I want to search for...

Permit #2021120563

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-2630
CONDITIONED SPACE: 2250 sqft
GARAGE: 558 sqft
OPENED PORCH (WITH ROOF) : 331 sqft
OPENED PORCH (WITH ROOF) : 60 sqft
Total Square Footage: 3199 sqft
Block: 00000
Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH
Job Phone: 386-447-4400
Location Address: 193 ASPEN WAY
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/24/2022
NOC: RECORDED
Applicant name: DAVID PAUL CROCKETT
Owner: FRANK & GWENN V PIETRANTONI

Address

7 GUILFORD CIRCLE

GOLDENS BRIDGE, NY 10526

Lot: 2630
Contracted Stated Job Value: ¤477,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SALTWATER HOMES INC
Status Location Address Mailing Address State License Number Phone Fax
DECEASED

138 PALM COAST PARKWAY

PALM COAST, FL 32137

SUITE 328

PALM COAST, FL 32137

RG0041345 (Exp: 08/31/2025) 386-447-4400 866-244-9639

Sub Contractors

DENNIS GENE GAINEY
Status Location Address State License Number Phone Fax
INACTIVE

P.O. BOX 1203

Bunnell, FL 32110

CFC046004 (Exp: 08/31/2026) (386) 437-5637 386-437-3012
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
ERIC FRANCO
Status Location Address Mailing Address State License Number Phone
INACTIVE

840 DELTONA BLVD

DELTONA, FL 32725

STE F2

DELTONA, FL 32725

CCC1327280 (Exp: 08/31/2026) 386-575-4007
CHARLES K DAVIS
Status Location Address State License Number Phone
ACTIVE

3000 E MOODY BLVD BLDG 2

BUNNELL , FL 32110

EC13004270 (Exp: 08/31/2026) 386-931-6614

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/22/2023 FINAL APPROVED AGAETANO
Note: Master bedroom has a small stress crack in the right window. Superintendent and homeowner is aware and will address.
U-CROSS CONNECTION 08/18/2023 APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 08/18/2023 FINAL APPROVED EMADISON
ROW - STORMWATER FINAL 08/18/2023 FINAL APPROVED EMADISON
U -UTILITY RESIDENTIAL FINAL 08/18/2023 FINAL APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 08/17/2023 APPROVED EMADISON
FINAL SURVEY (OFFICE USE ONLY) 08/17/2023 APPROVED EMADISON
GRAVITY SEWER TEST 05/12/2023 APPROVED MGIBSON
U - SEWER TIE IN 05/12/2023 APPROVED MGIBSON
ROW- PRE-APRON (PRE-POUR) 04/20/2023 APPROVED EMADISON
Note: ** 04/20/23 READY TO SET PAVERS __________________________________________________________________________________________________________________ 4/11/2023 - PREVIOUS INSPECTION NOTES ** 04/11/23 READY TO POUR APRON AND PAVER RESTRAINTS ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL __________________________________________________________________________________________________________________________ 4/10/2023 - PREVIOUS INSPECTION NOTES
ROW- PAVER RESTRAINTS 04/11/2023 APPROVED EMADISON
Note: ** 04/11/23 READY TO POUR APRON AND PAVER RESTRAINTS ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
ROW- PRE-APRON (PRE-POUR) 04/11/2023 PARTIALLY APPROVED EMADISON
Note: ** 04/11/23 READY TO POUR APRON AND PAVER RESTRAINTS ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL __________________________________________________________________________________________________________________________ 4/10/2023 - PREVIOUS INSPECTION NOTES
ROW- PRE-APRON (PRE-POUR) 04/10/2023 CANCELLED BY APPLICANT EMADISON
ELECTRIC - EARLY POWER 04/10/2023 APPROVED RMARTIN
LATH/BRICK/ WATER BARRIER 02/07/2023 APPROVED AGAETANO
INSULATION 12/09/2022 APPROVED AGAETANO
ALL ROUGH 11/29/2022 APPROVED AGAETANO
WALL SHEATHING 11/28/2022 APPROVED AGAETANO
Note: 11/23/2022 - PREVIOUS INSPECTION NOTES 11-23-2022 Wall sheathing has Tyvek installed.
WALL SHEATHING 11/23/2022 Disapproved - NO FEE AGAETANO
Note: 11-23-2022 Wall sheathing has Tyvek installed.
ELECTRIC-TUG 11/23/2022 APPROVED AGAETANO
ROOF VALLEY & METAL 11/22/2022 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/02/2022 APPROVED AGAETANO
TIE BEAM / LINTEL 07/07/2022 APPROVED AGAETANO
FOUND SURVEY APPROVED (OFFICE) 05/11/2022 APPROVED TBAKER
MONOLITHIC SLAB 04/18/2022 APPROVED AGAETANO
PLUMBING 1ST ROUGH UNDERGROUND 04/11/2022 APPROVED RMARTIN
WATER METER INSTALLATION REQUEST 03/14/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 08/17/2023 08/21/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/11/2022 05/11/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/11/2022 05/11/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 03/11/2022 03/14/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 02/02/2022 02/02/2022
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/02/2022 02/03/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 02/02/2022 02/07/2022
Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 01/18/2022 01/18/2022
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Survey/site plan missing the front entry access Front entry on site paln doesn't match landscape plan submitted. Please take a look at landscape by foundation missing on site plan
ENGIN1 COMPLETE 01/18/2022 01/18/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 01/18/2022 01/24/2022
Note: Released By: PARREN FLANAGAN - -
BLD COMPLETE 12/13/2021 12/16/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 12/13/2021 12/16/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 12/13/2021 12/13/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/13/2021 12/13/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 12/13/2021 12/15/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 12/13/2021 12/14/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 12/13/2021 12/17/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
ZON HOLD 12/13/2021 12/13/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Incorrect flood map number on site plan/survey. This lot has two both must be listed Survey/site plan missing the front entry access On elevation page please remove wording or relabel the shutters as these do not meet the land development code definition for shutters
URB COMPLETE 12/13/2021 12/14/2021
Note: Released By: JOHN BEAUDET - (386)986-2456 -

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 08/22/2023
CONTRACTOR CHANGE ¤40.00 08/22/2023
PLAN REVIEW - REVISION ¤0.00 08/22/2023
PLAN REVIEW - REVISION ¤32.50 08/22/2023
CONNECTION FEES ¤25.00 02/24/2022
METER - DEPOSIT ¤60.00 02/24/2022
WATER-METER ¤467.09 02/24/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/24/2022
INSPECTION - RESIDENTIAL ¤1,311.75 02/24/2022
PLAN REVIEW - RESIDENTIAL ¤372.06 02/24/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 02/24/2022
IMPACT FEE FIRE ¤388.65 02/24/2022
IMPACT FEE PARKS ¤1,455.13 02/24/2022
IMPACT FEE SCHOOL ¤3,600.00 02/24/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 02/24/2022
SURCHARGE FS 533.721 ¤17.89 02/24/2022
SURCHARGE - FS 468.631 ¤26.83 02/24/2022
SW ENG - FOUNDATION SURVEY ¤20.00 02/24/2022
SW ENG INSPECTION 80 ¤80.00 02/24/2022
SW ENG PRE APRON ¤30.00 02/24/2022
SW ENG - REVIEW 20 ¤20.00 02/24/2022
SW ENG RES REVIEW 200 ¤200.00 02/24/2022
TRANSPORTATION IMPACT FEE ¤3,139.00 02/24/2022
3% TRANS IMPACT FEE CREDIT (¤94.17) 02/24/2022
SEWER INSPECTION ¤25.00 02/24/2022
SITE PLAN 30 ¤30.00 02/24/2022
Fees Total Due: ¤0.00 Total Paid: ¤11,241.42