I want to search for...
Permit #2021120505
Permit Details
Status: COED
| Parcel Id: 07-11-31-7022-00110-0100 |
| CONDITIONED SPACE: 2023 sqft |
| GARAGE: 724 sqft |
| OPENED PORCH (WITH ROOF) : 210 sqft |
| Total Square Footage: 2957 sqft |
| Block: 00110 |
| Subdivision: 2217 - SECTION 22-WYNNFIELD |
| Job Phone: 386-445-3405 |
| Location Address: 34 WESTBURY LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/22/2022 |
| NOC: RECORDED |
| Applicant name: JAY DARREN CURBOW |
| Owner: BLUE WATER HOMES INC |
|
Address STE #1 PALM COAST, FL 32137 |
|
Address 4881 PALM COAST PKWY NW PALM COAST, FL 32137 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤239,135.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
BLUE WATER HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4881 PALM COAST PARKWAY NW UNIT 1 PALM COAST, FL 32137 |
CBC1258679 (Exp: 08/31/2026) | 386-445-3405 |
Sub Contractors
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/23/2023 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 02/22/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. Outside hose bibs missing back flow preventers 2. Water supply shut off outside needs a hand hole for access 3. Ufer ground needs to be accessible 4. Extra construction materials need to be removed (doors) 5. No hot water in master bathroom 6. outlets not working in master bathroom Stopped inspection, not ready, stopped in master bedroom did not check kitchen, living or spare bedrooms. | |||
| BLD - BUILDING FINAL | 02/16/2023 | CANCELLED BY APPLICANT | MKRASKI |
| ROW- PROJECT STATUS | 02/08/2023 | APPROVED | GBERTOLA |
| Note: bUILDER ASK ME TO CHECK THE RIGHT SIDE SWALE | |||
| ROW - STORMWATER FINAL | 02/08/2023 | APPROVED | GBERTOLA |
| Note: 2/8/23=CORRECTION WERE MADE 2/1/2023 - PREVIOUS INSPECTION NOTES 02/01/23=NEED TO BUILD UP THE RIGHT SIDE SWALE MATCH EXISTING GRADE AT EACH PROPERTY LINE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/31/2023 - PREVIOUS INSPECTION NOTES NEED TO PICK ALL TRASH AND CONSTRUCTION DEBRIS FROM LOT -------------------------------------------------------------------------- 1/11/2023 - PREVIOUS INSPECTION NOTES 01/11/23=need to MATCH EXISTING GRADE ON THE RIGHT SIDE. _______________________________________________________________________________________________________________________ | |||
| ROW- PROJECT STATUS | 02/03/2023 | APPROVED | GBERTOLA |
| Note: 02/3/23=builder ask me to stop by and LOOK THE REPAIR THEY NEED TO RISE THE SWALE | |||
| ROW - STORMWATER FINAL | 02/01/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 02/01/23=NEED TO BUILD UP THE RIGHT SIDE SWALE MATCH EXISTING GRADE AT EACH PROPERTY LINE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/31/2023 - PREVIOUS INSPECTION NOTES NEED TO PICK ALL TRASH AND CONSTRUCTION DEBRIS FROM LOT -------------------------------------------------------------------------- 1/11/2023 - PREVIOUS INSPECTION NOTES 01/11/23=need to MATCH EXISTING GRADE ON THE RIGHT SIDE. _______________________________________________________________________________________________________________________ | |||
| ROW - STORMWATER FINAL | 01/31/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO PICK ALL TRASH AND CONSTRUCTION DEBRIS FROM LOT -------------------------------------------------------------------------- 1/11/2023 - PREVIOUS INSPECTION NOTES 01/11/23=need to MATCH EXISTING GRADE ON THE RIGHT SIDE. ON THE BACK OF THE HOUSE RUN FLAT.Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E) WATER NEED GO AWAY FROM THE HOUSE _______________________________________________________________________________________________________________________ at the END of the swale NEED TO CUT DOWM A HUMP BLOCKING THE FLOW OF THE WATER , WATER FLOW FROM THE LEFT TO RIGHT ACCORDING TO THE SWALE PLAN DETAIL | |||
| U -UTILITY RESIDENTIAL FINAL | 01/11/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: clean out water meter pit of all soils-contact me 386-286-2041 for a post inspection | |||
| ROW - STORMWATER FINAL | 01/11/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 01/11/23=need to MATCH EXISTING GRADE ON THE RIGHT SIDE. ON THE BACK OF THE HOUSE RUN FLAT.Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E) WATER NEED GO AWAY FROM THE HOUSE _______________________________________________________________________________________________________________________ at the END of the swale NEED TO CUT DOWM A HUMP BLOCKING THE FLOW OF THE WATER , WATER FLOW FROM THE LEFT TO RIGHT ACCORDING TO THE SWALE PLAN DETAIL | |||
| U-CROSS CONNECTION | 01/11/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 01/11/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| U - SEWER TIE IN | 01/09/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: 9/26/2022 - PREVIOUS INSPECTION NOTES Tie in has been back filled THIS WS A VIRTUAL INSPECTION | |||
| TUB SET | 01/06/2023 | APPROVED | MKRASKI |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/15/2022 | APPROVED | GBERTOLA |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/15/2022 | APPROVED | GBERTOLA |
| ROW- PRE-APRON (PRE-POUR) | 11/07/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ELECTRIC - EARLY POWER | 10/27/2022 | APPROVED | JMUNSON |
| U - SEWER TIE IN | 09/26/2022 | Disapproved - NO FEE | MKRASKI |
| Note: Tie in has been back filled | |||
| U - SEWER TIE IN | 09/21/2022 | CANCELLED BY APPLICANT | WEB |
| LATH/BRICK/ WATER BARRIER | 09/09/2022 | APPROVED | MKRASKI |
| INSULATION | 08/31/2022 | APPROVED | MKRASKI |
| ALL ROUGH | 08/23/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: Added tub set inspection, drain for tub will need to be sealed at tub set inspection | |||
| ROOF VALLEY & METAL | 08/10/2022 | APPROVED | MKRASKI |
| ROOF VALLEY & METAL | 08/03/2022 | Disapproved - NO FEE | MKRASKI |
| Note: Drip edge missing by front entry | |||
| WALL SHEATHING | 08/02/2022 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/02/2022 | APPROVED | MKRASKI |
| TIE BEAM / LINTEL | 07/08/2022 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. GROUTED SOLID… REQUIREMENTS FOR GROUTED MASONRY… FBC, R606.3.5.2 FOREIGN MATER NEEDS TO BE REMOVED (front collumn and back right cornera) 2. CLEARANCE FROM EARTH AND WEATHER R606.13.5 REINFORCING BARS USED IN MASONRY WALLS SHALL HAVE A MASONRY COVER, INCLUDUNG GROUT, OF NOT LESS THAN 2 inches FOR MASONRY UNITS WITH FACE EXPOSED TO EARTH OR WEATHER AND 1.5 inches NOT EXPOSED TO EARTH OR WEATHER (Front collumn) 3. Bed Joints at window sills are not within tollerance 606.3.1 (Max 1/2 inch) 7/6/22 No corrections have been made | |||
| TIE BEAM / LINTEL | 07/06/2022 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: THIS IS A REINSPECTION 1. GROUTED SOLID… REQUIREMENTS FOR GROUTED MASONRY… FBC, R606.3.5.2 FOREIGN MATER NEEDS TO BE REMOVED (front collumn and back right cornera) 2. CLEARANCE FROM EARTH AND WEATHER R606.13.5 REINFORCING BARS USED IN MASONRY WALLS SHALL HAVE A MASONRY COVER, INCLUDUNG GROUT, OF NOT LESS THAN 2 inches FOR MASONRY UNITS WITH FACE EXPOSED TO EARTH OR WEATHER AND 1.5 inches NOT EXPOSED TO EARTH OR WEATHER (Front collumn) 3. Bed Joints at window sills are not within tollerance 606.3.1 (Max 1/2 inch) 7/6/22 No corrections have been made | |||
| FOUND SURVEY APPROVED (OFFICE) | 06/29/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 06/27/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 1. GROUTED SOLID… REQUIREMENTS FOR GROUTED MASONRY… FBC, R606.3.5.2 FOREIGN MATER NEEDS TO BE REMOVED (front collumn and back right cornera) 2. CLEARANCE FROM EARTH AND WEATHER R606.13.5 REINFORCING BARS USED IN MASONRY WALLS SHALL HAVE A MASONRY COVER, INCLUDUNG GROUT, OF NOT LESS THAN 2 inches FOR MASONRY UNITS WITH FACE EXPOSED TO EARTH OR WEATHER AND 1.5 inches NOT EXPOSED TO EARTH OR WEATHER (Front collumn) 3. Bed Joints at window sills are not within tollerance 606.3.1 (Max 1/2 inch) | |||
| MONOLITHIC SLAB | 06/06/2022 | APPROVED | KSANDOE |
| GRAVITY SEWER TEST | 05/31/2022 | APPROVED | MGIBSON |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/27/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: GRAVITY SEWER NEEDS TO BE SCHEDULED FOR TUESDAY | |||
| WATER METER INSTALLATION REQUEST | 05/04/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 06/29/2022 | 06/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/29/2022 | 06/29/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/10/2021 | 12/14/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 12/10/2021 | 12/16/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 12/10/2021 | 12/10/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/10/2021 | 12/10/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 12/10/2021 | 12/14/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/10/2021 | 12/13/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/10/2021 | 12/17/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/10/2021 | 12/10/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 12/10/2021 | 02/08/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/23/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/23/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/23/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 02/23/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 02/23/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 02/23/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 02/23/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 02/23/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 02/23/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 02/23/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 02/23/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/22/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/22/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 03/22/2022 |
| SEWER CREDIT | (¤1,466.00) | 03/22/2022 |
| SEWER INSPECTION | ¤25.00 | 03/22/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 03/22/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 03/22/2022 |
| SITE PLAN 30 | ¤30.00 | 03/22/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 03/22/2022 |
| IMPACT FEE FIRE | ¤388.65 | 03/22/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 03/22/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/22/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 03/22/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/22/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 03/22/2022 |
| SURCHARGE FS 533.721 | ¤9.30 | 03/22/2022 |
| SURCHARGE - FS 468.631 | ¤13.95 | 03/22/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/22/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/22/2022 |
| SW ENG PRE APRON | ¤30.00 | 03/22/2022 |
| CONNECTION FEES | ¤1,077.88 | 03/22/2022 |
| METER - DEPOSIT | ¤60.00 | 03/22/2022 |
| WATER- TURN ON | ¤25.00 | 03/22/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/22/2022 |
| INSPECTION - RESIDENTIAL | ¤660.00 | 03/22/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤186.58 | 03/22/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,967.90 |