I want to search for...

Permit #2021120504

Permit Details

Status: COED

Parcel Id: 07-11-31-7063-00280-0180
CONDITIONED SPACE: 2023 sqft
GARAGE: 724 sqft
OPENED PORCH (WITH ROOF) : 210 sqft
Total Square Footage: 2957 sqft
Block: 00280
Subdivision: -
Job Phone: 386-445-3405
Location Address: 30 ZINNIA TR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/22/2022
NOC: RECORDED
Applicant name: JAY DARREN CURBOW
Owner: BLUE WATER HOMES INC

Address

4881 PALM COASTPKWY, STE 1

PALM COAST, FL 32137

Lot: 0180
Contracted Stated Job Value: ¤239,135.00
Job Description: Single Family Residence
Type: CN

Contractor

BLUE WATER HOMES INC
Status Location Address State License Number Phone
ACTIVE

4881 PALM COAST PARKWAY NW UNIT 1

PALM COAST, FL 32137

CBC1258679 (Exp: 08/31/2026) 386-445-3405

Sub Contractors

JACK DOUGLAS LANIER
Status Location Address State License Number Phone Fax
ACTIVE

485 COMMERCE WAY

LONGWOOD , FL 32750

CCC058022 (Exp: 08/31/2026) (321)441-2300 (321)441-2313
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
BRETT CHRISTIAN GIBSON
Status Location Address State License Number Phone
ACTIVE

250 SEGOVIA RD

ST AUGUSTINE, FL 32086

CAC1818423 (Exp: 08/31/2026) 904-229-8131
RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
CANCEL

P. O. Box 1963

Bunnell, FL 32110

ER0011613 (Exp: 08/31/2008) (386) 437-0607 (386)437-1847
RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
CANCEL

P. O. Box 1963

Bunnell, FL 32110

ER0011613 (Exp: 08/31/2008) (386) 437-0607 (386)437-1847
RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1963

BUNNELL, FL 32110

ES12001217 (Exp: 08/31/2026) 386-437-0607 386-437-1847

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 01/26/2023 FINAL APPROVED RSIMS
Note: 1/24/2023 - PREVIOUS INSPECTION NOTES 1/24/23: Cancelled by applicant verbally. Not ready. 1/20/2023 - PREVIOUS INSPECTION NOTES 1/20/23: Cancelled by applicant via phone call at @ 12:43. Stated not ready.
BLD - BUILDING FINAL 01/24/2023 CANCELLED BY APPLICANT RSIMS
Note: 1/24/23: Cancelled by applicant verbally. Not ready. 1/20/2023 - PREVIOUS INSPECTION NOTES 1/20/23: Cancelled by applicant via phone call at @ 12:43. Stated not ready.
U-CROSS CONNECTION 01/20/2023 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation-no cross connection
BLD - BUILDING FINAL 01/20/2023 CANCELLED BY APPLICANT RSIMS
Note: 1/20/23: Cancelled by applicant via phone call at @ 12:43. Stated not ready.
ROW - STORMWATER FINAL 01/17/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
U -UTILITY RESIDENTIAL FINAL 01/17/2023 FINAL APPROVED DHANEY
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/13/2023 APPROVED PFLANAGAN
Note: 12/19/2022 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE 5% OR 6" FALL 10' OUT FROM STURCTURE Florida Building Code, Residential, Chapter 4, R401.3F 2) THE SITE PLAN CALLS FOR A COMMON SWALE ON THE LEFT SIDE OF THE HOME NEED TO REGRADE TO MAKE DRAINAGE ON THE PROPERTY LINE 3) YOU IMPACTING THE RESERVE PARCEL BEHIND YOUR LOT THE SITE PLAN SHOWED ALL WATER TO DRAIN FROM BACK TO FRONT
ROW FIELD SURVEY /GRADING CERTIFICATION 01/13/2023 APPROVED PFLANAGAN
ROW - FINAL APRON (AFTER POUR) 01/13/2023 APPROVED PFLANAGAN
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/19/2022 Disapproved - NO FEE PFLANAGAN
Note: 1) NEED TO HAVE 5% OR 6" FALL 10' OUT FROM STURCTURE Florida Building Code, Residential, Chapter 4, R401.3F 2) THE SITE PLAN CALLS FOR A COMMON SWALE ON THE LEFT SIDE OF THE HOME NEED TO REGRADE TO MAKE DRAINAGE ON THE PROPERTY LINE 3) YOU IMPACTING THE RESERVE PARCEL BEHIND YOUR LOT THE SITE PLAN SHOWED ALL WATER TO DRAIN FROM BACK TO FRONT
ROW- PRE-APRON (PRE-POUR) 10/14/2022 APPROVED PFLANAGAN
Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE FOR DRIVEWAY ------------------------------------------------------------------------------------------------- 10/12/2022 - PREVIOUS INSPECTION NOTES Culvert pipe was set within tolerance. However, Culvert footers at the end need reestabliched. *Large Concrete chunks and misc trash need removed along the garage entrance. *Too much material in the center of the driveway pour. Less than 2 inches in some places per string line. 10/3/2022 - PREVIOUS INSPECTION NOTES 10/03/22=TOO MUCH WATER IN THE POUR AREA. WATER INSIDE THE CULVERT FROM LAST NIGHTS RAIN. WAY TOO SOFT TO POUR. BUILDER MAY WANT TO PUT ROCK AND/OR ROADBASE TO STABILIZE GROUND FOR BETTER COMPACTION.
ELECTRIC - EARLY POWER 10/14/2022 APPROVED JMUNSON
ROW- PRE-APRON (PRE-POUR) 10/12/2022 Disapproved -FEE REQUIRED RGROSS
Note: Culvert pipe was set within tolerance. However, Culvert footers at the end need reestabliched. *Large Concrete chunks and misc trash need removed along the garage entrance. *Too much material in the center of the driveway pour. Less than 2 inches in some places per string line. 10/3/2022 - PREVIOUS INSPECTION NOTES 10/03/22=TOO MUCH WATER IN THE POUR AREA. WATER INSIDE THE CULVERT FROM LAST NIGHTS RAIN. WAY TOO SOFT TO POUR. BUILDER MAY WANT TO PUT ROCK AND/OR ROADBASE TO STABILIZE GROUND FOR BETTER COMPACTION.
ROW- PRE-APRON (PRE-POUR) 10/03/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 10/03/22=TOO MUCH WATER IN THE POUR AREA. WATER INSIDE THE CULVERT FROM LAST NIGHTS RAIN. WAY TOO SOFT TO POUR. BUILDER MAY WANT TO PUT ROCK AND/OR ROADBASE TO STABILIZE GROUND FOR BETTER COMPACTION.
U - SEWER TIE IN 09/15/2022 APPROVED MGIBSON
PEP TANK INSTALLATION REQUEST 08/30/2022 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 08/25/2022 APPROVED JWALKER
INSULATION 08/16/2022 APPROVED MKRASKI
INSULATION 08/15/2022 Disapproved - NO FEE BTAYLOR
Note: Inspector Notes from Inspection 2420 Reconnect bath fan//ok to insulate 8-15-22 1. Threaded rod not completely fire foamed in. 2. Garage door not installed.
ALL ROUGH 08/04/2022 APPROVED - AS NOTED TSTAUFFACHER
Note: Reconnect bath fan//ok to insulate
ROOF VALLEY & METAL 07/20/2022 APPROVED LMILLER
WALL SHEATHING 07/15/2022 APPROVED TSTAUFFACHER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/15/2022 APPROVED TSTAUFFACHER
FOUND SURVEY APPROVED (OFFICE) 06/29/2022 APPROVED TBAKER
TIE BEAM / LINTEL 06/23/2022 APPROVED JWALKER
MONOLITHIC SLAB 06/08/2022 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Plans provided are not COPC approved set
MONOLITHIC SLAB 06/07/2022 Disapproved - NO FEE TSTAUFFACHER
Note: Plans provided are not COPC approved set
GRAVITY SEWER TEST 05/31/2022 APPROVED MGIBSON
PLUMBING 1ST ROUGH UNDERGROUND 05/27/2022 APPROVED - AS NOTED MGIBSON
Note: GRAVITY SEWER NEEDS TO BE SCHEDULED FOR TUESDAY
WATER METER INSTALLATION REQUEST 05/04/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 01/24/2023 01/24/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/29/2022 06/29/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/29/2022 06/29/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 12/10/2021 12/14/2021
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
CUSVC COMPLETE 12/10/2021 12/16/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 12/10/2021 12/10/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/10/2021 12/10/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 12/10/2021 12/14/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 12/10/2021 12/13/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 12/10/2021 12/17/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
ZON COMPLETE 12/10/2021 12/10/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
SWALE COMPLETE 12/10/2021 02/08/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 01/05/2023
CONTRACTOR CHANGE ¤20.00 01/05/2023
CONTRACTOR CHANGE ¤20.00 01/05/2023
SW ENG REINSPECTION 30 ¤30.00 01/05/2023
SW ENG REINSPECTION 30 ¤30.00 01/05/2023
SW ENG - REVIEW 20 ¤20.00 03/22/2022
SW ENG RES REVIEW 200 ¤200.00 03/22/2022
3% TRANS IMPACT FEE CREDIT (¤51.54) 03/22/2022
SEWER CREDIT (¤1,082.31) 03/22/2022
SEWER INSPECTION ¤25.00 03/22/2022
SEWER CAPITAL FACILITY ¤4,939.76 03/22/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 03/22/2022
SITE PLAN 30 ¤30.00 03/22/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 03/22/2022
IMPACT FEE FIRE ¤388.65 03/22/2022
IMPACT FEE PARKS ¤1,455.13 03/22/2022
IMPACT FEE SCHOOL ¤3,600.00 03/22/2022
IMPACT FEE TRANSPORTATION ¤1,718.00 03/22/2022
WATER -IRRIGATION INSPECTION ¤25.00 03/22/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 03/22/2022
SURCHARGE FS 533.721 ¤9.07 03/22/2022
SURCHARGE - FS 468.631 ¤13.74 03/22/2022
SW ENG - FOUNDATION SURVEY ¤20.00 03/22/2022
SW ENG INSPECTION 80 ¤80.00 03/22/2022
SW ENG PRE APRON ¤30.00 03/22/2022
METER - DEPOSIT ¤60.00 03/22/2022
WATER- TURN ON ¤25.00 03/22/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/22/2022
INSPECTION - RESIDENTIAL ¤660.00 03/22/2022
PLAN REVIEW - RESIDENTIAL ¤186.58 03/22/2022
CONNECTION FEES ¤1,077.88 03/22/2022
Fees Total Due: ¤0.00 Total Paid: ¤17,171.15