I want to search for...
Permit #2021110598
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00090-0080 |
| CONDITIONED SPACE: 384 sqft |
| CONDITIONED SPACE: 2488 sqft |
| GARAGE: 898 sqft |
| OPENED PORCH (WITH ROOF) : 91 sqft |
| OPENED PORCH (WITH ROOF) : 442 sqft |
| OPENED PORCH (WITH ROOF) : 367 sqft |
| Total Square Footage: 4670 sqft |
| Block: 00090 |
| Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA |
| Job Phone: 863-420-2100 |
| Location Address: 86 NEW LEATHERWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/19/2021 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/07/2022 | FINAL APPROVED | DCUSHING |
| ROW - STORMWATER FINAL | 08/30/2022 | APPROVED | RGROSS |
| U -UTILITY RESIDENTIAL FINAL | 08/30/2022 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 08/25/2022 | APPROVED | PFLANAGAN |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/25/2022 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/25/2022 | APPROVED | PFLANAGAN |
| U-CROSS CONNECTION | 08/17/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| TIE BEAM / LINTEL | 08/03/2022 | APPROVED | LMILLER |
| ROW- PRE-APRON (PRE-POUR) | 07/14/2022 | APPROVED | PFLANAGAN |
| ROW- PAVER RESTRAINTS | 07/11/2022 | APPROVED | PFLANAGAN |
| ROW- PRE-APRON (PRE-POUR) | 07/11/2022 | APPROVED | PFLANAGAN |
| ELECTRIC - EARLY POWER | 07/05/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 1:24 pm | |||
| INSULATION | 04/22/2022 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION NOT READY 4-13-22 cancelled per Mason 4-18-22 cancelled per Mason 4-14-22 energty calcs show R-20 at roof deck, (House is prepped for blown in insulation) If blown is to be used a revision is needed and baffles are needed at changes of ceiling heights, If energy calc is correct please apply foam insulation at roof deck per energy calcs also need fire foam at wire penetrations (shown to Greg at inspection) 4-22-22 notes above resolved | |||
| INSULATION | 04/20/2022 | CANCELLED BY APPLICANT | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION NOT READY 4-13-22 cancelled per Mason 4-18-22 cancelled per Mason 4-14-22 energty calcs show R-20 at roof deck, (House is prepped for blown in insulation) If blown is to be used a revision is needed and baffles are needed at changes of ceiling heights, If energy calc is correct please apply foam insulation at roof deck per energy calcs also need fire foam at wire penetrations (shown to Greg at inspection) | |||
| INSULATION | 04/18/2022 | CANCELLED BY APPLICANT | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION NOT READY 4-13-22 cancelled per Mason 4-18-22 cancelled per Mason 4-14-22 energty calcs show R-20 at roof deck, (House is prepped for blown in insulation) If blown is to be used a revision is needed and baffles are needed at changes of ceiling heights, If energy calc is correct please apply foam insulation at roof deck per energy calcs also need fire foam at wire penetrations (shown to Greg at inspection) | |||
| INSULATION | 04/14/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION NOT READY 4-13-22 cancelled per Mason 4-14-22 energty calcs show R-20 at roof deck, (House is prepped for blown in insulation) If blown is to be used a revision is needed and baffles are needed at changes of ceiling heights, If energy calc is correct please apply foam insulation at roof deck per energy calcs also need fire foam at wire penetrations (shown to Greg at inspection) | |||
| INSULATION | 04/13/2022 | CANCELLED BY APPLICANT | LMILLER |
| Note: THIS IS A REINSPECTION NOT READY 4-13-22 cancelled per Mason | |||
| INSULATION | 04/12/2022 | Disapproved - NO FEE | RMARTIN |
| Note: NOT READY | |||
| U - SEWER TIE IN | 04/12/2022 | APPROVED | RMARTIN |
| GRAVITY SEWER TEST | 04/12/2022 | APPROVED | RMARTIN |
| LATH/BRICK/ WATER BARRIER | 04/06/2022 | APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION Section of lath over summer kitchen @ flat trusses, not properly lapped, needs to be metal on metal, paper on paper | |||
| LATH/BRICK/ WATER BARRIER | 04/05/2022 | Disapproved - NO FEE | DCUSHING |
| Note: Section of lath over summer kitchen @ flat trusses, not properly lapped, needs to be metal on metal, paper on paper | |||
| ALL ROUGH | 03/29/2022 | APPROVED | RMARTIN |
| ROOF VALLEY & METAL | 02/24/2022 | APPROVED | JWALKER |
| WALL SHEATHING | 02/22/2022 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION partial for exterior sub-siding (needed inspection for installation tyvech, still need to see sub0siding inside of entryway) | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/10/2022 | APPROVED - AS NOTED | KSANDOE |
| Note: THIS IS A REINSPECTION FRONT ENTRY ONLY A06, 07, 08, and 09 out of plumb on rear patio. B08 needs scabbed according to packet. | |||
| WALL SHEATHING | 02/08/2022 | PARTIALLY APPROVED | LMILLER |
| Note: partial for exterior sub-siding (needed inspection for installation tyvech, still need to see sub0siding inside of entryway) | |||
| ROOF SHEATHING | 02/07/2022 | APPROVED | RMARTIN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/07/2022 | PARTIALLY APPROVED | RMARTIN |
| Note: FRONT ENTRY ONLY | |||
| FOUND SURVEY APPROVED (OFFICE) | 02/04/2022 | APPROVED | TBAKER |
| ELECTRIC-TUG | 02/01/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 3:10 | |||
| TIE BEAM / LINTEL | 01/26/2022 | APPROVED | RMARTIN |
| MONOLITHIC SLAB | 01/13/2022 | APPROVED | LMILLER |
| Note: need to see porch collumn pad footing at Mono Slab inspection 01-13-21... notes above resolved | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/10/2022 | APPROVED | MGIBSON |
| FOOTER | 12/17/2021 | APPROVED - AS NOTED | LMILLER |
| Note: need to see porch collumn pad footing at Mono Slab inspection | |||
| WATER METER INSTALLATION REQUEST | 12/02/2021 | APPROVED | TCHURCHILL |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 04/18/2022 | 04/19/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/04/2022 | 02/04/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/04/2022 | 02/04/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/18/2021 | 11/18/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/18/2021 | 11/18/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/18/2021 | 11/19/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 11/17/2021 | 11/18/2021 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - | |||
| BLD | COMPLETE | 11/12/2021 | 11/15/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 11/12/2021 | 11/18/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 11/12/2021 | 11/15/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/12/2021 | 11/12/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 11/12/2021 | 11/16/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/12/2021 | 11/17/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/12/2021 | 11/18/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 11/12/2021 | 11/17/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Total lot square footage on site plan/survey incorrect |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 08/17/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 08/17/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/17/2022 |
| CONNECTION FEES | ¤25.00 | 11/19/2021 |
| METER - DEPOSIT | ¤60.00 | 11/19/2021 |
| WATER-METER | ¤441.07 | 11/19/2021 |
| WATER-METER | ¤366.42 | 11/19/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/19/2021 |
| INSPECTION - RESIDENTIAL | ¤1,080.75 | 11/19/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤306.54 | 11/19/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 11/19/2021 |
| IMPACT FEE FIRE | ¤388.65 | 11/19/2021 |
| IMPACT FEE PARKS | ¤1,455.13 | 11/19/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/19/2021 |
| IMPACT FEE TRANSPORTATION | ¤3,139.00 | 11/19/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 11/19/2021 |
| SURCHARGE FS 533.721 | ¤14.84 | 11/19/2021 |
| SURCHARGE - FS 468.631 | ¤22.27 | 11/19/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/19/2021 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/19/2021 |
| SW ENG PRE APRON | ¤30.00 | 11/19/2021 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/19/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/19/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤94.17) | 11/19/2021 |
| SEWER INSPECTION | ¤25.00 | 11/19/2021 |
| SITE PLAN 30 | ¤30.00 | 11/19/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤11,297.69 |