I want to search for...
Permit #2021120336
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00090-0120 |
| GARAGE: 764 sqft |
| OPENED PORCH (WITH ROOF) : 91 sqft |
| PATIO/DECK (NO ROOF) : 442 sqft |
| CONDITIONED SPACE: 2712 sqft |
| Total Square Footage: 4009 sqft |
| Block: 00090 |
| Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA |
| Job Phone: 863-420-2100 |
| Location Address: 94 NEW LEATHERWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/06/2022 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0120 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
DAVID MILLER
| Status | Location Address | State License Number | Phone |
| CANCEL |
2659 MERCY DRIVE ORLANDO, FL 32808 |
06157 (Exp: 08/31/2024) | 407-466-6514 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
NICHOLAS KEITH REX
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1408 HAMLIN UNIT B SAINT CLOUD, FL 34771 |
EC13006779 (Exp: 08/31/2026) | 407-873-2231 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/17/2023 | FINAL APPROVED | BTAYLOR |
| Note: 2/16/2023 - PREVIOUS INSPECTION NOTES | |||
| BLD - BUILDING FINAL | 02/16/2023 | CANCELLED BY APPLICANT | BTAYLOR |
| U-CROSS CONNECTION | 02/14/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: reclaim irrigation-no crosscconnection | |||
| U -UTILITY RESIDENTIAL FINAL | 02/14/2023 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/13/2023 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/13/2023 | APPROVED | EMADISON |
| ROW - STORMWATER FINAL | 02/13/2023 | FINAL APPROVED | EMADISON |
| ROW - FINAL APRON (AFTER POUR) | 02/13/2023 | FINAL APPROVED | EMADISON |
| ELECTRIC - EARLY POWER | 02/06/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 2-6-23 Emailed FPL at 10:06. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/31/2023 | APPROVED | GBERTOLA |
| Note: READY FOR PAVERS 1/27/2023 - PREVIOUS INSPECTION NOTES READY TO POUR 1. APRON 2. SIDEWALK 3. PAVER RESTRAINTS ONLY. BEFORE THE NEXT PRE POUR ALL PAVER BASE NEED TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/27/2023 | PARTIALLY APPROVED | PFLANAGAN |
| Note: READY TO POUR 1. APRON 2. SIDEWALK 3. PAVER RESTRAINTS ONLY. BEFORE THE NEXT PRE POUR ALL PAVER BASE NEED TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. | |||
| TIE BEAM / LINTEL | 01/17/2023 | APPROVED | BTAYLOR |
| LATH/BRICK/ WATER BARRIER | 11/29/2022 | APPROVED | AGAETANO |
| GRAVITY SEWER TEST | 11/04/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 11/04/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 11/04/2022 | APPROVED | KSANDOE |
| ALL ROUGH | 10/28/2022 | APPROVED | KSANDOE |
| WALL SHEATHING | 08/30/2022 | APPROVED | RMARTIN |
| ROOF VALLEY & METAL | 08/30/2022 | APPROVED | RMARTIN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/25/2022 | APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION ROOF SHEATHING ONLY | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/12/2022 | PARTIALLY APPROVED | DCUSHING |
| Note: ROOF SHEATHING ONLY | |||
| FOUND SURVEY APPROVED (OFFICE) | 08/11/2022 | APPROVED | TBAKER |
| ELECTRIC-TUG | 03/08/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 10:33 am | |||
| TIE BEAM / LINTEL | 03/01/2022 | APPROVED | LMILLER |
| MONOLITHIC SLAB | 02/10/2022 | APPROVED | KSANDOE |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/07/2022 | APPROVED | MGIBSON |
| FOOTER | 01/20/2022 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION 1. clearance issue all around (need a mimumum of 3 inches clearance from soil to reinforcing bars, 2. missing compaction report 3. missing several vertical bars (check all) ALL ITEMS ADDRESSED | |||
| FOOTER | 01/19/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 1. clearance issue all around (need a mimumum of 3 inches clearance from soil to reinforcing bars, 2. missing compaction report 3. missing several vertical bars (check all) | |||
| WATER METER INSTALLATION REQUEST | 01/07/2022 | APPROVED | TCHURCHILL |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/16/2023 | 02/16/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/01/2022 | 09/02/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/29/2022 | 08/01/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/29/2022 | 08/01/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/29/2022 | 07/29/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/05/2022 | 07/05/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/05/2022 | 01/06/2022 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/03/2022 | 01/03/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | HOLD | 01/03/2022 | 01/05/2022 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Revised elevation plan - Sheet A-3 shall have verifiable, digital signature of engineer of record per F.S. 471.025 and F.A.C. 61G15-23.001. | |||
| URB | COMPLETE | 12/08/2021 | 12/09/2021 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - | |||
| BLD | COMPLETE | 12/07/2021 | 12/14/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 12/07/2021 | 12/14/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 12/07/2021 | 12/08/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/07/2021 | 12/08/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 12/07/2021 | 12/10/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/07/2021 | 12/08/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/07/2021 | 12/15/2021 |
| Note: Released By: CONRAD TROHA - (386)986-4767 - CTROHA@PALMCOASTGOV.COM Meets minimum requirements | |||
| ZON | HOLD | 12/07/2021 | 12/08/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Banding must wrap around all windows and doors facing public right of way |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 02/16/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/06/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 02/06/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 07/20/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/20/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 07/20/2022 |
| CONNECTION FEES | ¤25.00 | 01/06/2022 |
| METER - DEPOSIT | ¤60.00 | 01/06/2022 |
| WATER-METER | ¤467.09 | 01/06/2022 |
| WATER-METER | ¤388.04 | 01/06/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/06/2022 |
| INSPECTION - RESIDENTIAL | ¤973.50 | 01/06/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤276.12 | 01/06/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 01/06/2022 |
| IMPACT FEE FIRE | ¤388.65 | 01/06/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 01/06/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/06/2022 |
| IMPACT FEE TRANSPORTATION | ¤3,139.00 | 01/06/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 01/06/2022 |
| SURCHARGE FS 533.721 | ¤13.43 | 01/06/2022 |
| SURCHARGE - FS 468.631 | ¤20.15 | 01/06/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/06/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/06/2022 |
| SW ENG PRE APRON | ¤30.00 | 01/06/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/06/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/06/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤94.17) | 01/06/2022 |
| SEWER INSPECTION | ¤25.00 | 01/06/2022 |
| SITE PLAN 30 | ¤30.00 | 01/06/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤11,289.13 |