Permit #2021120241

Permit Details

Status: COED

Parcel Id: 35-11-31-4075-00000-1160
COMMERCIAL SQUARE FOOTAGE: 2974 sqft
GARAGE: 670 sqft
OPENED PORCH (WITH ROOF) : 433 sqft
PATIO/DECK (NO ROOF) : 32 sqft
Total Square Footage: 4109 sqft
Block: 00000
Subdivision: 2296 - MARINA DEL PALMA SUBDIVISION
Job Phone: 863-647-5815
Location Address: 7 MENORCA WAY
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/10/2022
NOC: RECORDED
Applicant name: MARK ALLAN HULBERT
Owner: MIGLIOZZI ANTHONY MATTHEW & JOAN ARLEEN H&W

Address

12981 PAVILION COURT

UNION, KY 41091

Lot: 1160
Contracted Stated Job Value: ¤480,000.00
Job Description: Single Family Residence
Type: CN

Contractor

HULBERT HOMES INC
Status Location Address State License Number Phone
INACTIVE

PO BOX 6254

LAKELAND, FL 33813

CRC1331304 (Exp: 08/31/2026) 863-647-5815

Sub Contractors

JOHN EDWARD GAMBONE
Status Location Address Mailing Address State License Number Phone
ACTIVE

15 HARGROVE LN

PALM COAST, FL 32137

1G

PALM COAST, FL 32137

EC13006037 (Exp: 08/31/2026) 386-586-9144
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
ANTONIO VINCENZO DAHM
Status Location Address State License Number Phone
ACTIVE

10 RYBAR LANE

PALM COAST, FL 32164

CFC1429951 (Exp: 08/31/2026) 386-237-5692
MOISES MERINO DIAZ
Status Location Address State License Number Phone
ACTIVE

3104 ORANOLE ROAD

ORLANDO, FL 32810

CAC1820980 (Exp: 08/31/2026) 407-225-3149

Inspection History

Type Request Date Result Inspector
WINDOW NAILING 02/17/2023 FINAL APPROVED TSTAUFFACHER
Note: 2/14/2023 - PREVIOUS INSPECTION NOTES Screws missing in header jamb on downstairs rear slider New inspection due to canceled inspection 11/3/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2490 10/17/2022 - PREVIOUS INSPECTION NOTES Need to call in window nailing (added) for missing slider doors prior to final 10-17-22 Not ready Still being insulated. 10.19.22 - several batts fell down from wind, ensure they are in place before drywalling 11-3-22 Missing Screws (check all)
BLD - BUILDING FINAL 02/17/2023 FINAL APPROVED TSTAUFFACHER
Note: 2/14/2023 - PREVIOUS INSPECTION NOTES 02/14/2023- Multiple items incomplete or not installed house is not ready for final at this time. New inspection due to canceled inspection Need to call in window nailing (added) for missing slider doors Need revision on added electric by final
WINDOW NAILING 02/14/2023 Disapproved - NO FEE TSTAUFFACHER
Note: Screws missing in header jamb on downstairs rear slider New inspection due to canceled inspection 11/3/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2490 10/17/2022 - PREVIOUS INSPECTION NOTES Need to call in window nailing (added) for missing slider doors prior to final 10-17-22 Not ready Still being insulated. 10.19.22 - several batts fell down from wind, ensure they are in place before drywalling 11-3-22 Missing Screws (check all)
BLD - BUILDING FINAL 02/14/2023 Disapproved - NO FEE TSTAUFFACHER
Note: 02/14/2023- Multiple items incomplete or not installed house is not ready for final at this time. New inspection due to canceled inspection Need to call in window nailing (added) for missing slider doors Need revision on added electric by final
WINDOW NAILING 02/01/2023 CANCELLED BY APPLICANT WEB
Note: 11/3/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2490 10/17/2022 - PREVIOUS INSPECTION NOTES Need to call in window nailing (added) for missing slider doors prior to final 10-17-22 Not ready Still being insulated. 10.19.22 - several batts fell down from wind, ensure they are in place before drywalling 11-3-22 Missing Screws (check all)
BLD - BUILDING FINAL 02/01/2023 CANCELLED BY APPLICANT WEB
Note: Need to call in window nailing (added) for missing slider doors Need revision on added electric by final
U-CROSS CONNECTION 01/26/2023 APPROVED - AS NOTED LFITZGERALD
Note: please have Pressure breaker assembly equal or higher then hose bib/has potable irrigation with PVB installed-no cross connection
ROW - STORMWATER FINAL 01/26/2023 FINAL APPROVED PFLANAGAN
U -UTILITY RESIDENTIAL FINAL 01/26/2023 APPROVED - AS NOTED LFITZGERALD
Note: use flush mount sewer clean out cap in future(not the current square nut type)
ROW - FINAL APRON (AFTER POUR) 01/25/2023 APPROVED PFLANAGAN
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/25/2023 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 01/25/2023 APPROVED PFLANAGAN
Note: 1/17/2023 - PREVIOUS INSPECTION NOTES 01/17/23= YOU PROPOSE WAS WATER IS GOING FROM THE BACK TO THE FRONT, BUT IN YOU FINAL SURVEY YOU CHANGE THE FLOW OF THE WATER. NEED TO HAVE POSITE FALL IN EACH SIDE TO THE FRONT OF THE PROPERTY
FINAL SURVEY (OFFICE USE ONLY) 01/17/2023 Disapproved -FEE REQUIRED GBERTOLA
Note: 01/17/23= YOU PROPOSE WAS WATER IS GOING FROM THE BACK TO THE FRONT, BUT IN YOU FINAL SURVEY YOU CHANGE THE FLOW OF THE WATER. NEED TO HAVE POSITE FALL IN EACH SIDE TO THE FRONT OF THE PROPERTY
ELECTRIC - EARLY POWER 01/17/2023 APPROVED LMILLER
Note: 1/13/2023 - PREVIOUS INSPECTION NOTES 1/10/2023 - PREVIOUS INSPECTION NOTES 1/5/2023 - PREVIOUS INSPECTION NOTES 1. Panel cover needs to be installed 2. Outlet upstairs needs to be safed off 1-10-23 Not ready. 1-13-23 Outlet in garage not safed off. 1-17-23 note above resolved
ELECTRIC - EARLY POWER 01/13/2023 Disapproved - NO FEE BTAYLOR
Note: 1/10/2023 - PREVIOUS INSPECTION NOTES 1/5/2023 - PREVIOUS INSPECTION NOTES 1. Panel cover needs to be installed 2. Outlet upstairs needs to be safed off 1-10-23 Not ready. 1-13-23 Outlet in garage not safed off.
ELECTRIC - EARLY POWER 01/10/2023 Disapproved - NO FEE BTAYLOR
Note: 1/5/2023 - PREVIOUS INSPECTION NOTES 1. Panel cover needs to be installed 2. Outlet upstairs needs to be safed off 1-10-23 Not ready.
ELECTRIC - EARLY POWER 01/05/2023 Disapproved - NO FEE JMUNSON
Note: 1. Panel cover needs to be installed 2. Outlet upstairs needs to be safed off
GRAVITY SEWER TEST 12/09/2022 APPROVED DCUSHING
U - SEWER TIE IN 12/09/2022 APPROVED DCUSHING
ROW- PRE-APRON (PRE-POUR) 12/07/2022 APPROVED PFLANAGAN
Note: READY FOR PAVERS ---------------------------------------------------- 12/6/2022 - PREVIOUS INSPECTION NOTES THIS IS NOT READY FOR THE SECOND INSPECTION THERE IS NO BASE SPREAD AND COMPACTED SEE PHOTOS OF THE RESULTS OF THE INSPECTION ---------------------------------------------------------------------------------------- 11/21/2022 - PREVIOUS INSPECTION NOTES READY TO POUR 1) APRON 2) SIDEWALK 3) PAVER RESTRAINTS ONLY BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID
ROW- PRE-APRON (PRE-POUR) 12/06/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: THIS IS NOT READY FOR THE SECOND INSPECTION THERE IS NO BASE SPREAD AND COMPACTED SEE PHOTOS OF THE RESULTS OF THE INSPECTION ---------------------------------------------------------------------------------------- 11/21/2022 - PREVIOUS INSPECTION NOTES READY TO POUR 1) APRON 2) SIDEWALK 3) PAVER RESTRAINTS ONLY BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID
ROW- PRE-APRON (PRE-POUR) 11/21/2022 PARTIALLY APPROVED PFLANAGAN
Note: READY TO POUR 1) APRON 2) SIDEWALK 3) PAVER RESTRAINTS ONLY BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID
LATH/BRICK/ WATER BARRIER 11/15/2022 APPROVED DCUSHING
WINDOW NAILING 11/03/2022 Disapproved -FEE REQUIRED LMILLER
Note: Inspector Notes from Inspection 2490 10/17/2022 - PREVIOUS INSPECTION NOTES Need to call in window nailing (added) for missing slider doors prior to final 10-17-22 Not ready Still being insulated. 10.19.22 - several batts fell down from wind, ensure they are in place before drywalling 11-3-22 Missing Screws (check all)
INSULATION 10/19/2022 APPROVED - AS NOTED DCUSHING
Note: 10/17/2022 - PREVIOUS INSPECTION NOTES Need to call in window nailing (added) for missing slider doors prior to final 10-17-22 Not ready Still being insulated. 10.19.22 - several batts fell down from wind, ensure they are in place before drywalling
INSULATION 10/17/2022 Disapproved -FEE REQUIRED BTAYLOR
Note: Need to call in window nailing (added) for missing slider doors prior to final 10-17-22 Not ready Still being insulated.
ALL ROUGH 10/05/2022 APPROVED RMARTIN
Note: 9/20/2022 - PREVIOUS INSPECTION NOTES 9/19/2022 - PREVIOUS INSPECTION NOTES 09-19-2022 1. UFER ground not protected. UFER needs to be protected NEC 250.64. 2. Wires not phased out in electrical panel. 3. Drain pipe in garage needs plate at slab. NAIL PLATES FOR PLUMBING P2603.2.1 PROTECTION AGAINST PHYSICAL DAMAGE 4. Grounds not connected on second floor hallway. All grounds need to be connected – NEC 110.14A. Check all. 5. Outlet hanging in second floor master bath at pocket door, 6. Wire not connected at same area but different box. 7. Box loose and wires not fastened at second floor left of patio door. 9-20-22 1. 5ft head test 2. nail plates on electric 3. low voltage 1 1/4 from edge 4. fireblocking 5. fireblocking materials 6. nail plates on mechanical (liquid lines top plat (wrong nail plarte used) 7. plumbing is out of wall (down stairs) 8. A/C register is not mounted in bath down stairs 9. missing shower pans (and need to have test on pan/liner when installed) 10. Missing test on tub Need to call in window nailing (added) for missing slider doors prior to final Need revision on added electric by final
ALL ROUGH 09/20/2022 Disapproved -FEE REQUIRED LMILLER
Note: 9/19/2022 - PREVIOUS INSPECTION NOTES 09-19-2022 1. UFER ground not protected. UFER needs to be protected NEC 250.64. 2. Wires not phased out in electrical panel. 3. Drain pipe in garage needs plate at slab. NAIL PLATES FOR PLUMBING P2603.2.1 PROTECTION AGAINST PHYSICAL DAMAGE 4. Grounds not connected on second floor hallway. All grounds need to be connected – NEC 110.14A. Check all. 5. Outlet hanging in second floor master bath at pocket door, 6. Wire not connected at same area but different box. 7. Box loose and wires not fastened at second floor left of patio door. 9-20-22 1. 5ft head test 2. nail plates on electric 3. low voltage 1 1/4 from edge 4. fireblocking 5. fireblocking materials 6. nail plates on mechanical (liquid lines top plat (wrong nail plarte used) 7. plumbing is out of wall (down stairs) 8. A/C register is not mounted in bath down stairs 9. missing shower pans (and need to have test on pan/liner when installed) 10. Missing test on tub Need to call in window nailing (added) for missing slider doors Need revision on added electric by final
ALL ROUGH 09/19/2022 Disapproved - NO FEE AGAETANO
Note: 09-19-2022 1. UFER ground not protected. UFER needs to be protected NEC 250.64. 2. Wires not phased out in electrical panel. 3. Drain pipe in garage needs plate at slab. NAIL PLATES FOR PLUMBING P2603.2.1 PROTECTION AGAINST PHYSICAL DAMAGE 4. Grounds not connected on second floor hallway. All grounds need to be connected – NEC 110.14A. Check all. 5. Outlet hanging in second floor master bath at pocket door, 6. Wire not connected at same area but different box. 7. Box loose and wires not fastened at second floor left of patio door.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/16/2022 APPROVED DCUSHING
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 7-19-22 1. missing nails at truss plates (highlighted on plans) 2. see symbol for Simpsonmissing HTT4 or double straps on second floor plan (highlighted) 7/22/22 The Htt4 nor the (2) LSTA18 tie downs have been installed the contrator installed H2.5 anchors. These are not sufficent for the required Uplift. The Htt4 or the LSTA's will need to be anchored to the CMU walls below. 08/10/2022-Prior inspector notes have not been completed.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/10/2022 Disapproved -FEE REQUIRED TSTAUFFACHER
Note: THIS IS A REINSPECTION 7-19-22 1. missing nails at truss plates (highlighted on plans) 2. see symbol for Simpsonmissing HTT4 or double straps on second floor plan (highlighted) 7/22/22 The Htt4 nor the (2) LSTA18 tie downs have been installed the contrator installed H2.5 anchors. These are not sufficent for the required Uplift. The Htt4 or the LSTA's will need to be anchored to the CMU walls below. 08/10/2022-Prior inspector notes have not been completed.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/22/2022 Disapproved -FEE REQUIRED JWALKER
Note: 7-19-22 1. missing nails at truss plates (highlighted on plans) 2. see symbol for Simpsonmissing HTT4 or double straps on second floor plan (highlighted) 7/22/22 The Htt4 nor the (2) LSTA18 tie downs have been installed the contrator installed H2.5 anchors. These are not sufficent for the required Uplift. The Htt4 or the LSTA's will need to be anchored to the CMU walls below.
ROOF VALLEY & METAL 07/21/2022 APPROVED DCUSHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/19/2022 Disapproved - NO FEE LMILLER
Note: THIS IS A REINSPECTION need to organize paperwork, Please provide a set of plans and documents for inspectors to use at time of inspections that are organized, complete, and otherwise not crumpled and missing pages. it is apparent that the 4x4 posts are missing connection for Continuous load path… R301,2.1 (no connections on several areas) SP2 connectors have been deformed and used incorrectly (need a complete set of usable plans and documents for further inspection) Inspection Stopped. 7-19-22 1. missing nails at truss plates (highlighted on plans) 2. see symbol for Simpsonmissing HTT4 or double straps on second floor plan (highlighted)
WALL SHEATHING 07/19/2022 APPROVED LMILLER
Note: THIS IS A REINSPECTION need to organize paperwork, Please provide a set of plans and documents for inspectors to use at time of inspections that are organized, complete, and otherwise not crumpled and missing pages 7-19-22 notes above resolved
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/13/2022 Disapproved -FEE REQUIRED LMILLER
Note: need to organize paperwork, Please provide a set of plans and documents for inspectors to use at time of inspections that are organized, complete, and otherwise not crumpled and missing pages. it is apparent that the 4x4 posts are missing connection for Continuous load path… R301,2.1 (no connections on several areas) SP2 connectors have been deformed and used incorrectly (need a complete set of usable plans and documents for further inspection) Inspection Stopped.
WALL SHEATHING 07/13/2022 Disapproved - NO FEE LMILLER
Note: need to organize paperwork, Please provide a set of plans and documents for inspectors to use at time of inspections that are organized, complete, and otherwise not crumpled and missing pages
ELECTRIC-TUG 06/10/2022 APPROVED - AS NOTED RMARTIN
FOUND SURVEY APPROVED (OFFICE) 05/16/2022 APPROVED TBAKER
TIE BEAM / LINTEL 05/09/2022 APPROVED KSANDOE
WATER METER INSTALLATION REQUEST 03/29/2022 APPROVED CSTONE
MONOLITHIC SLAB 03/22/2022 APPROVED LMILLER
Note: THIS IS A REINSPECTION need compaction report on site 3-22-22 notes above resolved
MONOLITHIC SLAB 03/18/2022 Disapproved - NO FEE LMILLER
Note: need compaction report on site
PLUMBING 1ST ROUGH UNDERGROUND 02/07/2022 APPROVED MGIBSON

Review History

Department Status Date In Date Out
BADMIN INFORMATION 09/20/2022 09/20/2022
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Rename your file to the plan sheet name
BLD COMPLETE 08/11/2022 08/15/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD HOLD 07/26/2022 07/27/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: Repeat Comments 1. Provide product approval for the proposed FramFAST fasteners. 2. Simpson HTT4 had an uplift design of 3105 and LSTA18 designed of 1235. Provide the uplift of the proposed fastener can meet the required up lift.
ENGIN1 COMPLETE 05/16/2022 05/16/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/16/2022 05/16/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 01/05/2022 01/06/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD HOLD 12/30/2021 01/03/2022
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Product approval for wood anchors is still missing. Provide only one(1) FL Number.
MECH COMPLETE 12/16/2021 12/17/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 12/16/2021 12/17/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
BLD HOLD 12/16/2021 12/16/2021
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM Repeat Comment 1. Provide components and cladding pressure zones per FBCR 7th Edition, Figure R301.2(7). 2. OK
ENGIN1 COMPLETE 12/16/2021 12/17/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 12/16/2021 12/28/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
URB COMPLETE 12/07/2021 12/08/2021
Note: Released By: JOHN BEAUDET - (386)986-2456 -
BLD HOLD 12/06/2021 12/10/2021
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM 1. Provide components and cladding pressure zones per FBCR 7th Edition, Figure R301.2(7). 2. Provide product approval of garage door, wood anchors and truss plates per F.S. 553.842.
CUSVC COMPLETE 12/06/2021 12/10/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 12/06/2021 12/06/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/06/2021 12/06/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 12/06/2021 12/08/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 12/06/2021 12/07/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the builder
SW1 COMPLETE 12/06/2021 12/14/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
ZON HOLD 12/06/2021 12/07/2021
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Survey/ Site plan : state 1 story plpans show two story home, please correct

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 02/17/2023
REINSPECTION RESIDENTIAL ¤40.00 02/17/2023
REINSPECTION RESIDENTIAL ¤40.00 02/17/2023
REINSPECTION RESIDENTIAL ¤40.00 02/17/2023
REINSPECTION RESIDENTIAL ¤40.00 02/17/2023
REINSPECTION RESIDENTIAL ¤40.00 02/17/2023
REINSPECTION RESIDENTIAL ¤40.00 02/17/2023
CONTRACTOR CHANGE ¤20.00 02/17/2023
SW ENG REINSPECTION 30 ¤30.00 02/17/2023
REINSPECTION FEE ¤40.00 02/17/2023
SURCHARGE FS 533.721 ¤17.99 01/10/2022
SURCHARGE - FS 468.631 ¤26.99 01/10/2022
SW ENG - FOUNDATION SURVEY ¤20.00 01/10/2022
SW ENG INSPECTION 80 ¤80.00 01/10/2022
SW ENG PRE APRON ¤30.00 01/10/2022
SW ENG - REVIEW 20 ¤20.00 01/10/2022
SW ENG RES REVIEW 200 ¤200.00 01/10/2022
3% TRANS IMPACT FEE CREDIT (¤94.17) 01/10/2022
SEWER INSPECTION ¤25.00 01/10/2022
SEWER CAPITAL FACILITY ¤2,607.06 01/10/2022
WATER CAPITAL FACILITY FEE ¤2,436.75 01/10/2022
SITE PLAN 30 ¤30.00 01/10/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 01/10/2022
IMPACT FEE FIRE ¤388.65 01/10/2022
IMPACT FEE PARKS ¤1,455.13 01/10/2022
IMPACT FEE SCHOOL ¤3,600.00 01/10/2022
IMPACT FEE TRANSPORTATION ¤3,139.00 01/10/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 01/10/2022
METER - DEPOSIT ¤60.00 01/10/2022
WATER-METER ¤467.09 01/10/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/10/2022
INSPECTION - RESIDENTIAL ¤1,320.00 01/10/2022
PLAN REVIEW - RESIDENTIAL ¤374.40 01/10/2022
CONNECTION FEES ¤25.00 01/10/2022
Fees Total Due: ¤0.00 Total Paid: ¤16,566.08