I want to search for...
Permit #2021110591
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00090-0090 |
| CONDITIONED SPACE: 2123 sqft |
| CONDITIONED SPACE: 300 sqft |
| GARAGE: 856 sqft |
| OPENED PORCH (WITH ROOF) : 507 sqft |
| OPENED PORCH (WITH ROOF) : 162 sqft |
| OPENED PORCH (WITH ROOF) : 76 sqft |
| Total Square Footage: 4024 sqft |
| Block: 00090 |
| Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA |
| Job Phone: 863-420-2100 |
| Location Address: 88 NEW LEATHERWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/02/2022 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
NICHOLAS KEITH REX
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1408 HAMLIN UNIT B SAINT CLOUD, FL 34771 |
EC13006779 (Exp: 08/31/2026) | 407-873-2231 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/20/2023 | FINAL APPROVED | TSTAUFFACHER |
| Note: 1/19/2023 - PREVIOUS INSPECTION NOTES 1/18/2023 - PREVIOUS INSPECTION NOTES 1. BEDROOM SMOKE DETECTORS ARE NOT COMMUNICATING WITH EACH OTHER AND FBC R314.4 2. IDENTIFY BREAKERS IN PANEL, E3706.2 ALL CIRCUITS SHALL BE LEGIBLY IDENTIFIED AS TO THEIR CLEAR, EVIDENT, AND SPECIFIC PURPOSE OR USE. (AHU not marked) 3. GARAGE CEILING (electric from AHU), HOLE NEEDS TO BE SEALED R302.5, 302.5.2, 302.5.3, 302.6, OPENINGS 4. each exterior door needs to have a light and switch R 3903.3 1-19-23 made two visits today, one at approximately 10:30, came back about 30 minutes later, camck again at approximately 1:30 bedroom smoke detectors are still not communicating with each other FBC R314.4 | |||
| BLD - BUILDING FINAL | 01/19/2023 | Disapproved - NO FEE | LMILLER |
| Note: 1/18/2023 - PREVIOUS INSPECTION NOTES 1. BEDROOM SMOKE DETECTORS ARE NOT COMMUNICATING WITH EACH OTHER AND FBC R314.4 2. IDENTIFY BREAKERS IN PANEL, E3706.2 ALL CIRCUITS SHALL BE LEGIBLY IDENTIFIED AS TO THEIR CLEAR, EVIDENT, AND SPECIFIC PURPOSE OR USE. (AHU not marked) 3. GARAGE CEILING (electric from AHU), HOLE NEEDS TO BE SEALED R302.5, 302.5.2, 302.5.3, 302.6, OPENINGS 4. each exterior door needs to have a light and switch R 3903.3 1-19-23 made two visits today, one at approximately 10:30, came back about 30 minutes later, camck again at approximately 1:30 bedroom smoke detectors are still not communicating with each other FBC R314.4 | |||
| BLD - BUILDING FINAL | 01/18/2023 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 1. BEDROOM SMOKE DETECTORS ARE NOT COMMUNICATING WITH EACH OTHER AND FBC R314.4 2. IDENTIFY BREAKERS IN PANEL, E3706.2 ALL CIRCUITS SHALL BE LEGIBLY IDENTIFIED AS TO THEIR CLEAR, EVIDENT, AND SPECIFIC PURPOSE OR USE. (AHU not marked) 3. GARAGE CEILING (electric from AHU), HOLE NEEDS TO BE SEALED R302.5, 302.5.2, 302.5.3, 302.6, OPENINGS 4. each exterior door needs to have a light and switch R 3903.3 | |||
| U-CROSS CONNECTION | 01/12/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: reclaim irrigation-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 01/12/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: please make sewer clean out cap in walk way flush with walk and in future please make flush all the time and use a flush-flat cap versus the knob type | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/11/2023 | APPROVED | PFLANAGAN |
| Note: 1/6/2023 - PREVIOUS INSPECTION NOTES THIS WAS THE WRONG FINAL SURVEY NEED TO GIVE US THE RIGHT SURVEY. THE ONE ON FILE IS FOR ADDRESS #86 | |||
| ROW - STORMWATER FINAL | 01/11/2023 | FINAL APPROVED | PFLANAGAN |
| Note: LOOKS GOOD AT THE TIME OF INSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 01/11/2023 | APPROVED | PFLANAGAN |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/11/2023 | APPROVED | PFLANAGAN |
| Note: 1/9/2023 - PREVIOUS INSPECTION NOTES ALL SOD ELEVATIONS UP AGAINST THE HOUSE NEED TO BE 4" BELOW FFE FOR CONCRETE BLOCK HOMES AND 6" FOR WOOS FRAME HOMES | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/09/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: ALL SOD ELEVATIONS UP AGAINST THE HOUSE NEED TO BE 4" BELOW FFE FOR CONCRETE BLOCK HOMES AND 6" FOR WOOS FRAME HOMES | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/06/2023 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/06/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: THIS WAS THE WRONG FINAL SURVEY NEED TO GIVE US THE RIGHT SURVEY. THE ONE ON FILE IS FOR ADDRESS #86 | |||
| ELECTRIC - EARLY POWER | 01/04/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 0738. Release Power | |||
| ROW- PRE-APRON (PRE-POUR) | 12/16/2022 | APPROVED | PFLANAGAN |
| Note: READY FOR PAVERS --------------------------------------------------------------- 12/12/2022 - PREVIOUS INSPECTION NOTES READY TO POUR 1) APRON 2) SIDEWALK 3) PAVER RESTRAINTS ONLY BEFORE THE NEXT PRE POUR INSPECTION ALL BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS | |||
| ROW- PAVER RESTRAINTS | 12/12/2022 | APPROVED | PFLANAGAN |
| ROW- PRE-APRON (PRE-POUR) | 12/12/2022 | PARTIALLY APPROVED | PFLANAGAN |
| Note: READY TO POUR 1) APRON 2) SIDEWALK 3) PAVER RESTRAINTS ONLY BEFORE THE NEXT PRE POUR INSPECTION ALL BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS | |||
| U - SEWER TIE IN | 12/09/2022 | APPROVED | DCUSHING |
| GRAVITY SEWER TEST | 12/09/2022 | APPROVED | DCUSHING |
| TIE BEAM / LINTEL | 11/04/2022 | APPROVED | KSANDOE |
| LATH/BRICK/ WATER BARRIER | 10/12/2022 | APPROVED | DCUSHING |
| INSULATION | 10/04/2022 | APPROVED | RMARTIN |
| ALL ROUGH | 09/22/2022 | APPROVED | RMARTIN |
| WALL SHEATHING | 09/21/2022 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION ZIP SYSTEM panels need solid framing or blocking behind all panel edges and panel edges need to be nailed per manufacturer documents 8/24/22 Notes above not addressed 9-21-22 notes above resolved | |||
| WALL SHEATHING | 08/25/2022 | Disapproved - NO FEE | KSANDOE |
| Note: THIS IS A REINSPECTION ZIP SYSTEM panels need solid framing or blocking behind all panel edges and panel edges need to be nailed per manufacturer documents 8/24/22 Notes above not addressed | |||
| WALL SHEATHING | 07/19/2022 | Disapproved - NO FEE | LMILLER |
| Note: ZIP SYSTEM panels need solid framing or blocking behind all panel edges and panel edges need to be nailed per manufacturer documents | |||
| ROOF VALLEY & METAL | 07/19/2022 | APPROVED | LMILLER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/28/2022 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION sheathing only 6-28-22 approved | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/24/2022 | PARTIALLY APPROVED | RMARTIN |
| Note: sheathing only | |||
| FOUND SURVEY APPROVED (OFFICE) | 06/23/2022 | APPROVED | TBAKER |
| ELECTRIC-TUG | 05/09/2022 | APPROVED - AS NOTED | LMILLER |
| Note: notified FPL at: 1:03 | |||
| TIE BEAM / LINTEL | 03/31/2022 | APPROVED | LMILLER |
| MONOLITHIC SLAB | 03/17/2022 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION missing dowels (check all) Filled cells need to be grouted solid (soil in cells) Plastic needs to cover all Inspection stopped 3-17-22 notes above resolved | |||
| MONOLITHIC SLAB | 03/16/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: missing dowels (check all) Filled cells need to be grouted solid (soil in cells) Plastic needs to cover all Inspection stopped | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/14/2022 | APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION TEST NOT HOLDING 5' HEAD DUE TO GLUE JOINT AT BLOCK WALL LAV | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/11/2022 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: TEST NOT HOLDING 5' HEAD DUE TO GLUE JOINT AT BLOCK WALL LAV | |||
| FOOTER | 02/15/2022 | APPROVED | LMILLER |
| WATER METER INSTALLATION REQUEST | 02/10/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 01/16/2023 | 01/17/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 08/31/2022 | 08/31/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/05/2022 | 07/05/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/22/2022 | 06/22/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/22/2022 | 06/22/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/01/2022 | 02/02/2022 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/31/2022 | 01/31/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | HOLD | 01/31/2022 | 01/31/2022 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Identify the change(s) made by a "clouded" symbol on sheet A-3 as it appears to be the same as original plan for clarification per FBC 7th Ed. Sec. 107.3. | |||
| ZON | HOLD | 01/21/2022 | 01/21/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM what was submitted labed Site plan is not document we in zoning will stamp you original Survey needs to be labeled a siteplan and submitted to match landscape and floor plan | |||
| BLD | COMPLETE | 01/21/2022 | 01/24/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/19/2022 | 01/19/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Site plan /Survey must match your landscape all three must match Please open all and look. The right side of house has a square included on landscape plan and the siteplan doesnt but the plans have the same square on the right of the house. please lookat all three and adjust them so that they all match | |||
| ZON | HOLD | 01/12/2022 | 01/12/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Site plan /Survey must match your landscape all three must match Please open all and look. The right side of house has a square included on landscape plan and the siteplan doesnt but the plans have the same square on the right of the house. | |||
| ZON | HOLD | 01/03/2022 | 01/03/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Floor plan shows two AC units. Site plan/survey only shows one. Please correct whichever is wrong. your Survey/ siteplan shows i/one AC your floor plan submited earlier shows 2 ac on the property please make floor plan and site plan match | |||
| ENGIN1 | COMPLETE | 01/03/2022 | 01/03/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/03/2022 | 01/11/2022 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 11/17/2021 | 11/18/2021 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - | |||
| BLD | COMPLETE | 11/12/2021 | 11/15/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 11/12/2021 | 11/18/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 11/12/2021 | 11/15/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/12/2021 | 11/12/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 11/12/2021 | 11/16/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/12/2021 | 11/17/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/12/2021 | 11/18/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 11/12/2021 | 11/17/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Total lot square footage missing on site plan/survey Floor plan shows two AC units. Site plan/survey only shows one. Please correct whichever is wrong. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/18/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 01/17/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 01/13/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 01/13/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 01/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/18/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/18/2022 |
| CONNECTION FEES | ¤25.00 | 02/02/2022 |
| METER - DEPOSIT | ¤60.00 | 02/02/2022 |
| WATER-METER | ¤467.09 | 02/02/2022 |
| WATER-METER | ¤388.04 | 02/02/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/02/2022 |
| INSPECTION - RESIDENTIAL | ¤921.25 | 02/02/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤261.30 | 02/02/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 02/02/2022 |
| IMPACT FEE FIRE | ¤388.65 | 02/02/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 02/02/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/02/2022 |
| IMPACT FEE TRANSPORTATION | ¤3,139.00 | 02/02/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 02/02/2022 |
| SURCHARGE FS 533.721 | ¤12.74 | 02/02/2022 |
| SURCHARGE - FS 468.631 | ¤19.12 | 02/02/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/02/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/02/2022 |
| SW ENG PRE APRON | ¤30.00 | 02/02/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/02/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/02/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤94.17) | 02/02/2022 |
| SEWER INSPECTION | ¤25.00 | 02/02/2022 |
| SITE PLAN 30 | ¤30.00 | 02/02/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤11,267.84 |