Permit #2021120185
Permit Details
Status: COED
| Parcel Id: 07-11-31-7023-00630-0210 |
| CONDITIONED SPACE: 2170 sqft |
| GARAGE: 473 sqft |
| OPENED PORCH (WITH ROOF) : 497 sqft |
| OPENED PORCH (WITH ROOF) : 114 sqft |
| Total Square Footage: 3254 sqft |
| Block: 00630 |
| Subdivision: 2191 - SECTION 23-WYNNFIELD |
| Job Phone: 386-447-7007 |
| Location Address: 6 WHELAN PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/18/2022 |
| NOC: RECORDED |
| Applicant name: MAXIM TARANNIK |
| Owner: PAZ, ANTHONY |
|
Address 17133 NW 87 PLACE HIALEAH, FL 33018 |
| Lot: 0210 |
| Contracted Stated Job Value: ¤363,400.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
GOLDEN MAGNOLIA, INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1 ROCKEFELLER DRIVE PALM COAST, FL 32164 |
RR282811984 (Exp: 08/31/2025) | 386-447-7007 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
FERNANDO MEZA SR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
457 CHELSEA PLACE AVE ORMOND BEACH, FL 32174 |
EC13003906 (Exp: 08/31/2026) | 386-241-5211 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/09/2024 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 12/05/2024 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: 112/05/24 #1-2. FBC. R302.6-Garage penitrations must be sealed around plenums ( please used proper material for seal ( Fire rate foam / ac air duct mastic ) #2-Sotfit where over head service wire was before need to be seal with a proper material ( not a plastic bag ) 11/1/2024 - PREVIOUS INSPECTION NOTES 11/1/24 1. Over head service wires do not meet clearances over roof per NEC 230.24 2. Garage penitrations must be sealed around plenums FBC R302.6 3. Garage door anchors for bucks have been cut off during door installed, replace anchors peover headr detail 10/25/2024 - PREVIOUS INSPECTION NOTES 1. Garage outlets must be GFCI protected NEC 210.8 2. Light not working outside garage side door NEC 210.70 3. Seal all garage penitrations in ceiling and wall (low voltage wiring AHU plenum Conduits) FBC R302.6 4. Condensation line must slope downhill 5. Attic light not working NEC 210.70 | |||
| BLD - BUILDING FINAL | 11/01/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 11/1/24 1. Over head service wires do not meet clearances over roof per NEC 230.24 2. Garage penitrations must be sealed around plenums FBC R302.6 3. Garage door anchors for bucks have been cut off during door installed, replace anchors per detail 10/25/2024 - PREVIOUS INSPECTION NOTES 1. Garage outlets must be GFCI protected NEC 210.8 2. Light not working outside garage side door NEC 210.70 3. Seal all garage penitrations in ceiling and wall (low voltage wiring AHU plenum Conduits) FBC R302.6 4. Condensation line must slope downhill 5. Attic light not working NEC 210.70 | |||
| BLD - BUILDING FINAL | 10/25/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Garage outlets must be GFCI protected NEC 210.8 2. Light not working outside garage side door NEC 210.70 3. Seal all garage penitrations in ceiling and wall (low voltage wiring AHU plenum Conduits) FBC R302.6 4. Condensation line must slope downhill 5. Attic light not working NEC 210.70 | |||
| U -UTILITY RESIDENTIAL FINAL | 09/26/2024 | APPROVED | LFITZGERALD |
| Note: 9/10/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 9/10/2024 10:54:20 AM *** gravity sewer line to pep tank is all exposed-needs covering with sod-C/O cap to be flush to grade Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 9/9/2024 11:24:24 AM *** no irrigation-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 09/10/2024 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/10/2024 10:54:20 AM *** gravity sewer line to pep tank is all exposed-needs covering with sod-C/O cap to be flush to grade Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 9/9/2024 11:24:24 AM *** no irrigation-no cross connection | |||
| U - SEWER TIE IN | 09/09/2024 | APPROVED | MGIBSON |
| Note: 8/27/2024 - PREVIOUS INSPECTION NOTES SEE GRAVITY SEWER NOTE | |||
| U-CROSS CONNECTION | 09/09/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/9/2024 11:24:24 AM *** no irrigation-no cross connection | |||
| GRAVITY SEWER TEST | 09/09/2024 | APPROVED | MGIBSON |
| Note: 8/27/2024 - PREVIOUS INSPECTION NOTES NEED TO APPLY FOR REVISION FOR GRAVITY SEWER GOING INTO LIFT STATION TANK, POWER SOURCE TO BE INCLUDED, TO REVISION | |||
| ROW - FINAL APRON (AFTER POUR) | 09/03/2024 | APPROVED | TPOLACEK |
| Note: 09/03/24 TPOLACEK*** THERE IS A CRACK IN DRIVEWAY BY SIDEWALK THAT SHOULD BE REPAIRED. APPROVING AS NOTED. PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9470 FINAL GRADING DONE ON THIS SITE ALREADY PASSING ----------------------------------------------------------- THIS IS A REINSPECTION NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE AND ALL THE WAY DOWN TO THE SWALE ON THE DOWNSTREAM Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK ON 09/6/22 | |||
| ROW - STORMWATER FINAL | 09/03/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ FINAL GRADING DONE ON THIS SITE ALREADY PASSING ----------------------------------------------------------- THIS IS A REINSPECTION NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE AND ALL THE WAY DOWN TO THE SWALE ON THE DOWNSTREAM Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK ON 09/6/22 | |||
| U - SEWER TIE IN | 08/27/2024 | Disapproved - NO FEE | MGIBSON |
| Note: SEE GRAVITY SEWER NOTE | |||
| GRAVITY SEWER TEST | 08/27/2024 | Disapproved - NO FEE | MGIBSON |
| Note: NEED TO APPLY FOR REVISION FOR GRAVITY SEWER GOING INTO LIFT STATION TANK, POWER SOURCE TO BE INCLUDED, TO REVISION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 08/01/2024 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/01/2024 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9270 TALKED TO THE CONTRACTOR ABOUT THE THE FLAIRS OF THE MITER END THATHAT THEY NEEDED TO BE FIX SO THEY HAD 18" AT THE DRIVEWAY AND 9" AT THE END OF CULVERT HE STATES THAT HE WOULD TAKE CARE OF IT BEFORE POURING. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. ---------------------------------------------------------------------------------- 5/28/2024 - PREVIOUS INSPECTION NOTES 05/28/24 TPOLACEK*** MET WITH TROY ON SITE. HE KNOWS WHAT NEEDS TO BE DONE TO PASS. BOTH WINGS NEED TO BE 36" AND NEEDS 6" FROM MITER CUT TO EDGE OF DRIVEWAY. ONCE HE MAKES CHANGES HE WILL RESCHEDULE PRE POUR. AT THE TIME OF INSPECTION CULVERT WAS GOOD ++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/23/2024 - PREVIOUS INSPECTION NOTES 05/23/24 TPOLACEK*** NEED TO VERIFY WITH JEFF BM AND ELEVATIONS SITE NOT FORMED. | |||
| ELECTRIC - EARLY POWER | 06/10/2024 | APPROVED | AGAETANO |
| Note: 6/7/2024 - PREVIOUS INSPECTION NOTES 06-07-2024 Doors locked. Need access for inspection. 06-07-2024 Inspector was able to return. | |||
| ELECTRIC - EARLY POWER | 06/07/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 06-07-2024 Doors locked. Need access for inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/03/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: TALKED TO THE CONTRACTOR ABOUT THE THE FLAIRS OF THE MITER END THATHAT THEY NEEDED TO BE FIX SO THEY HAD 18" AT THE DRIVEWAY AND 9" AT THE END OF CULVERT HE STATES THAT HE WOULD TAKE CARE OF IT BEFORE POURING. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. ---------------------------------------------------------------------------------- 5/28/2024 - PREVIOUS INSPECTION NOTES 05/28/24 TPOLACEK*** MET WITH TROY ON SITE. HE KNOWS WHAT NEEDS TO BE DONE TO PASS. BOTH WINGS NEED TO BE 36" AND NEEDS 6" FROM MITER CUT TO EDGE OF DRIVEWAY. ONCE HE MAKES CHANGES HE WILL RESCHEDULE PRE POUR. AT THE TIME OF INSPECTION CULVERT WAS GOOD ++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/23/2024 - PREVIOUS INSPECTION NOTES 05/23/24 TPOLACEK*** NEED TO VERIFY WITH JEFF BM AND ELEVATIONS SITE NOT FORMED. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/28/2024 | Disapproved - NO FEE | TPOLACEK |
| Note: 05/28/24 TPOLACEK*** MET WITH TROY ON SITE. HE KNOWS WHAT NEEDS TO BE DONE TO PASS. BOTH WINGS NEED TO BE 36" AND NEEDS 6" FROM MITER CUT TO EDGE OF DRIVEWAY. ONCE HE MAKES CHANGES HE WILL RESCHEDULE PRE POUR. AT THE TIME OF INSPECTION CULVERT WAS GOOD ++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/23/2024 - PREVIOUS INSPECTION NOTES 05/23/24 TPOLACEK*** NEED TO VERIFY WITH JEFF BM AND ELEVATIONS SITE NOT FORMED. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/23/2024 | Disapproved - NO FEE | TPOLACEK |
| Note: 05/23/24 TPOLACEK*** NEED TO VERIFY WITH JEFF BM AND ELEVATIONS SITE NOT FORMED. | |||
| PEP TANK INSTALLATION REQUEST | 02/05/2024 | APPROVED | BVITALE |
| Note: 1/31/2024 2:17:02 PM- PREVIOUS INSPECTION NOTES STUCCO | |||
| PEP TANK INSTALLATION REQUEST | 01/31/2024 | Disapproved -FEE REQUIRED | BVITALE |
| Note: STUCCO | |||
| U - SEWER TIE IN | 01/30/2024 | CANCELLED BY APPLICANT | WEB |
| LATH/BRICK/ WATER BARRIER | 12/04/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: 12/4/23 Trash needs to be cleaned up by next inspection 11/15/2023 - PREVIOUS INSPECTION NOTES 11/15/23: * Holes in Cinderblock at low voltage & romex on front, left & right sides of the house need wire lath installed over opening. Also, hose bibb directly against door trim on right side should be moved prior to stucco so that the opening can be covered with wire lath. | |||
| LATH/BRICK/ WATER BARRIER | 11/15/2023 | Disapproved - NO FEE | RSIMS |
| Note: 11/15/23: * Holes in Cinderblock at low voltage & romex on front, left & right sides of the house need wire lath installed over opening. Also, hose bibb directly against door trim on right side should be moved prior to stucco so that the opening can be covered with wire lath. | |||
| INSULATION | 11/13/2023 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 11/2/23 Appears mid blocking has been removed in several spots in load bearing walls, Can not find a load bearing wall detail in plans, Replace mid blocking or have approved detail showing they are not required, check at insulation 10/31/2023 - PREVIOUS INSPECTION NOTES 10/31/23 Repair all previous items before calling in re-inspection Stopped inspection @ item 1 10/24/2023 - PREVIOUS INSPECTION NOTES 1. No 5' head pressure test 2. No 50 lbs. of pressure on supply lines 3. Windows installed do not match product approval sheet and a revision is required 4. No E-cals on site, Need approved duct layout to check register locations and duct sizes 5. Dryer vent seam needs to be sealed by approved mathod Stopped inspection in garage, NOT READY. | |||
| ALL ROUGH | 11/02/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: 11/2/23 Appears mid blocking has been removed in several spots in load bearing walls, Can not find a load bearing wall detail in plans, Replace mid blocking or have approved detail showing they are not required, check at insulation 10/31/2023 - PREVIOUS INSPECTION NOTES 10/31/23 Repair all previous items before calling in re-inspection Stopped inspection @ item 1 10/24/2023 - PREVIOUS INSPECTION NOTES 1. No 5' head pressure test 2. No 50 lbs. of pressure on supply lines 3. Windows installed do not match product approval sheet and a revision is required 4. No E-cals on site, Need approved duct layout to check register locations and duct sizes 5. Dryer vent seam needs to be sealed by approved mathod Stopped inspection in garage, NOT READY. | |||
| ALL ROUGH | 10/31/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 10/31/23 Repair all previous items before calling in re-inspection Stopped inspection @ item 1 10/24/2023 - PREVIOUS INSPECTION NOTES 1. No 5' head pressure test 2. No 50 lbs. of pressure on supply lines 3. Windows installed do not match product approval sheet and a revision is required 4. No E-cals on site, Need approved duct layout to check register locations and duct sizes 5. Dryer vent seam needs to be sealed by approved mathod Stopped inspection in garage, NOT READY. | |||
| ALL ROUGH | 10/24/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. No 5' head pressure test 2. No 50 lbs. of pressure on supply lines 3. Windows installed do not match product approval sheet and a revision is required 4. No E-cals on site, Need approved duct layout to check register locations and duct sizes 5. Dryer vent seam needs to be sealed by approved mathod Stopped inspection in garage, NOT READY. | |||
| WALL SHEATHING | 10/23/2023 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 04/24/2023 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/18/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 4/18/23 1. Moisture barriers are required where truss's touches CMU (lani wall) 4/17/23 1. All wood to truss connections shall be made with MTS 12's per detail 2. Coller ties missing on over framing per detail 3. Load bearing garage wall per detail indicates that footinf detail "C-C" require tie down anchors 4. Moisture barrier for trusses missing on lani block wall 5. Stopped inspection did not look at truss engineering 4/13/2023 - PREVIOUS INSPECTION NOTES 1. Missing multiple truss straps 2. No wood frame load bearing wall detail Stopped inspection | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/18/2023 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/17/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 4/17/23 1. All wood to truss connections shall be made with MTS 12's per detail 2. Coller ties missing on over framing per detail 3. Load bearing garage wall per detail indicates that footinf detail "C-C" require tie down anchors 4. Moisture barrier for trusses missing on lani block wall 5. Stopped inspection did not look at truss engineering 4/13/2023 - PREVIOUS INSPECTION NOTES 1. Missing multiple truss straps 2. No wood frame load bearing wall detail Stopped inspection | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/13/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Missing multiple truss straps 2. No wood frame load bearing wall detail Stopped inspection | |||
| TIE BEAM / LINTEL | 11/07/2022 | APPROVED | MKRASKI |
| ROW - DRAINAGE | 08/29/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE AND ALL THE WAY DOWN TO THE SWALE ON THE DOWNSTREAM Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK ON 09/6/22 | |||
| ROW - DRAINAGE | 08/06/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: FINAL GRADING DONE ON THIS SITE ALREADY PASSING ----------------------------------------------------------- THIS IS A REINSPECTION NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE AND ALL THE WAY DOWN TO THE SWALE ON THE DOWNSTREAM Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK ON 09/6/22 | |||
| ROW - DRAINAGE | 07/27/2022 | APPROVED | GBERTOLA |
| Note: 07/27/22=CORRECTION WERE MADE 07/26/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE AT THE NED OF THE WEEK WE WILL add a STOP WORK ORDER UNTIL THE SWALE IT'S FIXED INSPECTOR BE BACK 07/27/22 ........................................................................ 07/25/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE NEED TO REMOVE THE POTTY FROM THE SWALE AND PLACE ON YOUR PROPERTY inspector be back on ROW NEED A PIPE ON THE GROUND ASAP MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE INSPECTOR BE BACK 7/25/22 | |||
| ROW - DRAINAGE | 07/26/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 07/26/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE AT THE NED OF THE WEEK WE WILL add a STOP WORK ORDER UNTIL THE SWALE IT'S FIXED INSPECTOR BE BACK 07/27/22 ........................................................................ 07/25/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE NEED TO REMOVE THE POTTY FROM THE SWALE AND PLACE ON YOUR PROPERTY inspector be back on ROW NEED A PIPE ON THE GROUND ASAP MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE INSPECTOR BE BACK 7/25/22 | |||
| ROW - DRAINAGE | 07/25/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 07/25/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE NEED TO REMOVE THE POTTY FROM THE SWALE AND PLACE ON YOUR PROPERTY inspector be back on 07/26/22 ROW NEED A PIPE ON THE GROUND ASAP MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE INSPECTOR BE BACK 7/25/22 | |||
| ROW - DRAINAGE | 07/21/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: ROW NEED A PIPE ON THE GROUND ASAP MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE REMOVE THE CONCRETE DUMPED IN THE SWALE INSPECTOR BE BACK 7/25/22 | |||
| FOUND SURVEY APPROVED (OFFICE) | 06/10/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 04/18/2022 | APPROVED | MKRASKI |
| MONOLITHIC SLAB | 04/14/2022 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: THIS IS A REINSPECTION Missing (3) dowels marked on foundation print 4/14/22 Still missing dowels | |||
| MONOLITHIC SLAB | 04/12/2022 | Disapproved - NO FEE | MKRASKI |
| Note: Missing (3) dowels marked on foundation print | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/06/2022 | APPROVED | KSANDOE |
| WATER METER INSTALLATION REQUEST | 03/16/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 09/24/2024 | 09/26/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 08/29/2024 | 09/06/2024 |
| Note: Released By: ALPHANETTE WATERS - (386)986-2624 - AWATERS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/25/2023 | 10/30/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/10/2023 | 04/10/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 04/10/2023 | 04/10/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM This should be uploaded either under the truss plan or the engineer letter. | |||
| ENGIN1 | COMPLETE | 06/09/2022 | 06/10/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/09/2022 | 06/09/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 06/08/2022 | 06/08/2022 |
| Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM Uploaded foundation survey file name was not correct - Example: Site plan=site plan (no names or extra numbers added) | |||
| BLD | COMPLETE | 04/29/2022 | 04/29/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 03/18/2022 | 03/21/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Door is being added. Provide the proposed lintel for proposed door. 2. Revise the Product Approval Sheet to note the proposed door. | |||
| BLD | COMPLETE | 03/17/2022 | 03/17/2022 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/16/2022 | 02/16/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/16/2022 | 02/16/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/01/2022 | 02/01/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Landscape plan must match siteplan please add the walkway to the landscape plan as well. | |||
| MECH | HOLD | 02/01/2022 | 02/01/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Design location on Energy Calc and heatload need to match. Daytona Beach or St.augustine | |||
| ENGIN1 | COMPLETE | 02/01/2022 | 02/01/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/01/2022 | 02/07/2022 |
| Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM | |||
| MECH | HOLD | 01/10/2022 | 01/10/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Orientation of Energy calcs does not match the site plan. Revise to match 2. Duct layout needs to be signed by the AC contractor (Second Request) | |||
| ZON | HOLD | 01/10/2022 | 01/10/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM site plan: Missing entry walk way from drive way to to entrance. landscape plan : One tree for every 2500 square ft. All calculations are rounded to the nearest whole number. This property requires 6 trees | |||
| SW1 | COMPLETE | 01/10/2022 | 01/18/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/10/2022 | 01/10/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 12/06/2021 | 02/01/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/03/2021 | 12/09/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 12/03/2021 | 12/06/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 12/03/2021 | 12/06/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/03/2021 | 12/06/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 12/03/2021 | 12/07/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 12/03/2021 | 12/06/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Orientation of Energy calcs does not match the site plan. Revise to match 2. Duct layout needs to be signed by the AC contractor | |||
| SW1 | HOLD | 12/03/2021 | 12/10/2021 |
| Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM There are several missing requirements from the Stormwater review that needs to be added to the site plan. See attached Checklist dated 12/10/21. Go over each item and add to a revised site plan. Too many missing items to itemize. | |||
| ZON | HOLD | 12/03/2021 | 12/06/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Site plan?survey: missing proposed drive way materials missing width of proposed entry way missing square footage of lot site plan and landscape dont match (Different homes) site plan does not match floor plan and lanscape plan. Color Sheet: gray does not meet code too dark Lrv must be 25 or greater Color submitted is LRV 23 please submit coors for garage. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 12/09/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 12/09/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 12/09/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/09/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/09/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/09/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/09/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/09/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/09/2024 |
| CONTRACTOR CHANGE | ¤40.00 | 12/09/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 12/09/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 12/09/2024 |
| EXTENSION | ¤40.00 | 12/09/2024 |
| REINSPECTION FEE | ¤40.00 | 12/09/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/09/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/09/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/09/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/09/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/09/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/09/2024 |
| UTILITY PEP REINSPECTION | ¤40.00 | 12/09/2024 |
| SEWER CREDIT | (¤1,806.00) | 02/18/2022 |
| SEWER INSPECTION | ¤25.00 | 02/18/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 02/18/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 02/18/2022 |
| SITE PLAN 30 | ¤30.00 | 02/18/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/18/2022 |
| SW ENG PRE APRON | ¤30.00 | 02/18/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/18/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/18/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 02/18/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 02/18/2022 |
| SURCHARGE FS 533.721 | ¤13.79 | 02/18/2022 |
| SURCHARGE - FS 468.631 | ¤20.69 | 02/18/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/18/2022 |
| INSPECTION - RESIDENTIAL | ¤1,001.00 | 02/18/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤283.92 | 02/18/2022 |
| METER - DEPOSIT | ¤60.00 | 02/18/2022 |
| WATER- TURN ON | ¤25.00 | 02/18/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/18/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 02/18/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 02/18/2022 |
| IMPACT FEE FIRE | ¤388.65 | 02/18/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 02/18/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/18/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 02/18/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/18/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 02/18/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 02/18/2022 |
| CONNECTION FEES | ¤1,077.88 | 02/18/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,308.12 |