I want to search for...
Permit #2021120090
Permit Details
Status: COED
| Parcel Id: 35-11-31-4075-00000-1410 |
| COMMERCIAL SQUARE FOOTAGE: 2200 sqft |
| GARAGE: 648 sqft |
| OPENED PORCH (WITH ROOF) : 245 sqft |
| Total Square Footage: 3093 sqft |
| Block: 00000 |
| Subdivision: 2296 - MARINA DEL PALMA SUBDIVISION |
| Job Phone: 863-647-5815 |
| Location Address: 26 RIO VISTA DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/06/2022 |
| NOC: RECORDED |
| Applicant name: MARK ALLAN HULBERT |
| Owner: TEAGUE STEVEN EARL |
|
Address 1572 SUGARBUSH STREET BUNNELL, FL 32110 |
| Lot: 1410 |
| Contracted Stated Job Value: ¤330,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
HULBERT HOMES INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 6254 LAKELAND, FL 33813 |
CRC1331304 (Exp: 08/31/2026) | 863-647-5815 |
Sub Contractors
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
ANTONIO VINCENZO DAHM
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 RYBAR LANE PALM COAST, FL 32164 |
CFC1429951 (Exp: 08/31/2026) | 386-237-5692 |
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/14/2022 | FINAL APPROVED | DCUSHING |
| U-CROSS CONNECTION | 10/14/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| ROW - FINAL APRON (AFTER POUR) | 10/14/2022 | APPROVED | PFLANAGAN |
| Note: Inspector Notes from Inspection 9465 Sod will be needed at the end of the sidewalk and the sod buffer along the vacant lot will need reestablished before the Final Stormwater can be approved. | |||
| ROW - STORMWATER FINAL | 10/14/2022 | FINAL APPROVED | PFLANAGAN |
| Note: Inspector Notes from Inspection 9465 Sod will be needed at the end of the sidewalk and the sod buffer along the vacant lot will need reestablished before the Final Stormwater can be approved. | |||
| U -UTILITY RESIDENTIAL FINAL | 10/14/2022 | FINAL APPROVED | JHARDING |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/13/2022 | APPROVED | RGROSS |
| Note: 10/4/2022 - PREVIOUS INSPECTION NOTES ALL ELEVATIONS AROUND HOME NEED TO BE 4" BELOW FFE SITE PLAN SHOWS DRAINAGE ON RIGHT SIDE OF HOUSE FLOWING TO THE FRONT NEED TO REGRADE SO WATER CAN FLOW TO THE FRONT | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/13/2022 | APPROVED - AS NOTED | RGROSS |
| Note: Sod will be needed at the end of the sidewalk and the sod buffer along the vacant lot will need reestablished before the Final Stormwater can be approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/04/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: ALL ELEVATIONS AROUND HOME NEED TO BE 4" BELOW FFE SITE PLAN SHOWS DRAINAGE ON RIGHT SIDE OF HOUSE FLOWING TO THE FRONT NEED TO REGRADE SO WATER CAN FLOW TO THE FRONT | |||
| ELECTRIC - EARLY POWER | 09/08/2022 | APPROVED - AS NOTED | LMILLER |
| Note: NOTIFIED FPL AT 11:35AM | |||
| ROW- PRE-APRON (PRE-POUR) | 08/25/2022 | APPROVED | PFLANAGAN |
| Note: THIS IS THE INSPECTION ON THE CONCRETE SIDEWALK ON THE NORTH SIDE OF HOUSE | |||
| ROW- PRE-APRON (PRE-POUR) | 08/16/2022 | APPROVED | PFLANAGAN |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 8/2/22 BEFORE NEXT PRE POUR ALL BASE NEEDS TO BE DOWN AND COMPACTED NO PAVERS SHOULD BE PLACED BEFORE THE NEXT INSPECTION IF THERE IS ALL PAVERS WILL NEED TO REMOVED --------------------------------------------------------------------------------------------------------------------------------- Paver restraints are good but the sidewalk is not pitched toward the street. ADA recommends 1.5% but not more than 2%. currently the sidewalk is level and will hold stormwater. 8/9/22 - Driveway base needed a 2nd inspection BEFORE the pavers are placed. Remove pavers so that the base can be inspected. ------------------------------------------------------------------------------------------------------------------------------- 8/16/22 READY TO PUT PAVERS DONE | |||
| ROW- PRE-APRON (PRE-POUR) | 08/09/2022 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION 8/2/22 BEFORE NEXT PRE POUR ALL BASE NEEDS TO BE DOWN AND COMPACTED NO PAVERS SHOULD BE PLACED BEFORE THE NEXT INSPECTION IF THERE IS ALL PAVERS WILL NEED TO REMOVED --------------------------------------------------------------------------------------------------------------------------------- Paver restraints are good but the sidewalk is not pitched toward the street. ADA recommends 1.5% but not more than 2%. currently the sidewalk is level and will hold stormwater. 8/9/22 - Driveway base needed a 2nd inspection BEFORE the pavers are placed. Remove pavers so that the base can be inspected. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/02/2022 | PARTIALLY APPROVED | PFLANAGAN |
| Note: 8/2/22 BEFORE NEXT PRE POUR ALL BASE NEEDS TO BE DOWN AND COMPACTED NO PAVERS SHOULD BE PLACED BEFORE THE NEXT INSPECTION IF THERE IS ALL PAVERS WILL NEED TO REMOVED --------------------------------------------------------------------------------------------------------------------------------- Paver restraints are good but the sidewalk is not pitched toward the street. ADA recommends 1.5% but not more than 2%. currently the sidewalk is level and will hold stormwater. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/27/2022 | Disapproved - NO FEE | RGROSS |
| Note: Paver restraints are good but the sidewalk is not pitched toward the street. ADA recommends 1.5% but not more than 2%. currently the sidewalk is level and will hold stormwater. | |||
| ROW- PAVER RESTRAINTS | 07/27/2022 | APPROVED | RGROSS |
| LATH/BRICK/ WATER BARRIER | 06/28/2022 | APPROVED | LMILLER |
| WINDOW NAILING | 06/28/2022 | CANCELLED BY APPLICANT | WEB |
| WINDOW NAILING | 06/28/2022 | APPROVED | LMILLER |
| GRAVITY SEWER TEST | 06/17/2022 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 06/17/2022 | APPROVED | MGIBSON |
| INSULATION | 05/31/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: 05-11-2022 - Nail guards approved. Garage windows and small garage door not installed. Check at next inspection. 5/31/22 WILL ADD A WINDOW NAILING INSPECTION ON FOR MISSING GARAGE DOOR AND GARAGE WINDOWS, CONTRACTOR WILL NEED TO SCHEDULE INSPECTON WHEN THEY ARE INSTALLED | |||
| ALL ROUGH | 05/11/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: THIS IS A REINSPECTION Nail guards missing, electrical and plumbing @ master shower 05-11-2022 - Nail guards approved. Garage windows and small garage door not installed. Check at next inspection. | |||
| ALL ROUGH | 05/10/2022 | Disapproved - NO FEE | DCUSHING |
| Note: Nail guards missing, electrical and plumbing @ master shower | |||
| ROOF VALLEY & METAL | 04/25/2022 | APPROVED | DCUSHING |
| WALL SHEATHING | 04/25/2022 | APPROVED | DCUSHING |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/25/2022 | APPROVED | DCUSHING |
| WATER METER INSTALLATION REQUEST | 04/22/2022 | APPROVED | CSTONE |
| ELECTRIC-TUG | 04/12/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 10:00 | |||
| ROOF SHEATHING | 04/04/2022 | APPROVED | DCUSHING |
| FOUND SURVEY APPROVED (OFFICE) | 02/25/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 02/01/2022 | APPROVED | TSTAUFFACHER |
| MONOLITHIC SLAB | 01/14/2022 | APPROVED | JWALKER |
| MONOLITHIC SLAB | 01/13/2022 | CANCELLED BY APPLICANT | WEB |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/10/2022 | APPROVED | MGIBSON |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/07/2022 | CANCELLED BY APPLICANT | WEB |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 09/22/2022 | 09/22/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO BLOWER DOOR.PDF | |||
| ENGIN1 | COMPLETE | 02/24/2022 | 02/25/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/24/2022 | 02/24/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/16/2021 | 12/16/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Site plan please reduce the 8 ft drive way on site plan to a 6ft and please label it a walk way instead. | |||
| BLD | COMPLETE | 12/16/2021 | 12/16/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/16/2021 | 12/17/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/16/2021 | 12/28/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/16/2021 | 12/17/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 12/13/2021 | 12/14/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 12/13/2021 | 12/14/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Residential PLAN REVIEW COMMENTS: Repeat Comment Product Approval Specification Sheet per F.S.553.842: 1. OK 2. FL 474.116 for Wood connectors - cannot be found in approved product listing. Number submitted for review is from a previous approval that is no longer approved. Please provide a product approval that is current. | |||
| MECH | COMPLETE | 12/13/2021 | 12/14/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/13/2021 | 12/13/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM please specify where the pavered drive way will stop before apron. if it will continue to ROW please fill out a right of way Utilization agreement and submitsigned and toarized by all owners. repeat comment: Garage depth max is 30 you plans show depth of 36.4 total | |||
| SW1 | HOLD | 12/13/2021 | 12/16/2021 |
| Note: Held By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| BLD | HOLD | 12/02/2021 | 12/02/2021 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Product Approval Specification Sheet per F.S.553.842: 1. FL Number of Garage doors, Wood anchors and Truss plates - missing. 2. FL 474.116 for Wood connectors - cannot be found in approved product listing. | |||
| CUSVC | COMPLETE | 12/02/2021 | 12/06/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 12/02/2021 | 12/02/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit riser diagram and and manufacture specs on generator. | |||
| ENGIN1 | COMPLETE | 12/02/2021 | 12/02/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 12/02/2021 | 12/07/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 12/02/2021 | 12/03/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Orientation of Energy calcs does not match the site plan. Revise to match 2. Energy calcs need to be signed by the builder | |||
| SW1 | HOLD | 12/02/2021 | 12/08/2021 |
| Note: Held By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM No structures are permitted to encroach within any easements. ( C) • Sidewalks patios or other impervious surfaces cannot interfere with the lot drainage pattern or easements | |||
| ZON | HOLD | 12/02/2021 | 12/03/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Site plan states concrete for drive way and landscape states pavers please correct information should match Garage has exceeded the 30 ‘ depth max allowed | |||
| URB | COMPLETE | 12/02/2021 | 12/03/2021 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 10/14/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 10/14/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/06/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/06/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤94.17) | 01/06/2022 |
| SEWER INSPECTION | ¤25.00 | 01/06/2022 |
| SEWER CAPITAL FACILITY | ¤2,607.06 | 01/06/2022 |
| WATER CAPITAL FACILITY FEE | ¤2,436.75 | 01/06/2022 |
| SITE PLAN 30 | ¤30.00 | 01/06/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 01/06/2022 |
| IMPACT FEE FIRE | ¤388.65 | 01/06/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 01/06/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/06/2022 |
| IMPACT FEE TRANSPORTATION | ¤3,139.00 | 01/06/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 01/06/2022 |
| SURCHARGE FS 533.721 | ¤12.56 | 01/06/2022 |
| SURCHARGE - FS 468.631 | ¤18.84 | 01/06/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/06/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/06/2022 |
| SW ENG PRE APRON | ¤30.00 | 01/06/2022 |
| METER - DEPOSIT | ¤60.00 | 01/06/2022 |
| WATER-METER | ¤467.09 | 01/06/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/06/2022 |
| INSPECTION - RESIDENTIAL | ¤907.50 | 01/06/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤257.40 | 01/06/2022 |
| CONNECTION FEES | ¤25.00 | 01/06/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,730.50 |