Permit #2021111215
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7007-00040-0200 |
| Block: 00040 |
| Subdivision: 2185 - SECTION 7-FLORIDA PARK |
| Job Phone: 386-313-6950 |
| Location Address: 54 FORDHAM LN |
| Type: BIA - BUILDING INTERIOR EXTERIOR ALTERATION |
| Issue Date: 12/20/2021 |
| NOC: RECORDED |
| Applicant name: MARK ANTHONY LANGELLO |
| Owner: FLORIDA REFERRALS AND INVESTMENTS LLC |
|
Address 7 FLORIDA PARK DR N PALM COAST, FL 32137 |
|
Address STE D PALM COAST, FL 32137 |
| Lot: 0200 |
| Contracted Stated Job Value: ¤22,000.00 |
| Job Description: Interior/Exterior Renovations |
| Type: CN |
Contractor
M & M DEVELOPMENT & CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
2323 N. STATE ST BUNNELL, FL 32110 |
RG291103911 (Exp: 08/31/2023) | 386-313-6950 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
ROBERT CARLTON LITTLE
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3050 EAST MOODY BLVD BUNNELL, FL 32110 |
EC13003740 (Exp: 08/31/2026) | 386-931-1708 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/08/2022 | FINAL APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION 1. P2717.2 Sink and dishwasher. The dishwasher discharge pipe or tubing shall rise to the underside of the counter and be fastened or otherwise held in that position before connecting to the head of the food-waste disposer or to a wye fitting in the sink tailpiece 2. IDENTIFY BREAKERS IN PANEL, E3706.2 ALL CIRCUITS SHALL BE LEGIBLY IDENTIFIED AS TO THEIR CLEAR, EVIDENT, AND SPECIFIC PURPOSE OR USE. 3. master bath hot water and cold water is reversed and right sink stopper is stuck and will not drain properly. HOT WATER (Left-Hand Side) FIXTURE FITTING. P2722.2 Fixtures with hot and cold water shall be installed so theat the left hand side represents the flow of hot water when facing the outlet. 4. Need dedicated circuits for Dishwasher NEC 210.52 (B) 1, 2, and 3. | |||
| BLD - BUILDING FINAL | 06/30/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 1. P2717.2 Sink and dishwasher. The dishwasher discharge pipe or tubing shall rise to the underside of the counter and be fastened or otherwise held in that position before connecting to the head of the food-waste disposer or to a wye fitting in the sink tailpiece 2. IDENTIFY BREAKERS IN PANEL, E3706.2 ALL CIRCUITS SHALL BE LEGIBLY IDENTIFIED AS TO THEIR CLEAR, EVIDENT, AND SPECIFIC PURPOSE OR USE. 3. master bath hot water and cold water is reversed and right sink stopper is stuck and will not drain properly. HOT WATER (Left-Hand Side) FIXTURE FITTING. P2722.2 Fixtures with hot and cold water shall be installed so theat the left hand side represents the flow of hot water when facing the outlet. 4. Need dedicated circuits for Dishwasher NEC 210.52 (B) 1, 2, and 3. | |||
| LATH/BRICK/ WATER BARRIER | 04/28/2022 | APPROVED | AGAETANO |
| LATH/BRICK/ WATER BARRIER | 04/27/2022 | CANCELLED BY APPLICANT | WEB |
| LATH/BRICK/ WATER BARRIER | 04/26/2022 | CANCELLED BY APPLICANT | WEB |
| ALL ROUGH | 04/01/2022 | APPROVED | AGAETANO |
| ROOF IN PROGRESS- MIDROOF | 04/01/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: Contractor completed the roof except for the dryer vent installation. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/31/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Please provide the entry framing detail. Ceiling joists and header not per spec. 03-24-2022 - Please provide approved drawings for entry framing detail. Door locked. No drawings on site for inspection. 3025022 area at fron entry still not built per plans, please follow approved details or obtain revision that match conditions at site | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/25/2022 | Disapproved - NO FEE | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Please provide the entry framing detail. Ceiling joists and header not per spec. 03-24-2022 - Please provide approved drawings for entry framing detail. Door locked. No drawings on site for inspection. 3025022 area at fron entry still not built per plans, please follow approved details or obtain revision that match conditions at site | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/24/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: THIS IS A REINSPECTION Please provide the entry framing detail. Ceiling joists and header not per spec. 03-24-2022 - Please provide approved drawings for entry framing detail. Door locked. No drawings on site for inspection. | |||
| ROOF VALLEY & METAL | 03/04/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION Roof for entry has no underlayment and valley metal. | |||
| ROOF VALLEY & METAL | 03/02/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Roof for entry has no underlayment and valley metal. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/02/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Please provide the entry framing detail. Ceiling joists and header not per spec. | |||
| FRAMING | 02/24/2022 | APPROVED | AGAETANO |
| DOWN CELL | 02/24/2022 | APPROVED | AGAETANO |
| COLUMN POST/BEAM/TIE DOWN CONNECTOR | 01/25/2022 | APPROVED | AGAETANO |
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 01/25/2022 | APPROVED | DHANEY |
| MONOLITHIC SLAB | 12/28/2021 | APPROVED | AGAETANO |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/22/2021 | APPROVED | AGAETANO |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 03/30/2022 | 03/30/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/04/2022 | 03/04/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 12/17/2021 | 12/20/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/17/2021 | 12/20/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 12/15/2021 | 12/15/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to show correct outylet spacing. NEC 2017 210.52 2. Show outlet on front porch. NEC 2017 210.52 (E) 3.Need switch and light by exterior door in the old porch NEC 2017 210.70 | |||
| BLD | HOLD | 12/15/2021 | 12/16/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM 1. Provide Product Approval for proposed underlayment. | |||
| ZON | COMPLETE | 12/15/2021 | 12/15/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 11/30/2021 | 11/30/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| BLD | HOLD | 11/29/2021 | 11/30/2021 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM 1. Provide Roofing Worksheet available at City's website. 2. Provide Product Approval Specification Sheet for the missing items per F.S. 553.82 and Administrative Code 9B-72. a. Soffit - New significant Residential Code changes has been adapted. Make sure the soffit installation comply with FBCR 7th Ed. Sec. R704.2. b. Zip system. | |||
| ELEC | HOLD | 11/29/2021 | 11/30/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit a scop of work for the electrical. | |||
| MECH | COMPLETE | 11/29/2021 | 11/30/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | HOLD | 11/29/2021 | 11/30/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Floor plan needs to be more clear on the renovations taking place. back porch on floor plan is different that site plan submitted. Roof: will the roof match excisting roof materials. Site plan needs to show alll propsed work being done onside and out of home.Elevation page will be needed with all proposed changes to the front entrance and if colors and material will match exciting home or will colors be changed |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/07/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/29/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 06/29/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 06/29/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/20/2021 |
| INSPECTION - RESIDENTIAL | ¤60.50 | 12/20/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 12/20/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 12/20/2021 |
| SURCHARGE - FS 468.631 | ¤2.86 | 12/20/2021 |
| SITE PLAN 30 | ¤30.00 | 12/20/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤335.36 |