I want to search for...
Permit #2021110400
Permit Details
Status: EXPIRED
| Parcel Id: 07-11-31-7002-00060-0130 |
| Total Square Footage: 742 sqft |
| Block: 00060 |
| Subdivision: 2218 - SECTION 2-FLORIDA PARK |
| Job Phone: 908-334-6117 |
| Location Address: 16 FELICIA CT |
| Type: BA - BUILDING ADDITION |
| Issue Date: 01/26/2022 |
| NOC: RECORDED |
| Applicant name: KIM EUGENE ADAMS |
| Owner: CASTELLO RONALD S & JOSEPHINE A SANCHEZ CASTELLO H |
|
Address 16 FELICIA COURT PALM COAST, FL 32137 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤15,000.00 |
| Job Description: Addition |
| Type: CN |
Contractor
JMD QUALITY CONSTRUCTION, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
300 CANOPY WALK LANE APT 342 ZEPHYRHILLS, FL 33542 |
CGC1526854 (Exp: 08/31/2026) | 908-334-6117 |
Sub Contractors
MISHA ROMANOVSKIY
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
77 PEBBLE BEACH DRIVE PALM COAST, FL 32164 |
ER13015548 (Exp: 08/31/2024) | 386-793-5553 | 386-961-4388 |
DANIEL GOULDNER
| Status | Location Address | State License Number |
| ACTIVE |
400 OLD HAW CREEK RD BUNNELL, FL 32110 |
CAC1818907 (Exp: 08/31/2026) |
GIOVANNI DISARRO
| Status | Location Address | State License Number |
| INACTIVE |
107 BURROUGHS DRIVE PALM COAST, FL 32137 |
CFC1430761 (Exp: 08/31/2026) |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/04/2024 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Need to submitt Energy Calcs to City building department. 2. Facia covering is missing and coming apart in several areas. 3. outlet in kitchen is not GFCI Protected 4. Missing notice to onwer A/C in attic. 5. Missing termite sticker. 6. Revise plans to show new location of A/C, attic access, and new kitchen layout. 7. Spoke with contractor 8. Resident living in the addition. 5/10/2024 - PREVIOUS INSPECTION NOTES 5-10-24 energy calcs model numbers not matching (revision needed) FBC 107.3 need trim around attic access FBC. R807.1 6/21/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2490 THIS IS A REINSPECTION Inspector Notes from Inspection 2420 THIS IS A REINSPECTION 1. Windows and doors not installed. 2. AC/ AHU line not supported in attic. PIPING SUPPORT TABLE: G2424.1 (415) 3. AC/AHU drain line not supported or insulated. CONDENSATE LINES INSULATION REQUIRED M307.2.5 4. Dryer vent not sealed at roof deck. DUCT PROPERLY SEALED..FBCM.603.1 5. Attic access not framed. 6. Appliances in attics. M1305.1, M 1305.1.3, 1305.1.3.1. Receptacle and light needed. Appliance needs to be removed for future. 7. Line diagram for subpanel needed. Verification of wire size requested. 08-3-2022 - NEED TO VERIFY WIRE SIZE AND LINE DIAGRAM FOR SUB PANEL. Check at insuation. Attic access not framed. 08-31-2022 1. Need to verify wire size and line diagram for sub panel. See above notes. 2. Sub panel not noted on drawings. 3. Attic access not ionstalled. 4. Front entry door not installed. Electrical panel cover is on and covered with plastic. 09-09-2022 Attic access not installed. 06-21-2023 1. Please provide landing, deck, and railing details to the building department for review and have approved drawings on site for inspection. Landings. Landing not proper height and railing not installed properly. 2. Energy calculations not on site. 3. Product Approval for SGD and windows nor on site. 4. Only one kitchen circuit. 5. Window stickers not on site. Inspection stopped. | |||
| BLD - BUILDING FINAL | 05/10/2024 | Disapproved - NO FEE | LMILLER |
| Note: 5-10-24 energy calcs model numbers not matching (revision needed) FBC 107.3 need trim around attic access FBC. R807.1 6/21/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2490 THIS IS A REINSPECTION Inspector Notes from Inspection 2420 THIS IS A REINSPECTION 1. Windows and doors not installed. 2. AC/ AHU line not supported in attic. PIPING SUPPORT TABLE: G2424.1 (415) 3. AC/AHU drain line not supported or insulated. CONDENSATE LINES INSULATION REQUIRED M307.2.5 4. Dryer vent not sealed at roof deck. DUCT PROPERLY SEALED..FBCM.603.1 5. Attic access not framed. 6. Appliances in attics. M1305.1, M 1305.1.3, 1305.1.3.1. Receptacle and light needed. Appliance needs to be removed for future. 7. Line diagram for subpanel needed. Verification of wire size requested. 08-3-2022 - NEED TO VERIFY WIRE SIZE AND LINE DIAGRAM FOR SUB PANEL. Check at insuation. Attic access not framed. 08-31-2022 1. Need to verify wire size and line diagram for sub panel. See above notes. 2. Sub panel not noted on drawings. 3. Attic access not ionstalled. 4. Front entry door not installed. Electrical panel cover is on and covered with plastic. 09-09-2022 Attic access not installed. 06-21-2023 1. Please provide landing, deck, and railing details to the building department for review and have approved drawings on site for inspection. Landings. Landing not proper height and railing not installed properly. 2. Energy calculations not on site. 3. Product Approval for SGD and windows nor on site. 4. Only one kitchen circuit. 5. Window stickers not on site. Inspection stopped. | |||
| WINDOW NAILING | 05/10/2024 | APPROVED | LMILLER |
| Note: 5-10-24 Entry door installed ENTRY DOOR. | |||
| ROW - FINAL INSPECTION | 12/05/2023 | APPROVED | EMADISON |
| Note: | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/05/2023 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/05/2023 | APPROVED | EMADISON |
| ROW - FINAL INSPECTION | 06/21/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 06/21/23 BUILDER NEEDS TO PROVIDE A FINAL SURVEY FOR SITE AS IT IS OVER 300 SQ FT. BEFORE THE FINAL ROW CAN BE APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 06/21/2023 | FINAL APPROVED | JHARDING |
| BLD - BUILDING FINAL | 06/21/2023 | Disapproved - NO FEE | AGAETANO |
| Note: Inspector Notes from Inspection 2490 THIS IS A REINSPECTION Inspector Notes from Inspection 2420 THIS IS A REINSPECTION 1. Windows and doors not installed. 2. AC/ AHU line not supported in attic. PIPING SUPPORT TABLE: G2424.1 (415) 3. AC/AHU drain line not supported or insulated. CONDENSATE LINES INSULATION REQUIRED M307.2.5 4. Dryer vent not sealed at roof deck. DUCT PROPERLY SEALED..FBCM.603.1 5. Attic access not framed. 6. Appliances in attics. M1305.1, M 1305.1.3, 1305.1.3.1. Receptacle and light needed. Appliance needs to be removed for future. 7. Line diagram for subpanel needed. Verification of wire size requested. 08-3-2022 - NEED TO VERIFY WIRE SIZE AND LINE DIAGRAM FOR SUB PANEL. Check at insuation. Attic access not framed. 08-31-2022 1. Need to verify wire size and line diagram for sub panel. See above notes. 2. Sub panel not noted on drawings. 3. Attic access not ionstalled. 4. Front entry door not installed. Electrical panel cover is on and covered with plastic. 09-09-2022 Attic access not installed. 06-21-2023 1. Please provide landing, deck, and railing details to the building department for review and have approved drawings on site for inspection. Landings. Landing not proper height and railing not installed properly. 2. Energy calculations not on site. Please have a clean set of approved drawings on site for inspection. 3. Product Approval for SGD and windows nor on site. 4. Only one kitchen circuit. NEC 210.52(B): Receptacle Outlets served 5. Window stickers not on site. 6. Attic light not working. M1305.1.3 1. M1305.1.3 Appliances in attics 7. AHU not accessible. No walkway for access to AHU. M1305.1.3 1. M1305.1.3 Appliances in attics Inspection stopped. | |||
| GRAVITY SEWER TEST | 04/06/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 PAN DRAIN LINE NEEDS TO BE 'CPVC' NOT PVC ALSO IT HAS TO BE SLEEVED 2''2X DIAMETER LARGER THAN PIPE PASSING THROUGH FOOTER, CONTRACTOR INFORMED ME THAT IT WAS CHANGING TO TANKLESS TYPE NEED REVISION TO SHOW AND LOAD CALCULAATION CHANGE BRASS C/O NEEDED IN DRIVEWAY | |||
| INSULATION | 09/09/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: THIS IS A REINSPECTION Inspector Notes from Inspection 2420 THIS IS A REINSPECTION 1. Windows and doors not installed. 2. AC/ AHU line not supported in attic. PIPING SUPPORT TABLE: G2424.1 (415) 3. AC/AHU drain line not supported or insulated. CONDENSATE LINES INSULATION REQUIRED M307.2.5 4. Dryer vent not sealed at roof deck. DUCT PROPERLY SEALED..FBCM.603.1 5. Attic access not framed. 6. Appliances in attics. M1305.1, M 1305.1.3, 1305.1.3.1. Receptacle and light needed. Appliance needs to be removed for future. 7. Line diagram for subpanel needed. Verification of wire size requested. 08-3-2022 - NEED TO VERIFY WIRE SIZE AND LINE DIAGRAM FOR SUB PANEL. Check at insuation. Attic access not framed. 08-31-2022 1. Need to verify wire size and line diagram for sub panel. See above notes. 2. Sub panel not noted on drawings. 3. Attic access not ionstalled. 4. Front entry door not installed. Electrical panel cover is on and covered with plastic. 09-09-2022 Attic access not installed. | |||
| INSULATION | 08/31/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Inspector Notes from Inspection 2420 THIS IS A REINSPECTION 1. Windows and doors not installed. 2. AC/ AHU line not supported in attic. PIPING SUPPORT TABLE: G2424.1 (415) 3. AC/AHU drain line not supported or insulated. CONDENSATE LINES INSULATION REQUIRED M307.2.5 4. Dryer vent not sealed at roof deck. DUCT PROPERLY SEALED..FBCM.603.1 5. Attic access not framed. 6. Appliances in attics. M1305.1, M 1305.1.3, 1305.1.3.1. Receptacle and light needed. Appliance needs to be removed for future. 7. Line diagram for subpanel needed. Verification of wire size requested. 08-3-2022 - NEED TO VERIFY WIRE SIZE AND LINE DIAGRAM FOR SUB PANEL. Check at insuation. Attic access not framed. 08-31-2022 1. Need to verify wire size and line diagram for sub panel. See above notes. 2. Sub panel not noted on drawings. 3. Attic access not ionstalled. 4. Front entry door not installed. Electrical panel cover is on and covered with plastic. | |||
| ROOF VALLEY & METAL | 08/03/2022 | APPROVED | AGAETANO |
| ALL ROUGH | 08/03/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: THIS IS A REINSPECTION 1. Windows and doors not installed. 2. AC/ AHU line not supported in attic. PIPING SUPPORT TABLE: G2424.1 (415) 3. AC/AHU drain line not supported or insulated. CONDENSATE LINES INSULATION REQUIRED M307.2.5 4. Dryer vent not sealed at roof deck. DUCT PROPERLY SEALED..FBCM.603.1 5. Attic access not framed. 6. Appliances in attics. M1305.1, M 1305.1.3, 1305.1.3.1. Receptacle and light needed. Appliance needs to be removed for future. 7. Line diagram for subpanel needed. Verification of wire size requested. 08-3-2022 - NEED TO VERIFY WIRE SIZE AND LINE DIAGRAM FOR SUB PANEL. Check at insuation. Attic access not framed. | |||
| ALL ROUGH | 07/12/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 1. Windows and doors not installed. 2. AC/ AHU line not supported in attic. PIPING SUPPORT TABLE: G2424.1 (415) 3. AC/AHU drain line not supported or insulated. CONDENSATE LINES INSULATION REQUIRED M307.2.5 4. Dryer vent not sealed at roof deck. DUCT PROPERLY SEALED..FBCM.603.1 5. Attic access not framed. 6. Appliances in attics. M1305.1, M 1305.1.3, 1305.1.3.1. Receptacle and light needed. Appliance needs to be removed for future. 7. Line diagram for subpanel needed. Verification of wire size requested. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/06/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Please submit a full set of approved drawings including roof framing, tie downs, and braces. 6-8-22 plans per notes above were not on site. Need approved revision on site for inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/08/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: THIS IS A REINSPECTION Please submit a full set of approved drawings including roof framing, tie downs, and braces. 6-8-22 plans per notes above were not on site. Need approved revision on site for inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/23/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Please submit a full set of approved drawings including roof framing, tie downs, and braces. | |||
| TIE BEAM / LINTEL | 04/28/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Please have approved drawings on site for inspection. Lintel schedule details missing. 04-19-2022 1. Back left SGD is missing down cell. Noted on drawings. 2. Back left SGD opening is 6' and 5' opening submitted on drawings. Please submit a revision to the building department for 6' opening. Energy calculations will also need to be adjusted if 6' opening is installed. | |||
| TIE BEAM / LINTEL | 04/19/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: THIS IS A REINSPECTION Please have approved drawings on site for inspection. Lintel schedule details missing. 04-19-2022 1. Back left SGD is missing down cell. Noted on drawings. 2. Back left SGD opening is 6' and 5' opening submitted on drawings. Please submit a revision to the building department for 6' opening. Energy calculations will also need to be adjusted if 6' opening is installed. Inspection stopped. | |||
| TIE BEAM / LINTEL | 03/29/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Please have approved drawings on site for inspection. Lintel schedule details missing. | |||
| MONOLITHIC SLAB | 02/15/2022 | APPROVED | AGAETANO |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/08/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: PAN DRAIN LINE NEEDS TO BE 'CPVC' NOT PVC ALSO IT HAS TO BE SLEEVED 2''2X DIAMETER LARGER THAN PIPE PASSING THROUGH FOOTER, CONTRACTOR INFORMED ME THAT IT WAS CHANGING TO TANKLESS TYPE NEED REVISION TO SHOW AND LOAD CALCULAATION CHANGE | |||
| BLD - BUILDING FINAL | |||
| Note: 10/4/2024 - PREVIOUS INSPECTION NOTES 1. Need to submitt Energy Calcs to City building department. 2. Facia covering is missing and coming apart in several areas. 3. outlet in kitchen is not GFCI Protected 4. Missing notice to onwer A/C in attic. 5. Missing termite sticker. 6. Revise plans to show new location of A/C, attic access, and new kitchen layout. 7. Spoke with contractor 8. Resident living in the addition. 5/10/2024 - PREVIOUS INSPECTION NOTES 5-10-24 energy calcs model numbers not matching (revision needed) FBC 107.3 need trim around attic access FBC. R807.1 6/21/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2490 THIS IS A REINSPECTION Inspector Notes from Inspection 2420 THIS IS A REINSPECTION 1. Windows and doors not installed. 2. AC/ AHU line not supported in attic. PIPING SUPPORT TABLE: G2424.1 (415) 3. AC/AHU drain line not supported or insulated. CONDENSATE LINES INSULATION REQUIRED M307.2.5 4. Dryer vent not sealed at roof deck. DUCT PROPERLY SEALED..FBCM.603.1 5. Attic access not framed. 6. Appliances in attics. M1305.1, M 1305.1.3, 1305.1.3.1. Receptacle and light needed. Appliance needs to be removed for future. 7. Line diagram for subpanel needed. Verification of wire size requested. 08-3-2022 - NEED TO VERIFY WIRE SIZE AND LINE DIAGRAM FOR SUB PANEL. Check at insuation. Attic access not framed. 08-31-2022 1. Need to verify wire size and line diagram for sub panel. See above notes. 2. Sub panel not noted on drawings. 3. Attic access not ionstalled. 4. Front entry door not installed. Electrical panel cover is on and covered with plastic. 09-09-2022 Attic access not installed. 06-21-2023 1. Please provide landing, deck, and railing details to the building department for review and have approved drawings on site for inspection. Landings. Landing not proper height and railing not installed properly. 2. Energy calculations not on site. 3. Product Approval for SGD and windows nor on site. 4. Only one kitchen circuit. 5. Window stickers not on site. Inspection stopped. |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 11/05/2024 | 11/12/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/15/2024 | 10/18/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 05/08/2024 | 05/08/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM The NOC submitted is expired (3/31/24) | |||
| BADMIN | INFORMATION | 12/04/2023 | 12/04/2023 |
| Note: Marked INFORMATION By: LIBBY MUSGROVE - (386)986-3780 - LMUSGROVE@PALMCOASTGOV.COM Doc name and file name must match - ex - site plan =site plan | |||
| ELEC | COMPLETE | 09/01/2022 | 09/02/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/31/2022 | 06/01/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/22/2022 | 04/25/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/12/2022 | 04/13/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/11/2022 | 03/11/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/11/2022 | 03/11/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/27/2022 | 01/27/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/27/2022 | 02/02/2022 |
| Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/27/2022 | 01/27/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/06/2022 | 01/06/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/05/2022 | 01/05/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM AC pad that is shown on plans are not shown on site plan. Please show ac location on site plan. It must meet a 5ft setback so it does not encroach in the 5ft utility easement. Please show the width of breezeway on site plan for review | |||
| ZON | HOLD | 01/05/2022 | 01/05/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Ac pad location on plan doesn't match new site plan submitted Plans show that breezway width is 5ft. Site plan doesn't match. Both must match | |||
| MECH | COMPLETE | 12/30/2021 | 12/30/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 12/30/2021 | 12/30/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/30/2021 | 12/30/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/30/2021 | 12/30/2021 |
| Note: Held By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM Provide roof slope of breezeway | |||
| MECH | HOLD | 12/03/2021 | 12/03/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide Duct layout signed by the AC contractor | |||
| ELEC | HOLD | 12/03/2021 | 12/06/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Outlets in bar area, bathroom, and outside need to be GFCI protected. NEC 2017 210.8 2nd REQUEST | |||
| BLD | HOLD | 12/03/2021 | 12/06/2021 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Repeat comment item1: 1. Provide an updated City of Palm Coast Roofing Worksheet. Note: Roofing Worksheet is the same as previously submitted. Please use Asphalt Shingles Roof Covering Type. | |||
| ZON | HOLD | 12/03/2021 | 12/07/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide new elevation plans showing the breezway that was added. Please make note that all roof and exterior will match existing house. | |||
| BLD | HOLD | 11/08/2021 | 11/12/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Residential PLAN REVIEW COMMENTS: 1. Provide an updated City of Palm Coast Roofing Worksheet. 2. Note on drawings call-out Grade #2 species. Provide species of lumber to be used. | |||
| ELEC | HOLD | 11/08/2021 | 11/08/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Outlets in bar area, bathroom, and outside need to be GFCI protected. NEC 2017 210.8 | |||
| MECH | HOLD | 11/08/2021 | 11/08/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calculations | |||
| PLUM | COMPLETE | 11/08/2021 | 11/12/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/08/2021 | 11/15/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | HOLD | 11/08/2021 | 11/12/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Accessory structures other than fences, walls, arbors, trellises, pergolas, and detached garages shall be located behind the front and side street building facades of the principal structure. This would not be an addition if it is not attached to the primary structure. Site plan must show all setbacks from structure to property lines. Accessory building exterior must match the house. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EXTENSION | ¤40.00 | 02/10/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | 10/21/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/24/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/24/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/24/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/24/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/24/2024 |
| EXTENSION | ¤40.00 | 04/24/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/26/2022 |
| INSPECTION - RESIDENTIAL | ¤60.00 | 01/26/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 01/26/2022 |
| SURCHARGE FS 533.721 | ¤2.00 | 01/26/2022 |
| SURCHARGE - FS 468.631 | ¤2.85 | 01/26/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/26/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/26/2022 |
| SITE PLAN 30 | ¤30.00 | 01/26/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤519.85 |