I want to search for...

Permit #2021110591

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00090-0090
CONDITIONED SPACE: 2123 sqft
CONDITIONED SPACE: 300 sqft
GARAGE: 856 sqft
OPENED PORCH (WITH ROOF) : 507 sqft
OPENED PORCH (WITH ROOF) : 162 sqft
OPENED PORCH (WITH ROOF) : 76 sqft
Total Square Footage: 4024 sqft
Block: 00090
Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA
Job Phone: 863-420-2100
Location Address: 88 NEW LEATHERWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/02/2022
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0090
Contracted Stated Job Value: ¤300,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
NICHOLAS KEITH REX
Status Location Address State License Number Phone
ACTIVE

1408 HAMLIN UNIT B

SAINT CLOUD, FL 34771

EC13006779 (Exp: 08/31/2026) 407-873-2231

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 01/20/2023 FINAL APPROVED TSTAUFFACHER
Note: 1/19/2023 - PREVIOUS INSPECTION NOTES 1/18/2023 - PREVIOUS INSPECTION NOTES 1. BEDROOM SMOKE DETECTORS ARE NOT COMMUNICATING WITH EACH OTHER AND FBC R314.4 2. IDENTIFY BREAKERS IN PANEL, E3706.2 ALL CIRCUITS SHALL BE LEGIBLY IDENTIFIED AS TO THEIR CLEAR, EVIDENT, AND SPECIFIC PURPOSE OR USE. (AHU not marked) 3. GARAGE CEILING (electric from AHU), HOLE NEEDS TO BE SEALED R302.5, 302.5.2, 302.5.3, 302.6, OPENINGS 4. each exterior door needs to have a light and switch R 3903.3 1-19-23 made two visits today, one at approximately 10:30, came back about 30 minutes later, camck again at approximately 1:30 bedroom smoke detectors are still not communicating with each other FBC R314.4
BLD - BUILDING FINAL 01/19/2023 Disapproved - NO FEE LMILLER
Note: 1/18/2023 - PREVIOUS INSPECTION NOTES 1. BEDROOM SMOKE DETECTORS ARE NOT COMMUNICATING WITH EACH OTHER AND FBC R314.4 2. IDENTIFY BREAKERS IN PANEL, E3706.2 ALL CIRCUITS SHALL BE LEGIBLY IDENTIFIED AS TO THEIR CLEAR, EVIDENT, AND SPECIFIC PURPOSE OR USE. (AHU not marked) 3. GARAGE CEILING (electric from AHU), HOLE NEEDS TO BE SEALED R302.5, 302.5.2, 302.5.3, 302.6, OPENINGS 4. each exterior door needs to have a light and switch R 3903.3 1-19-23 made two visits today, one at approximately 10:30, came back about 30 minutes later, camck again at approximately 1:30 bedroom smoke detectors are still not communicating with each other FBC R314.4
BLD - BUILDING FINAL 01/18/2023 Disapproved -FEE REQUIRED LMILLER
Note: 1. BEDROOM SMOKE DETECTORS ARE NOT COMMUNICATING WITH EACH OTHER AND FBC R314.4 2. IDENTIFY BREAKERS IN PANEL, E3706.2 ALL CIRCUITS SHALL BE LEGIBLY IDENTIFIED AS TO THEIR CLEAR, EVIDENT, AND SPECIFIC PURPOSE OR USE. (AHU not marked) 3. GARAGE CEILING (electric from AHU), HOLE NEEDS TO BE SEALED R302.5, 302.5.2, 302.5.3, 302.6, OPENINGS 4. each exterior door needs to have a light and switch R 3903.3
U-CROSS CONNECTION 01/12/2023 APPROVED - AS NOTED LFITZGERALD
Note: reclaim irrigation-no cross connection
U -UTILITY RESIDENTIAL FINAL 01/12/2023 APPROVED - AS NOTED LFITZGERALD
Note: please make sewer clean out cap in walk way flush with walk and in future please make flush all the time and use a flush-flat cap versus the knob type
ROW FIELD SURVEY /GRADING CERTIFICATION 01/11/2023 APPROVED PFLANAGAN
Note: 1/6/2023 - PREVIOUS INSPECTION NOTES THIS WAS THE WRONG FINAL SURVEY NEED TO GIVE US THE RIGHT SURVEY. THE ONE ON FILE IS FOR ADDRESS #86
ROW - STORMWATER FINAL 01/11/2023 FINAL APPROVED PFLANAGAN
Note: LOOKS GOOD AT THE TIME OF INSPECTION
ROW - FINAL APRON (AFTER POUR) 01/11/2023 APPROVED PFLANAGAN
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/11/2023 APPROVED PFLANAGAN
Note: 1/9/2023 - PREVIOUS INSPECTION NOTES ALL SOD ELEVATIONS UP AGAINST THE HOUSE NEED TO BE 4" BELOW FFE FOR CONCRETE BLOCK HOMES AND 6" FOR WOOS FRAME HOMES
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/09/2023 Disapproved - NO FEE PFLANAGAN
Note: ALL SOD ELEVATIONS UP AGAINST THE HOUSE NEED TO BE 4" BELOW FFE FOR CONCRETE BLOCK HOMES AND 6" FOR WOOS FRAME HOMES
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/06/2023 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 01/06/2023 Disapproved - NO FEE PFLANAGAN
Note: THIS WAS THE WRONG FINAL SURVEY NEED TO GIVE US THE RIGHT SURVEY. THE ONE ON FILE IS FOR ADDRESS #86
ELECTRIC - EARLY POWER 01/04/2023 APPROVED - AS NOTED KSANDOE
Note: Emailed FPL @ 0738. Release Power
ROW- PRE-APRON (PRE-POUR) 12/16/2022 APPROVED PFLANAGAN
Note: READY FOR PAVERS --------------------------------------------------------------- 12/12/2022 - PREVIOUS INSPECTION NOTES READY TO POUR 1) APRON 2) SIDEWALK 3) PAVER RESTRAINTS ONLY BEFORE THE NEXT PRE POUR INSPECTION ALL BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS
ROW- PAVER RESTRAINTS 12/12/2022 APPROVED PFLANAGAN
ROW- PRE-APRON (PRE-POUR) 12/12/2022 PARTIALLY APPROVED PFLANAGAN
Note: READY TO POUR 1) APRON 2) SIDEWALK 3) PAVER RESTRAINTS ONLY BEFORE THE NEXT PRE POUR INSPECTION ALL BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS
U - SEWER TIE IN 12/09/2022 APPROVED DCUSHING
GRAVITY SEWER TEST 12/09/2022 APPROVED DCUSHING
TIE BEAM / LINTEL 11/04/2022 APPROVED KSANDOE
LATH/BRICK/ WATER BARRIER 10/12/2022 APPROVED DCUSHING
INSULATION 10/04/2022 APPROVED RMARTIN
ALL ROUGH 09/22/2022 APPROVED RMARTIN
WALL SHEATHING 09/21/2022 APPROVED LMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION ZIP SYSTEM panels need solid framing or blocking behind all panel edges and panel edges need to be nailed per manufacturer documents 8/24/22 Notes above not addressed 9-21-22 notes above resolved
WALL SHEATHING 08/25/2022 Disapproved - NO FEE KSANDOE
Note: THIS IS A REINSPECTION ZIP SYSTEM panels need solid framing or blocking behind all panel edges and panel edges need to be nailed per manufacturer documents 8/24/22 Notes above not addressed
WALL SHEATHING 07/19/2022 Disapproved - NO FEE LMILLER
Note: ZIP SYSTEM panels need solid framing or blocking behind all panel edges and panel edges need to be nailed per manufacturer documents
ROOF VALLEY & METAL 07/19/2022 APPROVED LMILLER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/28/2022 APPROVED LMILLER
Note: THIS IS A REINSPECTION sheathing only 6-28-22 approved
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/24/2022 PARTIALLY APPROVED RMARTIN
Note: sheathing only
FOUND SURVEY APPROVED (OFFICE) 06/23/2022 APPROVED TBAKER
ELECTRIC-TUG 05/09/2022 APPROVED - AS NOTED LMILLER
Note: notified FPL at: 1:03
TIE BEAM / LINTEL 03/31/2022 APPROVED LMILLER
MONOLITHIC SLAB 03/17/2022 APPROVED LMILLER
Note: THIS IS A REINSPECTION missing dowels (check all) Filled cells need to be grouted solid (soil in cells) Plastic needs to cover all Inspection stopped 3-17-22 notes above resolved
MONOLITHIC SLAB 03/16/2022 Disapproved -FEE REQUIRED LMILLER
Note: missing dowels (check all) Filled cells need to be grouted solid (soil in cells) Plastic needs to cover all Inspection stopped
PLUMBING 1ST ROUGH UNDERGROUND 03/14/2022 APPROVED MGIBSON
Note: THIS IS A REINSPECTION TEST NOT HOLDING 5' HEAD DUE TO GLUE JOINT AT BLOCK WALL LAV
PLUMBING 1ST ROUGH UNDERGROUND 03/11/2022 Disapproved -FEE REQUIRED MGIBSON
Note: TEST NOT HOLDING 5' HEAD DUE TO GLUE JOINT AT BLOCK WALL LAV
FOOTER 02/15/2022 APPROVED LMILLER
WATER METER INSTALLATION REQUEST 02/10/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 01/16/2023 01/17/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 08/31/2022 08/31/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 07/05/2022 07/05/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/22/2022 06/22/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/22/2022 06/22/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 02/01/2022 02/02/2022
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
ZON COMPLETE 01/31/2022 01/31/2022
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
BLD HOLD 01/31/2022 01/31/2022
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Identify the change(s) made by a "clouded" symbol on sheet A-3 as it appears to be the same as original plan for clarification per FBC 7th Ed. Sec. 107.3.
ZON HOLD 01/21/2022 01/21/2022
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM what was submitted labed Site plan is not document we in zoning will stamp you original Survey needs to be labeled a siteplan and submitted to match landscape and floor plan
BLD COMPLETE 01/21/2022 01/24/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON HOLD 01/19/2022 01/19/2022
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Site plan /Survey must match your landscape all three must match Please open all and look. The right side of house has a square included on landscape plan and the siteplan doesnt but the plans have the same square on the right of the house. please lookat all three and adjust them so that they all match
ZON HOLD 01/12/2022 01/12/2022
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Site plan /Survey must match your landscape all three must match Please open all and look. The right side of house has a square included on landscape plan and the siteplan doesnt but the plans have the same square on the right of the house.
ZON HOLD 01/03/2022 01/03/2022
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Floor plan shows two AC units. Site plan/survey only shows one. Please correct whichever is wrong. your Survey/ siteplan shows i/one AC your floor plan submited earlier shows 2 ac on the property please make floor plan and site plan match
ENGIN1 COMPLETE 01/03/2022 01/03/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 01/03/2022 01/11/2022
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
URB COMPLETE 11/17/2021 11/18/2021
Note: Released By: JOHN BEAUDET - (386)986-2456 -
BLD COMPLETE 11/12/2021 11/15/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 11/12/2021 11/18/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 11/12/2021 11/15/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/12/2021 11/12/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 11/12/2021 11/16/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 11/12/2021 11/17/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 11/12/2021 11/18/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON HOLD 11/12/2021 11/17/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Total lot square footage missing on site plan/survey Floor plan shows two AC units. Site plan/survey only shows one. Please correct whichever is wrong.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 01/18/2023
PLAN REVIEW - REVISION ¤32.50 01/17/2023
PLAN REVIEW - REVISION ¤32.50 01/13/2023
CONTRACTOR CHANGE ¤40.00 01/13/2023
CONTRACTOR CHANGE ¤20.00 01/13/2023
REINSPECTION RESIDENTIAL ¤40.00 03/18/2022
REINSPECTION RESIDENTIAL ¤40.00 03/18/2022
CONNECTION FEES ¤25.00 02/02/2022
METER - DEPOSIT ¤60.00 02/02/2022
WATER-METER ¤467.09 02/02/2022
WATER-METER ¤388.04 02/02/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/02/2022
INSPECTION - RESIDENTIAL ¤921.25 02/02/2022
PLAN REVIEW - RESIDENTIAL ¤261.30 02/02/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 02/02/2022
IMPACT FEE FIRE ¤388.65 02/02/2022
IMPACT FEE PARKS ¤1,455.13 02/02/2022
IMPACT FEE SCHOOL ¤3,600.00 02/02/2022
IMPACT FEE TRANSPORTATION ¤3,139.00 02/02/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 02/02/2022
SURCHARGE FS 533.721 ¤12.74 02/02/2022
SURCHARGE - FS 468.631 ¤19.12 02/02/2022
SW ENG - FOUNDATION SURVEY ¤20.00 02/02/2022
SW ENG INSPECTION 80 ¤80.00 02/02/2022
SW ENG PRE APRON ¤30.00 02/02/2022
SW ENG - REVIEW 20 ¤20.00 02/02/2022
SW ENG RES REVIEW 200 ¤200.00 02/02/2022
3% TRANS IMPACT FEE CREDIT (¤94.17) 02/02/2022
SEWER INSPECTION ¤25.00 02/02/2022
SITE PLAN 30 ¤30.00 02/02/2022
Fees Total Due: ¤0.00 Total Paid: ¤11,267.84