDENTIAL FINAL 10/26/2022 FINAL APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 10/25/2022 APPROVED RGROSS
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/25/2022 APPROVED RGROSS
Note: Builder made adjustments for the Field Survey to reflect the approved swale drainage. 10/24/2022 - PREVIOUS INSPECTION NOTES Swale grade not graded to flow down stream. Compare 12.85 to 12.45 near the right side of the property line in the ROW.
ROW FIELD SURVEY /GRADING CERTIFICATION 10/25/2022 APPROVED RGROSS
ROW - STORMWATER FINAL 10/25/2022 APPROVED RGROSS
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/24/2022 Disapproved - NO FEE RGROSS
Note: Swale grade not graded to flow down stream. Compare 12.85 to 12.45 near the left side of the property line in the ROW.
ELECTRIC - EARLY POWER 10/13/2022 APPROVED AGAETANO
Note: 10-13-2022 FPL notified at 10:30am
ROW- PRE-APRON (PRE-POUR) 10/10/2022 APPROVED EMADISON
Note: ** 10/10/22 AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD BUILDER ON SITE CONCRETE SCHEDULED TO POUR TODAY 10/6/2022 - PREVIOUS INSPECTION NOTES ** 10/06/22 SITE IS FLOODED OUT ** ATTACHED PHOTOS FROM TODAYS INSPECTION 10/4/2022 - PREVIOUS INSPECTION NOTES ** 10/04/22 POUR SITE HAS TOO MUCH WATER RUNNING THROUGH APRON, AS WELL AS CULVERT AND THE FOOTER ENDS ARE FILLED WITH WATER. ** CULVERT HAS TOO MUCH MATERIAL AROUND IT, CULVERT IS TO BE BURIED 1/2 WAY UP AND COMPACTED MATERIAL AROUND IT ** SEE ATTACHED PHOTOS
ROW- PRE-APRON (PRE-POUR) 10/06/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/06/22 SITE IS FLOODED OUT ** ATTACHED PHOTOS FROM TODAYS INSPECTION 10/4/2022 - PREVIOUS INSPECTION NOTES ** 10/04/22 POUR SITE HAS TOO MUCH WATER RUNNING THROUGH APRON, AS WELL AS CULVERT AND THE FOOTER ENDS ARE FILLED WITH WATER. ** CULVERT HAS TOO MUCH MATERIAL AROUND IT, CULVERT IS TO BE BURIED 1/2 WAY UP AND COMPACTED MATERIAL AROUND IT ** SEE ATTACHED PHOTOS
ROW- PRE-APRON (PRE-POUR) 10/04/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/04/22 POUR SITE HAS TOO MUCH WATER RUNNING THROUGH APRON, AS WELL AS CULVERT AND THE FOOTER ENDS ARE FILLED WITH WATER. ** CULVERT HAS TOO MUCH MATERIAL AROUND IT, CULVERT IS TO BE BURIED 1/2 WAY UP AND COMPACTED MATERIAL AROUND IT ** SEE ATTACHED PHOTOS
ROW- PRE-APRON (PRE-POUR) 09/21/2022 CANCELLED BY APPLICANT WEB
TUB SET 09/21/2022 APPROVED MGIBSON
Note: 9/16/2022 - PREVIOUS INSPECTION NOTES TUB NOT FILLED TO CHECK WASTE AND OVERFLOW, FILL TUB UP WITH WATER AND CALL BACK IN FOR INSPECTION
TUB SET 09/16/2022 Disapproved - NO FEE MGIBSON
Note: TUB NOT FILLED TO CHECK WASTE AND OVERFLOW, FILL TUB UP WITH WATER AND CALL BACK IN FOR INSPECTION
U - SEWER TIE IN 09/09/2022 APPROVED - AS NOTED MGIBSON
Note: THIS IS A REINSPECTION THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 09/07/2022 PARTIALLY APPROVED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
WINDOW NAILING 07/29/2022 APPROVED AGAETANO
Note: Inspector Notes from Inspection 2320 THIS IS A REINSPECTION Inspector Notes from Inspection 2420 THIS IS A REINSPECTION 1. Missing duct jumper in maser bed room 2. Missing duct jumper in spare bed room 3. Missing supply ducts for dinning and kitchen area 4. No 5' head pressure 5. Power for island needs to be sealed at floor Check on insulation 06-17-2022 - Front entry window not installed. Window, entry door, and garage stops not installed. Wire mesh not installed at entry. 6/23/22 WILL ADD WINDOW NAILING FOR FRONT WINDOW OVER DOOR, CALL IN WHEN IT IS INSTALLED
INSULATION 07/28/2022 APPROVED AGAETANO
Note: Inspector Notes from Inspection 2320 THIS IS A REINSPECTION Inspector Notes from Inspection 2420 THIS IS A REINSPECTION 1. Missing duct jumper in maser bed room 2. Missing duct jumper in spare bed room 3. Missing supply ducts for dinning and kitchen area 4. No 5' head pressure 5. Power for island needs to be sealed at floor Check on insulation 06-17-2022 - Front entry window not installed. Window, entry door, and garage stops not installed. Wire mesh not installed at entry. 6/23/22 WILL ADD WINDOW NAILING FOR FRONT WINDOW OVER DOOR, CALL IN WHEN IT IS INSTALLED
LATH/BRICK/ WATER BARRIER 06/23/2022 APPROVED - AS NOTED RMARTIN
Note: THIS IS A REINSPECTION Inspector Notes from Inspection 2420 THIS IS A REINSPECTION 1. Missing duct jumper in maser bed room 2. Missing duct jumper in spare bed room 3. Missing supply ducts for dinning and kitchen area 4. No 5' head pressure 5. Power for island needs to be sealed at floor Check on insulation 06-17-2022 - Front entry window not installed. Window, entry door, and garage stops not installed. Wire mesh not installed at entry. 6/23/22 WILL ADD WINDOW NAILING FOR FRONT WINDOW OVER DOOR, CALL IN WHEN IT IS INSTALLED
LATH/BRICK/ WATER BARRIER 06/17/2022 APPROVED AGAETANO
Note: Inspector Notes from Inspection 2420 THIS IS A REINSPECTION 1. Missing duct jumper in maser bed room 2. Missing duct jumper in spare bed room 3. Missing supply ducts for dinning and kitchen area 4. No 5' head pressure 5. Power for island needs to be sealed at floor Check on insulation
LATH/BRICK/ WATER BARRIER 06/17/2022 Disapproved - NO FEE AGAETANO
Note: Inspector Notes from Inspection 2420 THIS IS A REINSPECTION 1. Missing duct jumper in maser bed room 2. Missing duct jumper in spare bed room 3. Missing supply ducts for dinning and kitchen area 4. No 5' head pressure 5. Power for island needs to be sealed at floor Check on insulation 06-17-2022 - Front entry window not installed. Window, entry door, and garage stops not installed. Wire mesh not installed at entry.
ALL ROUGH 06/06/2022 Disapproved - NO FEE MKRASKI
Note: 1. Missing duct jumper in maser bed room 2. Missing duct jumper in spare bed room 3. Missing supply ducts for dinning and kitchen area 4. No 5' head pressure 5. Power for island needs to be sealed at floor
ALL ROUGH 06/06/2022 APPROVED - AS NOTED MKRASKI
Note: THIS IS A REINSPECTION 1. Missing duct jumper in maser bed room 2. Missing duct jumper in spare bed room 3. Missing supply ducts for dinning and kitchen area 4. No 5' head pressure 5. Power for island needs to be sealed at floor Check on insulation
WALL SHEATHING 04/21/2022 APPROVED DCUSHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/21/2022 APPROVED DCUSHING
ROOF VALLEY & METAL 04/21/2022 APPROVED DCUSHING
FOUND SURVEY APPROVED (OFFICE) 04/20/2022 APPROVED TBAKER
TIE BEAM / LINTEL 03/21/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION Please have a full set of APPROVED drawings on site for inspection.
TIE BEAM / LINTEL 03/18/2022 Disapproved - NO FEE AGAETANO
Note: Please have a full set of APPROVED drawings on site for inspection.
MONOLITHIC SLAB 03/07/2022 APPROVED AGAETANO
PLUMBING 1ST ROUGH UNDERGROUND 03/03/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 03/03/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 02/11/2022 APPROVED CSTONE
Note: THIS IS A REINSPECTION ADDED ON 2/7/2022 8:59:41 AM lot not cleared
WATER METER INSTALLATION REQUEST 02/02/2022 Disapproved - NO FEE CSTONE
Note: lot not cleared

Review History

Department Status Date In Date Out
MECH CANCEL 10/27/2022 10/27/2022
MECH COMPLETE 10/27/2022 10/28/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 04/13/2022 04/13/2022
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
SW1 COMPLETE 04/13/2022 04/18/2022
Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/08/2022 04/08/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 04/08/2022 04/08/2022
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please have surveyor double check the front setbacks. They do not appear to be correct.
ENGIN1 COMPLETE 02/22/2022 02/23/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 HOLD 02/22/2022 02/28/2022
Note: Held By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
ZON COMPLETE 02/22/2022 02/22/2022
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
MECH COMPLETE 11/09/2021 11/09/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 11/02/2021 11/03/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 11/02/2021 11/08/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 11/02/2021 11/02/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/02/2021 11/02/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 11/02/2021 11/04/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 11/02/2021 11/03/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1.Indoor design temp on heatload must be a minimum of 75 degrees per R302.1 FBC Energy Conservation 2020 7Th edition 2. Outdoor design temp on heatload for St.Augustine @ 1% needs to be a minimum of 89 degrees
SW1 COMPLETE 11/02/2021 11/09/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON COMPLETE 11/02/2021 11/04/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SWALE COMPLETE 11/02/2021 01/18/2022
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 10/28/2022
CONTRACTOR CHANGE ¤20.00 10/27/2022
CONTRACTOR CHANGE ¤40.00 10/27/2022
SW ENG REINSPECTION 30 ¤30.00 10/27/2022
SW ENG REINSPECTION 30 ¤30.00 10/27/2022
SW ENG - REVIEW 20 ¤20.00 01/21/2022
SW ENG RES REVIEW 200 ¤200.00 01/21/2022
3% TRANS IMPACT FEE CREDIT (¤51.54) 01/21/2022
SEWER CREDIT (¤1,147.00) 01/21/2022
SEWER INSPECTION ¤25.00 01/21/2022
SEWER CAPITAL FACILITY ¤4,939.76 01/21/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 01/21/2022
SITE PLAN 30 ¤30.00 01/21/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 01/21/2022
IMPACT FEE FIRE ¤388.65 01/21/2022
IMPACT FEE PARKS ¤1,455.13 01/21/2022
IMPACT FEE SCHOOL ¤3,600.00 01/21/2022
IMPACT FEE TRANSPORTATION ¤1,718.00 01/21/2022
WATER -IRRIGATION INSPECTION ¤25.00 01/21/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 01/21/2022
SURCHARGE FS 533.721 ¤12.35 01/21/2022
SURCHARGE - FS 468.631 ¤18.52 01/21/2022
SW ENG - FOUNDATION SURVEY ¤20.00 01/21/2022
SW ENG INSPECTION 80 ¤80.00 01/21/2022
SW ENG PRE APRON ¤30.00 01/21/2022
CONNECTION FEES ¤1,077.88 01/21/2022
METER - DEPOSIT ¤60.00 01/21/2022
WATER- TURN ON ¤25.00 01/21/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/21/2022
INSPECTION - RESIDENTIAL ¤891.00 01/21/2022
PLAN REVIEW - RESIDENTIAL ¤252.72 01/21/2022
Fees Total Due: ¤0.00 Total Paid: ¤17,424.16