I want to search for...
Permit #2021120464
Permit Details
Status: COED
| Parcel Id: 07-11-31-7058-00720-0020 |
| GARAGE: 674 sqft |
| OPENED PORCH (WITH ROOF) : 209 sqft |
| CONDITIONED SPACE: 1840 sqft |
| Total Square Footage: 2723 sqft |
| Block: 00720 |
| Subdivision: 2215 - SECTION 58-SEMINOLE PARK |
| Job Phone: 386-445-3405 |
| Location Address: 14 SECKEL CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/22/2022 |
| NOC: RECORDED |
| Applicant name: JAY DARREN CURBOW |
| Owner: BLUE WATER HOMES INC |
|
Address 4881 PALM COAST PKWY NW STE 1 PALM COAST, FL 32137 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤215,365.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
BLUE WATER HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4881 PALM COAST PARKWAY NW UNIT 1 PALM COAST, FL 32137 |
CBC1258679 (Exp: 08/31/2026) | 386-445-3405 |
Sub Contractors
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/25/2023 | FINAL APPROVED | BTAYLOR |
| Note: 4/14/2023 - PREVIOUS INSPECTION NOTES 4/13/2023 - PREVIOUS INSPECTION NOTES 4-14-23 1. Energy cals do not match equipment installed. | |||
| BLD - BUILDING FINAL | 04/14/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 4/13/2023 - PREVIOUS INSPECTION NOTES 4-14-23 1. Energy cals do not match equipment installed. | |||
| BLD - BUILDING FINAL | 04/13/2023 | CANCELLED BY APPLICANT | BTAYLOR |
| ROW - STORMWATER FINAL | 04/11/2023 | FINAL APPROVED | PFLANAGAN |
| Note: 4/10/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN ALL CONSTRUCTION DEBRIS AND TRASH OUT OF VACANT 2) NEED TO CLEAN ALL DIRT OUT OF CULVERT PIPE --------------------------------------------------------------------- 4/3/2023 - PREVIOUS INSPECTION NOTES NOTHING BEEN CORRECTED AT THIS TIME OF INSPECTION PLEASE READ ALL NOTES FROM INSPECTION ON DATE 3/31/23 FOR ALL REQUIREMENTS ---------------------------------------------------------------------------------------- ** BEFORE ROW FINAL IS APPROVED** ** 03/31/23 NEED TO REPAIR SWALE ON LEFT SIDE MATCH EXISTING GRADE AND SOD WITHIN THE PINK OUTLINED AREA. **NEED TO CLEAN BOTH CULVERT ENDS ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS ON LEFT SIDE VACANT. | |||
| ROW - STORMWATER FINAL | 04/10/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO CLEAN ALL CONSTRUCTION DEBRIS AND TRASH OUT OF VACANT 2) NEED TO CLEAN ALL DIRT OUT OF CULVERT PIPE --------------------------------------------------------------------- 4/3/2023 - PREVIOUS INSPECTION NOTES NOTHING BEEN CORRECTED AT THIS TIME OF INSPECTION PLEASE READ ALL NOTES FROM INSPECTION ON DATE 3/31/23 FOR ALL REQUIREMENTS ---------------------------------------------------------------------------------------- ** BEFORE ROW FINAL IS APPROVED** ** 03/31/23 NEED TO REPAIR SWALE ON LEFT SIDE MATCH EXISTING GRADE AND SOD WITHIN THE PINK OUTLINED AREA. **NEED TO CLEAN BOTH CULVERT ENDS ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS ON LEFT SIDE VACANT. | |||
| ROW - STORMWATER FINAL | 04/03/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NOTHING BEEN CORRECTED AT THIS TIME OF INSPECTION PLEASE READ ALL NOTES FROM INSPECTION ON DATE 3/31/23 FOR ALL REQUIREMENTS ---------------------------------------------------------------------------------------- ** BEFORE ROW FINAL IS APPROVED** ** 03/31/23 NEED TO REPAIR SWALE ON LEFT SIDE MATCH EXISTING GRADE AND SOD WITHIN THE PINK OUTLINED AREA. **NEED TO CLEAN BOTH CULVERT ENDS ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS ON LEFT SIDE VACANT. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/03/2023 | FINAL APPROVED | JHARDING |
| ROW - FINAL APRON (AFTER POUR) | 03/31/2023 | FINAL APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/31/2023 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/31/2023 | APPROVED | EMADISON |
| Note: ** 03/31/23 NEED TO REPAIR SWALE ON LEFT SIDE MATCH EXISTING GRADE AND SOD WITHIN THE PINK OUTLINED AREA. **NEED TO CLEAN BOTH CULVERT ENDS ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS ON LEFT SIDE VACANT. | |||
| U-CROSS CONNECTION | 03/31/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ROW- PRE-APRON (PRE-POUR) | 02/27/2023 | APPROVED | EMADISON |
| Note: ** 02/27/23 CORRECTIONS MADE IN THE EVENT OF RAIN RECHECK CULVERT AND COMPACTION ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ____________________________________________________________________________________________________________________ 2/22/2023 - PREVIOUS INSPECTION NOTES ** 02/22/23 NEED TO REMOVE EXCESS MATERIAL FROM THE APRON AREA ** ABOVE ROW NEED A MINIMUM OF 4 INCHES OF CONCRETE MOUNDS AND HIGH AREAS NEED TO BE REMOVED ** ALSO I FRONT OF GARAGE OPENING NEED A MINIMU7M OF 4 INCHES. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/22/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 02/22/23 NEED TO REMOVE EXCESS MATERIAL FROM THE APRON AREA ** ABOVE ROW NEED A MINIMUM OF 4 INCHES OF CONCRETE MOUNDS AND HIGH AREAS NEED TO BE REMOVED ** ALSO I FRONT OF GARAGE OPENING NEED A MINIMU7M OF 4 INCHES. | |||
| ELECTRIC - EARLY POWER | 02/22/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 2/14/2023 - PREVIOUS INSPECTION NOTES 2-14-23 Light a front door not safed off. 2-22-23 1. Emailed FPL at 2:12. | |||
| U - SEWER TIE IN | 02/17/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ELECTRIC - EARLY POWER | 02/14/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 2-14-23 Light a front door not safed off. | |||
| LATH/BRICK/ WATER BARRIER | 10/21/2022 | APPROVED | BTAYLOR |
| TIE DOWN | 10/21/2022 | APPROVED | BTAYLOR |
| INSULATION | 10/21/2022 | APPROVED | BTAYLOR |
| Note: 10/19/2022 - PREVIOUS INSPECTION NOTES Multiple baffels used to create the 1" airspace between the roof decking and the fiberglass insulation have been compress or not extenend out to the eave far enough and are coved by the insulation. | |||
| INSULATION | 10/19/2022 | Disapproved - NO FEE | JWALKER |
| Note: Multiple baffels used to create the 1" airspace between the roof decking and the fiberglass insulation have been compress or not extenend out to the eave far enough and are coved by the insulation. | |||
| ALL ROUGH | 10/13/2022 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2460 9/27/2022 - PREVIOUS INSPECTION NOTES 9/15/2022 - PREVIOUS INSPECTION NOTES 9-15-22 Inspection stopped. Not ready 1. Straps missing throughout house. 2. Straps not nailed off. 9-27-22 1. Straps not nailed off. 2. Truss A04 engineering needs to fixed. 3. Straps on rear beam are wrong . 4. Beam buckets not nailed off. 10-11-22 1. Beam buckets not nailed off. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/11/2022 | APPROVED - AS NOTED | BTAYLOR |
| Note: 9/27/2022 - PREVIOUS INSPECTION NOTES 9/15/2022 - PREVIOUS INSPECTION NOTES 9-15-22 Inspection stopped. Not ready 1. Straps missing throughout house. 2. Straps not nailed off. 9-27-22 1. Straps not nailed off. 2. Truss A04 engineering needs to fixed. 3. Straps on rear beam are wrong . 4. Beam buckets not nailed off. 10-11-22 1. Beam buckets not nailed off. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/27/2022 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: 9/15/2022 - PREVIOUS INSPECTION NOTES 9-15-22 Inspection stopped. Not ready 1. Straps missing throughout house. 2. Straps not nailed off. 9-27-22 1. Straps not nailed off. 2. Truss A04 engineering needs to fixed. 3. Straps on rear beam are wrong . 4. Beam buckets not nailed off. | |||
| TIE DOWN | 09/27/2022 | CANCELLED BY APPLICANT | WEB |
| WALL SHEATHING | 09/15/2022 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/15/2022 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: 9-15-22 Inspection stopped. Not ready 1. Straps missing throughout house. 2. Straps not nailed off. | |||
| ROOF VALLEY & METAL | 09/06/2022 | APPROVED | BTAYLOR |
| TIE BEAM / LINTEL | 08/04/2022 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 07/19/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 06/17/2022 | APPROVED | TSTAUFFACHER |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/13/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 06/13/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 05/04/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 04/14/2023 | 04/17/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/19/2022 | 07/19/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/19/2022 | 07/19/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/23/2022 | 03/23/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/23/2022 | 03/28/2022 |
| Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/23/2022 | 03/23/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 12/10/2021 | 02/07/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/09/2021 | 12/15/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 12/09/2021 | 12/14/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 12/09/2021 | 12/10/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/09/2021 | 12/10/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 12/09/2021 | 12/13/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/09/2021 | 12/10/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/09/2021 | 12/16/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/09/2021 | 12/10/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 04/26/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/26/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/26/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 04/26/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 04/26/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/26/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/26/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/22/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/22/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 03/22/2022 |
| SEWER CREDIT | (¤2,932.00) | 03/22/2022 |
| SEWER INSPECTION | ¤25.00 | 03/22/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 03/22/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 03/22/2022 |
| SITE PLAN 30 | ¤30.00 | 03/22/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 03/22/2022 |
| IMPACT FEE FIRE | ¤388.65 | 03/22/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 03/22/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/22/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 03/22/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/22/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 03/22/2022 |
| SURCHARGE FS 533.721 | ¤9.34 | 03/22/2022 |
| SURCHARGE - FS 468.631 | ¤14.01 | 03/22/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/22/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/22/2022 |
| SW ENG PRE APRON | ¤30.00 | 03/22/2022 |
| CONNECTION FEES | ¤1,077.88 | 03/22/2022 |
| METER - DEPOSIT | ¤60.00 | 03/22/2022 |
| WATER- TURN ON | ¤25.00 | 03/22/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/22/2022 |
| INSPECTION - RESIDENTIAL | ¤662.75 | 03/22/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤187.98 | 03/22/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,398.65 |