Permit #2021120464

Permit Details

Status: COED

Parcel Id: 07-11-31-7058-00720-0020
GARAGE: 674 sqft
OPENED PORCH (WITH ROOF) : 209 sqft
CONDITIONED SPACE: 1840 sqft
Total Square Footage: 2723 sqft
Block: 00720
Subdivision: 2215 - SECTION 58-SEMINOLE PARK
Job Phone: 386-445-3405
Location Address: 14 SECKEL CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/22/2022
NOC: RECORDED
Applicant name: JAY DARREN CURBOW
Owner: BLUE WATER HOMES INC

Address

4881 PALM COAST PKWY NW STE 1

PALM COAST, FL 32137

Lot: 0020
Contracted Stated Job Value: ¤215,365.00
Job Description: Single Family Residence
Type: CN

Contractor

BLUE WATER HOMES INC
Status Location Address State License Number Phone
ACTIVE

4881 PALM COAST PARKWAY NW UNIT 1

PALM COAST, FL 32137

CBC1258679 (Exp: 08/31/2026) 386-445-3405

Sub Contractors

JACK DOUGLAS LANIER
Status Location Address State License Number Phone Fax
ACTIVE

485 COMMERCE WAY

LONGWOOD , FL 32750

CCC058022 (Exp: 08/31/2026) (321)441-2300 (321)441-2313
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
BRETT CHRISTIAN GIBSON
Status Location Address State License Number Phone
ACTIVE

250 SEGOVIA RD

ST AUGUSTINE, FL 32086

CAC1818423 (Exp: 08/31/2026) 904-229-8131
RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1963

BUNNELL, FL 32110

ES12001217 (Exp: 08/31/2026) 386-437-0607 386-437-1847

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/25/2023 FINAL APPROVED BTAYLOR
Note: 4/14/2023 - PREVIOUS INSPECTION NOTES 4/13/2023 - PREVIOUS INSPECTION NOTES 4-14-23 1. Energy cals do not match equipment installed.
BLD - BUILDING FINAL 04/14/2023 Disapproved - NO FEE BTAYLOR
Note: 4/13/2023 - PREVIOUS INSPECTION NOTES 4-14-23 1. Energy cals do not match equipment installed.
BLD - BUILDING FINAL 04/13/2023 CANCELLED BY APPLICANT BTAYLOR
ROW - STORMWATER FINAL 04/11/2023 FINAL APPROVED PFLANAGAN
Note: 4/10/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN ALL CONSTRUCTION DEBRIS AND TRASH OUT OF VACANT 2) NEED TO CLEAN ALL DIRT OUT OF CULVERT PIPE --------------------------------------------------------------------- 4/3/2023 - PREVIOUS INSPECTION NOTES NOTHING BEEN CORRECTED AT THIS TIME OF INSPECTION PLEASE READ ALL NOTES FROM INSPECTION ON DATE 3/31/23 FOR ALL REQUIREMENTS ---------------------------------------------------------------------------------------- ** BEFORE ROW FINAL IS APPROVED** ** 03/31/23 NEED TO REPAIR SWALE ON LEFT SIDE MATCH EXISTING GRADE AND SOD WITHIN THE PINK OUTLINED AREA. **NEED TO CLEAN BOTH CULVERT ENDS ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS ON LEFT SIDE VACANT.
ROW - STORMWATER FINAL 04/10/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) NEED TO CLEAN ALL CONSTRUCTION DEBRIS AND TRASH OUT OF VACANT 2) NEED TO CLEAN ALL DIRT OUT OF CULVERT PIPE --------------------------------------------------------------------- 4/3/2023 - PREVIOUS INSPECTION NOTES NOTHING BEEN CORRECTED AT THIS TIME OF INSPECTION PLEASE READ ALL NOTES FROM INSPECTION ON DATE 3/31/23 FOR ALL REQUIREMENTS ---------------------------------------------------------------------------------------- ** BEFORE ROW FINAL IS APPROVED** ** 03/31/23 NEED TO REPAIR SWALE ON LEFT SIDE MATCH EXISTING GRADE AND SOD WITHIN THE PINK OUTLINED AREA. **NEED TO CLEAN BOTH CULVERT ENDS ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS ON LEFT SIDE VACANT.
ROW - STORMWATER FINAL 04/03/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: NOTHING BEEN CORRECTED AT THIS TIME OF INSPECTION PLEASE READ ALL NOTES FROM INSPECTION ON DATE 3/31/23 FOR ALL REQUIREMENTS ---------------------------------------------------------------------------------------- ** BEFORE ROW FINAL IS APPROVED** ** 03/31/23 NEED TO REPAIR SWALE ON LEFT SIDE MATCH EXISTING GRADE AND SOD WITHIN THE PINK OUTLINED AREA. **NEED TO CLEAN BOTH CULVERT ENDS ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS ON LEFT SIDE VACANT.
U -UTILITY RESIDENTIAL FINAL 04/03/2023 FINAL APPROVED JHARDING
ROW - FINAL APRON (AFTER POUR) 03/31/2023 FINAL APPROVED EMADISON
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/31/2023 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 03/31/2023 APPROVED EMADISON
Note: ** 03/31/23 NEED TO REPAIR SWALE ON LEFT SIDE MATCH EXISTING GRADE AND SOD WITHIN THE PINK OUTLINED AREA. **NEED TO CLEAN BOTH CULVERT ENDS ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS ON LEFT SIDE VACANT.
U-CROSS CONNECTION 03/31/2023 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation-no cross connection
ROW- PRE-APRON (PRE-POUR) 02/27/2023 APPROVED EMADISON
Note: ** 02/27/23 CORRECTIONS MADE IN THE EVENT OF RAIN RECHECK CULVERT AND COMPACTION ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ____________________________________________________________________________________________________________________ 2/22/2023 - PREVIOUS INSPECTION NOTES ** 02/22/23 NEED TO REMOVE EXCESS MATERIAL FROM THE APRON AREA ** ABOVE ROW NEED A MINIMUM OF 4 INCHES OF CONCRETE MOUNDS AND HIGH AREAS NEED TO BE REMOVED ** ALSO I FRONT OF GARAGE OPENING NEED A MINIMU7M OF 4 INCHES.
ROW- PRE-APRON (PRE-POUR) 02/22/2023 Disapproved - NO FEE EMADISON
Note: ** 02/22/23 NEED TO REMOVE EXCESS MATERIAL FROM THE APRON AREA ** ABOVE ROW NEED A MINIMUM OF 4 INCHES OF CONCRETE MOUNDS AND HIGH AREAS NEED TO BE REMOVED ** ALSO I FRONT OF GARAGE OPENING NEED A MINIMU7M OF 4 INCHES.
ELECTRIC - EARLY POWER 02/22/2023 APPROVED - AS NOTED BTAYLOR
Note: 2/14/2023 - PREVIOUS INSPECTION NOTES 2-14-23 Light a front door not safed off. 2-22-23 1. Emailed FPL at 2:12.
U - SEWER TIE IN 02/17/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ELECTRIC - EARLY POWER 02/14/2023 Disapproved - NO FEE BTAYLOR
Note: 2-14-23 Light a front door not safed off.
LATH/BRICK/ WATER BARRIER 10/21/2022 APPROVED BTAYLOR
TIE DOWN 10/21/2022 APPROVED BTAYLOR
INSULATION 10/21/2022 APPROVED BTAYLOR
Note: 10/19/2022 - PREVIOUS INSPECTION NOTES Multiple baffels used to create the 1" airspace between the roof decking and the fiberglass insulation have been compress or not extenend out to the eave far enough and are coved by the insulation.
INSULATION 10/19/2022 Disapproved - NO FEE JWALKER
Note: Multiple baffels used to create the 1" airspace between the roof decking and the fiberglass insulation have been compress or not extenend out to the eave far enough and are coved by the insulation.
ALL ROUGH 10/13/2022 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2460 9/27/2022 - PREVIOUS INSPECTION NOTES 9/15/2022 - PREVIOUS INSPECTION NOTES 9-15-22 Inspection stopped. Not ready 1. Straps missing throughout house. 2. Straps not nailed off. 9-27-22 1. Straps not nailed off. 2. Truss A04 engineering needs to fixed. 3. Straps on rear beam are wrong . 4. Beam buckets not nailed off. 10-11-22 1. Beam buckets not nailed off.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/11/2022 APPROVED - AS NOTED BTAYLOR
Note: 9/27/2022 - PREVIOUS INSPECTION NOTES 9/15/2022 - PREVIOUS INSPECTION NOTES 9-15-22 Inspection stopped. Not ready 1. Straps missing throughout house. 2. Straps not nailed off. 9-27-22 1. Straps not nailed off. 2. Truss A04 engineering needs to fixed. 3. Straps on rear beam are wrong . 4. Beam buckets not nailed off. 10-11-22 1. Beam buckets not nailed off.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/27/2022 Disapproved -FEE REQUIRED BTAYLOR
Note: 9/15/2022 - PREVIOUS INSPECTION NOTES 9-15-22 Inspection stopped. Not ready 1. Straps missing throughout house. 2. Straps not nailed off. 9-27-22 1. Straps not nailed off. 2. Truss A04 engineering needs to fixed. 3. Straps on rear beam are wrong . 4. Beam buckets not nailed off.
TIE DOWN 09/27/2022 CANCELLED BY APPLICANT WEB
WALL SHEATHING 09/15/2022 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/15/2022 Disapproved -FEE REQUIRED BTAYLOR
Note: 9-15-22 Inspection stopped. Not ready 1. Straps missing throughout house. 2. Straps not nailed off.
ROOF VALLEY & METAL 09/06/2022 APPROVED BTAYLOR
TIE BEAM / LINTEL 08/04/2022 APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 07/19/2022 APPROVED TBAKER
MONOLITHIC SLAB 06/17/2022 APPROVED TSTAUFFACHER
PLUMBING 1ST ROUGH UNDERGROUND 06/13/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 06/13/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 05/04/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 04/14/2023 04/17/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/19/2022 07/19/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 07/19/2022 07/19/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/23/2022 03/23/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 03/23/2022 03/28/2022
Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 03/23/2022 03/23/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SWALE COMPLETE 12/10/2021 02/07/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 12/09/2021 12/15/2021
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
CUSVC COMPLETE 12/09/2021 12/14/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 12/09/2021 12/10/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/09/2021 12/10/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 12/09/2021 12/13/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 12/09/2021 12/10/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 12/09/2021 12/16/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
ZON COMPLETE 12/09/2021 12/10/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 04/26/2023
REINSPECTION RESIDENTIAL ¤40.00 04/26/2023
REINSPECTION RESIDENTIAL ¤40.00 04/26/2023
CONTRACTOR CHANGE ¤20.00 04/26/2023
CONTRACTOR CHANGE ¤40.00 04/26/2023
SW ENG REINSPECTION 20 ¤20.00 04/26/2023
SW ENG REINSPECTION 20 ¤20.00 04/26/2023
SW ENG - REVIEW 20 ¤20.00 03/22/2022
SW ENG RES REVIEW 200 ¤200.00 03/22/2022
3% TRANS IMPACT FEE CREDIT (¤51.54) 03/22/2022
SEWER CREDIT (¤2,932.00) 03/22/2022
SEWER INSPECTION ¤25.00 03/22/2022
SEWER CAPITAL FACILITY ¤4,939.76 03/22/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 03/22/2022
SITE PLAN 30 ¤30.00 03/22/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 03/22/2022
IMPACT FEE FIRE ¤388.65 03/22/2022
IMPACT FEE PARKS ¤1,455.13 03/22/2022
IMPACT FEE SCHOOL ¤3,600.00 03/22/2022
IMPACT FEE TRANSPORTATION ¤1,718.00 03/22/2022
WATER -IRRIGATION INSPECTION ¤25.00 03/22/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 03/22/2022
SURCHARGE FS 533.721 ¤9.34 03/22/2022
SURCHARGE - FS 468.631 ¤14.01 03/22/2022
SW ENG - FOUNDATION SURVEY ¤20.00 03/22/2022
SW ENG INSPECTION 80 ¤80.00 03/22/2022
SW ENG PRE APRON ¤30.00 03/22/2022
CONNECTION FEES ¤1,077.88 03/22/2022
METER - DEPOSIT ¤60.00 03/22/2022
WATER- TURN ON ¤25.00 03/22/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/22/2022
INSPECTION - RESIDENTIAL ¤662.75 03/22/2022
PLAN REVIEW - RESIDENTIAL ¤187.98 03/22/2022
Fees Total Due: ¤0.00 Total Paid: ¤15,398.65