I want to search for...

Permit #2021120285

Permit Details

Status: COED

Parcel Id: 07-11-31-7057-00360-0100
CONDITIONED SPACE: 2536 sqft
GARAGE: 500 sqft
OPENED PORCH (WITH ROOF) : 191 sqft
OPENED PORCH (WITH ROOF) : 226 sqft
Total Square Footage: 3453 sqft
Block: 00360
Subdivision: 2123 - SECTION 57-ULYSSES TREES
Job Phone: (386) 445-2222
Location Address: 6 UPSHUR CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/20/2021
NOC: RECORDED
Applicant name: MICHAEL STEPHAN MULLEN
Owner: KENNETH AND KRISTINA UDELL

Address

6 UPSHUR CT

PALM COAST, FL 32164

Lot: 0100
Contracted Stated Job Value: ¤250,000.00
Job Description: Single Family Residence
Type: CN

Contractor

TOWN & COUNTRY HOMES
Status Location Address State License Number Phone
ACTIVE

1 Enterprise Drive

Bunnell, FL 32110

CGC049972 (Exp: 08/31/2026) (386) 445-2222

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614
YORDANIS GONZALEZ
Status Location Address State License Number Phone
ACTIVE

33 RICKENBACKER DRIVE

PALM COAST, FL 32164

CCC1328730 (Exp: 08/31/2026) 386-804-4109
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488

Inspection History

Type Request Date Result Inspector
U-CROSS CONNECTION 01/26/2023 APPROVED - AS NOTED JHARDING
Note: 1/24/2023 - PREVIOUS INSPECTION NOTES Not Ready 1/25/2023 No cross connections.
ROW - STORMWATER FINAL 01/26/2023 FINAL APPROVED PFLANAGAN
Note: ALL CORRECTIONS MADE 1/23/2023 - PREVIOUS INSPECTION NOTES 1) NEED THE PORTER JOHN REMOVED AND HAVE SOD WHERE THE PORTER JOHN WAS SITTING 2) NEED TO HAVE SEED AND STRAW ON ALL BARE AREAS ON THE VACANT LOT TO THE RIGHT OF YOURS AND AND SLOPE GREATER 4:1 NEED TO HAVE SOD
U-CROSS CONNECTION 01/25/2023 CANCELLED BY APPLICANT JHARDING
Note: Not Ready
BLD - BUILDING FINAL 01/24/2023 FINAL APPROVED BTAYLOR
Note: 1/23/2023 - PREVIOUS INSPECTION NOTES 1-23-23 1. Wrong size breaker for air handler unit.
BLD - BUILDING FINAL 01/23/2023 Disapproved - NO FEE BTAYLOR
Note: 1-23-23 1. Wrong size breaker for air handler unit.
ROW - STORMWATER FINAL 01/23/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) NEED THE PORTER JOHN REMOVED AND HAVE SOD WHERE THE PORTER JOHN WAS SITTING 2) NEED TO HAVE SEED AND STRAW ON ALL BARE AREAS ON THE VACANT LOT TO THE RIGHT OF YOURS AND AND SLOPE GREATER 4:1 NEED TO HAVE SOD
U -UTILITY RESIDENTIAL FINAL 01/23/2023 FINAL APPROVED JHARDING
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/20/2023 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 01/20/2023 APPROVED PFLANAGAN
ROW - FINAL APRON (AFTER POUR) 01/20/2023 APPROVED PFLANAGAN
ELECTRIC - EARLY POWER 12/15/2022 APPROVED BTAYLOR
ROW- PRE-APRON (PRE-POUR) 11/18/2022 APPROVED PFLANAGAN
Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE FOR THE DRIVEWAY ------------------------------------------------------------------------------------------------ 11/15/2022 - PREVIOUS INSPECTION NOTES 1) SOIL AROUND CULVERT PIPE IS TO SOFT NEED TO HAVE 95% COMPACTION IN THE ENTIRE POURING AREA 2) THE LEFT END OF THE CULVERT IS NOT THE MINIMUM DISTANCE FROM EDGE OF PAVEMENT CULVERTS IN A CAL DE SAC NEED TO BE 5' FROM EDGE OF PAVEMENT
ROW- PRE-APRON (PRE-POUR) 11/17/2022 CANCELLED BY APPLICANT PFLANAGAN
Note: 11/15/2022 - PREVIOUS INSPECTION NOTES 1) SOIL AROUND CULVERT PIPE IS TO SOFT NEED TO HAVE 95% COMPACTION IN THE ENTIRE POURING AREA 2) THE LEFT END OF THE CULVERT IS NOT THE MINIMUM DISTANCE FROM EDGE OF PAVEMENT CULVERTS IN A CAL DE SAC NEED TO BE 5' FROM EDGE OF PAVEMENT
ROW- PRE-APRON (PRE-POUR) 11/15/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) SOIL AROUND CULVERT PIPE IS TO SOFT NEED TO HAVE 95% COMPACTION IN THE ENTIRE POURING AREA 2) THE LEFT END OF THE CULVERT IS NOT THE MINIMUM DISTANCE FROM EDGE OF PAVEMENT CULVERTS IN A CAL DE SAC NEED TO BE 5' FROM EDGE OF PAVEMENT
LATH/BRICK/ WATER BARRIER 09/26/2022 Disapproved - NO FEE BTAYLOR
Note: 9-26-22 1. No wire lath on gable.
LATH/BRICK/ WATER BARRIER 09/26/2022 APPROVED BTAYLOR
Note: 9/26/2022 - PREVIOUS INSPECTION NOTES
GRAVITY SEWER TEST 09/23/2022 APPROVED MGIBSON
U - SEWER TIE IN 09/23/2022 APPROVED MGIBSON
INSULATION 09/19/2022 APPROVED BTAYLOR
Note: 9/15/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 8-30-22 1. A/C duct ripped in left rear room. 9-15-22 1. Holes in top plates need fire foam. 2. Need proof that foam installed has ignition barrier intergrated in it due to storage space in garage. FBC R316.
INSULATION 09/15/2022 Disapproved - NO FEE BTAYLOR
Note: Inspector Notes from Inspection 2420 8-30-22 1. A/C duct ripped in left rear room. 9-15-22 1. Holes in top plates need fire foam. 2. Need proof that foam installed has ignition barrier intergrated in it due to storage space in garage. FBC R316.
ALL ROUGH 08/30/2022 APPROVED - AS NOTED BTAYLOR
Note: 8-30-22 1. A/C duct ripped in left rear room.
ELECTRIC-TUG 08/23/2022 APPROVED BTAYLOR
Note: THIS IS A REINSPECTION ADDED ON 8/19/2022 3:51:05 PM
ELECTRIC-TUG 08/22/2022 CANCELLED BY APPLICANT MRAMOS
WALL SHEATHING 06/02/2022 APPROVED RMARTIN
ROOF VALLEY & METAL 06/02/2022 APPROVED RMARTIN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/26/2022 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Gable rafter tie downs not fastened to trusses below Roof sheathing has large gaps, H Clips not engaged in several areas
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/24/2022 Disapproved - NO FEE DCUSHING
Note: Gable rafter tie downs not fastened to trusses below Roof sheathing has large gaps, H Clips not engaged in several areas
DOWN CELL 05/24/2022 APPROVED DCUSHING
Note: THIS IS A REINSPECTION Multiple bar do not meet 3/4 clearance Bar on right side near rear of home needs to be drilled and epoxied//loose and outside footing Was re-checked w/ concrete sub on site
FOUND SURVEY APPROVED (OFFICE) 05/23/2022 APPROVED TBAKER
TIE BEAM / LINTEL 04/26/2022 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Multiple bar do not meet 3/4" clearance guidelines Bar on right side near rear ouside footing and loose--drill and epoxy
DOWN CELL 04/25/2022 Disapproved - NO FEE TSTAUFFACHER
Note: Multiple bar do not meet 3/4 clearance Bar on right side near rear of home needs to be drilled and epoxied//loose and outside footing
TIE BEAM / LINTEL 04/25/2022 Disapproved - NO FEE TSTAUFFACHER
Note: Multiple bar do not meet 3/4" clearance guidelines Bar on right side near rear ouside footing and loose--drill and epoxy
MONOLITHIC SLAB 03/07/2022 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Pipes passing through footings must have either a sleeve or bridge. Dont forget your electric chase at island
MONOLITHIC SLAB 02/28/2022 Disapproved - NO FEE TSTAUFFACHER
Note: Pipes passing through footings must have either a sleeve or bridge. Dont forget your electric chase at island
PLUMBING 1ST ROUGH UNDERGROUND 02/22/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 01/28/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
BLD COMPLETE 09/13/2022 09/13/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BADMIN INFORMATION 08/12/2022 08/12/2022
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Rename your file to gas riser diagram.
ENGIN1 COMPLETE 05/19/2022 05/23/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/19/2022 05/19/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM no zoning changes
MECH COMPLETE 12/17/2021 12/17/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 12/14/2021 12/14/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH HOLD 12/14/2021 12/14/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Orientation of Energy calcs does not match the site plan. Revise to match. (Second Request)
ZON COMPLETE 12/14/2021 12/14/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
SWALE COMPLETE 12/07/2021 02/02/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 12/06/2021 12/10/2021
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
CUSVC COMPLETE 12/06/2021 12/10/2021
Note: Released By: HALEIGH HAND - -
ELEC HOLD 12/06/2021 12/07/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to have correct outlet spacing in nook area. NEC 2017 210.52 2. Need to add outlet in garage. NEC 210.52 (G) (1)
ENGIN1 COMPLETE 12/06/2021 12/07/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 12/06/2021 12/08/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 12/06/2021 12/07/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Orientation of Energy calcs does not match the site plan. Revise to match 2. Energy Calcs need to be signed by the builder
SW1 COMPLETE 12/06/2021 12/14/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
ZON HOLD 12/06/2021 12/08/2021
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM landscape plan: Grass being placed and if it will need an irrigation system. mechanical equiptment must be screened it by seven gallon shrubs please correct. site plan mising right rear set set back.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 01/26/2023
SW ENG REINSPECTION 30 ¤30.00 01/19/2023
PLAN REVIEW - REVISION ¤32.50 01/19/2023
CONTRACTOR CHANGE ¤40.00 01/27/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 12/20/2021
IMPACT FEE FIRE ¤388.65 12/20/2021
IMPACT FEE PARKS ¤1,455.13 12/20/2021
IMPACT FEE SCHOOL ¤3,600.00 12/20/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 12/20/2021
WATER -IRRIGATION INSPECTION ¤25.00 12/20/2021
3% PARKS IMPACT FEE CREDIT (¤43.65) 12/20/2021
SURCHARGE FS 533.721 ¤12.16 12/20/2021
SURCHARGE - FS 468.631 ¤18.25 12/20/2021
SW ENG - FOUNDATION SURVEY ¤20.00 12/20/2021
SW ENG INSPECTION 80 ¤80.00 12/20/2021
SW ENG PRE APRON ¤30.00 12/20/2021
SW ENG - REVIEW 20 ¤20.00 12/20/2021
SW ENG RES REVIEW 200 ¤200.00 12/20/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 12/20/2021
SEWER INSPECTION ¤25.00 12/20/2021
SEWER CAPITAL FACILITY ¤4,939.76 12/20/2021
WATER CAPITAL FACILITY FEE ¤3,626.50 12/20/2021
SITE PLAN 30 ¤30.00 12/20/2021
CONNECTION FEES ¤1,077.88 12/20/2021
METER - DEPOSIT ¤60.00 12/20/2021
WATER- TURN ON ¤25.00 12/20/2021
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/20/2021
INSPECTION - RESIDENTIAL ¤877.25 12/20/2021
PLAN REVIEW - RESIDENTIAL ¤248.82 12/20/2021
Fees Total Due: ¤0.00 Total Paid: ¤18,523.05